KitLog pro

Powered By Kitlog Pro v2.0

GAYLON'S WEB SITE
Work Logs Found: 289
Category Work Time: 1519 Hours
 Date
Hours
Work Log Summary

Details

 12-31-2013
30.00
MORE ….. Avionics Wire work…..
Details

 12-31-2013
0.10
Engine and EFII Ign
Details

 12-04-2013
1.00
Our Barrett Precision Engine (BPA) comes to life !
Details

 11-30-2013
3.00
Wing Root Panels
Details

 11-29-2013
6.00
Top Tailcone Skin, Upper FWD Fuselage Skin Attache
Details

 11-27-2013
20.00
Panel Work Continued
Details

 11-24-2013
48.00
Avionics Work Continued
Details

 11-16-2013
8.00
Avionics Work
Details

 11-10-2013
8.00
Avionics Work
Details

 11-09-2013
8.00
Avionics Work
Details

 11-07-2013
16.00
Aerosport Panels Arrive
Details

 10-27-2013
5.00
Mounting G3X Components
Details

 10-26-2013
2.00
Mounting GNC-305 Autopilot Control Panel
Details

 10-22-2013
7.00
Mounting GTS-800 TAS Antenna
Details

 10-19-2013
8.00
The Start of Mounting the Avionics
Details

 10-03-2013
5.00
Aerosport Headliner Trimming
Details

 09-29-2013
8.00
Installed the ELT – ACK Technologies
Details

 09-28-2013
8.00
Various Cable Routing throughout Fuselage
Details

 09-27-2013
2.00
Install of Roll and Pitch Servo – Garmin GSA 28
Details

 09-25-2013
2.00
Defrost Vents
Details

 09-23-2013
1.00
Stein sent me some “stuff”
Details

 09-14-2013
1.00
Mountain High Refill Station
Details

 09-14-2013
3.00
Bonaco Fuel Lines – Tunnel
Details

 09-05-2013
1.00
Avionics at Steins Facility
Details

 08-31-2013
6.00
Center Console Mountain High Oxygen System air con
Details

 08-25-2013
1.00
Engine oil cooler mod
Details

 08-25-2013
2.00
Aerosport throttle quad mounting
Details

 08-22-2013
1.00
Spinner (D-7709P) and prop gov arm (C-4582-P)
Details

 08-21-2013
1.00
Panel Design Rev A
Details

 08-20-2013
2.00
Elevator Trim Plates -redo
Details

 08-18-2013
8.00
EDS-DP Type E3
Details

 08-14-2013
2.00
EDS-4ip MH Oxygen System
Details

 08-11-2013
4.00
EDS-4ip MH Oxygen System
Details

 08-07-2013
0.10
A Family Change amongst all the other changes in o
Details

 08-05-2013
1.00
Prop Arrived
Details

 08-05-2013
6.00
Aerosport Side Panels
Details

 08-03-2013
12.00
Aerosport Center Armrest and Console
Details

 08-02-2013
16.00
Aerosport RV10 Panel
Details

 07-27-2013
10.00
Empennage Fairing Fit/Install
Details

 05-22-2013
0.10
New Home Purchase - Polly Ranch Estates (7XS0)
Details

 03-16-2013
4.00
Overhead cabin transitions from Evaporator
Details

 03-16-2013
2.00
Landing Gear mount
Details

 03-09-2013
9.00
Overhead Switch, Air Vents, and Light install
Details

 03-03-2013
8.00
Overhead Switch Panel Design
Details
       

 03-02-2013
6.00
Overhead light and wire work
Details
     

 02-23-2013
8.00
Flightline AC, Evaporator to Overhead Tarnistion
Details
     

 02-22-2013
2.00
Flightline AC, Evaporator and Overhead Transition
Details
       

 02-21-2013
2.00
Flightline AC, Evaporator to Overhead Transition W
Details
       

 02-20-2013
2.00
Flightline AC overhead to Evaporator transition
Details
       

 02-18-2013
2.00
Flightline AC Evaporator to Overhead transition wo
Details
       

 02-17-2013
9.00
Fuel Pump, Tunnel Battery Relay Wiring
Details
       

 02-16-2013
8.00
Flightline AC System tray, flap sensor, and flap m
Details
       

 02-15-2013
4.00
Flightline AC, Access panel pass thru for the hose
Details
       

 02-10-2013
2.50
Flightline AC System, Evaporator Install
Details
       

 02-02-2013
4.00
Section 46, Enginer Mount
Details
       

 02-02-2013
8.00
Flightline AC System
Details
       

 01-27-2013
9.00
Aft 12Volt Battery Power and associated Terminal/F
Details
       

 01-26-2013
10.00
Flightline Air Conditioning Condenser Fit/Temp Ins
Details
       

 01-19-2013
9.00
Firewall Battery Box Installation
Details
       

 01-13-2013
8.00
Tunnel Battery Relay Contact and 4 AWG wire routin
Details
       

 12-28-2012
5.00
Tunnel access cover installation
Details
       

 12-28-2012
4.00
Section 37, Fuel System - Andair Fuel Valve
Details
       

 12-27-2012
2.00
Section 45, Door Fitting
Details
       

 12-15-2012
1.00
Section 38, Rudder Pedal after Market Brake Lines
Details
       

 12-09-2012
13.00
Door Fitting, door seal, door strut
Details
       

 12-08-2012
10.00
Section 45, Door Fitting to Cabin Top
Details
       

 12-04-2012
4.00
Section 45, Door Mechanism continued
Details
     

 12-02-2012
6.00
Section 45, Door Locking Mechanism
Details
       

 12-01-2012
12.00
Section 45, Cabin Doors and Transparencies
Details
       

 11-15-2012
4.00
Cabin Doors and Transparencies
Details
       

 11-11-2012
6.00
Cabin Doors and Transparencies
Details
       

 11-10-2012
8.00
Cabin Doors and Transparencies
Details
       

 11-09-2012
12.50
Cabin Cover
Details
       

 10-27-2012
3.00
Rear Seat Backs
Details
     

 10-21-2012
3.00
Flap System Install - Electric Motor
Details
     

 10-07-2012
8.00
Control System
Details
       

 10-06-2012
7.00
More Brake Lines
Details
       

 10-05-2012
9.00
Side Panels, painting
Details
     

 10-05-2012
8.00
Brake Lines and side Panels
Details
       

 10-03-2012
3.00
Finish Kit Inventory
Details
       

 08-12-2012
8.00
Tailcone Attachment
Details
       

 08-12-2012
5.00
Baggage Door
Details
       

 08-07-2012
4.50
Step Installation
Details
     

 08-05-2012
90.00
Fuselage Side Skins
Details
       

 07-07-2012
14.00
Upper Forward Fuselage Assembly
Details
       

 07-04-2012
35.00
FWD Fuse Ribs, BHDS & Bottom Skin
Details
       

 06-06-2012
7.00
MotoPod HardPoint Mount
Details
       

 06-05-2012
25.00
Mid Fuselage Ribs and Bottom Skins
Details
       

 05-27-2012
20.00
Firewall
Details
     

 05-12-2012
20.00
Mid Fuselage Bulkheads
Details

 05-10-2012
6.00
Fuselage arrives in the crate
Details
       

 05-05-2012
6.00
Control Approach Rudder Pedals
Details
     

 04-06-2012
2.00
Wing Tip mounting and wire stuff
Details
       

 03-25-2012
15.00
Wing Tips
Details
       

 03-25-2012
22.00
Bottom Wing Skin
Details
       

 02-17-2012
15.00
Gretz Pitot, VHF antenna
Details
       

 12-17-2011
8.00
AOA, Leading Edge & Fuel Tank Attach
Details
       

 12-16-2011
4.00
AOA install in Left Leading Edge
Details
       

 12-12-2011
6.00
Flap Construction
Details
       

 12-04-2011
5.00
Attaching Right Wing Leading Edge and Fuel Tank
Details
       

 12-03-2011
8.00
Wing HID Lights
Details
       

 12-02-2011
2.00
Pressure Testing fuel Tanks
Details
     

 11-12-2011
12.00
Sealing Fuel Tanks
Details
       

 11-06-2011
8.00
Ailerons
Details
       

 11-05-2011
10.00
Sealing Left Fuel Tank
Details
       

 11-04-2011
8.00
Fuel Tank Sealant
Details
       

 10-16-2011
6.00
Step 1-7, Step 1-2 page 21-5
Details
     

 10-16-2011
8.00
Ailerons
Details
       

 10-06-2011
4.00
Step 1 - 7
Details
       

 10-01-2011
5.00
Page 18-5 Step 7
Details

 09-28-2011
8.00
Rivet Aileron
Details
       

 09-27-2011
2.50
Step 4 and 5
Details
       

 09-26-2011
1.50
Step 4 conti
Details

 09-25-2011
8.00
Step 2-4
Details
       

 09-24-2011
6.00
Section 18-5
Details
     

 09-13-2011
2.00
Reassembling the fuel tanks
Details
     

 09-06-2011
1.00
Section 19 Page 19-3
Details
     

 09-06-2011
1.00
Section 17 Page 17-3
Details
     

 09-05-2011
2.00
Step 8
Details

 09-04-2011
6.00
Step 14
Details

 09-03-2011
6.00
Section 17 Step 11-14
Details
       

 09-01-2011
3.00
Section 17-3
Details

 08-30-2011
3.00
Aluma prep and Alodine
Details

 08-29-2011
5.00
Section 18 dimple
Details

 08-28-2011
6.00
Section 18
Details

 08-27-2011
6.00
Section 18-3
Details

 08-26-2011
8.00
Section 18-2/3
Details

 08-25-2011
8.00
Section 18-2, Step 2 - Step 5
Details

 08-24-2011
0.00
Casey Wayne Koenning
Details
     

 08-21-2011
5.00
Section 18, Fuel Tank
Details
     

 08-20-2011
2.00
Section 19 Step 1 - Step 8 Stall Warning System
Details
       

 08-20-2011
4.00
Section 17-3, Fitting ribs and Splice Strips
Details
     

 08-14-2011
5.00
Started Section 17
Details

 08-13-2011
5.00
Section 16, Final rivets
Details
       

 08-08-2011
2.00
Sectin 16-4 Aileron Hinge Bracket
Details
       

 08-07-2011
6.00
Section 16 Rivet Skins
Details
     

 08-06-2011
7.00
Section 16-3 - Rivet Skins
Details
       

 08-01-2011
2.00
Al prep and Alodine
Details

 07-31-2011
10.00
Dimple, Dimple, Dimple
Details
       

 07-26-2011
3.00
Final Drill #40 holes
Details
     

 07-25-2011
3.00
Top Wing Skins
Details
       

 07-24-2011
6.00
Rivet Rear Spar
Details
       

 07-24-2011
0.50
Laid top skins on the wings
Details
     

 07-23-2011
9.00
Rear Spar
Details
       

 07-22-2011
3.00
Torq all AN3 bolts
Details

 07-21-2011
3.00
Install bolts into wing spar and web
Details

 07-20-2011
3.00
Rivet wing ribs to spar
Details

 07-17-2011
5.00
System Penetrations in Wing Ribs
Details
       

 07-16-2011
11.00
Debur, Aluminum Prep, Alodine, Rivet
Details
       

 07-12-2011
3.00
Steps 1-3
Details

 07-11-2011
3.00
Step 9 and 10
Details

 07-10-2011
4.00
Flute Wing Spars, cutting and fitting W 1010-R/L
Details
       

 07-09-2011
11.00
13-3 to 13-5
Details
       

 07-08-2011
2.50
Wing Spar Section 13-
Details
       

 07-07-2011
1.00
Wing Spar
Details

 07-06-2011
2.00
Rivet fuel tank skin attach nutplates
Details

 07-05-2011
1.50
Wing Spar Machine Coutersink
Details

 07-04-2011
11.00
Wing Spars conti
Details
       

 07-03-2011
5.00
Started work on Wing_Spar_Left
Details
       

 06-28-2011
2.00
Inventory of Wing Kit
Details

 06-27-2011
2.00
Wing Kit Crates arrive
Details

 02-05-2011
8.00
Wing tip Led's
Details
       

 02-04-2011
4.00
Wing tips lights
Details
       

 12-27-2010
6.00
VOR antenna
Details
       

 12-18-2010
8.00
Vertical Stab Camera
Details
     

 02-27-2010
8.00
Rudder Trim
Details
       

 02-20-2010
8.00
Rudder Trim
Details
       

 12-31-2009
8.00
Rudder Trim
Details
       

 10-24-2008
2.00
SB 08-6-1
Details
       

 10-23-2008
2.00
F-1010 Bulkhead reinforcement procedures
Details
       

 10-20-2008
6.00
HS, Rudder, Elevator Fairings
Details
       

 06-06-2008
1.50
Revised aft LED tie down light
Details
     

 06-04-2008
2.00
Rear Tie Down light
Details
       

 06-04-2008
4.00
Fiber Glass parts,etc
Details
       

 05-01-2008
3.00
HS Fairings, Rudder Top/Bottom Fairings
Details
       

 04-24-2008
3.00
Started Emp. fairings
Details
       

 04-22-2008
2.00
Mount Strobe Power Supply Bracket
Details
     

 04-21-2008
3.00
Paint, rivet battery box mod
Details
       

 03-27-2008
1.30
Rework F-1095G brackets
Details
       

 03-26-2008
1.20
Elevator push rod adj, HS Elevator stop/doubler ad
Details
       

 03-25-2008
1.00
Solenoid mount for battery box
Details
       

 03-12-2008
1.00
Mounted Rudder
Details
       

 03-12-2008
0.20
Modify battery box
Details
     

 03-11-2008
3.00
Mounting HS, Elevators, and VS
Details
       

 03-10-2008
2.00
Paint and drill pushrod tube
Details

 02-28-2008
5.00
HS Setup, Hardware
Details
       

 02-26-2008
2.00
Starting to mount elevator to HS
Details
       

 02-20-2008
1.00
Started working on Battery Box redesign
Details
     

 02-14-2008
2.00
Top Skins
Details
       

 01-31-2008
2.00
Rear Tail section Aft Deck
Details
       

 01-29-2008
2.00
Rivet bottom & side skin
Details

 01-22-2008
3.00
Rivet Tail Cone Section
Details
       

 01-08-2008
2.00
Rivet Tail Cone Skins
Details
       

 12-20-2007
2.50
Right Side cover & back up plate.
Details
       

 12-19-2007
2.00
Dimple back up plate and cover plate, create right
Details
       

 12-18-2007
2.00
Cutting parts
Details
       

 12-17-2007
2.00
Rudder Cover plates
Details
       

 12-12-2007
2.00
Rivet Tail Cone ribs to skin
Details
       

 11-28-2007
3.00
Rivet bottom skin
Details
       

 11-26-2007
2.50
Rivet parts
Details

 11-17-2007
1.00
Clean up and re organize shop
Details

 11-16-2007
4.00
Prime Skins
Details
     

 11-15-2007
3.00
Primer
Details
       

 11-14-2007
2.25
Prep for paint
Details
     

 11-13-2007
2.25
AlumiPrep
Details

 11-12-2007
3.00
Dimple Debure starting prep for paint
Details

 11-09-2007
5.00
Dimple Debur
Details

 10-31-2007
2.50
Starting tear down process
Details

 10-25-2007
3.00
F-1010A,B and F-1014 then F-1011D and F-1012D
Details
       

 10-23-2007
3.00
Drill Skins, start top skins
Details
       

 10-18-2007
2.00
Longerons
Details

 10-14-2007
5.00
Longerons, F-1006, F-1028
Details
       

 10-05-2007
3.00
Rudder Stop Brackets
Details
       

 10-04-2007
4.00
Left side skin, F-1011, F-1012A,B
Details
       

 09-26-2007
3.00
Stiffners , bell crank ribs, and tail skin
Details
       

 09-25-2007
2.00
J-stiffners
Details
       

 09-08-2007
0.01
Bahama's Sandals Resort Vacation
Details
       

 08-29-2007
2.00
Cut J-stiffners
Details

 08-28-2007
3.00
Starting on the TailCone section
Details
       

 08-28-2007
5.00
Longerons
Details
       

 08-25-2007
2.00
Add R-1014 weight to the rudder
Details
       

 08-24-2007
2.00
Roll Leading edge of Rudder, install R-1014 weight
Details
       

 08-23-2007
2.00
Roll Elevator Leading Edges
Details
       

 08-23-2007
2.50
Rivet Elevator Hinge
Details
       

 08-21-2007
3.50
Rivet Trailing Edges, drill Trim Tab Hinges
Details
       

 08-15-2007
3.50
Trailing Edge
Details
       

 08-14-2007
3.50
Riveting the Tip Rib Assembly
Details
       

 08-13-2007
2.50
Riveting the Root Rib, Spars and skins
Details
       

 08-09-2007
5.00
Rivet Rear Spar, Rivet Ribs
Details
       

 08-08-2007
3.00
Rivet Rear Spar
Details
       

 08-07-2007
3.00
More assembly
Details
       

 08-04-2007
2.00
Elevator part assembly
Details
       

 07-30-2007
2.00
Stating assembly
Details
       

 07-29-2007
2.00
Clean up and sanding
Details
       

 07-27-2007
3.00
Paint
Details
       

 07-22-2007
8.00
Bending Tabs and trim tab bottom skins
Details
       

 07-21-2007
8.00
Debur, start elevator trim tabs
Details
       

 07-20-2007
5.00
Dimple, Debur, countersink drill
Details
       

 07-18-2007
4.00
Debur, Dimple
Details
       

 07-17-2007
3.00
Debur elevators
Details
       

 07-16-2007
6.00
Final Drill
Details
       

 07-12-2007
1.00
Match drill sheer plate and attach Elevator Horn
Details
       

 07-11-2007
2.50
Still putting togather parts
Details
       

 07-10-2007
3.50
Elevator piece fitting
Details
       

 07-09-2007
3.00
Started on Elevator
Details
       

 07-07-2007
9.00
Finish the HS
Details
       

 07-05-2007
4.00
Rivit the skins
Details
     

 06-27-2007
3.00
Continue re-installing HS-1004 ribs
Details
       

 06-26-2007
3.00
Started final assemble of parts
Details
       

 06-20-2007
1.50
Garage A/C and Nose ribs
Details
       

 06-19-2007
3.50
Rivet
Details
       

 06-15-2007
4.00
More spar work
Details
       

 06-14-2007
2.00
Clean up from paint and start the rivet process
Details
     

 06-12-2007
2.00
Primer
Details
       

 06-09-2007
2.00
Alodine
Details
       

 06-08-2007
8.00
Nothing new, debur, countersink, prep
Details
     

 06-07-2007
3.50
Dimpling the skins
Details
       

 06-06-2007
2.00
Parts prep
Details

 06-05-2007
2.00
Dimple
Details
       

 06-03-2007
0.10
More feary flights
Details
       

 05-31-2007
3.00
Drill, debur
Details

 05-30-2007
4.50
Assembling HS for the first time
Details
       

 05-26-2007
2.00
Nose ribs, debur
Details
       

 05-25-2007
1.50
Trailing Edge
Details
       

 05-25-2007
2.00
Rivet the R-1001 skin
Details
       

 05-25-2007
2.00
Pop Rivet R-1002
Details
       

 05-24-2007
0.10
Picked up a PA28R-201
Details
       

 05-23-2007
2.50
Front Spar and Ribs
Details
       

 05-22-2007
3.00
Debur and macth drill
Details
       

 05-19-2007
7.00
Started assembling rudder
Details
       

 05-19-2007
0.10
More rudder assembly pictures
Details
       

 05-18-2007
2.00
Re-prime
Details
     

 05-18-2007
1.00
Epoxy Primer outside of VS
Details
       

 05-17-2007
2.00
Horizontal Stab
Details
       

 05-17-2007
2.00
Alumiprep33, Alodine 1201, prime
Details
       

 05-14-2007
0.10
VACATION CANCUN
Details
       

 05-02-2007
2.00
Front Spar Attachment Brackets
Details
     

 05-02-2007
2.00
Debur, bend, drill
Details
     

 05-01-2007
1.00
Rudder fitting
Details
       

 05-01-2007
2.50
Pitch Trim Actuator
Details
       

 04-30-2007
1.00
Trimmed/debur parts for rudder
Details
     

 04-30-2007
1.50
Trim Cable Anchor Brackets
Details
       

 04-30-2007
2.00
Rivet VS-1004, VS-1006
Details
       

 04-27-2007
1.00
Removed VS-1004
Details
       

 04-25-2007
1.00
More rivet work installing doubler
Details
       

 04-24-2007
3.00
Service Bulletin 06-2-3
Details
     

 04-24-2007
0.20
Lightning hole VS-1006 for wire pass through
Details
     

 02-21-2007
18.00
RV Training Kit
Details
       

 02-07-2007
0.00
Shop Tools
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.