KitLog pro

Powered By Kitlog Pro v2.0

Anthonys Web Site
Work Logs Found: 470
Category Work Time: 1312 Hours
 Date
Hours
Work Log Summary

Details

 01-03-2013
4.00
oil door
Details

 01-02-2013
4.00
oil door
Details

 01-01-2013
1.00
trim system
Details

 01-01-2013
2.00
Skirt
Details

 01-01-2013
1.00
audio panel wiring
Details

 12-31-2012
2.00
trim motor wiring
Details

 12-31-2012
2.00
skirt
Details

 12-31-2012
1.00
correcting wiring at the audio panel connectors
Details

 12-30-2012
3.00
skirt
Details

 12-29-2012
5.00
Skirt
Details

 12-27-2012
3.50
skirt - trimming and fitting
Details

 11-02-2012
1.50
auto pilot pitch servo mount
Details

 11-01-2012
1.50
fitting the skirt
Details

 11-01-2012
0.50
changed crystals in dehumidifing system
Details

 11-01-2012
2.00
auto pilot pitch servo
Details

 10-24-2012
2.00
skirt - refitted port side
Details

 10-22-2012
2.00
skirt - port - remove and fill existing holes
Details

 10-18-2012
1.00
trim tab wiring
Details

 10-18-2012
2.20
Skirt
Details

 10-16-2012
0.50
trim tab wiring
Details

 10-16-2012
2.00
canopy skirt
Details

 10-15-2012
6.00
Drilling elevator horns to airframe, setting trave
Details

 10-11-2012
3.50
Drilled Skirt to canopy frame
Details

 10-10-2012
3.00
trial fitted elevators - trim motor wiring
Details

 10-10-2012
1.00
drilling canpoy starboard canopy skirt
Details

 10-03-2012
2.00
Trim tab wiring
Details

 10-02-2012
0.40
remove electric trim motor from elevator
Details

 09-30-2012
1.00
canopy skirt
Details

 09-30-2012
6.00
attached vertical stab
Details

 09-29-2012
5.00
Installed horizontal stab
Details

 09-29-2012
1.50
flap positioning system drop down tray plate nut
Details

 09-29-2012
1.50
began fitting the skirt
Details

 09-28-2012
1.50
preparing to bolt the HS and VS on the airframe
Details

 09-28-2012
1.50
drop down tray for FPS, installing nutplate
Details

 09-22-2012
2.00
remote compass tray
Details

 09-22-2012
5.00
empennage attachment prep
Details

 09-14-2012
2.00
Deck for remote magnotmeters
Details

 09-14-2012
3.00
Attachement of Vertical and Horizontal stabs
Details

 09-13-2012
15.00
moved fuse blocks behind panel
Details

 09-13-2012
1.50
fitting the VS and HS
Details

 09-09-2012
5.00
ICOM radio and radio test
Details

 09-08-2012
5.00
move to airport
Details

 08-30-2012
1.50
SL30 problem and clock wiring
Details

 08-29-2012
2.50
radios
Details

 08-28-2012
2.00
radios-air switch- dehydrator plugs
Details

 08-27-2012
1.50
D6 audio - 396 audio - co pilot ptt
Details

 08-26-2012
2.00
marker beacon ant - mic and headphone jacks - musi
Details

 08-23-2012
2.00
marker beacon antenna
Details

 08-19-2012
2.00
marker beacon ant wiring
Details

 08-18-2012
2.00
audio panel wiring - grt efis audio
Details

 08-17-2012
4.00
audio panel wiring
Details

 08-16-2012
3.50
D6 audio and GRT audio wiring - pitot static syste
Details

 07-31-2012
1.00
wiring Sport and D6 audio
Details

 07-31-2012
0.50
airswtich
Details

 07-30-2012
1.00
garmin 396 connection to audio panel
Details

 07-29-2012
2.50
gps 396 cable wiring to audio panel - air switch
Details

 07-28-2012
5.00
air switch - pitot static - audio panel
Details

 07-27-2012
2.00
audio panel - music wiring- 396 audio wiring-alt s
Details

 07-27-2012
1.00
alternate static air
Details

 07-24-2012
2.50
lighting
Details

 07-22-2012
2.50
marker beacon ant - music jack circuit
Details

 07-22-2012
2.70
install music plug - secure audio panel connectors
Details

 07-20-2012
1.00
marker beacon antenna
Details

 07-15-2012
2.00
set transponder interface w GRT Sport
Details

 07-11-2012
3.00
configuring Sport EFIS and interfaces
Details
       

 07-10-2012
3.20
finish PTT wiring - program GRT EFIS
Details
       

 07-09-2012
2.70
PTT circuits - audio panel wiring fix
Details

 07-05-2012
5.00
PTT wiring
Details

 07-04-2012
1.50
Icom backlighing, dimmer circuit, SL30 failed
Details

 07-03-2012
3.00
complete transponder installation
Details

 07-02-2012
3.00
radio check-xponder-map lights
Details

 06-25-2012
2.00
wired clock to battery - confirmed fuseblock conne
Details

 06-24-2012
7.00
wiring clock/gmeter
Details
       

 06-23-2012
4.00
wired starter circuit
Details

 06-23-2012
3.00
sired D6 PC and GPS connections - tested radios
Details
       

 06-22-2012
1.50
testing radios
Details

 06-22-2012
0.50
starter circuit wiring
Details

 06-15-2012
2.50
D6 GPS and PC connector
Details
     

 06-14-2012
2.50
D6 wiring
Details
       

 06-13-2012
2.00
BU Batt wire - G meter
Details
     

 06-12-2012
5.00
finish bu battery wiring - troubleshoot stick wiri
Details

 05-31-2012
2.50
Wiring AP to GRT EFIS - check other wiring
Details

 05-30-2012
4.50
auto pilot wiring - identify loose wires
Details
       

 05-29-2012
5.50
bu battery - autopilot wiring - gps tray
Details
       

 05-28-2012
4.00
Back up Battery wiring
Details

 05-26-2012
0.50
LS30 testing
Details

 05-25-2012
3.50
SL30 testing - transponder ant - bu batt wiring
Details
       

 05-20-2012
5.00
SL30-GRT EFIS-GPS antenna tray
Details
       

 05-16-2012
1.00
wiring backup battery
Details
     

 05-16-2012
2.50
antenna installation, antenna connectors
Details

 05-15-2012
2.00
GRT Sport wiring - test
Details

 05-15-2012
2.00
aux battery
Details

 04-19-2012
1.50
Garmin 396 wiring and GPS tray
Details

 04-17-2012
2.00
Com antenna mounting holes
Details
       

 04-16-2012
5.00
GRT removed for return, ICOM powered up etc
Details
     

 04-15-2012
3.00
Powering up the avionics
Details

 04-13-2012
2.00
ICOM wiring
Details

 04-03-2012
3.50
ICOM wiring
Details

 04-02-2012
3.00
ICOM radio wiring
Details

 03-22-2012
1.50
ICOM radio wiring + dissident plugs
Details

 03-20-2012
1.00
ICOM wiring
Details

 03-19-2012
1.00
ICOM radio connections
Details

 03-16-2012
1.00
wiring ICOM radio
Details

 03-13-2012
1.00
wiring ICOM radio
Details

 02-07-2012
1.50
Cleaned bench sorted items
Details

 11-08-2011
3.50
auto pilot wiring - boost pump wiring - dimmer wir
Details

 11-07-2011
3.50
switches - auto pilot wiring
Details

 11-06-2011
4.00
transponder antenna - clock - avionics lighting
Details

 11-06-2011
3.00
panel switches and wiring
Details

 11-05-2011
8.00
dimmer-clock
Details

 11-03-2011
4.00
PTT-audio panel-ampmeter-bu battery
Details

 11-02-2011
0.30
clock - G meter
Details

 11-01-2011
4.50
audio panel, backup batt, EIS
Details

 10-31-2011
3.00
Wiring big red light and ampmeter sensor
Details

 10-27-2011
6.00
transponder and Com 2 antenna
Details

 10-25-2011
2.50
radio stack wiring complete except antennas
Details

 10-22-2011
1.00
swap connection.
Details

 10-21-2011
1.00
wiring
Details

 10-20-2011
4.00
wiring swap and flip flop functions
Details

 10-18-2011
5.00
audio panel wiring...auto pilot install
Details
       

 10-13-2011
9.00
auto pilot, mic and phone jacks
Details
     

 10-12-2011
9.00
wiring remote compasses, last ground, etc
Details

 10-11-2011
7.00
completed power and ground connections
Details
       

 10-10-2011
6.00
avionics ground block replaced, power and ground c
Details

 10-09-2011
5.00
Attach carbon fiber to panel front, drill holes
Details
       

 10-08-2011
5.00
Antenna wiring
Details
       

 10-07-2011
3.00
antenna cable runs
Details
     

 10-06-2011
4.00
Panel fitting, antenna cable connectors
Details
     

 10-04-2011
4.00
mount clock in panel, design antenna wiring plan
Details
       

 10-03-2011
4.00
antenna placement planning, clock
Details

 09-27-2011
3.00
magnometer mounting - determined
Details

 09-26-2011
3.00
remote compass wiring
Details

 09-14-2011
2.00
backup power to grt sport and Dynon D6
Details

 09-13-2011
5.00
finished ICOM wiring, finished transponder,
Details

 09-12-2011
2.50
Avionics wiring D6 gps to EFIS
Details

 08-11-2011
6.00
wiring, labeling, planning D6
Details
       

 08-10-2011
6.50
avionics wiring
Details
     

 08-09-2011
4.00
re wiring ICOM radio
Details

 08-08-2011
4.00
wiring ICOMM radio and GRT Sport
Details
       

 08-07-2011
4.00
wiring ICOM A200 radio
Details
       

 08-04-2011
4.00
wiring audio panel to SL 30
Details
     

 08-03-2011
6.00
avionics wiring
Details
     

 08-02-2011
5.00
Completed air gizmo install, planned avionics pino
Details

 07-27-2011
4.00
installing the radio stack
Details

 07-25-2011
4.00
test fitting radios in racks in panel
Details
     

 07-21-2011
3.00
planning connections and fitting radios
Details

 07-21-2011
2.00
fitting radio stack riveting nutplates
Details
       

 07-21-2011
0.50
Actually finishing the metal work on the panel
Details

 07-20-2011
4.00
finished the metal work on the panel
Details

 07-19-2011
4.00
mounting radio stack
Details
       

 07-18-2011
5.00
planning
Details

 07-16-2011
10.00
planning
Details

 07-14-2011
5.00
planning
Details

 07-14-2011
5.00
nutplates - support angles - countersinking
Details

 07-12-2011
5.00
cutout for radio stack - angle braces - dynon
Details
       

 07-11-2011
3.00
cutting panel fitting GRT sport
Details
       

 07-07-2011
3.00
panel design and layout
Details

 06-29-2011
3.00
Panel layout
Details
       

 06-28-2011
1.00
panel layout
Details

 06-28-2011
2.00
FPS position indicators
Details

 06-27-2011
2.00
FPS trim relay wiring
Details

 06-24-2011
10.50
FPS - flaps - trim
Details

 06-23-2011
3.00
FPS relay
Details

 06-22-2011
2.50
FPS and AP
Details

 06-21-2011
3.00
FPS
Details

 06-16-2011
2.00
FPS
Details

 06-15-2011
5.50
FPS
Details

 06-14-2011
5.50
warning lights finished - FPS
Details

 06-13-2011
0.50
warning light switch
Details

 06-13-2011
1.00
finished the snout extension
Details

 06-12-2011
1.50
warning lights
Details

 06-08-2011
3.00
snout fiberglass
Details

 06-02-2011
4.00
wiring, avionics circuits
Details

 06-01-2011
5.00
wiring
Details

 05-27-2011
3.00
EIS wiring and power distribution
Details

 05-27-2011
4.00
checked wiring, wired boost pump relay
Details

 05-26-2011
3.00
warning lights and breakers
Details

 05-24-2011
3.50
warning lights
Details

 05-24-2011
0.50
FAB
Details

 05-24-2011
2.00
EIS wiring
Details

 05-20-2011
1.00
wiring
Details

 05-19-2011
1.00
wiring
Details

 05-18-2011
2.00
EIS wiring
Details

 05-17-2011
3.00
wiring, alt field, tach switch, mock panel
Details
       

 05-12-2011
3.00
Wiring..alt..e/p mags
Details

 05-11-2011
2.50
EIS wiring
Details
       

 05-10-2011
4.00
EIS wiring
Details
     

 05-07-2011
2.00
E/Pmag wiring
Details

 05-06-2011
5.00
Emag and Pmag wiring
Details

 05-05-2011
2.00
EIS wiring
Details

 05-04-2011
3.50
EIS wiring
Details

 05-02-2011
2.50
EIS wiring
Details

 04-28-2011
4.00
EIS wiring
Details

 04-27-2011
5.00
EIS wiring
Details
     

 04-26-2011
1.00
panel desgin
Details

 04-26-2011
1.00
EIS wiring
Details

 04-26-2011
1.00
cleaned and organized shop
Details

 04-20-2011
2.00
EIS wiring spark plug wiring
Details

 04-19-2011
3.00
spark plug wires
Details
       

 04-18-2011
2.00
FAB and wiring
Details

 04-16-2011
3.00
EIS wiring
Details

 04-15-2011
3.00
FAB box alignment
Details
       

 04-14-2011
1.00
installed Emag and Pmag
Details

 04-14-2011
4.00
fabricating FAB mount plate.
Details

 04-14-2011
1.50
EIS wiring
Details

 04-13-2011
3.00
engine wiring
Details

 04-12-2011
3.00
firewall pass throughs, cables
Details
       

 04-08-2011
2.50
panel layout
Details

 04-08-2011
2.50
firewall penetrations and wiring
Details

 04-07-2011
3.50
FAB alignment, firewall passthrough for electrical
Details

 04-05-2011
1.00
EIS box location
Details

 03-24-2011
4.00
made fuel line and installed breather tube
Details
     

 03-23-2011
2.50
fuel hose and ground cable
Details

 03-22-2011
3.00
hose fittings, breather tube, alt cable
Details
     

 03-18-2011
5.00
sika flex applied to canopy
Details
       

 03-16-2011
0.50
Starter cable
Details

 03-14-2011
5.00
hose connections, EIS connections
Details
       

 03-09-2011
4.00
manifold spacer - oil and fuel sensors
Details
     

 03-08-2011
6.00
engine sensors and hoses
Details

 03-08-2011
0.70
cowl fiberglass work
Details

 03-07-2011
0.50
ground excess glass from ramp, adjusted skybolts
Details

 03-07-2011
2.00
FAB alignment shop organization
Details

 03-04-2011
6.00
Built FAB and fiberglass work on cowl
Details

 03-03-2011
4.00
cowl fiberglass work and FAB
Details

 03-02-2011
5.00
cowl fasteners, fiberglass work
Details

 03-01-2011
2.00
fuel and oil system diagrams
Details

 10-09-2010
1.50
installing skybolt fasteners
Details

 10-08-2010
4.00
Installed 11 skybolt fasteners in top cowl
Details

 10-07-2010
2.00
preparing to install skybolt fasteners
Details

 10-05-2010
4.00
fabricated and installed rods to attach tabs of l
Details

 10-04-2010
1.50
refit rubber seals around front
Details

 09-30-2010
4.00
riveted on rubber seal, fit seal to intake, trim c
Details

 09-29-2010
1.00
Riveting on rubber seal
Details

 09-28-2010
1.00
front seals
Details

 09-27-2010
3.00
Drilled and clecoed baffle seals
Details

 09-26-2010
6.00
move scat tube mount, begin seal installation
Details

 09-25-2010
2.50
Riveted on corner support piece
Details

 05-10-2010
0.50
oil cooler support bracket
Details

 05-04-2010
2.00
installed oil tube, hose fitting issue
Details

 05-02-2010
1.00
trim to fit, open wire holes
Details

 04-30-2010
2.00
final fitting of baffles
Details

 04-30-2010
1.50
determine fittings needed
Details

 04-28-2010
2.00
hole for fuel hose and scat tub for mech fuel pump
Details

 04-27-2010
2.00
pass thru for wires and scat hoses
Details

 04-27-2010
1.00
fuel hose from servo to divider
Details

 04-26-2010
1.00
determining fittings and hose runs
Details

 04-20-2010
2.00
determining hoses, fittings and other needs
Details

 04-20-2010
2.00
cabin heat opening
Details

 04-19-2010
0.50
front area, hinges
Details

 04-19-2010
0.50
determining fittings and hose routes
Details

 04-19-2010
0.50
cleaned up baffles
Details

 04-18-2010
2.50
doublers, retention clips
Details

 04-16-2010
1.00
retention clip and doubler fabrication
Details

 04-12-2010
2.00
Almost finished with the riveting
Details

 04-10-2010
4.00
baffle - oil cooler mounting area
Details

 04-09-2010
1.50
oil cooler section of baffle
Details

 04-08-2010
2.50
Oil Cooler area
Details

 04-07-2010
2.00
Final trimming
Details

 04-06-2010
3.00
Trim top baffle to cowl gap
Details

 04-05-2010
5.00
finished trimming the top
Details

 04-02-2010
2.50
trimming the top
Details

 04-01-2010
3.00
trimmed the top
Details

 03-31-2010
3.50
fitting- finger spacer-replace angle on corner
Details

 03-30-2010
3.00
complete riveting
Details

 03-29-2010
1.50
front bulhead attachment to inlet ramps
Details

 03-29-2010
0.50
EAA Tech Inspection
Details

 03-28-2010
1.50
front bulkheads
Details

 03-21-2010
6.00
inlets and front front bulkheads
Details
       

 03-18-2010
4.50
inlet floors
Details
       

 03-16-2010
0.50
making braces
Details

 03-15-2010
8.00
inlet ramps
Details
       

 03-14-2010
6.00
Fabricated and clecoed pieces on front
Details
     

 03-13-2010
4.50
initial fitting of baffles
Details
     

 03-13-2010
2.00
fitting hinges at cowl split
Details

 03-12-2010
4.00
hinges
Details

 03-10-2010
3.00
installed hinges on lower cowl at firewall
Details

 03-09-2010
3.00
drilled hinges on cowl split top and at firewall l
Details

 03-08-2010
0.50
fitting
Details

 03-04-2010
3.00
riveting mounting strips to airframe
Details

 03-03-2010
0.50
examine cowl situation with Dick Isherwood
Details

 03-03-2010
1.00
Baffeling
Details

 03-02-2010
4.00
fitting - mounting strips
Details

 03-01-2010
4.00
Install hinges
Details
       

 02-28-2010
10.00
Fitting - drill on hinges - top mounting strips
Details

 02-27-2010
4.00
mounting strips for skybolt fasteners
Details

 02-26-2010
2.50
fitting
Details

 02-23-2010
2.00
fitting....continued
Details

 02-18-2010
2.00
fitting
Details

 02-16-2010
2.25
continue fitting the cowl, worked on mounting stri
Details

 02-15-2010
0.50
riveted on small part - training
Details

 02-12-2010
0.50
drilled small piece
Details

 02-12-2010
2.00
cowl fitting
Details

 02-11-2010
4.00
fitting cowl and mounting strips
Details

 02-10-2010
2.00
cowl fitting
Details

 02-09-2010
3.00
cowl trimming
Details

 02-09-2010
2.00
Baffeling
Details

 02-08-2010
4.00
cowl mounting strips and cowl fitting
Details

 02-07-2010
4.00
cowl mounting strips
Details

 02-06-2010
5.00
cowl mounting strips for firewall
Details

 02-02-2010
0.50
engine preservation
Details

 12-30-2009
2.50
continued work on cowl mounting strips
Details

 12-29-2009
1.50
Mounting strips for cowl
Details

 12-17-2009
2.00
cowl mounting strips
Details

 12-16-2009
3.00
Cowl mount flange
Details

 10-20-2008
4.50
spacer for FAB
Details

 10-13-2008
3.00
remake of spacer for fuel servo
Details

 10-11-2008
6.00
fitting cowl, FAB
Details

 10-08-2008
3.00
FAB
Details

 10-07-2008
3.00
cowl
Details

 10-06-2008
4.00
mixture and throttle rigging
Details

 10-06-2008
1.50

Details

 10-05-2008
8.00
mixture and throttle rigging
Details

 10-03-2008
4.50
FAB and engine cable controls
Details

 09-08-2008
2.50
throttle to FAB spacer
Details

 09-07-2008
1.00
cowl alignment
Details

 08-25-2008
2.50
spacer for FAB to fuel injection unit
Details

 08-24-2008
2.00
fitting lower cowl
Details

 08-21-2008
2.50
fitting cowling
Details

 08-19-2008
2.50
fitting lower cowl
Details

 08-18-2008
2.00
top reat cowl trimming
Details

 08-17-2008
2.50
Cut lower cowling slot, fitting
Details
       

 08-16-2008
1.50
cowling prep
Details
     

 08-15-2008
2.00
skykbolt mounting strip...cowl
Details
       

 08-13-2008
1.00
Skybolt mounting strip
Details
     

 08-11-2008
1.50
trimming cowl
Details
       

 08-09-2008
2.00
exhaust, cowl
Details
       

 08-08-2008
1.00
exhaust hangers
Details
     

 08-07-2008
2.50
exhaust
Details

 08-06-2008
2.50
cooling ramp, exhaust
Details

 08-05-2008
3.00
cooling ramp, cowling
Details

 07-14-2008
1.00
baffles
Details

 07-13-2008
1.00
oil temp sender and dipstick tube
Details

 07-12-2008
3.00
EIS probes and Spinner plate
Details

 04-05-2008
2.00
skybolt mounting strip
Details

 03-23-2008
1.50
cowl mounting strip
Details
       

 03-23-2008
2.50
Cowl fastener mounting strip, drying plugs
Details

 03-20-2008
1.00
cowl
Details

 03-18-2008
1.50
cowling
Details

 03-04-2008
4.00
cowl mounting strips
Details

 03-03-2008
4.00
exhaust, cowling mounting strips
Details

 03-02-2008
0.50
Installed the lst AN3 bolt on the throttle quadran

 02-24-2008
1.50
topskin piece at firewall
Details

 02-24-2008
2.50
throttle and mixture cables; quadrant
Details

 02-23-2008
2.00
Throttle and mix cables, throttle body, FAB
Details

 02-23-2008
3.00
cooling ramp, topskin, control rod
Details

 02-18-2008
1.00
throttle cable bracket
Details

 02-17-2008
3.00
baggage door hinge, forward top skin
Details

 02-16-2008
1.00
forward baggage door hinge bracket
Details

 02-09-2008
2.00
cooling ramp, front top skin
Details

 02-08-2008
1.00
prep for cam lock mounting strip
Details

 02-07-2008
1.00
cooling ramp
Details

 02-05-2008
1.50
roll trim, control linkage
Details
     

 02-04-2008
0.75
throttle and mixture cables attach to quadrant
Details
       

 02-03-2008
0.50
inventory and store engine parts
Details

 02-02-2008
6.00
Mounted engine
Details
       

 01-29-2008
1.00
Engine mount, nosegear leg
Details

 01-28-2008
4.50
Put on the gear
Details
       

 01-27-2008
0.50
front seat mounting
Details

 01-27-2008
3.00
engine mount
Details
     

 01-26-2008
2.00
seats, trim spring
Details

 01-26-2008
2.00
firewall penetration for fuel, prepare for engine
Details

 01-22-2008
2.00
control linkages
Details

 01-21-2008
1.50
control linkages
Details

 01-20-2008
3.00
control linkages
Details

 01-19-2008
5.00
control linkage, throttle cable hole
Details

 01-14-2008
1.00
quadrant cable path
Details

 01-12-2008
5.00
Wire batt cables, check electrical system
Details

 01-08-2008
1.50
battery cables, main bus feed, trim wire
Details
     

 01-08-2008
1.00
attach canopy slide rail
Details
     

 01-07-2008
1.00
landing gear, mail axle safety wire hole
Details

 01-06-2008
2.50
landing gear
Details

 01-06-2008
1.50
checking wiring
Details

 01-05-2008
1.50
landing gear, install brake part to flange
Details

 01-05-2008
1.00
Flap deployment protection, trim speed
Details

 01-04-2008
1.00
main gear brake flange attachment
Details

 01-03-2008
3.00
check electrical system
Details

 12-29-2007
5.00
landing gear
Details
       

 12-28-2007
3.50
aileron push rod boots
Details
     

 12-27-2007
3.00
nosewheel attached to fork
Details

 12-26-2007
2.50
Landing gear
Details

 12-25-2007
1.00
nosewheel and tire
Details

 08-12-2007
4.00
cabin heat box and nosegear mod to engine mount
Details

 08-04-2007
3.50
cabin heat box, firewall penetrations
Details
       

 08-03-2007
1.00
nosegear modification
Details

 08-02-2007
3.00
front strut mout modification
Details

 08-01-2007
0.50
nose gear mount modification
Details

 07-31-2007
3.50
nose gear modification taper pin
Details

 07-30-2007
0.50
Marked firewall locations for drilling
Details

 07-30-2007
0.50
drilling nosegear strut for taper pin
Details

 07-28-2007
6.00
firewall preparation, cutting, drilling
Details

 07-27-2007
0.50
drilling holes for engine mount
Details

 07-23-2007
2.50
fitting engine mount
Details

 07-07-2007
1.00
enlarged canopy holes for fasteners
Details

 07-04-2007
5.00
application of adhesive
Details

 07-01-2007
2.50
prep of canopy and frame
Details

 06-30-2007
3.00
prep of canopy and frame
Details

 06-25-2007
1.00
prep for adhesive
Details

 05-26-2007
1.00
prepare canopy frame
Details

 05-25-2007
3.00
drill canopy frame for skirt
Details

 05-23-2007
1.50
taping
Details

 05-12-2007
10.00
drilled and fitted canopy to frame
Details
       

 05-11-2007
3.00
canopy fitting, drilled frame for skirt
Details
     

 05-09-2007
2.50
trimming and fitting
Details

 05-05-2007
2.50
the big cut
Details
       

 05-04-2007
0.50
trimming and fitting
Details

 05-03-2007
1.00
trimming
Details

 05-02-2007
2.00
trimming
Details

 05-01-2007
1.50
trimming
Details

 04-30-2007
4.00
trimming
Details

 04-29-2007
2.00
wiring boost pump and stick switch
Details

 04-29-2007
2.00
parking brake, cabin heat etc
Details

 04-29-2007
2.00
canopy marking and trimming
Details

 04-28-2007
4.00
wiring aux fuseblocks
Details

 04-27-2007
0.50
ergonomics, temp installed pilot seat
Details

 04-22-2007
1.00
roller rail cleaned and polished
Details

 04-21-2007
2.50
roller rails cleaned them up, painted roller mount
Details

 04-20-2007
1.00
roller rails, fitting
Details

 04-19-2007
2.00
roller rails, drilled
Details

 04-19-2007
2.00
canopy side rails
Details

 04-15-2007
8.00
frame and rails
Details

 04-15-2007
8.00
canopy frame, slide block, temp mount to rollers
Details

 04-15-2007
8.00
canopy frame
Details

 04-14-2007
2.00
slider rail, riveting
Details

 04-14-2007
2.00
slider rail
Details

 04-13-2007
3.00
slider rail and spacer bar
Details

 04-13-2007
3.00
slider rail
Details

 04-12-2007
2.50
slider rail, drilling
Details

 04-12-2007
2.50
slider rail
Details

 04-11-2007
1.50
slider rail, cont to make
Details

 04-11-2007
1.50
slider rail
Details

 04-10-2007
2.00
slider rail, making
Details

 04-10-2007
2.00
slide rail
Details

 04-08-2007
2.00
parts inventory, slider rail
Details

 04-08-2007
2.00
inventory of canopy parts slider rail spacer
Details

 04-07-2007
1.00
roller system and inventory of canopy parts
Details

 04-07-2007
1.00
located roller parts, reviewed plans and web
Details

 04-05-2007
2.00
LED indicators, FPS grounds
Details

 04-05-2007
2.00
FPS ground, wiring, LED indicator lights
Details

 04-03-2007
2.00
master switch, wiring diagram, wiring
Details

 04-03-2007
2.00
master switch
Details

 04-02-2007
2.00
wiring starter contacor, start warn light FPS
Details

 04-02-2007
2.00
starter warn light, wiring, fps box
Details

 03-27-2007
2.00
starter contactor and master contactor
Details

 03-27-2007
2.00
starter contactor
Details

 03-19-2007
2.50
starter relay, battery tray mod
Details

 03-19-2007
2.50
starter relay
Details

 03-15-2007
1.50
12v aux receptacle wiring
Details

 03-15-2007
1.50
12 aux wiring
Details

 03-05-2007
1.50
baggage lower bulkhead
Details

 03-05-2007
1.50
baggage lower bulkhead
Details

 03-04-2007
4.00
fuseblock, 12v aux, heat control
Details

 03-04-2007
4.00
fuseblock and master contactor
Details

 03-02-2007
2.00
cabin heat vent
Details

 03-02-2007
2.00
cabin heat routing
Details

 02-27-2007
1.00
12v aux receptacle mounting
Details

 02-27-2007
1.50
12v aux installation
Details

 02-26-2007
3.00
wired map light
Details

 02-26-2007
3.00
map light installed and wired
Details

 02-25-2007
3.00
wiring FPS, stick, boost pump, speaker
Details

 02-25-2007
3.00
wiring flap and trim FPS
Details

 02-24-2007
2.00
stick connector
Details

 01-02-2007
6.00
FPS wiring, lighting bus, stick wiring
Details

 01-01-2007
7.00
wiring
Details

 12-14-2006
4.00
LED warning lights, panel, elt
Details

 12-12-2006
6.00
labeling panel, wire runs
Details

 12-11-2006
6.00
wiring
Details

 10-27-2006
2.50
wiring runs
Details

 09-16-2006
4.00
wiring runs
Details

 12-10-2005
0.50
holes for ELT antenna and headphone jack
Details

 02-09-2005
1.00
cockpit EAA tech visit
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.