Michael's Sonex Project
Work Logs Found: 697
Category Work Time: 1496 Hours
 Date
Hours
Work Log Summary

Details

 11-30-2008
3.00
More Post Flight Work
Details
       

 11-28-2008
3.00
Fixing problems found
Details
       

 11-26-2008
0.00
First Flight
Details
       

 11-15-2008
4.00
Misc Finishing Work
Details
       

 11-06-2008
1.00
New Air Filter
Details
       

 11-02-2008
2.00
Taxi and Photo Session
Details
       

 11-01-2008
2.00
Engine Cooling Baffles
Details
       

 10-16-2008
4.00
Finishing up for Inspection
Details
       

 10-12-2008
5.00
Getting Ready for Inspection
Details
       

 10-11-2008
5.00
Finsh Work
Details

 10-06-2008
2.00
Airworthiness Inspection Paperwork
Details

 10-04-2008
0.00
ASA 2008 Crossville Fly-In
Details
     

 09-28-2008
3.00
W&B Measurements
Details
       

 09-21-2008
5.00
Taxi Testing
Details
       

 09-20-2008
5.00
Various Finishing Items
Details
       

 09-14-2008
4.00
Interior Work
Details
     

 09-13-2008
2.00
Misc Items
Details
       

 09-13-2008
2.00
Interior Installation
Details
       

 09-10-2008
4.00
Interior Parts
Details
       

 09-07-2008
4.00
Various Finishing Work
Details

 09-06-2008
3.00
Cleaning
Details

 08-31-2008
5.00
Misc Engine Work
Details
       

 08-30-2008
4.00
Various Firewall forward Items
Details
       

 08-27-2008
1.50
Finishing up First Stick Boot
Details
       

 08-26-2008
2.00
Control Stick Boots
Details
     

 08-24-2008
5.00
Finishing up the Cockpit Area
Details
       

 08-23-2008
5.00
Various Items
Details

 08-22-2008
3.00
Baggage Bag
Details

 08-17-2008
5.00
Various Items
Details

 08-16-2008
3.00
Sub-Panel Installed and Fuel Shutoff Installed
Details
       

 08-16-2008
2.00
ELT Mounting & Vents
Details
       

 08-10-2008
4.00
Working on Subpanel
Details

 08-09-2008
5.00
Pitot Static/Panel/Wiring
Details
       

 08-03-2008
2.00
Electric Flaps Done
Details
       

 08-03-2008
2.00
Avionics Work
Details
       

 08-02-2008
0.00
Helped Peter Rig is Waiex Wings
Details
       

 08-01-2008
5.00
Cleaning up Wiring
Details

 07-27-2008
4.00
Various Wiring
Details
       

 07-26-2008
4.00
Flap Control
Details
     

 07-20-2008
5.00
Flap work
Details
       

 07-19-2008
4.00
AutoPilot Servo Intalled
Details
       

 07-13-2008
4.50
Wing Leveler Autopilot Servo Installation
Details

 07-12-2008
4.00
Misc Finishing Work
Details
       

 06-22-2008
3.00
Flap Control Push Rods
Details

 06-21-2008
5.00
Installed the Fiberglass Wingtips
Details
       

 06-20-2008
5.00
Wingtipf
Details

 06-15-2008
5.00
More work on Landing Light
Details
     

 06-14-2008
5.00
Landing Light Install
Details
       

 06-13-2008
1.00
Wingtip Light Pods
Details
       

 06-12-2008
1.00
Wing Tip Pods
Details
       

 06-10-2008
1.00
Working on Fiberglass Wingtips
Details

 06-08-2008
4.00
Wing Wiring
Details
       

 06-07-2008
5.00
Aileron Installation
Details
       

 06-01-2008
4.00
Competed Wing Installation
Details
       

 05-31-2008
5.00
Wing Installation
Details
       

 05-25-2008
4.00
Installing Wings
Details
       

 05-24-2008
5.00
Various Panel Wiring Jobs
Details

 05-18-2008
3.00
Pitch AP Installed
Details
       

 05-17-2008
4.50
Opening up Inbound Wing Ribs
Details
       

 05-16-2008
1.00
Forward Wing Rib Modification
Details

 05-11-2008
3.00
Wiring Autopilot
Details

 05-10-2008
5.00
Installing COM Antenna and Coax
Details
       

 05-04-2008
2.00
Transponder Coax Installation
Details

 05-03-2008
4.00
Wing Light Wiring
Details

 04-30-2008
0.50
Tow Bar Shaft Collar
Details
     

 04-27-2008
4.00
Intercom Wiring
Details
       

 04-26-2008
5.00
Moved additional equipment ot the Airport
Details

 04-17-2008
3.00
Move Fuselage to Siler City Airport
Details
       

 04-16-2008
3.00
Loading Airplane on Trailer
Details
       

 03-27-2008
1.00
Seats
Details
       

 03-22-2008
2.00
Baggage Compartment Shelves
Details
       

 03-22-2008
2.00
Attaching the Fiberglass Vertical Tail Tip
Details
     

 03-20-2008
1.50
Baggage Area
Details

 03-18-2008
1.50
Finishing Up Seat Cushions
Details
       

 03-16-2008
3.00
Various Interior Items
Details
       

 03-14-2008
1.50
Glueing Foam
Details

 03-13-2008
1.00
Cutting Foam
Details
       

 03-12-2008
0.50
Glue Foam Together
Details
       

 03-11-2008
1.00
Cutting Seat Foam
Details

 03-10-2008
1.00
Designing Seat Foam
Details
     

 03-09-2008
2.00
Panel Work
Details

 03-02-2008
4.00
Finishing Up Baffles
Details
       

 03-01-2008
4.00
Engine Baffles and Rubber Seals
Details
       

 02-29-2008
1.00
Baffle Trimming
Details

 02-28-2008
1.50
Engine Baffle Work
Details
       

 02-24-2008
4.00
Panel Work
Details
       

 02-23-2008
3.00
Cowl Priming
Details
       

 02-22-2008
1.50
Right Exhaust Tunnel & Filler Work
Details
       

 02-20-2008
1.50
Cowl Exhaust Tunnel
Details
       

 02-19-2008
1.00
Cowl Work
Details

 02-18-2008
1.00
Cowl Epoxy Work
Details

 02-17-2008
2.00
Cowl Work
Details
       

 02-16-2008
3.00
Moving Wings to Airport
Details
       

 02-14-2008
1.00
Re-Drilling Bottom Hinge Halves
Details

 02-11-2008
1.00
Removing Incorrect Hinge Halves
Details

 02-10-2008
5.00
Cowl Work
Details

 02-09-2008
3.00
Riveting Cowl
Details

 02-08-2008
1.50
Cowl Exhaust Opening
Details

 02-07-2008
1.00
Cowl Work
Details

 02-06-2008
2.50
Exhaust Exit Lip
Details

 02-05-2008
1.00
Cowl Epoxy Work
Details

 02-04-2008
1.00
Cowl Epoxy Work
Details

 02-03-2008
3.00
Cowl Modification
Details
       

 02-02-2008
4.00
Cowl Work
Details

 01-29-2008
1.50
Drilling Left Cowl
Details

 01-26-2008
3.00
Installing Right Cowl
Details

 01-25-2008
1.00
Cowl Work
Details
       

 01-24-2008
1.00
Cowl Epoxy Work
Details
       

 01-23-2008
1.50
Cowl Work
Details

 01-22-2008
1.50
Cowl Work
Details
       

 01-20-2008
3.50
More Cowl Work
Details

 01-19-2008
3.00
Cowl Fitting
Details

 01-18-2008
1.50
Left & Right Cowl
Details
     

 01-17-2008
1.50
Left Cowl Fitting
Details

 01-16-2008
1.50
Started Work on Left Cowl
Details
       

 01-15-2008
1.50
Bottom Right Cowl Hinge
Details

 01-14-2008
1.50
Right Cowl Work
Details

 01-13-2008
4.00
Right Cowl and Hinges
Details
       

 01-12-2008
2.00
Right Cowl Half
Details

 01-11-2008
1.00
More Right Cowl Work
Details
       

 01-10-2008
2.00
Right Cowl Half
Details

 01-09-2008
1.50
Cutting Holes in Cowl
Details
       

 01-07-2008
1.50
Working on Prop Hub Spacer
Details
       

 12-16-2007
2.00
Finishing up Canopy
Details
       

 12-14-2007
4.00
Installing Canopy
Details
       

 12-13-2007
2.00
Windscreen Re-Install
Details

 12-12-2007
4.00
Re-Installing Canopy Parts
Details
     

 12-08-2007
3.00
Prime & Paint Parts
Details
       

 12-07-2007
3.00
Canopy Finish Work
Details
       

 12-06-2007
1.00
Canopy Countersink
Details

 12-02-2007
3.00
Canopy Side Clamp Work
Details
       

 12-01-2007
3.00
Canopy Fitting
Details
       

 11-30-2007
3.00
Canopy Fitting
Details
       

 11-28-2007
1.50
Canopy Fitting
Details

 11-27-2007
1.00
Tweaking Canopy
Details

 11-25-2007
4.00
Started Work on Canopy
Details
       

 11-24-2007
3.00
Canopy Frame Work
Details
       

 11-23-2007
4.00
Front Canopy Bow Work
Details

 11-21-2007
3.00
Working on Canopy Frame
Details
       

 11-20-2007
2.00
Working on Canopy Frame
Details
       

 11-14-2007
1.00
Completed Parts for Canopy
Details

 11-12-2007
1.50
Continued working on canopy Parts
Details

 11-07-2007
1.00
Canopy Modification
Details

 11-05-2007
1.50
Misc Canopy Parts
Details

 11-04-2007
3.00
Completed SNX-D02-14 Hook Angle
Details
       

 11-01-2007
1.50
Working on SNX-D02-14 Hook Angle
Details

 10-27-2007
2.00
Finished Windscreen.
Details

 09-16-2007
3.00
Drilling Windscreen
Details
       

 09-15-2007
3.00
Fitting Windscreen
Details
       

 09-14-2007
2.00
Windscreen Bow
Details
       

 09-09-2007
5.00
First Engine Start
Details
       

 09-03-2007
3.00
Turned Engine Over
Details
       

 09-02-2007
2.00
Exhaust Modification
Details
       

 09-01-2007
3.00
Finished wiring for the Time Being
Details

 09-01-2007
1.00
Engine Baffles
Details

 08-28-2007
1.00
Engine Wiring
Details

 08-26-2007
3.00
Engine Wiring
Details

 08-25-2007
5.00
Engine Wiring
Details
     

 08-24-2007
1.00
More Engine Wiring
Details

 08-24-2007
4.00
Connecting Avionics Power
Details
       

 08-23-2007
1.00
Continued Wiring of Engine
Details

 08-20-2007
5.00
Engine Wiring
Details

 08-19-2007
3.00
Engine Wiring
Details
     

 08-18-2007
3.00
Misc Engine Wiring
Details

 08-15-2007
1.00
EGT Probes
Details

 08-12-2007
3.50
CHT and EGT Probes Installation
Details
       

 08-11-2007
3.00
Main Air Baffles for Cylinders
Details
       

 08-05-2007
3.00
Oil Cooler Shroud Work
Details
       

 08-04-2007
1.00
Second Oil Cooler Connection
Details

 08-03-2007
1.00
Oil Cooler Work
Details

 08-02-2007
1.50
Connecting Fuel Line
Details
       

 07-31-2007
1.50
Oil Cooler Mounting
Details
       

 07-31-2007
1.00
Inter-Cylinder Baffles
Details

 07-30-2007
1.50
Oil Cooler Mounting
Details
       

 07-28-2007
3.00
Throttle and Mixture hookup
Details

 06-19-2007
1.00
AeroConversion Trim System
Details

 06-17-2007
3.00
AeroConversion Trim System
Details

 06-15-2007
1.50
AeroConversions Trim System
Details

 06-14-2007
1.00
Control Stick Interference Fix
Details

 06-12-2007
1.50
AeroConversion Trim System Rework
Details
     

 06-11-2007
1.00
AeroCarb Work
Details
     

 06-11-2007
1.00
Added Second Stick Grip
Details
     

 06-09-2007
2.00
Throttle and Mixture Cable Routing
Details
       

 06-09-2007
1.00
Installed Pilot Control Stick Grip
Details
     

 06-08-2007
1.50
AeroCarb Work
Details

 06-07-2007
1.00
Removed Jabiru Fuel Pump
Details
       

 06-07-2007
1.00
Installed Thottle in Cockpit
Details
     

 06-06-2007
1.50
AeroCarb Work
Details
       

 06-03-2007
3.00
More Work on Engine Installation
Details
       

 06-01-2007
1.00
Installed Voltage Regulator
Details

 05-30-2007
1.00
Inter-Cylinder Baffels
Details

 05-26-2007
2.50
Engine Installation
Details
       

 05-25-2007
1.00
Unpacking Engine
Details
       

 05-23-2007
1.00
Completed Magnetometer Bracket Installation
Details
     

 05-22-2007
1.50
BMA Magnetometer Bracket
Details
       

 05-20-2007
3.00
Auto Pilot Servo and Fuse Blocks
Details
       

 05-18-2007
4.00
Pitch Control Autopilot Servo
Details

 05-13-2007
3.00
Firewall to Gascolator Connection
Details
     

 05-13-2007
1.00
Finished Brake Installation
Details
     

 04-26-2007
1.50
Installing Brake Parts
Details
       

 04-25-2007
1.00
TriGear Brake Cable Guide
Details

 04-22-2007
2.00
Brake Handle Assembly
Details
       

 04-21-2007
2.00
Brake Handle and Parts
Details
       

 04-20-2007
3.00
Brake Control
Details

 04-18-2007
1.00
Control work
Details

 04-18-2007
1.00
Brake Cable Guide
Details

 04-14-2007
3.00
Misc Small Items
Details
       

 04-08-2007
2.00
Rigging Rudder Pedals
Details
       

 04-06-2007
2.00
Painted Glareshield and Fitted Windscreen Bow
Details
     

 04-04-2007
0.50
Prince Aircraft Propeller Arrived
Details
       

 04-01-2007
3.00
Working on Controls
Details
       

 03-27-2007
2.00
Adjusting Rudder Movement
Details
       

 03-25-2007
4.00
Completed mounting Vertical Stabilizer and Rudder
Details
       

 03-24-2007
4.00
Working on Horiz and Vert Stab Mounting
Details
       

 03-23-2007
2.00
Started Horizontal Stabilizer Install
Details

 03-18-2007
6.00
More Custom EIS Display
Details
     

 03-16-2007
1.50
Working on Custom EIS Display
Details
       

 03-09-2007
2.00
Panel Wiring
Details
     

 03-04-2007
3.00
COM and Intercom Wiring
Details

 03-02-2007
2.00
Started Wiring the Panel
Details
       

 02-26-2007
1.00
Installing Instruments
Details
       

 02-25-2007
6.00
Panel Labels
Details
       

 02-24-2007
3.00
Painting Panel
Details

 02-15-2007
1.50
Panel Mount Points and Support Angles
Details

 02-11-2007
4.00
Installing Panel Mounting Hardware in Fuselage
Details

 02-10-2007
2.00
Rework on Panel
Details

 02-09-2007
1.50
Installed all Components in Panel
Details
       

 02-08-2007
1.00
Panel Work
Details

 02-07-2007
1.50
Drilling Instrument Mounting Holes
Details
       

 02-06-2007
1.00
Continued Panel Work
Details

 02-05-2007
1.00
Added Instrument Mount Angles
Details
       

 02-04-2007
4.00
Finish Panel holes and cutouts
Details
     

 02-03-2007
4.00
New Panel Layout
Details

 02-02-2007
2.00
New Panel Work
Details

 01-28-2007
4.00
Panel Work
Details

 01-27-2007
3.00
Panel Cutout
Details

 01-26-2007
1.50
Panel Layout
Details

 01-25-2007
1.50
Panel Layout
Details
     

 01-24-2007
1.00
Layout of Panel Cutouts
Details
       

 01-23-2007
1.00
New Panel Design
Details

 01-21-2007
1.00
Finished Battery Box Install
Details
     

 01-21-2007
3.00
Electircal Wire Book Work
Details

 01-19-2007
1.00
Installing Battery Box on Firewall
Details
       

 01-18-2007
1.00
Finished Battery Box Construction
Details

 01-17-2007
1.50
Battery Box Hinges
Details
       

 01-15-2007
3.00
Battery Box Work
Details
       

 01-14-2007
2.00
Fuel Vent Work
Details
       

 01-13-2007
3.00
Fuel System Work
Details
       

 01-12-2007
6.00
Avionics Wire Book Work
Details

 01-08-2007
3.00
Fuel Tank Installation Complete!
Details
       

 01-07-2007
2.00
Tank Installation
Details

 01-06-2007
4.00
Fuel Tank Work
Details
       

 12-20-2006
1.00
Fitting Fuel Tank
Details
       

 12-19-2006
2.00
Fuel Tanks Straps and GlareShield ReInstallation
Details
       

 12-18-2006
3.00
Flap Tube Install and Rudder Pedal Springs
Details
       

 12-17-2006
3.00
Second NACA Air Vent and start Flap Tube
Details
     

 12-16-2006
2.00
Placing and Installing Side Air Vents
Details
       

 12-15-2006
3.00
Various Control Installations
Details
       

 12-10-2006
2.00
Started Rudder Pedal Insallation
Details
       

 12-09-2006
3.00
Working on Nose Wheel and Rudder Controls
Details
       

 12-07-2006
1.00
Installed Glare Shield Attach Angles
Details

 12-06-2006
1.00
Upper Firewall and Glare Shield Attach Angles Pain
Details
       

 12-06-2006
1.50
Rudder Pedal Installation
Details
     

 12-04-2006
1.00
Firewall/Glareshield Deburring
Details

 12-03-2006
1.00
Installed Nose Wheel Pushrod Boot
Details

 11-29-2006
1.00
Nose Wheel Push Rod Boot
Details
       

 11-26-2006
2.00
More Nose Wheel Work
Details
       

 11-25-2006
3.00
Nose Wheel Gear Work
Details
       

 11-22-2006
2.00
Working on Right Main Wheels
Details

 11-19-2006
2.00
Working on Left Main Wheel
Details
       

 11-17-2006
0.50
Final Install of the Right Main Landing Gear
Details

 11-15-2006
1.00
Re-Installing Titanium Landing Gear
Details

 11-12-2006
3.00
Dual Control Stick Details
Details
       

 11-04-2006
3.00
Installing Various SNX-F01 Rivets/Fasteners
Details
       

 10-29-2006
2.00
Starting to Rivet Spar Box
Details
       

 10-29-2006
4.00
Finishing up Main Spar Box and Aft Spar Carry Thro
Details
       

 10-28-2006
2.00
Finishing up Fuselage Interior
Details
       

 10-21-2006
2.00
Completed the SNX-SB-003 Work
Details
     

 10-19-2006
1.50
Working on Optoinal Service Bulletin 003
Details
     

 10-15-2006
2.50
Priming Parts and SNX-SB-003 Work
Details

 10-14-2006
1.50
Cleaning up Installed Parts
Details

 10-07-2006
0.00
3rd Annual American Sonex Association Fly-In
Details
       

 09-17-2006
3.00
Removing wings for storage
Details
     

 09-16-2006
2.00
Drilling Main Wing Spars
Details
       

 09-15-2006
2.50
Verified Wings Dimensions and drilled rear Spars
Details
     

 09-14-2006
3.00
Working on Wings Again
Details

 09-12-2006
3.00
Working on getting wings Square
Details

 09-11-2006
7.00
Rigging the Wings, Day 2
Details

 09-10-2006
5.00
Wing Rigging Day 1
Details
       

 09-09-2006
3.50
Finishing up Rear Spar Carry Through
Details
     

 09-08-2006
1.50
Rear Spar Carry Through Details
Details
     

 09-06-2006
1.50
Rear Spar Carry Through Details
Details

 09-04-2006
0.50
Working on Wheels/Brakes
Details
     

 09-03-2006
3.00
Installed TriGear Landing Gear
Details
       

 09-03-2006
3.00
Engine Mount Installation
Details
       

 09-02-2006
3.00
Drilled Upper Gear Leg Inside Cockpit & Installed
Details
       

 09-01-2006
2.00
Drill second Axle Welded parts and Setting Toe-In
Details
       

 08-31-2006
0.50
Installed Axle Weld Bolt
Details

 08-30-2006
1.00
Drilling Holes for Axle Welded parts
Details

 08-29-2006
1.00
Tires, Tubes, and Hubs
Details
       

 08-28-2006
1.50
Raising the Plane
Details

 08-27-2006
2.00
Installing Engine Mount
Details
     

 08-26-2006
2.00
Final Painting of Engine Mount
Details

 08-25-2006
3.00
Repainting Motor Mount
Details
       

 08-24-2006
2.00
Playing around with Panel Layout
Details
       

 08-23-2006
2.00
Working on Panel
Details

 08-22-2006
1.50
Glare Shield Installation
Details
       

 08-20-2006
4.00
Glare Shield Details
Details
       

 08-19-2006
2.00
Started Work on Glareshield
Details
       

 08-19-2006
2.00
Completed Installing Seat Sling
Details
       

 08-18-2006
2.00
Finished Seat Sling Assembly
Details
       

 08-17-2006
1.00
Seat Hinge Pins and Halves
Details

 08-15-2006
1.00
Hinge Pins
Details

 08-15-2006
0.50
Dual Stick Welded Parts
Details

 08-14-2006
1.50
Seat Hinge Halves and Trim Lever
Details

 08-13-2006
2.00
Lowered the Whole Fuselage
Details
     

 08-12-2006
3.00
Working on Seat Sling
Details
       

 08-10-2006
0.50
Re-install Landing Gear Mounts
Details
       

 08-09-2006
0.50
Painting Main Landing Gear Mounts
Details

 08-06-2006
3.00
Deburring and Priming Parts
Details
       

 08-04-2006
1.00
Drilling holes to Final Size
Details
       

 08-03-2006
1.00
Drilling Welded Main Gear Mounts
Details

 08-02-2006
1.00
Drilling Holes in Landing Gear
Details

 08-01-2006
1.00
Setting up Gear Angles
Details
       

 07-31-2006
1.00
Making Main Gear Holes in Lower Fuselage Skin
Details
       

 07-30-2006
3.00
SNX-L04-10 Gear Locator Tool/Jig
Details
       

 07-29-2006
4.00
Final Riveting of Under Seat Details
Details
       

 07-22-2006
3.00
Priming Parts for SNX-F09
Details

 07-21-2006
1.00
Dis-assembly of parts
Details

 07-16-2006
2.50
Installing more SNX-F09 parts
Details
       

 07-15-2006
3.00
Installing parts for SNX-F09
Details
       

 07-13-2006
1.50
Started SNX-F09
Details
       

 07-12-2006
1.00
Idler Support Assembly, SNX-F10-17
Details
       

 07-11-2006
1.50
Parts building on SNX-F10
Details

 07-09-2006
2.00
Aft Lower Cabin Parts
Details

 06-30-2006
1.50
More work on Aft Lower Cabin Details
Details

 06-26-2006
1.00
Building More Parts
Details
       

 06-25-2006
2.50
More Under the Seat Pan work
Details
       

 06-22-2006
2.00
Started SNX-F10 Plans Page
Details
       

 06-20-2006
0.50
SNX-F10-07 Parts Built
Details

 06-18-2006
3.00
Finished up SNX-F11
Details
       

 06-17-2006
0.50
Installing Bolts in Fore/Aft Fuselage Splice Plate
Details

 06-16-2006
2.00
Started Riveting of Forward Fuselage
Details

 06-11-2006
3.00
Re-Assembly of Forward Fuselage
Details
       

 06-10-2006
4.00
Cleaning and Priming Parts
Details
       

 06-09-2006
0.50
Deburring
Details

 06-02-2006
0.50
Deburring Forward Fuselage....Again.
Details

 06-01-2006
1.50
Forward Fuselage Disassembly
Details

 05-29-2006
2.00
Upper Firewall Installation
Details
       

 05-28-2006
2.00
More SNX-F11 work
Details
       

 05-28-2006
2.00
Continued work on Joining Forward and Aft Fuselage
Details
       

 05-27-2006
4.00
Fuselage Box Assembly
Details
       

 05-25-2006
1.50
Adding Forward Fuselage Sides to Aft Fuselage
Details
       

 05-24-2006
2.00
Moved Aft Fuselage back into Garage
Details
       

 05-22-2006
0.50
Continuing Shop Cleanup and Remodel
Details

 05-21-2006
2.00
Cleaned up Shop
Details

 05-20-2006
2.50
Forward Tunnel Zee, SNX-F16-02
Details

 05-18-2006
1.50
Finished Firewall, SNX-F17
Details

 05-17-2006
1.50
More Firewall Parts
Details

 05-14-2006
1.00
Small Parts
Details

 05-12-2006
2.00
Upper Firewall Riveting and Drilling
Details
       

 05-10-2006
1.50
Upper Firewall Work
Details
       

 05-09-2006
0.50
Started Firewall Work
Details

 05-09-2006
0.50
Aft Tunnel Web Assembly, SNX-F16-03, Re-assembled
Details

 05-08-2006
1.50
Priming Parts
Details
       

 05-07-2006
4.00
Cleaning up SNX-F16 Parts and building Assemblies
Details
       

 05-06-2006
4.00
Continued work on SNX-F16 parts
Details
     

 05-05-2006
1.00
Cleaned up Yesterday's Parts
Details

 05-04-2006
2.00
Misc Pieces from SNX-F16
Details

 05-03-2006
1.00
SNX-F16-01 Lower Fwd Fuselage Floor Skin
Details

 05-02-2006
0.50
SNX-F16-01 Fwd Fuselage Floor
Details

 04-30-2006
1.00
Fwd Fuselage Skin Asseblies completed
Details
       

 04-30-2006
3.00
Final Assembly of Right Fwd Fuselage Skin Assembly
Details
       

 04-29-2006
3.00
Right Side Parts Primed
Details
       

 04-28-2006
1.50
Disassembly of Right Fwd Fuselage Skin Assembly
Details

 04-27-2006
1.00
All part installed on Right Fwd Fuselage Skin Asse
Details

 04-26-2006
1.00
More Right Foward Fuselage Skin Assembly Work
Details

 04-25-2006
1.50
Continued Adding Parts to Right Fwd Fuselage Assem
Details
       

 04-24-2006
1.00
Begin Right Forward Fuselage Skin Assembly
Details

 04-23-2006
3.00
Completed Left Forward Fuselage Skin Assembly
Details
       

 04-22-2006
1.50
Priming Parts
Details
     

 04-21-2006
1.50
Deburred Skin and Primed
Details
     

 03-30-2006
1.00
Completed Drilling Left Skin Assembly
Details
       

 03-29-2006
1.00
Left Forward Fuselage Skin Assembly
Details
       

 03-27-2006
1.00
Continued Work on Left Fwd Fuselage Skin Assembly
Details

 03-26-2006
4.00
Working on Left Side Fwd Fuselage Skin Assembly
Details

 03-25-2006
3.00
Started the Forward Fuselage Side Skin Asseblies
Details
       

 03-24-2006
2.50
Finished up SNX-F13
Details
       

 03-23-2006
1.00
Lower Longerons, SNX-F13-06R/L
Details

 03-22-2006
0.50
Canopy Latch Strike Plate, SNX-F13-04
Details

 03-21-2006
1.00
Canopy Latch Strike Plate, SNX-F13-04
Details

 03-19-2006
3.00
Complete Left and Right Upper Longeron
Details
     

 03-18-2006
2.50
Started Fwd Fuselage Side Skins and Longerons
Details

 03-12-2006
5.00
Finished parts on SNX-F14
Details
       

 03-10-2006
1.50
Working on SNX-F14-08R/L
Details

 03-05-2006
3.00
SNX-F14 Foward Fuselage Side Panel Work
Details
       

 03-04-2006
3.00
Building SNX-F14-01R/L
Details
       

 02-26-2006
2.00
Started Work on SNX-F14
Details
       

 02-25-2006
2.00
Finishing up SNX-F15
Details
     

 02-24-2006
1.00
Continued SNX-F15 Work
Details
       

 02-23-2006
1.00
Finished SNX-F15-07 & SNX-F15-12
Details

 02-22-2006
1.00
Cleaned up SNX-F15 parts
Details

 01-18-2006
1.00
More SNX-F15 Work
Details

 01-15-2006
1.50
More SNX-F15 Parts
Details
     

 01-08-2006
3.00
Continued Work on SNX-F15
Details
       

 01-07-2006
2.50
Upper and Lower Motor Mount Extrustion Work
Details
       

 01-05-2006
1.00
Continued Work on Upper Motor Mounts
Details

 01-04-2006
1.00
Started on Side Skin Assemblies
Details
     

 12-09-2005
3.00
Complete Riveting of Aft Fuselage
Details
       

 12-04-2005
2.50
Completed Deburring Left Turtle Desk
Details

 12-01-2005
1.00
Deburring Turtle Deck
Details
       

 11-26-2005
3.00
Installed Formers #2, #,3, and #4
Details
       

 11-22-2005
2.50
Added Former #1 to Assembly
Details
       

 11-20-2005
1.50
Installed Former #5 & Aft Clip
Details
       

 11-19-2005
1.50
Drilling Turtle Deck
Details
       

 11-16-2005
1.00
Placed Turtle Deck on Aft Fuselage Box
Details
       

 11-14-2005
1.00
Completed Riveting of Turtle Deck Backbone
Details

 11-13-2005
2.50
Turtle Deck Assembly Work
Details
       

 10-29-2005
1.50
Small Piece Work for Turtledeck
Details
       

 10-22-2005
3.00
Turtledeck work
Details
       

 10-21-2005
1.50
More Turtle Deck Work
Details

 10-20-2005
1.50
Deburring Turtledeck Formers
Details

 10-14-2005
1.50
Completed Riveting Lower Aft Fuselage
Details

 10-12-2005
1.00
Continued Lower Aft Fuselage Work
Details
       

 10-11-2005
2.00
Deburring and riveting Lower Aft Fuselage
Details

 10-10-2005
1.50
Riveting started on Lower Aft Fuselage
Details
       

 10-09-2005
2.50
Drilling Finished on Lower Aft Fuselage
Details
       

 10-08-2005
3.00
Continued work on Lower Aft Fuselage
Details

 10-01-2005
0.00
ASA 2005 Trip
Details
       

 09-27-2005
0.50
Aft Shear Web Assembly Drilling
Details
       

 09-26-2005
1.00
Aft Fuselage work
Details

 09-25-2005
3.50
Continued Aft Fuselage Work
Details
       

 09-23-2005
1.00
More Aft Fuselage Work
Details

 09-21-2005
0.50
More Aft Fuselage work
Details
     

 09-20-2005
1.00
Adding Horizontal Channels to Aft Fuselage
Details

 09-17-2005
3.50
Squaring up Aft Fuselage Box
Details
       

 09-15-2005
1.50
Aft Fuselage Box
Details
       

 09-09-2005
2.00
Finished up SNX-F25
Details
       

 09-07-2005
1.00
Deburring Right Aft Fuselage Skin
Details

 09-06-2005
1.00
Right Aft Fuselage Splice Plates
Details

 09-05-2005
3.50
Attaching Vertical Channels to Aft Wing Skins
Details
       

 09-02-2005
0.50
Aft Fuselage Side Skins
Details

 08-31-2005
1.50
Right Aft Fuselage Skin and Longerons
Details

 08-30-2005
1.00
Attaching Left Longerons to Side Skins
Details
     

 08-29-2005
1.00
Started on Left Aft Fuselage Side
Details
     

 08-26-2005
1.50
Completed SNX-F26
Details

 08-24-2005
1.00
Rudder Stops, SNX-F27-08
Details

 08-21-2005
3.00
Started Work on SNX-F26
Details
       

 08-20-2005
3.00
Finished up SNX-F27 Plans Page
Details
       

 08-19-2005
1.50
Drilled Large Holes in Aft Vertical Channels
Details
       

 08-18-2005
1.00
Aft Fuselage Channel Drilling
Details

 08-17-2005
2.50
Cutting Vertical Channels to Shape
Details

 08-15-2005
1.00
More SNX-F27 Vertical Channel work
Details

 08-14-2005
2.00
Contiued work on SNX-F27 Vertical Channels
Details
       

 08-13-2005
1.50
Start SNX-F27 Page
Details
       

 08-06-2005
3.00
Completed SNX-F22
Details
       

 08-05-2005
1.00
Aft Shear Web Assembly parts
Details

 07-24-2005
6.00
Finished SNX-F23
Details
       

 07-23-2005
2.00
Misc Aft Fuselage Assemblies & Parts
Details

 07-21-2005
1.50
SNX-F23-02 Bulkhead
Details
       

 07-20-2005
1.00
Misc Aft Fuselage Parts
Details

 07-19-2005
1.50
Started Aft Fuselauge Misc Details Page
Details
       

 07-14-2005
2.50
Completed SNX-F24 Aft Fuselage Cross Ties
Details
       

 07-13-2005
1.50
Finished Aft Fuselage Cross Tie pieces
Details

 07-12-2005
1.00
Upper Fuselage Cross Ties
Details

 07-11-2005
1.50
Fuselage Cross Ties
Details

 06-27-2005
1.00
Aft Fuselage Cross Ties
Details

 06-26-2005
2.00
Fuselage Cross Ties
Details
       

 05-23-2005
1.00
Hanging Left Wing in Storage Location
Details
       

 05-22-2005
1.00
Completed Riveting and Wingtip
Details

 05-21-2005
1.00
Left Wing Bottom Riveting
Details

 05-20-2005
1.50
Left Top Leading Edge Riveting
Details

 05-19-2005
1.50
Top Aft Skin Riveting
Details

 05-18-2005
1.00
Wiring Conduit
Details

 05-17-2005
2.00
Left Wing Reassembly
Details

 05-16-2005
1.50
Left Wing Work
Details

 05-10-2005
1.50
Deburring/Dimpling Left Leading Edge
Details

 05-09-2005
1.50
Left Wing Deburring & Dimpling
Details

 05-08-2005
2.50
Left Wing Disassembly
Details

 05-07-2005
3.50
Left Wing Work
Details

 04-30-2005
2.50
Left Leading Edge Wing Skin
Details

 04-29-2005
1.00
Left Bottom Leading Edge Drilling
Details

 04-27-2005
1.00
Left Leading Edge Skin
Details

 04-26-2005
1.00
Flap Hinge Installation
Details

 04-25-2005
4.00
Left Wing Bottom Aft Skin
Details
     

 04-21-2005
1.00
Flip Left Wing
Details

 04-20-2005
1.00
Left Wing Aileron Hinge
Details

 04-10-2005
2.00
Left Top Aft Wing Skin Drilling
Details

 04-09-2005
2.00
Drilling Left Wing Skin
Details

 04-04-2005
1.00
Leveling Wing Assembly
Details

 04-03-2005
2.00
Left Root Ribs Installed
Details

 04-02-2005
2.50
Left Root Rib Installation
Details

 03-31-2005
0.50
Root Ribs
Details

 03-30-2005
1.00
Root Rib Support Brackets
Details

 03-29-2005
1.50
Root Ribs
Details

 03-28-2005
4.00
Left Wing Skeleton Complete
Details

 03-23-2005
1.00
Left Wing Skeleton
Details

 03-22-2005
1.00
Left Wing Work
Details

 03-21-2005
1.50
Left Wing Start
Details

 02-20-2005
2.00
Store Right Wing in Shed
Details
       

 02-15-2005
2.50
Finishing up Right Wing
Details
       

 02-14-2005
1.50
Completed riveting the Right Wing
Details
       

 02-13-2005
4.00
Riveting Right Wing
Details

 02-12-2005
4.00
Riveting Wings
Details
       

 02-11-2005
2.00
Deburring Right Wing
Details

 02-09-2005
1.00
Dimpling Leading Edge Ribs
Details
       

 02-08-2005
1.00
Right Wing Dimpling and Priming
Details

 02-07-2005
4.00
Right Wing Work
Details
       

 02-06-2005
4.00
Right Wing Dis-assembly
Details

 02-05-2005
3.50
Right Wing Dis-assembly
Details
       

 02-02-2005
1.00
Deburring Wing Skin
Details

 02-01-2005
2.00
Right Wing Finish Drilling
Details
       

 01-30-2005
2.00
Root Doubler & Wing Tip
Details

 01-29-2005
4.00
Right Wing Tip and Flap Hinge
Details
       

 01-28-2005
1.50
Drilling Right Wing Skin
Details

 01-24-2005
5.00
Misc Wing Work
Details
       

 01-21-2005
1.00
Right Wing Drilling
Details

 01-20-2005
2.50
Right Wing Assembly
Details
       

 01-17-2005
1.50
Drilling Right Wing
Details

 01-16-2005
2.50
Drilling Top Right Wing Skin
Details
       

 01-15-2005
2.00
Leveling Right Wing for Top Skin
Details
       

 01-13-2005
1.50
Right Wing Assemblyi
Details

 01-10-2005
1.50
Right Wing Assembly
Details

 12-19-2004
2.00
Root Rib Install
Details
     

 12-18-2004
3.00
Riveting Right Wing Ribs
Details

 12-17-2004
4.00
Root Rib Installation on Right Wing
Details
     

 12-14-2004
1.00
Right Root Rib Reinforcement Brackets
Details

 12-13-2004
1.00
Root Rib Work
Details
     

 12-13-2004
1.00
Main Wing Ribs
Details
       

 12-11-2004
1.50
Rib Installation
Details

 12-10-2004
1.00
Pitot Tubing Support Assemblies
Details
     

 12-10-2004
3.00
Attaching Ribs to Right Spar
Details
       

 12-08-2004
1.00
Pitot / Static Tube Assembly
Details

 12-07-2004
0.50
Pitot/Static Mount Plate
Details
       

 12-05-2004
1.50
Pitot Static System
Details
       

 12-05-2004
3.00
Aileron Bellcrank Rib Assembly
Details
     

 12-04-2004
2.50
Aileron Bellcrank Assembly
Details
       

 12-03-2004
1.50
Aileron Bellcrank Work
Details
       

 11-30-2004
1.50
SNX-W21-09 Clips
Details

 11-29-2004
1.50
More Bell Crank Assembly Work
Details
       

 11-26-2004
4.00
Bell Crank Assembly Work
Details
       

 11-23-2004
4.00
More Aft Rib Work
Details
       

 11-22-2004
4.00
Aft Rib Work
Details
       

 11-21-2004
1.00
Gussets
Details

 11-20-2004
1.00
Gusset Blanks
Details
     

 11-19-2004
1.50
Forward Ribs
Details

 11-18-2004
2.00
Forward Ribs
Details
       

 11-17-2004
1.00
Forward Wing Ribs
Details

 11-16-2004
1.00
Forward Rib Gussets
Details

 11-15-2004
2.00
Rib Attach Gussets
Details
     

 11-14-2004
4.00
Forward Ribs and Gussets
Details
       

 11-13-2004
2.00
Completed Rear Spars SNX-W12-01L/R
Details
       

 11-12-2004
3.00
Left Rear Spar
Details

 11-11-2004
2.00
Right Rear Spar Assembly
Details
     

 11-04-2004
1.00
Completed Splice Plates
Details
     

 11-03-2004
1.00
Rear Spar Splice
Details

 11-02-2004
2.50
Rear Spar Channels
Details
       

 10-31-2004
2.00
Outboard Rear Spar Channels
Details
       

 10-30-2004
0.50
SNX-W13-04 Tip Rib Attach Angle
Details

 10-29-2004
2.50
Rear Spar Parts
Details
       

 10-28-2004
1.00
Left Hand Root Rib Attach Angle
Details

 10-27-2004
1.50
Rear Spar Parts
Details

 10-25-2004
2.50
Aligned and drilled Spars Together
Details
     

 10-23-2004
0.50
Crossville, TN Sonex Flying
Details
       

 10-19-2004
2.00
Completed Left Main Spar
Details

 10-17-2004
2.00
Continue to Rivet Left Main Spar
Details

 10-16-2004
3.00
Riveting Left Main Spar
Details

 10-13-2004
1.00
Assembled Left Main Spar
Details
       

 10-12-2004
0.50
Primed Left Main Spar
Details

 10-10-2004
4.00
Dimple and Countersink Left Main Spar
Details
       

 10-04-2004
1.00
Deburring pieces for spar
Details
     

 09-22-2004
1.00
Taking Spar Apart
Details

 09-21-2004
2.50
Left Main Spar
Details
       

 09-16-2004
1.00
Left Spar Work
Details

 09-14-2004
1.50
Left Wing Spar Work
Details
       

 09-12-2004
2.00
Drilling Spars
Details

 09-11-2004
3.00
Left Spar Work
Details

 09-02-2004
0.50
Received SNX-W10-02 from Sonex LTD
Details

 08-22-2004
1.50
Started on Left Main Spar
Details

 08-21-2004
3.50
Finished Right Main Spar
Details

 08-19-2004
2.00
Right Main Spar Work
Details
       

 08-18-2004
1.50
Right Main Spar
Details

 08-17-2004
1.00
Right Mian Spar
Details

 08-16-2004
1.00
Continue to Drive Rivets
Details

 08-15-2004
2.00
Driving More Rivets
Details

 08-14-2004
3.50
Riveting Right Spar
Details
       

 08-10-2004
1.50
Re-Assembling Right Main Spar
Details

 08-01-2004
2.50
Countersinking Right Spar
Details

 07-31-2004
3.50
Dimpling & Countersinking Right Spar
Details
       

 07-27-2004
1.50
Deburring Right Main Spar
Details

 07-26-2004
1.50
Finished Drilling of Right Main Spar
Details
       

 07-18-2004
2.00
Working on Main Spar
Details
       

 07-17-2004
2.00
Main Spar Work
Details
     

 07-10-2004
4.00
Drilling Spars
Details
       

 06-22-2004
1.50
Root Rib Attach Angle
Details
       

 06-11-2004
1.50
Root Attach Angles
Details

 06-09-2004
1.00
Root Attach Angle
Details

 06-08-2004
1.00
Wing Spar Assembly
Details

 06-03-2004
0.50
Spar Cap
Details
       

 06-03-2004
1.00
Deburred Spar Web parts
Details

 05-31-2004
5.00
Main Spar Webs
Details
       

 05-10-2004
1.50
Completed SNX-W11 Plans Page
Details
       

 05-06-2004
1.00
New SNX-W11-03 Completed
Details
     

 04-26-2004
1.00
Wing Attach Blocks
Details
       

 04-25-2004
6.00
Building Spar Parts
Details
       

 04-22-2004
1.00
Completed SNX-W11-01 parts
Details

 04-21-2004
0.50
SNX-W11-01 Part #2
Details

 04-18-2004
1.50
SNX-W11-03 Wing Attach Blocks
Details

 04-13-2004
1.50
Spar Parts
Details
       

 04-10-2004
2.00
Started Spar Parts
Details

 03-29-2004
1.50
Finished Second Flap
Details
       

 03-27-2004
4.00
Flap Assembly
Details
       

 03-26-2004
1.50
Working on Flaps
Details

 03-25-2004
2.00
Working on Flaps
Details

 03-24-2004
1.00
Prepare Flap Skin
Details

 03-21-2004
1.00
Finished Second Aileron
Details
       

 03-20-2004
4.00
Second Aileron Work
Details

 03-16-2004
2.50
Completed First Aileron
Details
       

 03-15-2004
1.50
Installed First Aileron Tip Rib
Details

 03-14-2004
3.00
Build new Aileron Tip Ribs
Details

 03-13-2004
2.00
Aileron Assembly
Details
     

 03-09-2004
2.00
Aileron Work
Details

 03-08-2004
2.00
Aileron Counterweight Assembly
Details

 03-07-2004
2.00
Aileron Counterbalance Assembly
Details
       

 03-05-2004
1.50
Aileron Assembly
Details

 03-04-2004
1.50
Cut Aileron Skin and Hinge Half
Details

 03-03-2004
1.50
Aileron Skins
Details

 02-29-2004
2.00
Working on Aileron
Details
       

 02-28-2004
3.00
Building Aileron Parts
Details
       

 02-27-2004
2.00
Started Work on Ailerons
Details
       

 02-22-2004
3.00
Wing Cut Incorrectly
Details
       

 02-21-2004
3.00
Flap Assembly
Details

 02-20-2004
3.00
Finished Flap Parts
Details
       

 02-20-2004
1.00
Drilling Flaps Ribs
Details
     

 02-17-2004
1.50
Flap Hinge Half
Details

 02-16-2004
1.00
Started Working on Flaps
Details
       

 02-15-2004
3.00
Finished Installing Horizontal Tail Tips
Details
       

 02-14-2004
3.00
Working on Fiberglass Tail Tips
Details
       

 02-09-2004
1.00
Working on Fiberglass Tail Tips
Details
     

 02-08-2004
2.00
Working on Fiberglass Tail Tips
Details
       

 02-07-2004
2.00
Working on Fiberglass Tail Tips
Details

 02-03-2004
1.00
Working on Tail Tips Mounts
Details

 02-02-2004
1.00
Tail Tip Installation Work
Details
     

 01-29-2004
1.50
Installation of Elevator Horn Assembly
Details
       

 01-28-2004
1.50
Rebuilt Elevator Horn Assembly
Details

 01-26-2004
2.00
Working on Tail Tips
Details

 01-24-2004
3.00
Removing Elevator Horn Rivets
Details

 01-21-2004
3.00
Assembly & Attachment of Elevators
Details

 01-17-2004
3.00
Elevator Work
Details

 01-14-2004
2.00
Final Riveting of Horiz Stab. & Misc.
Details
       

 01-13-2004
1.00
Drilled Elevator Horn
Details

 01-10-2004
2.00
Various Horiz Stab Tasks
Details

 01-08-2004
1.50
Drilled and Clecoed Top Skin of HS
Details
       

 01-07-2004
0.50
Riveted Bottom Horiz Stab Skin
Details

 01-06-2004
1.50
Skinning Horizontal Stabilizer
Details

 12-20-2003
3.00
Finished One Horiz Stab
Details
       

 12-19-2003
3.00
Installing Horizontal Stab. Skin
Details
     

 12-17-2003
2.00
Riveting framework for Horizontal Stab
Details

 12-16-2003
2.00
Building Horizontal Stabilizer Assembly
Details
       

 12-14-2003
3.00
Horiz Stabilizer Forward Spar Assembly
Details
       

 12-13-2003
3.00
Horiz Stabilizer Main Spar Assembly
Details
       

 12-09-2003
2.00
Horizontal Tail Spar Channels
Details
     

 12-07-2003
4.00
Horizontal Main Spar Fitting
Details
       

 12-06-2003
4.00
Building SNX-T03-02 Main Spar
Details
       

 11-30-2003
3.00
Finished Horizontal Stabilizer Ribs
Details
       

 11-29-2003
3.00
Working on Horizontal Ribs
Details
     

 11-28-2003
3.00
Finishing the Forward Spar Fitting
Details
       

 11-26-2003
3.00
Continued Contruction of SNX-T06-03
Details

 11-25-2003
3.00
Building Parts for Horizontal Stabilizer
Details
       

 11-19-2003
1.00
Horizontal Stabilizer Misc Details
Details

 11-16-2003
3.00
Finished working on page SNX-T07
Details
       

 11-15-2003
2.00
Started Work on Elevator Parts
Details

 11-07-2003
2.00
Tail Tip Modifications
Details
       

 11-06-2003
2.00
Vertical Stabilizer Work
Details

 11-05-2003
2.50
Riveting Rudder & Vertical Stab.
Details
       

 11-02-2003
4.00
Rudder Ribs and Painting
Details
       

 10-31-2003
4.00
Deburred and Primed Vertical Stab.
Details
     

 10-30-2003
2.00
Finished Drilling Vertical Stab
Details
     

 10-29-2003
2.50
Attaching Tail Wing Skin
Details
       

 10-28-2003
2.50
Assembled Vertical Tail Frame
Details
       

 10-27-2003
1.00
Alodine of Tail Parts
Details

 10-26-2003
3.00
Assembly of Vertical Tail Assembly
Details

 10-25-2003
4.00
Vertical Tail Spar Assemblies
Details

 10-23-2003
1.50
Finished Parts on SNX-T10
Details
     

 10-22-2003
1.50
Started Work on Vert. Tail Ribs
Details
       

 10-22-2003
1.00
Pilot Drill and Deburr Vert Tail Skin
Details

 10-22-2003
1.50
Completed Misc Parts for Vertical Tail
Details
       

 10-17-2003
0.50
SNX-T12-07 Forward Spar Fitting
Details

 10-16-2003
1.50
Conitinued Work on SNX-T12
Details

 10-15-2003
1.00
Remade SNX-T12-05
Details

 10-14-2003
1.50
Continued Work on SNX-T12 parts
Details

 10-12-2003
3.00
Continued work on SNX-T12
Details
       

 10-11-2003
0.50
Started work on SNX-T12
Details

 10-11-2003
1.00
Finshed Drilling Rudder Hinge
Details

 10-10-2003
2.00
Rudder Skin Prep Work
Details

 10-09-2003
2.00
Finish Rudder Horn Assembly
Details
       

 10-08-2003
2.00
Rudder Assemblies
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.