Powered By Kitlog Pro v2.0
Larry and Eddie - Sportsman
GS-2 Sportsman
All
Work Logs Found:
62
Category Work Time:
242 Hours
Date
Hours
Work Log Summary
Details
10-16-2012
3.00
Cut the Filler Neck Opening in the Upper Outboard
Details
10-15-2012
3.00
Fit the fuel lines (aux tank)
Details
10-14-2012
2.00
Fit the fuel lines (redo)
Details
09-21-2012
1.50
Fit the fuel lines
08-23-2012
2.00
Finish left wing vent lines
Details
08-13-2012
3.00
Seam the Wingtip Fairing Halves Together
08-05-2012
3.00
Route Vent Lines
08-04-2012
5.00
Install Vent and Fuel Line Fittings in the Tanks a
Details
07-22-2012
5.00
Rivet Transfer Pump Doubler
Details
05-23-2012
2.00
Position, Drill and Rivet the Transfer Pump Mounti
05-22-2012
3.00
Position, Drill and Rivet the Transfer Pump Mounti
05-21-2012
1.00
Install Bumpers on the Tank Perimeter
Details
05-20-2012
3.00
Position and Drill the Aux Tank Mounting Channels
Details
05-20-2012
5.00
Cut Hole in the Upper Wing Skin for the Filler Nec
Details
05-18-2012
2.50
Make a Cutout in the Root Rib for the Fuel Gauge M
Details
05-18-2012
1.00
Drill Holes in the Root Rib for the Main and Retur
Details
05-18-2012
3.00
Drill Holes in Root Rib for the Main and Return Fu
Details
05-17-2012
3.50
Refining Hole in the Lower Wing Skin for the Main
Details
05-17-2012
1.00
Make a Cutout in the Root Rib for the Fuel Gauge M
Details
04-29-2012
2.00
Install the Drain Valve
04-29-2012
2.00
Install header tanks
Details
04-29-2012
1.00
Drill the Drain Valve Holes in the Fuselage Floor
04-28-2012
1.00
Test fitting front seats for brake usage
Details
04-24-2012
2.00
Creating jack point/step part 2
Details
04-23-2012
3.00
Creating jack point/step
Details
04-21-2012
1.00
Removing front baffling to remove firewall screws
Details
04-21-2012
5.00
Brake Line Installation
Details
04-15-2012
3.00
Preliminary brake line installation
Details
01-17-2012
0.50
Test Fit the Upper-Surface Hat Sections
Details
01-17-2012
2.50
lnstall "Bumpers" Around the Perimeter of the Tank
Details
01-16-2012
3.50
Test Fit the Upper-Surface Hat Sections
Details
01-16-2012
3.00
Make a Cutout in the Root Rib for the Fuel Gauge M
Details
01-16-2012
0.00
Make a Cutout in the Root Rib for the Fuel Gauge M
Details
01-16-2012
1.00
Apply Anti-Chafe Tape to the Hat Section Stiffener
Details
01-15-2012
3.00
Drill a Hole in the Lower Wing Skin for the Main T
Details
01-15-2012
0.00
Drill a Hole in the Lower Wing Skin for the Main T
Details
01-10-2012
2.50
Figuring out the brake system
Details
01-03-2012
1.00
Test fit the Main Fuel Tank (Left)
Details
10-16-2011
2.00
Aileron Deflections
Details
10-15-2011
3.00
Fabricate the Aileron Cable Guides
Details
10-01-2011
3.00
Route the Flap Deployment Cable
Details
10-01-2011
5.00
Route the Aileron Control Cables
07-16-2007
10.00
Instrument Panel Installation
Details
05-25-2007
6.00
Mount the Rear Door Latch Assembly
05-20-2007
8.00
Trial Fit Baggage Door
Details
05-15-2007
16.00
Install Hinges on right front door and align
Details
05-13-2007
16.00
Trial Fit Doors
Details
05-11-2007
12.00
Install New Glareshield
Details
05-04-2007
5.00
Install the Back Seat
05-02-2007
3.00
Trial Fit Seat Covers
Details
05-01-2007
8.00
Glareshield
Details
04-30-2007
16.00
Cut out and fit instrument panel
Details
04-03-2007
1.50
Prop/Cowling
Details
08-31-2006
3.00
Install Engine
06-26-2006
5.00
Install Firewall
05-21-2006
4.00
Horizontal stabilizer/elevator assembly
Details
05-20-2006
5.00
Drill the Horizontal Stabilizer Aft Attach Bracket
04-20-2006
4.00
Mount the Rudder Pedals on the Rudder Control Weld
04-20-2006
3.00
Install the Brake Master Cylinders
04-06-2006
8.00
Align and Cleco the Vertical Fin Half
Details
02-09-2006
3.00
Hanging Fuselage
Details
02-08-2006
3.00
Unpacking box
SITE NAVIGATION
Contact Builder
GS-2 Sportsman Home
Category
# Logs
# Hours
All
62
242
Avionics
4
46
Baggage Door
1
6
Baggage Doors
1
8
Empennage
3
17
Engine
2
8
Front Doors
2
32
Front Seats
2
4
Fuselage
2
6
Prop
1
2
Rear Seats
1
5
Systems
38
92
Wings
5
16
Copyright © 2001-2024 Matronics. All Rights Reserved.