Date
|
Hours
|
Work Log Summary
|
Details
|
11-30-2008
|
3.00
|
More Post Flight Work
|
Details
|
|
|
11-28-2008
|
3.00
|
Fixing problems found
|
Details
|
|
|
11-26-2008
|
0.00
|
First Flight
|
Details
|
|
|
11-15-2008
|
4.00
|
Misc Finishing Work
|
Details
|
|
|
11-06-2008
|
1.00
|
New Air Filter
|
Details
|
|
|
11-02-2008
|
2.00
|
Taxi and Photo Session
|
Details
|
|
|
11-01-2008
|
2.00
|
Engine Cooling Baffles
|
Details
|
|
|
10-16-2008
|
4.00
|
Finishing up for Inspection
|
Details
|
|
|
10-12-2008
|
5.00
|
Getting Ready for Inspection
|
Details
|
|
|
10-11-2008
|
5.00
|
Finsh Work
|
Details
|
|
|
10-06-2008
|
2.00
|
Airworthiness Inspection Paperwork
|
Details
|
|
|
10-04-2008
|
0.00
|
ASA 2008 Crossville Fly-In
|
Details
|
|
|
09-28-2008
|
3.00
|
W&B Measurements
|
Details
|
|
|
09-21-2008
|
5.00
|
Taxi Testing
|
Details
|
|
|
09-20-2008
|
5.00
|
Various Finishing Items
|
Details
|
|
|
09-14-2008
|
4.00
|
Interior Work
|
Details
|
|
|
09-13-2008
|
2.00
|
Misc Items
|
Details
|
|
|
09-13-2008
|
2.00
|
Interior Installation
|
Details
|
|
|
09-10-2008
|
4.00
|
Interior Parts
|
Details
|
|
|
09-07-2008
|
4.00
|
Various Finishing Work
|
Details
|
|
|
09-06-2008
|
3.00
|
Cleaning
|
Details
|
|
|
08-31-2008
|
5.00
|
Misc Engine Work
|
Details
|
|
|
08-30-2008
|
4.00
|
Various Firewall forward Items
|
Details
|
|
|
08-27-2008
|
1.50
|
Finishing up First Stick Boot
|
Details
|
|
|
08-26-2008
|
2.00
|
Control Stick Boots
|
Details
|
|
|
08-24-2008
|
5.00
|
Finishing up the Cockpit Area
|
Details
|
|
|
08-23-2008
|
5.00
|
Various Items
|
Details
|
|
|
08-22-2008
|
3.00
|
Baggage Bag
|
Details
|
|
|
08-17-2008
|
5.00
|
Various Items
|
Details
|
|
|
08-16-2008
|
3.00
|
Sub-Panel Installed and Fuel Shutoff Installed
|
Details
|
|
|
08-16-2008
|
2.00
|
ELT Mounting & Vents
|
Details
|
|
|
08-10-2008
|
4.00
|
Working on Subpanel
|
Details
|
|
|
08-09-2008
|
5.00
|
Pitot Static/Panel/Wiring
|
Details
|
|
|
08-03-2008
|
2.00
|
Electric Flaps Done
|
Details
|
|
|
08-03-2008
|
2.00
|
Avionics Work
|
Details
|
|
|
08-02-2008
|
0.00
|
Helped Peter Rig is Waiex Wings
|
Details
|
|
|
08-01-2008
|
5.00
|
Cleaning up Wiring
|
Details
|
|
|
07-27-2008
|
4.00
|
Various Wiring
|
Details
|
|
|
07-26-2008
|
4.00
|
Flap Control
|
Details
|
|
|
07-20-2008
|
5.00
|
Flap work
|
Details
|
|
|
07-19-2008
|
4.00
|
AutoPilot Servo Intalled
|
Details
|
|
|
07-13-2008
|
4.50
|
Wing Leveler Autopilot Servo Installation
|
Details
|
|
|
07-12-2008
|
4.00
|
Misc Finishing Work
|
Details
|
|
|
06-22-2008
|
3.00
|
Flap Control Push Rods
|
Details
|
|
|
06-21-2008
|
5.00
|
Installed the Fiberglass Wingtips
|
Details
|
|
|
06-20-2008
|
5.00
|
Wingtipf
|
Details
|
|
|
06-15-2008
|
5.00
|
More work on Landing Light
|
Details
|
|
|
06-14-2008
|
5.00
|
Landing Light Install
|
Details
|
|
|
06-13-2008
|
1.00
|
Wingtip Light Pods
|
Details
|
|
|
06-12-2008
|
1.00
|
Wing Tip Pods
|
Details
|
|
|
06-10-2008
|
1.00
|
Working on Fiberglass Wingtips
|
Details
|
|
|
06-08-2008
|
4.00
|
Wing Wiring
|
Details
|
|
|
06-07-2008
|
5.00
|
Aileron Installation
|
Details
|
|
|
06-01-2008
|
4.00
|
Competed Wing Installation
|
Details
|
|
|
05-31-2008
|
5.00
|
Wing Installation
|
Details
|
|
|
05-25-2008
|
4.00
|
Installing Wings
|
Details
|
|
|
05-24-2008
|
5.00
|
Various Panel Wiring Jobs
|
Details
|
|
|
05-18-2008
|
3.00
|
Pitch AP Installed
|
Details
|
|
|
05-17-2008
|
4.50
|
Opening up Inbound Wing Ribs
|
Details
|
|
|
05-16-2008
|
1.00
|
Forward Wing Rib Modification
|
Details
|
|
|
05-11-2008
|
3.00
|
Wiring Autopilot
|
Details
|
|
|
05-10-2008
|
5.00
|
Installing COM Antenna and Coax
|
Details
|
|
|
05-04-2008
|
2.00
|
Transponder Coax Installation
|
Details
|
|
|
05-03-2008
|
4.00
|
Wing Light Wiring
|
Details
|
|
|
04-30-2008
|
0.50
|
Tow Bar Shaft Collar
|
Details
|
|
|
04-27-2008
|
4.00
|
Intercom Wiring
|
Details
|
|
|
04-26-2008
|
5.00
|
Moved additional equipment ot the Airport
|
Details
|
|
|
04-17-2008
|
3.00
|
Move Fuselage to Siler City Airport
|
Details
|
|
|
04-16-2008
|
3.00
|
Loading Airplane on Trailer
|
Details
|
|
|
03-27-2008
|
1.00
|
Seats
|
Details
|
|
|
03-22-2008
|
2.00
|
Baggage Compartment Shelves
|
Details
|
|
|
03-22-2008
|
2.00
|
Attaching the Fiberglass Vertical Tail Tip
|
Details
|
|
|
03-20-2008
|
1.50
|
Baggage Area
|
Details
|
|
|
03-18-2008
|
1.50
|
Finishing Up Seat Cushions
|
Details
|
|
|
03-16-2008
|
3.00
|
Various Interior Items
|
Details
|
|
|
03-14-2008
|
1.50
|
Glueing Foam
|
Details
|
|
|
03-13-2008
|
1.00
|
Cutting Foam
|
Details
|
|
|
03-12-2008
|
0.50
|
Glue Foam Together
|
Details
|
|
|
03-11-2008
|
1.00
|
Cutting Seat Foam
|
Details
|
|
|
03-10-2008
|
1.00
|
Designing Seat Foam
|
Details
|
|
|
03-09-2008
|
2.00
|
Panel Work
|
Details
|
|
|
03-02-2008
|
4.00
|
Finishing Up Baffles
|
Details
|
|
|
03-01-2008
|
4.00
|
Engine Baffles and Rubber Seals
|
Details
|
|
|
02-29-2008
|
1.00
|
Baffle Trimming
|
Details
|
|
|
02-28-2008
|
1.50
|
Engine Baffle Work
|
Details
|
|
|
02-24-2008
|
4.00
|
Panel Work
|
Details
|
|
|
02-23-2008
|
3.00
|
Cowl Priming
|
Details
|
|
|
02-22-2008
|
1.50
|
Right Exhaust Tunnel & Filler Work
|
Details
|
|
|
02-20-2008
|
1.50
|
Cowl Exhaust Tunnel
|
Details
|
|
|
02-19-2008
|
1.00
|
Cowl Work
|
Details
|
|
|
02-18-2008
|
1.00
|
Cowl Epoxy Work
|
Details
|
|
|
02-17-2008
|
2.00
|
Cowl Work
|
Details
|
|
|
02-16-2008
|
3.00
|
Moving Wings to Airport
|
Details
|
|
|
02-14-2008
|
1.00
|
Re-Drilling Bottom Hinge Halves
|
Details
|
|
|
02-11-2008
|
1.00
|
Removing Incorrect Hinge Halves
|
Details
|
|
|
02-10-2008
|
5.00
|
Cowl Work
|
Details
|
|
|
02-09-2008
|
3.00
|
Riveting Cowl
|
Details
|
|
|
02-08-2008
|
1.50
|
Cowl Exhaust Opening
|
Details
|
|
|
02-07-2008
|
1.00
|
Cowl Work
|
Details
|
|
|
02-06-2008
|
2.50
|
Exhaust Exit Lip
|
Details
|
|
|
02-05-2008
|
1.00
|
Cowl Epoxy Work
|
Details
|
|
|
02-04-2008
|
1.00
|
Cowl Epoxy Work
|
Details
|
|
|
02-03-2008
|
3.00
|
Cowl Modification
|
Details
|
|
|
02-02-2008
|
4.00
|
Cowl Work
|
Details
|
|
|
01-29-2008
|
1.50
|
Drilling Left Cowl
|
Details
|
|
|
01-26-2008
|
3.00
|
Installing Right Cowl
|
Details
|
|
|
01-25-2008
|
1.00
|
Cowl Work
|
Details
|
|
|
01-24-2008
|
1.00
|
Cowl Epoxy Work
|
Details
|
|
|
01-23-2008
|
1.50
|
Cowl Work
|
Details
|
|
|
01-22-2008
|
1.50
|
Cowl Work
|
Details
|
|
|
01-20-2008
|
3.50
|
More Cowl Work
|
Details
|
|
|
01-19-2008
|
3.00
|
Cowl Fitting
|
Details
|
|
|
01-18-2008
|
1.50
|
Left & Right Cowl
|
Details
|
|
|
01-17-2008
|
1.50
|
Left Cowl Fitting
|
Details
|
|
|
01-16-2008
|
1.50
|
Started Work on Left Cowl
|
Details
|
|
|
01-15-2008
|
1.50
|
Bottom Right Cowl Hinge
|
Details
|
|
|
01-14-2008
|
1.50
|
Right Cowl Work
|
Details
|
|
|
01-13-2008
|
4.00
|
Right Cowl and Hinges
|
Details
|
|
|
01-12-2008
|
2.00
|
Right Cowl Half
|
Details
|
|
|
01-11-2008
|
1.00
|
More Right Cowl Work
|
Details
|
|
|
01-10-2008
|
2.00
|
Right Cowl Half
|
Details
|
|
|
01-09-2008
|
1.50
|
Cutting Holes in Cowl
|
Details
|
|
|
01-07-2008
|
1.50
|
Working on Prop Hub Spacer
|
Details
|
|
|
12-16-2007
|
2.00
|
Finishing up Canopy
|
Details
|
|
|
12-14-2007
|
4.00
|
Installing Canopy
|
Details
|
|
|
12-13-2007
|
2.00
|
Windscreen Re-Install
|
Details
|
|
|
12-12-2007
|
4.00
|
Re-Installing Canopy Parts
|
Details
|
|
|
12-08-2007
|
3.00
|
Prime & Paint Parts
|
Details
|
|
|
12-07-2007
|
3.00
|
Canopy Finish Work
|
Details
|
|
|
12-06-2007
|
1.00
|
Canopy Countersink
|
Details
|
|
|
12-02-2007
|
3.00
|
Canopy Side Clamp Work
|
Details
|
|
|
12-01-2007
|
3.00
|
Canopy Fitting
|
Details
|
|
|
11-30-2007
|
3.00
|
Canopy Fitting
|
Details
|
|
|
11-28-2007
|
1.50
|
Canopy Fitting
|
Details
|
|
|
11-27-2007
|
1.00
|
Tweaking Canopy
|
Details
|
|
|
11-25-2007
|
4.00
|
Started Work on Canopy
|
Details
|
|
|
11-24-2007
|
3.00
|
Canopy Frame Work
|
Details
|
|
|
11-23-2007
|
4.00
|
Front Canopy Bow Work
|
Details
|
|
|
11-21-2007
|
3.00
|
Working on Canopy Frame
|
Details
|
|
|
11-20-2007
|
2.00
|
Working on Canopy Frame
|
Details
|
|
|
11-14-2007
|
1.00
|
Completed Parts for Canopy
|
Details
|
|
|
11-12-2007
|
1.50
|
Continued working on canopy Parts
|
Details
|
|
|
11-07-2007
|
1.00
|
Canopy Modification
|
Details
|
|
|
11-05-2007
|
1.50
|
Misc Canopy Parts
|
Details
|
|
|
11-04-2007
|
3.00
|
Completed SNX-D02-14 Hook Angle
|
Details
|
|
|
11-01-2007
|
1.50
|
Working on SNX-D02-14 Hook Angle
|
Details
|
|
|
10-27-2007
|
2.00
|
Finished Windscreen.
|
Details
|
|
|
09-16-2007
|
3.00
|
Drilling Windscreen
|
Details
|
|
|
09-15-2007
|
3.00
|
Fitting Windscreen
|
Details
|
|
|
09-14-2007
|
2.00
|
Windscreen Bow
|
Details
|
|
|
09-09-2007
|
5.00
|
First Engine Start
|
Details
|
|
|
09-03-2007
|
3.00
|
Turned Engine Over
|
Details
|
|
|
09-02-2007
|
2.00
|
Exhaust Modification
|
Details
|
|
|
09-01-2007
|
3.00
|
Finished wiring for the Time Being
|
Details
|
|
|
09-01-2007
|
1.00
|
Engine Baffles
|
Details
|
|
|
08-28-2007
|
1.00
|
Engine Wiring
|
Details
|
|
|
08-26-2007
|
3.00
|
Engine Wiring
|
Details
|
|
|
08-25-2007
|
5.00
|
Engine Wiring
|
Details
|
|
|
08-24-2007
|
1.00
|
More Engine Wiring
|
Details
|
|
|
08-24-2007
|
4.00
|
Connecting Avionics Power
|
Details
|
|
|
08-23-2007
|
1.00
|
Continued Wiring of Engine
|
Details
|
|
|
08-20-2007
|
5.00
|
Engine Wiring
|
Details
|
|
|
08-19-2007
|
3.00
|
Engine Wiring
|
Details
|
|
|
08-18-2007
|
3.00
|
Misc Engine Wiring
|
Details
|
|
|
08-15-2007
|
1.00
|
EGT Probes
|
Details
|
|
|
08-12-2007
|
3.50
|
CHT and EGT Probes Installation
|
Details
|
|
|
08-11-2007
|
3.00
|
Main Air Baffles for Cylinders
|
Details
|
|
|
08-05-2007
|
3.00
|
Oil Cooler Shroud Work
|
Details
|
|
|
08-04-2007
|
1.00
|
Second Oil Cooler Connection
|
Details
|
|
|
08-03-2007
|
1.00
|
Oil Cooler Work
|
Details
|
|
|
08-02-2007
|
1.50
|
Connecting Fuel Line
|
Details
|
|
|
07-31-2007
|
1.50
|
Oil Cooler Mounting
|
Details
|
|
|
07-31-2007
|
1.00
|
Inter-Cylinder Baffles
|
Details
|
|
|
07-30-2007
|
1.50
|
Oil Cooler Mounting
|
Details
|
|
|
07-28-2007
|
3.00
|
Throttle and Mixture hookup
|
Details
|
|
|
06-19-2007
|
1.00
|
AeroConversion Trim System
|
Details
|
|
|
06-17-2007
|
3.00
|
AeroConversion Trim System
|
Details
|
|
|
06-15-2007
|
1.50
|
AeroConversions Trim System
|
Details
|
|
|
06-14-2007
|
1.00
|
Control Stick Interference Fix
|
Details
|
|
|
06-12-2007
|
1.50
|
AeroConversion Trim System Rework
|
Details
|
|
|
06-11-2007
|
1.00
|
AeroCarb Work
|
Details
|
|
|
06-11-2007
|
1.00
|
Added Second Stick Grip
|
Details
|
|
|
06-09-2007
|
2.00
|
Throttle and Mixture Cable Routing
|
Details
|
|
|
06-09-2007
|
1.00
|
Installed Pilot Control Stick Grip
|
Details
|
|
|
06-08-2007
|
1.50
|
AeroCarb Work
|
Details
|
|
|
06-07-2007
|
1.00
|
Removed Jabiru Fuel Pump
|
Details
|
|
|
06-07-2007
|
1.00
|
Installed Thottle in Cockpit
|
Details
|
|
|
06-06-2007
|
1.50
|
AeroCarb Work
|
Details
|
|
|
06-03-2007
|
3.00
|
More Work on Engine Installation
|
Details
|
|
|
06-01-2007
|
1.00
|
Installed Voltage Regulator
|
Details
|
|
|
05-30-2007
|
1.00
|
Inter-Cylinder Baffels
|
Details
|
|
|
05-26-2007
|
2.50
|
Engine Installation
|
Details
|
|
|
05-25-2007
|
1.00
|
Unpacking Engine
|
Details
|
|
|
05-23-2007
|
1.00
|
Completed Magnetometer Bracket Installation
|
Details
|
|
|
05-22-2007
|
1.50
|
BMA Magnetometer Bracket
|
Details
|
|
|
05-20-2007
|
3.00
|
Auto Pilot Servo and Fuse Blocks
|
Details
|
|
|
05-18-2007
|
4.00
|
Pitch Control Autopilot Servo
|
Details
|
|
|
05-13-2007
|
3.00
|
Firewall to Gascolator Connection
|
Details
|
|
|
05-13-2007
|
1.00
|
Finished Brake Installation
|
Details
|
|
|
04-26-2007
|
1.50
|
Installing Brake Parts
|
Details
|
|
|
04-25-2007
|
1.00
|
TriGear Brake Cable Guide
|
Details
|
|
|
04-22-2007
|
2.00
|
Brake Handle Assembly
|
Details
|
|
|
04-21-2007
|
2.00
|
Brake Handle and Parts
|
Details
|
|
|
04-20-2007
|
3.00
|
Brake Control
|
Details
|
|
|
04-18-2007
|
1.00
|
Control work
|
Details
|
|
|
04-18-2007
|
1.00
|
Brake Cable Guide
|
Details
|
|
|
04-14-2007
|
3.00
|
Misc Small Items
|
Details
|
|
|
04-08-2007
|
2.00
|
Rigging Rudder Pedals
|
Details
|
|
|
04-06-2007
|
2.00
|
Painted Glareshield and Fitted Windscreen Bow
|
Details
|
|
|
04-04-2007
|
0.50
|
Prince Aircraft Propeller Arrived
|
Details
|
|
|
04-01-2007
|
3.00
|
Working on Controls
|
Details
|
|
|
03-27-2007
|
2.00
|
Adjusting Rudder Movement
|
Details
|
|
|
03-25-2007
|
4.00
|
Completed mounting Vertical Stabilizer and Rudder
|
Details
|
|
|
03-24-2007
|
4.00
|
Working on Horiz and Vert Stab Mounting
|
Details
|
|
|
03-23-2007
|
2.00
|
Started Horizontal Stabilizer Install
|
Details
|
|
|
03-18-2007
|
6.00
|
More Custom EIS Display
|
Details
|
|
|
03-16-2007
|
1.50
|
Working on Custom EIS Display
|
Details
|
|
|
03-09-2007
|
2.00
|
Panel Wiring
|
Details
|
|
|
03-04-2007
|
3.00
|
COM and Intercom Wiring
|
Details
|
|
|
03-02-2007
|
2.00
|
Started Wiring the Panel
|
Details
|
|
|
02-26-2007
|
1.00
|
Installing Instruments
|
Details
|
|
|
02-25-2007
|
6.00
|
Panel Labels
|
Details
|
|
|
02-24-2007
|
3.00
|
Painting Panel
|
Details
|
|
|
02-15-2007
|
1.50
|
Panel Mount Points and Support Angles
|
Details
|
|
|
02-11-2007
|
4.00
|
Installing Panel Mounting Hardware in Fuselage
|
Details
|
|
|
02-10-2007
|
2.00
|
Rework on Panel
|
Details
|
|
|
02-09-2007
|
1.50
|
Installed all Components in Panel
|
Details
|
|
|
02-08-2007
|
1.00
|
Panel Work
|
Details
|
|
|
02-07-2007
|
1.50
|
Drilling Instrument Mounting Holes
|
Details
|
|
|
02-06-2007
|
1.00
|
Continued Panel Work
|
Details
|
|
|
02-05-2007
|
1.00
|
Added Instrument Mount Angles
|
Details
|
|
|
02-04-2007
|
4.00
|
Finish Panel holes and cutouts
|
Details
|
|
|
02-03-2007
|
4.00
|
New Panel Layout
|
Details
|
|
|
02-02-2007
|
2.00
|
New Panel Work
|
Details
|
|
|
01-28-2007
|
4.00
|
Panel Work
|
Details
|
|
|
01-27-2007
|
3.00
|
Panel Cutout
|
Details
|
|
|
01-26-2007
|
1.50
|
Panel Layout
|
Details
|
|
|
01-25-2007
|
1.50
|
Panel Layout
|
Details
|
|
|
01-24-2007
|
1.00
|
Layout of Panel Cutouts
|
Details
|
|
|
01-23-2007
|
1.00
|
New Panel Design
|
Details
|
|
|
01-21-2007
|
1.00
|
Finished Battery Box Install
|
Details
|
|
|
01-21-2007
|
3.00
|
Electircal Wire Book Work
|
Details
|
|
|
01-19-2007
|
1.00
|
Installing Battery Box on Firewall
|
Details
|
|
|
01-18-2007
|
1.00
|
Finished Battery Box Construction
|
Details
|
|
|
01-17-2007
|
1.50
|
Battery Box Hinges
|
Details
|
|
|
01-15-2007
|
3.00
|
Battery Box Work
|
Details
|
|
|
01-14-2007
|
2.00
|
Fuel Vent Work
|
Details
|
|
|
01-13-2007
|
3.00
|
Fuel System Work
|
Details
|
|
|
01-12-2007
|
6.00
|
Avionics Wire Book Work
|
Details
|
|
|
01-08-2007
|
3.00
|
Fuel Tank Installation Complete!
|
Details
|
|
|
01-07-2007
|
2.00
|
Tank Installation
|
Details
|
|
|
01-06-2007
|
4.00
|
Fuel Tank Work
|
Details
|
|
|
12-20-2006
|
1.00
|
Fitting Fuel Tank
|
Details
|
|
|
12-19-2006
|
2.00
|
Fuel Tanks Straps and GlareShield ReInstallation
|
Details
|
|
|
12-18-2006
|
3.00
|
Flap Tube Install and Rudder Pedal Springs
|
Details
|
|
|
12-17-2006
|
3.00
|
Second NACA Air Vent and start Flap Tube
|
Details
|
|
|
12-16-2006
|
2.00
|
Placing and Installing Side Air Vents
|
Details
|
|
|
12-15-2006
|
3.00
|
Various Control Installations
|
Details
|
|
|
12-10-2006
|
2.00
|
Started Rudder Pedal Insallation
|
Details
|
|
|
12-09-2006
|
3.00
|
Working on Nose Wheel and Rudder Controls
|
Details
|
|
|
12-07-2006
|
1.00
|
Installed Glare Shield Attach Angles
|
Details
|
|
|
12-06-2006
|
1.00
|
Upper Firewall and Glare Shield Attach Angles Pain
|
Details
|
|
|
12-06-2006
|
1.50
|
Rudder Pedal Installation
|
Details
|
|
|
12-04-2006
|
1.00
|
Firewall/Glareshield Deburring
|
Details
|
|
|
12-03-2006
|
1.00
|
Installed Nose Wheel Pushrod Boot
|
Details
|
|
|
11-29-2006
|
1.00
|
Nose Wheel Push Rod Boot
|
Details
|
|
|
11-26-2006
|
2.00
|
More Nose Wheel Work
|
Details
|
|
|
11-25-2006
|
3.00
|
Nose Wheel Gear Work
|
Details
|
|
|
11-22-2006
|
2.00
|
Working on Right Main Wheels
|
Details
|
|
|
11-19-2006
|
2.00
|
Working on Left Main Wheel
|
Details
|
|
|
11-17-2006
|
0.50
|
Final Install of the Right Main Landing Gear
|
Details
|
|
|
11-15-2006
|
1.00
|
Re-Installing Titanium Landing Gear
|
Details
|
|
|
11-12-2006
|
3.00
|
Dual Control Stick Details
|
Details
|
|
|
11-04-2006
|
3.00
|
Installing Various SNX-F01 Rivets/Fasteners
|
Details
|
|
|
10-29-2006
|
2.00
|
Starting to Rivet Spar Box
|
Details
|
|
|
10-29-2006
|
4.00
|
Finishing up Main Spar Box and Aft Spar Carry Thro
|
Details
|
|
|
10-28-2006
|
2.00
|
Finishing up Fuselage Interior
|
Details
|
|
|
10-21-2006
|
2.00
|
Completed the SNX-SB-003 Work
|
Details
|
|
|
10-19-2006
|
1.50
|
Working on Optoinal Service Bulletin 003
|
Details
|
|
|
10-15-2006
|
2.50
|
Priming Parts and SNX-SB-003 Work
|
Details
|
|
|
10-14-2006
|
1.50
|
Cleaning up Installed Parts
|
Details
|
|
|
10-07-2006
|
0.00
|
3rd Annual American Sonex Association Fly-In
|
Details
|
|
|
09-17-2006
|
3.00
|
Removing wings for storage
|
Details
|
|
|
09-16-2006
|
2.00
|
Drilling Main Wing Spars
|
Details
|
|
|
09-15-2006
|
2.50
|
Verified Wings Dimensions and drilled rear Spars
|
Details
|
|
|
09-14-2006
|
3.00
|
Working on Wings Again
|
Details
|
|
|
09-12-2006
|
3.00
|
Working on getting wings Square
|
Details
|
|
|
09-11-2006
|
7.00
|
Rigging the Wings, Day 2
|
Details
|
|
|
09-10-2006
|
5.00
|
Wing Rigging Day 1
|
Details
|
|
|
09-09-2006
|
3.50
|
Finishing up Rear Spar Carry Through
|
Details
|
|
|
09-08-2006
|
1.50
|
Rear Spar Carry Through Details
|
Details
|
|
|
09-06-2006
|
1.50
|
Rear Spar Carry Through Details
|
Details
|
|
|
09-04-2006
|
0.50
|
Working on Wheels/Brakes
|
Details
|
|
|
09-03-2006
|
3.00
|
Installed TriGear Landing Gear
|
Details
|
|
|
09-03-2006
|
3.00
|
Engine Mount Installation
|
Details
|
|
|
09-02-2006
|
3.00
|
Drilled Upper Gear Leg Inside Cockpit & Installed
|
Details
|
|
|
09-01-2006
|
2.00
|
Drill second Axle Welded parts and Setting Toe-In
|
Details
|
|
|
08-31-2006
|
0.50
|
Installed Axle Weld Bolt
|
Details
|
|
|
08-30-2006
|
1.00
|
Drilling Holes for Axle Welded parts
|
Details
|
|
|
08-29-2006
|
1.00
|
Tires, Tubes, and Hubs
|
Details
|
|
|
08-28-2006
|
1.50
|
Raising the Plane
|
Details
|
|
|
08-27-2006
|
2.00
|
Installing Engine Mount
|
Details
|
|
|
08-26-2006
|
2.00
|
Final Painting of Engine Mount
|
Details
|
|
|
08-25-2006
|
3.00
|
Repainting Motor Mount
|
Details
|
|
|
08-24-2006
|
2.00
|
Playing around with Panel Layout
|
Details
|
|
|
08-23-2006
|
2.00
|
Working on Panel
|
Details
|
|
|
08-22-2006
|
1.50
|
Glare Shield Installation
|
Details
|
|
|
08-20-2006
|
4.00
|
Glare Shield Details
|
Details
|
|
|
08-19-2006
|
2.00
|
Started Work on Glareshield
|
Details
|
|
|
08-19-2006
|
2.00
|
Completed Installing Seat Sling
|
Details
|
|
|
08-18-2006
|
2.00
|
Finished Seat Sling Assembly
|
Details
|
|
|
08-17-2006
|
1.00
|
Seat Hinge Pins and Halves
|
Details
|
|
|
08-15-2006
|
1.00
|
Hinge Pins
|
Details
|
|
|
08-15-2006
|
0.50
|
Dual Stick Welded Parts
|
Details
|
|
|
08-14-2006
|
1.50
|
Seat Hinge Halves and Trim Lever
|
Details
|
|
|
08-13-2006
|
2.00
|
Lowered the Whole Fuselage
|
Details
|
|
|
08-12-2006
|
3.00
|
Working on Seat Sling
|
Details
|
|
|
08-10-2006
|
0.50
|
Re-install Landing Gear Mounts
|
Details
|
|
|
08-09-2006
|
0.50
|
Painting Main Landing Gear Mounts
|
Details
|
|
|
08-06-2006
|
3.00
|
Deburring and Priming Parts
|
Details
|
|
|
08-04-2006
|
1.00
|
Drilling holes to Final Size
|
Details
|
|
|
08-03-2006
|
1.00
|
Drilling Welded Main Gear Mounts
|
Details
|
|
|
08-02-2006
|
1.00
|
Drilling Holes in Landing Gear
|
Details
|
|
|
08-01-2006
|
1.00
|
Setting up Gear Angles
|
Details
|
|
|
07-31-2006
|
1.00
|
Making Main Gear Holes in Lower Fuselage Skin
|
Details
|
|
|
07-30-2006
|
3.00
|
SNX-L04-10 Gear Locator Tool/Jig
|
Details
|
|
|
07-29-2006
|
4.00
|
Final Riveting of Under Seat Details
|
Details
|
|
|
07-22-2006
|
3.00
|
Priming Parts for SNX-F09
|
Details
|
|
|
07-21-2006
|
1.00
|
Dis-assembly of parts
|
Details
|
|
|
07-16-2006
|
2.50
|
Installing more SNX-F09 parts
|
Details
|
|
|
07-15-2006
|
3.00
|
Installing parts for SNX-F09
|
Details
|
|
|
07-13-2006
|
1.50
|
Started SNX-F09
|
Details
|
|
|
07-12-2006
|
1.00
|
Idler Support Assembly, SNX-F10-17
|
Details
|
|
|
07-11-2006
|
1.50
|
Parts building on SNX-F10
|
Details
|
|
|
07-09-2006
|
2.00
|
Aft Lower Cabin Parts
|
Details
|
|
|
06-30-2006
|
1.50
|
More work on Aft Lower Cabin Details
|
Details
|
|
|
06-26-2006
|
1.00
|
Building More Parts
|
Details
|
|
|
06-25-2006
|
2.50
|
More Under the Seat Pan work
|
Details
|
|
|
06-22-2006
|
2.00
|
Started SNX-F10 Plans Page
|
Details
|
|
|
06-20-2006
|
0.50
|
SNX-F10-07 Parts Built
|
Details
|
|
|
06-18-2006
|
3.00
|
Finished up SNX-F11
|
Details
|
|
|
06-17-2006
|
0.50
|
Installing Bolts in Fore/Aft Fuselage Splice Plate
|
Details
|
|
|
06-16-2006
|
2.00
|
Started Riveting of Forward Fuselage
|
Details
|
|
|
06-11-2006
|
3.00
|
Re-Assembly of Forward Fuselage
|
Details
|
|
|
06-10-2006
|
4.00
|
Cleaning and Priming Parts
|
Details
|
|
|
06-09-2006
|
0.50
|
Deburring
|
Details
|
|
|
06-02-2006
|
0.50
|
Deburring Forward Fuselage....Again.
|
Details
|
|
|
06-01-2006
|
1.50
|
Forward Fuselage Disassembly
|
Details
|
|
|
05-29-2006
|
2.00
|
Upper Firewall Installation
|
Details
|
|
|
05-28-2006
|
2.00
|
More SNX-F11 work
|
Details
|
|
|
05-28-2006
|
2.00
|
Continued work on Joining Forward and Aft Fuselage
|
Details
|
|
|
05-27-2006
|
4.00
|
Fuselage Box Assembly
|
Details
|
|
|
05-25-2006
|
1.50
|
Adding Forward Fuselage Sides to Aft Fuselage
|
Details
|
|
|
05-24-2006
|
2.00
|
Moved Aft Fuselage back into Garage
|
Details
|
|
|
05-22-2006
|
0.50
|
Continuing Shop Cleanup and Remodel
|
Details
|
|
|
05-21-2006
|
2.00
|
Cleaned up Shop
|
Details
|
|
|
05-20-2006
|
2.50
|
Forward Tunnel Zee, SNX-F16-02
|
Details
|
|
|
05-18-2006
|
1.50
|
Finished Firewall, SNX-F17
|
Details
|
|
|
05-17-2006
|
1.50
|
More Firewall Parts
|
Details
|
|
|
05-14-2006
|
1.00
|
Small Parts
|
Details
|
|
|
05-12-2006
|
2.00
|
Upper Firewall Riveting and Drilling
|
Details
|
|
|
05-10-2006
|
1.50
|
Upper Firewall Work
|
Details
|
|
|
05-09-2006
|
0.50
|
Started Firewall Work
|
Details
|
|
|
05-09-2006
|
0.50
|
Aft Tunnel Web Assembly, SNX-F16-03, Re-assembled
|
Details
|
|
|
05-08-2006
|
1.50
|
Priming Parts
|
Details
|
|
|
05-07-2006
|
4.00
|
Cleaning up SNX-F16 Parts and building Assemblies
|
Details
|
|
|
05-06-2006
|
4.00
|
Continued work on SNX-F16 parts
|
Details
|
|
|
05-05-2006
|
1.00
|
Cleaned up Yesterday's Parts
|
Details
|
|
|
05-04-2006
|
2.00
|
Misc Pieces from SNX-F16
|
Details
|
|
|
05-03-2006
|
1.00
|
SNX-F16-01 Lower Fwd Fuselage Floor Skin
|
Details
|
|
|
05-02-2006
|
0.50
|
SNX-F16-01 Fwd Fuselage Floor
|
Details
|
|
|
04-30-2006
|
1.00
|
Fwd Fuselage Skin Asseblies completed
|
Details
|
|
|
04-30-2006
|
3.00
|
Final Assembly of Right Fwd Fuselage Skin Assembly
|
Details
|
|
|
04-29-2006
|
3.00
|
Right Side Parts Primed
|
Details
|
|
|
04-28-2006
|
1.50
|
Disassembly of Right Fwd Fuselage Skin Assembly
|
Details
|
|
|
04-27-2006
|
1.00
|
All part installed on Right Fwd Fuselage Skin Asse
|
Details
|
|
|
04-26-2006
|
1.00
|
More Right Foward Fuselage Skin Assembly Work
|
Details
|
|
|
04-25-2006
|
1.50
|
Continued Adding Parts to Right Fwd Fuselage Assem
|
Details
|
|
|
04-24-2006
|
1.00
|
Begin Right Forward Fuselage Skin Assembly
|
Details
|
|
|
04-23-2006
|
3.00
|
Completed Left Forward Fuselage Skin Assembly
|
Details
|
|
|
04-22-2006
|
1.50
|
Priming Parts
|
Details
|
|
|
04-21-2006
|
1.50
|
Deburred Skin and Primed
|
Details
|
|
|
03-30-2006
|
1.00
|
Completed Drilling Left Skin Assembly
|
Details
|
|
|
03-29-2006
|
1.00
|
Left Forward Fuselage Skin Assembly
|
Details
|
|
|
03-27-2006
|
1.00
|
Continued Work on Left Fwd Fuselage Skin Assembly
|
Details
|
|
|
03-26-2006
|
4.00
|
Working on Left Side Fwd Fuselage Skin Assembly
|
Details
|
|
|
03-25-2006
|
3.00
|
Started the Forward Fuselage Side Skin Asseblies
|
Details
|
|
|
03-24-2006
|
2.50
|
Finished up SNX-F13
|
Details
|
|
|
03-23-2006
|
1.00
|
Lower Longerons, SNX-F13-06R/L
|
Details
|
|
|
03-22-2006
|
0.50
|
Canopy Latch Strike Plate, SNX-F13-04
|
Details
|
|
|
03-21-2006
|
1.00
|
Canopy Latch Strike Plate, SNX-F13-04
|
Details
|
|
|
03-19-2006
|
3.00
|
Complete Left and Right Upper Longeron
|
Details
|
|
|
03-18-2006
|
2.50
|
Started Fwd Fuselage Side Skins and Longerons
|
Details
|
|
|
03-12-2006
|
5.00
|
Finished parts on SNX-F14
|
Details
|
|
|
03-10-2006
|
1.50
|
Working on SNX-F14-08R/L
|
Details
|
|
|
03-05-2006
|
3.00
|
SNX-F14 Foward Fuselage Side Panel Work
|
Details
|
|
|
03-04-2006
|
3.00
|
Building SNX-F14-01R/L
|
Details
|
|
|
02-26-2006
|
2.00
|
Started Work on SNX-F14
|
Details
|
|
|
02-25-2006
|
2.00
|
Finishing up SNX-F15
|
Details
|
|
|
02-24-2006
|
1.00
|
Continued SNX-F15 Work
|
Details
|
|
|
02-23-2006
|
1.00
|
Finished SNX-F15-07 & SNX-F15-12
|
Details
|
|
|
02-22-2006
|
1.00
|
Cleaned up SNX-F15 parts
|
Details
|
|
|
01-18-2006
|
1.00
|
More SNX-F15 Work
|
Details
|
|
|
01-15-2006
|
1.50
|
More SNX-F15 Parts
|
Details
|
|
|
01-08-2006
|
3.00
|
Continued Work on SNX-F15
|
Details
|
|
|
01-07-2006
|
2.50
|
Upper and Lower Motor Mount Extrustion Work
|
Details
|
|
|
01-05-2006
|
1.00
|
Continued Work on Upper Motor Mounts
|
Details
|
|
|
01-04-2006
|
1.00
|
Started on Side Skin Assemblies
|
Details
|
|
|
12-09-2005
|
3.00
|
Complete Riveting of Aft Fuselage
|
Details
|
|
|
12-04-2005
|
2.50
|
Completed Deburring Left Turtle Desk
|
Details
|
|
|
12-01-2005
|
1.00
|
Deburring Turtle Deck
|
Details
|
|
|
11-26-2005
|
3.00
|
Installed Formers #2, #,3, and #4
|
Details
|
|
|
11-22-2005
|
2.50
|
Added Former #1 to Assembly
|
Details
|
|
|
11-20-2005
|
1.50
|
Installed Former #5 & Aft Clip
|
Details
|
|
|
11-19-2005
|
1.50
|
Drilling Turtle Deck
|
Details
|
|
|
11-16-2005
|
1.00
|
Placed Turtle Deck on Aft Fuselage Box
|
Details
|
|
|
11-14-2005
|
1.00
|
Completed Riveting of Turtle Deck Backbone
|
Details
|
|
|
11-13-2005
|
2.50
|
Turtle Deck Assembly Work
|
Details
|
|
|
10-29-2005
|
1.50
|
Small Piece Work for Turtledeck
|
Details
|
|
|
10-22-2005
|
3.00
|
Turtledeck work
|
Details
|
|
|
10-21-2005
|
1.50
|
More Turtle Deck Work
|
Details
|
|
|
10-20-2005
|
1.50
|
Deburring Turtledeck Formers
|
Details
|
|
|
10-14-2005
|
1.50
|
Completed Riveting Lower Aft Fuselage
|
Details
|
|
|
10-12-2005
|
1.00
|
Continued Lower Aft Fuselage Work
|
Details
|
|
|
10-11-2005
|
2.00
|
Deburring and riveting Lower Aft Fuselage
|
Details
|
|
|
10-10-2005
|
1.50
|
Riveting started on Lower Aft Fuselage
|
Details
|
|
|
10-09-2005
|
2.50
|
Drilling Finished on Lower Aft Fuselage
|
Details
|
|
|
10-08-2005
|
3.00
|
Continued work on Lower Aft Fuselage
|
Details
|
|
|
10-01-2005
|
0.00
|
ASA 2005 Trip
|
Details
|
|
|
09-27-2005
|
0.50
|
Aft Shear Web Assembly Drilling
|
Details
|
|
|
09-26-2005
|
1.00
|
Aft Fuselage work
|
Details
|
|
|
09-25-2005
|
3.50
|
Continued Aft Fuselage Work
|
Details
|
|
|
09-23-2005
|
1.00
|
More Aft Fuselage Work
|
Details
|
|
|
09-21-2005
|
0.50
|
More Aft Fuselage work
|
Details
|
|
|
09-20-2005
|
1.00
|
Adding Horizontal Channels to Aft Fuselage
|
Details
|
|
|
09-17-2005
|
3.50
|
Squaring up Aft Fuselage Box
|
Details
|
|
|
09-15-2005
|
1.50
|
Aft Fuselage Box
|
Details
|
|
|
09-09-2005
|
2.00
|
Finished up SNX-F25
|
Details
|
|
|
09-07-2005
|
1.00
|
Deburring Right Aft Fuselage Skin
|
Details
|
|
|
09-06-2005
|
1.00
|
Right Aft Fuselage Splice Plates
|
Details
|
|
|
09-05-2005
|
3.50
|
Attaching Vertical Channels to Aft Wing Skins
|
Details
|
|
|
09-02-2005
|
0.50
|
Aft Fuselage Side Skins
|
Details
|
|
|
08-31-2005
|
1.50
|
Right Aft Fuselage Skin and Longerons
|
Details
|
|
|
08-30-2005
|
1.00
|
Attaching Left Longerons to Side Skins
|
Details
|
|
|
08-29-2005
|
1.00
|
Started on Left Aft Fuselage Side
|
Details
|
|
|
08-26-2005
|
1.50
|
Completed SNX-F26
|
Details
|
|
|
08-24-2005
|
1.00
|
Rudder Stops, SNX-F27-08
|
Details
|
|
|
08-21-2005
|
3.00
|
Started Work on SNX-F26
|
Details
|
|
|
08-20-2005
|
3.00
|
Finished up SNX-F27 Plans Page
|
Details
|
|
|
08-19-2005
|
1.50
|
Drilled Large Holes in Aft Vertical Channels
|
Details
|
|
|
08-18-2005
|
1.00
|
Aft Fuselage Channel Drilling
|
Details
|
|
|
08-17-2005
|
2.50
|
Cutting Vertical Channels to Shape
|
Details
|
|
|
08-15-2005
|
1.00
|
More SNX-F27 Vertical Channel work
|
Details
|
|
|
08-14-2005
|
2.00
|
Contiued work on SNX-F27 Vertical Channels
|
Details
|
|
|
08-13-2005
|
1.50
|
Start SNX-F27 Page
|
Details
|
|
|
08-06-2005
|
3.00
|
Completed SNX-F22
|
Details
|
|
|
08-05-2005
|
1.00
|
Aft Shear Web Assembly parts
|
Details
|
|
|
07-24-2005
|
6.00
|
Finished SNX-F23
|
Details
|
|
|
07-23-2005
|
2.00
|
Misc Aft Fuselage Assemblies & Parts
|
Details
|
|
|
07-21-2005
|
1.50
|
SNX-F23-02 Bulkhead
|
Details
|
|
|
07-20-2005
|
1.00
|
Misc Aft Fuselage Parts
|
Details
|
|
|
07-19-2005
|
1.50
|
Started Aft Fuselauge Misc Details Page
|
Details
|
|
|
07-14-2005
|
2.50
|
Completed SNX-F24 Aft Fuselage Cross Ties
|
Details
|
|
|
07-13-2005
|
1.50
|
Finished Aft Fuselage Cross Tie pieces
|
Details
|
|
|
07-12-2005
|
1.00
|
Upper Fuselage Cross Ties
|
Details
|
|
|
07-11-2005
|
1.50
|
Fuselage Cross Ties
|
Details
|
|
|
06-27-2005
|
1.00
|
Aft Fuselage Cross Ties
|
Details
|
|
|
06-26-2005
|
2.00
|
Fuselage Cross Ties
|
Details
|
|
|
05-23-2005
|
1.00
|
Hanging Left Wing in Storage Location
|
Details
|
|
|
05-22-2005
|
1.00
|
Completed Riveting and Wingtip
|
Details
|
|
|
05-21-2005
|
1.00
|
Left Wing Bottom Riveting
|
Details
|
|
|
05-20-2005
|
1.50
|
Left Top Leading Edge Riveting
|
Details
|
|
|
05-19-2005
|
1.50
|
Top Aft Skin Riveting
|
Details
|
|
|
05-18-2005
|
1.00
|
Wiring Conduit
|
Details
|
|
|
05-17-2005
|
2.00
|
Left Wing Reassembly
|
Details
|
|
|
05-16-2005
|
1.50
|
Left Wing Work
|
Details
|
|
|
05-10-2005
|
1.50
|
Deburring/Dimpling Left Leading Edge
|
Details
|
|
|
05-09-2005
|
1.50
|
Left Wing Deburring & Dimpling
|
Details
|
|
|
05-08-2005
|
2.50
|
Left Wing Disassembly
|
Details
|
|
|
05-07-2005
|
3.50
|
Left Wing Work
|
Details
|
|
|
04-30-2005
|
2.50
|
Left Leading Edge Wing Skin
|
Details
|
|
|
04-29-2005
|
1.00
|
Left Bottom Leading Edge Drilling
|
Details
|
|
|
04-27-2005
|
1.00
|
Left Leading Edge Skin
|
Details
|
|
|
04-26-2005
|
1.00
|
Flap Hinge Installation
|
Details
|
|
|
04-25-2005
|
4.00
|
Left Wing Bottom Aft Skin
|
Details
|
|
|
04-21-2005
|
1.00
|
Flip Left Wing
|
Details
|
|
|
04-20-2005
|
1.00
|
Left Wing Aileron Hinge
|
Details
|
|
|
04-10-2005
|
2.00
|
Left Top Aft Wing Skin Drilling
|
Details
|
|
|
04-09-2005
|
2.00
|
Drilling Left Wing Skin
|
Details
|
|
|
04-04-2005
|
1.00
|
Leveling Wing Assembly
|
Details
|
|
|
04-03-2005
|
2.00
|
Left Root Ribs Installed
|
Details
|
|
|
04-02-2005
|
2.50
|
Left Root Rib Installation
|
Details
|
|
|
03-31-2005
|
0.50
|
Root Ribs
|
Details
|
|
|
03-30-2005
|
1.00
|
Root Rib Support Brackets
|
Details
|
|
|
03-29-2005
|
1.50
|
Root Ribs
|
Details
|
|
|
03-28-2005
|
4.00
|
Left Wing Skeleton Complete
|
Details
|
|
|
03-23-2005
|
1.00
|
Left Wing Skeleton
|
Details
|
|
|
03-22-2005
|
1.00
|
Left Wing Work
|
Details
|
|
|
03-21-2005
|
1.50
|
Left Wing Start
|
Details
|
|
|
02-20-2005
|
2.00
|
Store Right Wing in Shed
|
Details
|
|
|
02-15-2005
|
2.50
|
Finishing up Right Wing
|
Details
|
|
|
02-14-2005
|
1.50
|
Completed riveting the Right Wing
|
Details
|
|
|
02-13-2005
|
4.00
|
Riveting Right Wing
|
Details
|
|
|
02-12-2005
|
4.00
|
Riveting Wings
|
Details
|
|
|
02-11-2005
|
2.00
|
Deburring Right Wing
|
Details
|
|
|
02-09-2005
|
1.00
|
Dimpling Leading Edge Ribs
|
Details
|
|
|
02-08-2005
|
1.00
|
Right Wing Dimpling and Priming
|
Details
|
|
|
02-07-2005
|
4.00
|
Right Wing Work
|
Details
|
|
|
02-06-2005
|
4.00
|
Right Wing Dis-assembly
|
Details
|
|
|
02-05-2005
|
3.50
|
Right Wing Dis-assembly
|
Details
|
|
|
02-02-2005
|
1.00
|
Deburring Wing Skin
|
Details
|
|
|
02-01-2005
|
2.00
|
Right Wing Finish Drilling
|
Details
|
|
|
01-30-2005
|
2.00
|
Root Doubler & Wing Tip
|
Details
|
|
|
01-29-2005
|
4.00
|
Right Wing Tip and Flap Hinge
|
Details
|
|
|
01-28-2005
|
1.50
|
Drilling Right Wing Skin
|
Details
|
|
|
01-24-2005
|
5.00
|
Misc Wing Work
|
Details
|
|
|
01-21-2005
|
1.00
|
Right Wing Drilling
|
Details
|
|
|
01-20-2005
|
2.50
|
Right Wing Assembly
|
Details
|
|
|
01-17-2005
|
1.50
|
Drilling Right Wing
|
Details
|
|
|
01-16-2005
|
2.50
|
Drilling Top Right Wing Skin
|
Details
|
|
|
01-15-2005
|
2.00
|
Leveling Right Wing for Top Skin
|
Details
|
|
|
01-13-2005
|
1.50
|
Right Wing Assemblyi
|
Details
|
|
|
01-10-2005
|
1.50
|
Right Wing Assembly
|
Details
|
|
|
12-19-2004
|
2.00
|
Root Rib Install
|
Details
|
|
|
12-18-2004
|
3.00
|
Riveting Right Wing Ribs
|
Details
|
|
|
12-17-2004
|
4.00
|
Root Rib Installation on Right Wing
|
Details
|
|
|
12-14-2004
|
1.00
|
Right Root Rib Reinforcement Brackets
|
Details
|
|
|
12-13-2004
|
1.00
|
Root Rib Work
|
Details
|
|
|
12-13-2004
|
1.00
|
Main Wing Ribs
|
Details
|
|
|
12-11-2004
|
1.50
|
Rib Installation
|
Details
|
|
|
12-10-2004
|
1.00
|
Pitot Tubing Support Assemblies
|
Details
|
|
|
12-10-2004
|
3.00
|
Attaching Ribs to Right Spar
|
Details
|
|
|
12-08-2004
|
1.00
|
Pitot / Static Tube Assembly
|
Details
|
|
|
12-07-2004
|
0.50
|
Pitot/Static Mount Plate
|
Details
|
|
|
12-05-2004
|
1.50
|
Pitot Static System
|
Details
|
|
|
12-05-2004
|
3.00
|
Aileron Bellcrank Rib Assembly
|
Details
|
|
|
12-04-2004
|
2.50
|
Aileron Bellcrank Assembly
|
Details
|
|
|
12-03-2004
|
1.50
|
Aileron Bellcrank Work
|
Details
|
|
|
11-30-2004
|
1.50
|
SNX-W21-09 Clips
|
Details
|
|
|
11-29-2004
|
1.50
|
More Bell Crank Assembly Work
|
Details
|
|
|
11-26-2004
|
4.00
|
Bell Crank Assembly Work
|
Details
|
|
|
11-23-2004
|
4.00
|
More Aft Rib Work
|
Details
|
|
|
11-22-2004
|
4.00
|
Aft Rib Work
|
Details
|
|
|
11-21-2004
|
1.00
|
Gussets
|
Details
|
|
|
11-20-2004
|
1.00
|
Gusset Blanks
|
Details
|
|
|
11-19-2004
|
1.50
|
Forward Ribs
|
Details
|
|
|
11-18-2004
|
2.00
|
Forward Ribs
|
Details
|
|
|
11-17-2004
|
1.00
|
Forward Wing Ribs
|
Details
|
|
|
11-16-2004
|
1.00
|
Forward Rib Gussets
|
Details
|
|
|
11-15-2004
|
2.00
|
Rib Attach Gussets
|
Details
|
|
|
11-14-2004
|
4.00
|
Forward Ribs and Gussets
|
Details
|
|
|
11-13-2004
|
2.00
|
Completed Rear Spars SNX-W12-01L/R
|
Details
|
|
|
11-12-2004
|
3.00
|
Left Rear Spar
|
Details
|
|
|
11-11-2004
|
2.00
|
Right Rear Spar Assembly
|
Details
|
|
|
11-04-2004
|
1.00
|
Completed Splice Plates
|
Details
|
|
|
11-03-2004
|
1.00
|
Rear Spar Splice
|
Details
|
|
|
11-02-2004
|
2.50
|
Rear Spar Channels
|
Details
|
|
|
10-31-2004
|
2.00
|
Outboard Rear Spar Channels
|
Details
|
|
|
10-30-2004
|
0.50
|
SNX-W13-04 Tip Rib Attach Angle
|
Details
|
|
|
10-29-2004
|
2.50
|
Rear Spar Parts
|
Details
|
|
|
10-28-2004
|
1.00
|
Left Hand Root Rib Attach Angle
|
Details
|
|
|
10-27-2004
|
1.50
|
Rear Spar Parts
|
Details
|
|
|
10-25-2004
|
2.50
|
Aligned and drilled Spars Together
|
Details
|
|
|
10-23-2004
|
0.50
|
Crossville, TN Sonex Flying
|
Details
|
|
|
10-19-2004
|
2.00
|
Completed Left Main Spar
|
Details
|
|
|
10-17-2004
|
2.00
|
Continue to Rivet Left Main Spar
|
Details
|
|
|
10-16-2004
|
3.00
|
Riveting Left Main Spar
|
Details
|
|
|
10-13-2004
|
1.00
|
Assembled Left Main Spar
|
Details
|
|
|
10-12-2004
|
0.50
|
Primed Left Main Spar
|
Details
|
|
|
10-10-2004
|
4.00
|
Dimple and Countersink Left Main Spar
|
Details
|
|
|
10-04-2004
|
1.00
|
Deburring pieces for spar
|
Details
|
|
|
09-22-2004
|
1.00
|
Taking Spar Apart
|
Details
|
|
|
09-21-2004
|
2.50
|
Left Main Spar
|
Details
|
|
|
09-16-2004
|
1.00
|
Left Spar Work
|
Details
|
|
|
09-14-2004
|
1.50
|
Left Wing Spar Work
|
Details
|
|
|
09-12-2004
|
2.00
|
Drilling Spars
|
Details
|
|
|
09-11-2004
|
3.00
|
Left Spar Work
|
Details
|
|
|
09-02-2004
|
0.50
|
Received SNX-W10-02 from Sonex LTD
|
Details
|
|
|
08-22-2004
|
1.50
|
Started on Left Main Spar
|
Details
|
|
|
08-21-2004
|
3.50
|
Finished Right Main Spar
|
Details
|
|
|
08-19-2004
|
2.00
|
Right Main Spar Work
|
Details
|
|
|
08-18-2004
|
1.50
|
Right Main Spar
|
Details
|
|
|
08-17-2004
|
1.00
|
Right Mian Spar
|
Details
|
|
|
08-16-2004
|
1.00
|
Continue to Drive Rivets
|
Details
|
|
|
08-15-2004
|
2.00
|
Driving More Rivets
|
Details
|
|
|
08-14-2004
|
3.50
|
Riveting Right Spar
|
Details
|
|
|
08-10-2004
|
1.50
|
Re-Assembling Right Main Spar
|
Details
|
|
|
08-01-2004
|
2.50
|
Countersinking Right Spar
|
Details
|
|
|
07-31-2004
|
3.50
|
Dimpling & Countersinking Right Spar
|
Details
|
|
|
07-27-2004
|
1.50
|
Deburring Right Main Spar
|
Details
|
|
|
07-26-2004
|
1.50
|
Finished Drilling of Right Main Spar
|
Details
|
|
|
07-18-2004
|
2.00
|
Working on Main Spar
|
Details
|
|
|
07-17-2004
|
2.00
|
Main Spar Work
|
Details
|
|
|
07-10-2004
|
4.00
|
Drilling Spars
|
Details
|
|
|
06-22-2004
|
1.50
|
Root Rib Attach Angle
|
Details
|
|
|
06-11-2004
|
1.50
|
Root Attach Angles
|
Details
|
|
|
06-09-2004
|
1.00
|
Root Attach Angle
|
Details
|
|
|
06-08-2004
|
1.00
|
Wing Spar Assembly
|
Details
|
|
|
06-03-2004
|
0.50
|
Spar Cap
|
Details
|
|
|
06-03-2004
|
1.00
|
Deburred Spar Web parts
|
Details
|
|
|
05-31-2004
|
5.00
|
Main Spar Webs
|
Details
|
|
|
05-10-2004
|
1.50
|
Completed SNX-W11 Plans Page
|
Details
|
|
|
05-06-2004
|
1.00
|
New SNX-W11-03 Completed
|
Details
|
|
|
04-26-2004
|
1.00
|
Wing Attach Blocks
|
Details
|
|
|
04-25-2004
|
6.00
|
Building Spar Parts
|
Details
|
|
|
04-22-2004
|
1.00
|
Completed SNX-W11-01 parts
|
Details
|
|
|
04-21-2004
|
0.50
|
SNX-W11-01 Part #2
|
Details
|
|
|
04-18-2004
|
1.50
|
SNX-W11-03 Wing Attach Blocks
|
Details
|
|
|
04-13-2004
|
1.50
|
Spar Parts
|
Details
|
|
|
04-10-2004
|
2.00
|
Started Spar Parts
|
Details
|
|
|
03-29-2004
|
1.50
|
Finished Second Flap
|
Details
|
|
|
03-27-2004
|
4.00
|
Flap Assembly
|
Details
|
|
|
03-26-2004
|
1.50
|
Working on Flaps
|
Details
|
|
|
03-25-2004
|
2.00
|
Working on Flaps
|
Details
|
|
|
03-24-2004
|
1.00
|
Prepare Flap Skin
|
Details
|
|
|
03-21-2004
|
1.00
|
Finished Second Aileron
|
Details
|
|
|
03-20-2004
|
4.00
|
Second Aileron Work
|
Details
|
|
|
03-16-2004
|
2.50
|
Completed First Aileron
|
Details
|
|
|
03-15-2004
|
1.50
|
Installed First Aileron Tip Rib
|
Details
|
|
|
03-14-2004
|
3.00
|
Build new Aileron Tip Ribs
|
Details
|
|
|
03-13-2004
|
2.00
|
Aileron Assembly
|
Details
|
|
|
03-09-2004
|
2.00
|
Aileron Work
|
Details
|
|
|
03-08-2004
|
2.00
|
Aileron Counterweight Assembly
|
Details
|
|
|
03-07-2004
|
2.00
|
Aileron Counterbalance Assembly
|
Details
|
|
|
03-05-2004
|
1.50
|
Aileron Assembly
|
Details
|
|
|
03-04-2004
|
1.50
|
Cut Aileron Skin and Hinge Half
|
Details
|
|
|
03-03-2004
|
1.50
|
Aileron Skins
|
Details
|
|
|
02-29-2004
|
2.00
|
Working on Aileron
|
Details
|
|
|
02-28-2004
|
3.00
|
Building Aileron Parts
|
Details
|
|
|
02-27-2004
|
2.00
|
Started Work on Ailerons
|
Details
|
|
|
02-22-2004
|
3.00
|
Wing Cut Incorrectly
|
Details
|
|
|
02-21-2004
|
3.00
|
Flap Assembly
|
Details
|
|
|
02-20-2004
|
3.00
|
Finished Flap Parts
|
Details
|
|
|
02-20-2004
|
1.00
|
Drilling Flaps Ribs
|
Details
|
|
|
02-17-2004
|
1.50
|
Flap Hinge Half
|
Details
|
|
|
02-16-2004
|
1.00
|
Started Working on Flaps
|
Details
|
|
|
02-15-2004
|
3.00
|
Finished Installing Horizontal Tail Tips
|
Details
|
|
|
02-14-2004
|
3.00
|
Working on Fiberglass Tail Tips
|
Details
|
|
|
02-09-2004
|
1.00
|
Working on Fiberglass Tail Tips
|
Details
|
|
|
02-08-2004
|
2.00
|
Working on Fiberglass Tail Tips
|
Details
|
|
|
02-07-2004
|
2.00
|
Working on Fiberglass Tail Tips
|
Details
|
|
|
02-03-2004
|
1.00
|
Working on Tail Tips Mounts
|
Details
|
|
|
02-02-2004
|
1.00
|
Tail Tip Installation Work
|
Details
|
|
|
01-29-2004
|
1.50
|
Installation of Elevator Horn Assembly
|
Details
|
|
|
01-28-2004
|
1.50
|
Rebuilt Elevator Horn Assembly
|
Details
|
|
|
01-26-2004
|
2.00
|
Working on Tail Tips
|
Details
|
|
|
01-24-2004
|
3.00
|
Removing Elevator Horn Rivets
|
Details
|
|
|
01-21-2004
|
3.00
|
Assembly & Attachment of Elevators
|
Details
|
|
|
01-17-2004
|
3.00
|
Elevator Work
|
Details
|
|
|
01-14-2004
|
2.00
|
Final Riveting of Horiz Stab. & Misc.
|
Details
|
|
|
01-13-2004
|
1.00
|
Drilled Elevator Horn
|
Details
|
|
|
01-10-2004
|
2.00
|
Various Horiz Stab Tasks
|
Details
|
|
|
01-08-2004
|
1.50
|
Drilled and Clecoed Top Skin of HS
|
Details
|
|
|
01-07-2004
|
0.50
|
Riveted Bottom Horiz Stab Skin
|
Details
|
|
|
01-06-2004
|
1.50
|
Skinning Horizontal Stabilizer
|
Details
|
|
|
12-20-2003
|
3.00
|
Finished One Horiz Stab
|
Details
|
|
|
12-19-2003
|
3.00
|
Installing Horizontal Stab. Skin
|
Details
|
|
|
12-17-2003
|
2.00
|
Riveting framework for Horizontal Stab
|
Details
|
|
|
12-16-2003
|
2.00
|
Building Horizontal Stabilizer Assembly
|
Details
|
|
|
12-14-2003
|
3.00
|
Horiz Stabilizer Forward Spar Assembly
|
Details
|
|
|
12-13-2003
|
3.00
|
Horiz Stabilizer Main Spar Assembly
|
Details
|
|
|
12-09-2003
|
2.00
|
Horizontal Tail Spar Channels
|
Details
|
|
|
12-07-2003
|
4.00
|
Horizontal Main Spar Fitting
|
Details
|
|
|
12-06-2003
|
4.00
|
Building SNX-T03-02 Main Spar
|
Details
|
|
|
11-30-2003
|
3.00
|
Finished Horizontal Stabilizer Ribs
|
Details
|
|
|
11-29-2003
|
3.00
|
Working on Horizontal Ribs
|
Details
|
|
|
11-28-2003
|
3.00
|
Finishing the Forward Spar Fitting
|
Details
|
|
|
11-26-2003
|
3.00
|
Continued Contruction of SNX-T06-03
|
Details
|
|
|
11-25-2003
|
3.00
|
Building Parts for Horizontal Stabilizer
|
Details
|
|
|
11-19-2003
|
1.00
|
Horizontal Stabilizer Misc Details
|
Details
|
|
|
11-16-2003
|
3.00
|
Finished working on page SNX-T07
|
Details
|
|
|
11-15-2003
|
2.00
|
Started Work on Elevator Parts
|
Details
|
|
|
11-07-2003
|
2.00
|
Tail Tip Modifications
|
Details
|
|
|
11-06-2003
|
2.00
|
Vertical Stabilizer Work
|
Details
|
|
|
11-05-2003
|
2.50
|
Riveting Rudder & Vertical Stab.
|
Details
|
|
|
11-02-2003
|
4.00
|
Rudder Ribs and Painting
|
Details
|
|
|
10-31-2003
|
4.00
|
Deburred and Primed Vertical Stab.
|
Details
|
|
|
10-30-2003
|
2.00
|
Finished Drilling Vertical Stab
|
Details
|
|
|
10-29-2003
|
2.50
|
Attaching Tail Wing Skin
|
Details
|
|
|
10-28-2003
|
2.50
|
Assembled Vertical Tail Frame
|
Details
|
|
|
10-27-2003
|
1.00
|
Alodine of Tail Parts
|
Details
|
|
|
10-26-2003
|
3.00
|
Assembly of Vertical Tail Assembly
|
Details
|
|
|
10-25-2003
|
4.00
|
Vertical Tail Spar Assemblies
|
Details
|
|
|
10-23-2003
|
1.50
|
Finished Parts on SNX-T10
|
Details
|
|
|
10-22-2003
|
1.50
|
Started Work on Vert. Tail Ribs
|
Details
|
|
|
10-22-2003
|
1.00
|
Pilot Drill and Deburr Vert Tail Skin
|
Details
|
|
|
10-22-2003
|
1.50
|
Completed Misc Parts for Vertical Tail
|
Details
|
|
|
10-17-2003
|
0.50
|
SNX-T12-07 Forward Spar Fitting
|
Details
|
|
|
10-16-2003
|
1.50
|
Conitinued Work on SNX-T12
|
Details
|
|
|
10-15-2003
|
1.00
|
Remade SNX-T12-05
|
Details
|
|
|
10-14-2003
|
1.50
|
Continued Work on SNX-T12 parts
|
Details
|
|
|
10-12-2003
|
3.00
|
Continued work on SNX-T12
|
Details
|
|
|
10-11-2003
|
0.50
|
Started work on SNX-T12
|
Details
|
|
|
10-11-2003
|
1.00
|
Finshed Drilling Rudder Hinge
|
Details
|
|
|
10-10-2003
|
2.00
|
Rudder Skin Prep Work
|
Details
|
|
|
10-09-2003
|
2.00
|
Finish Rudder Horn Assembly
|
Details
|
|
|
10-08-2003
|
2.00
|
Rudder Assemblies
|
Details
|
|