JIM'S WEB SITE
RV 8
All
Work Logs Found:
65
Category Work Time:
632 Hours
Date
Hours
Work Log Summary
Details
05-29-2007
2.00
Redo brake lines/ Paint parts
Details
05-27-2007
9.00
Preparing the RV for Shipping.
Details
05-24-2007
10.00
Remoned Empenage discussed future purchases
05-23-2007
4.00
Completed accsee door.Painting remaining parts
05-22-2007
4.00
Baggage Access door
Details
05-07-2007
2.00
Redo brake lines/Paint parts
Details
04-26-2007
14.00
Installed Propeller & Made Templates
Details
04-25-2007
12.00
Reviewed Progress,Installed autopilot se
Details
04-16-2007
1.00
Fabricate ELT mounting plate
03-15-2007
2.00
Sanded mold for lower cowl
03-14-2007
2.00
Made mold for fuel Injection mod.
01-27-2007
3.00
Battery tray and cable placement
Details
01-25-2007
12.00
Propeller Govenor installation
Details
01-24-2007
12.00
Fierwall forward Misc.
Details
11-21-2006
8.00
Continued engine accessory installation.
Details
11-20-2006
12.00
Completed fuel lines/Installed engine
Details
06-06-2006
30.00
Cutting/fitting FIRST canopy
Details
05-06-2006
18.00
Installed wings,roll bar,left flap,canop
Details
05-01-2006
5.00
Finshed painting for now
Details
04-28-2006
7.00
Painted the cockpit
Details
04-27-2006
5.00
Painted parts
Details
04-25-2006
5.00
Canopy slide rails
Details
04-24-2006
8.00
Ordered finishing kit/supplies/canopy
Details
04-10-2006
5.00
Painting
Details
03-30-2006
12.00
Painting with David Weldman
Details
03-29-2006
6.00
Painted loose parts
Details
03-28-2006
10.00
Preparing parts for painting
Details
02-26-2006
2.00
Started work on canopy slide
Details
02-23-2006
12.00
Completed elevator @ rudder control
Details
02-22-2006
3.00
Redo Paint Booth,Start Canopy
Details
02-17-2006
8.00
Drilled Elevator horns,Brakes,Tailwheel
Details
02-13-2006
5.00
Control rods an Brake system
Details
02-10-2006
5.00
Installed elevator control system
Details
02-03-2006
4.00
Construction of Paint Booth
Details
02-02-2006
12.00
Riveted of 810 BLKD and F-681
Details
02-01-2006
3.00
Construction of Paint Booth
Details
01-31-2006
10.00
Construction of Paint Booth
Details
01-30-2006
5.00
Bolting Horozontal Stab in Place
Details
01-29-2006
2.00
Cpostruction of Paint Booth
Details
01-27-2006
5.00
Construction of Paint Booth
Details
01-26-2006
12.00
Empennage Installation
Details
01-17-2006
6.00
Drilled remaining holes of the Vertical
Details
01-16-2006
4.00
Drilling of the Vertical Stablizer
Details
01-15-2006
3.00
Installing Vertical Stablizer
Details
01-10-2006
10.00
Rivet F-819 aft deck
Details
01-06-2006
8.00
Made fwd baggage door lock assembly
Details
01-02-2006
3.00
Made the F-866 Rudder stops
Details
12-28-2005
4.00
Made F-812 elevator angle
Details
12-26-2005
10.00
Reinstalled the F811 Al bars
Details
12-05-2005
5.00
Remove 2 811b bars
Details
12-02-2005
3.00
Riveted the fwd baggage door
Details
11-30-2005
10.00
Installing Horozontal Stablizer
Details
11-17-2005
4.00
Drilling the stablizer
Details
11-16-2005
2.00
Continued stsb preperation for level&dri
Details
11-15-2005
4.00
Leveling stablizer and aircraft
Details
04-20-2005
3.00
Install Cabin @ Baggage Floor Platenuts
Details
02-02-2005
8.00
Brake@Rudder Unit
Details
12-13-2004
10.00
Built F-8103 Latch Assem+Elevator pushro
Details
12-10-2004
6.00
Rudder Pedals @ Master cylinder
Details
12-09-2004
3.00
Sanded wd816 to slide wd817.Drilled fibe
Details
05-03-2004
5.00
Pushrod construction
Details
04-01-2004
3.00
Check for missing parts
Details
03-04-2004
10.00
Installing theF-805 floor support
Details
08-28-2003
100.00
Details
08-28-2002
100.00
Details
SITE NAVIGATION
Contact Builder
RV 8 Home
Category
# Logs
# Hours
All
65
632
Avionics
2
13
Canopy
4
45
Cowl
2
4
Empennage
19
219
Engine
2
20
Firewall Forward Instal.
3
27
Forward baggage comparmen
2
11
Fuselage
8
48
Miscellaneous
5
22
None
1
5
Paint Booth
6
27
Painting
7
50
Propeller
1
14
Shipping Preperation
1
9
Wings
2
118