Date
|
Hours
|
Work Log Summary
|
Details
|
05-21-2015
|
1.50
|
Transferred fuselage to saw horses.
|
Details
|
|
|
05-19-2015
|
1.00
|
Prepared saw horses for fuselage
|
Details
|
|
|
05-17-2015
|
1.50
|
Inventoried finishing kit
|
Details
|
|
|
04-17-2015
|
0.00
|
Finishing kit arrives!
|
Details
|
|
|
03-22-2015
|
0.00
|
Tanner started flying lessons.
|
Details
|
|
|
01-25-2015
|
0.00
|
Flying Leathernecks A-6 (cont)
|
Details
|
|
|
01-25-2015
|
0.00
|
A-6 Intruder with my paint scheme.
|
Details
|
|
|
01-25-2015
|
0.00
|
A-6 and RV-7 Mock-up paint scheme.
|
Details
|
|
|
09-28-2014
|
0.00
|
Built a yard shed
|
Details
|
|
|
07-31-2014
|
0.00
|
Oshkosh 2014
|
Details
|
|
|
04-01-2014
|
1.00
|
cockpit floor covers installed
|
Details
|
|
|
03-29-2014
|
4.00
|
Tested flap actuator assembly
|
Details
|
|
|
03-28-2014
|
1.50
|
Seat back brace and flap actuator covers
|
Details
|
|
|
03-27-2014
|
2.00
|
Finished flap actuator installation
|
Details
|
|
|
03-26-2014
|
1.50
|
More flap actuator assembly work
|
Details
|
|
|
03-24-2014
|
2.00
|
Flap actuator assy work
|
Details
|
|
|
03-23-2014
|
1.50
|
Prepped and primed flap actuator parts
|
Details
|
|
|
03-22-2014
|
0.50
|
Fabbed F-767 attach plate
|
Details
|
|
|
03-21-2014
|
2.00
|
Flap actualtor work
|
Details
|
|
|
03-06-2014
|
1.50
|
Flap actuator work
|
Details
|
|
|
03-03-2014
|
1.50
|
Flap bearing block work
|
Details
|
|
|
03-02-2014
|
2.00
|
Flap actuator work
|
Details
|
|
|
02-27-2014
|
1.00
|
Center cover and fuel valve mount
|
Details
|
|
|
02-23-2014
|
1.00
|
Center cover F-782C work
|
Details
|
|
|
02-22-2014
|
1.50
|
Fuel valve plate and cover work
|
Details
|
|
|
02-09-2014
|
2.00
|
Center cover work
|
Details
|
|
|
02-05-2014
|
1.50
|
Started F-782C center cabin cover
|
Details
|
|
|
02-04-2014
|
1.00
|
Completed seat backs!
|
Details
|
|
|
02-03-2014
|
3.00
|
Seat back parts prep.
|
Details
|
|
|
01-31-2014
|
0.50
|
Right seat back parts
|
Details
|
|
|
01-28-2014
|
1.50
|
Right seat back work
|
Details
|
|
|
01-25-2014
|
0.00
|
Attended SportAir class in Oshkosh
|
Details
|
|
|
01-19-2014
|
1.50
|
Started right seat back fabrication
|
Details
|
|
|
01-15-2014
|
1.50
|
Finished drilling left seat back.
|
Details
|
|
|
01-14-2014
|
1.50
|
Drilled holes in left seat back
|
Details
|
|
|
01-13-2014
|
1.50
|
Left seat back work
|
Details
|
|
|
01-06-2014
|
0.75
|
Seat back work
|
Details
|
|
|
01-04-2014
|
2.50
|
Seat back work
|
Details
|
|
|
11-26-2013
|
2.50
|
Routed slot in F-637B angles
|
Details
|
|
|
11-18-2013
|
1.00
|
Seat back angle work
|
Details
|
|
|
11-14-2013
|
3.00
|
Tunnel cover work
|
Details
|
|
|
11-13-2013
|
1.50
|
F-741 tunnel cover work
|
Details
|
|
|
11-04-2013
|
0.75
|
Fabbed F-741A(R) tunnel support
|
Details
|
|
|
11-03-2013
|
2.00
|
Floor and F-741 tunnel work
|
Details
|
|
|
11-02-2013
|
3.00
|
Seat floor work
|
Details
|
|
|
11-01-2013
|
1.50
|
Right seat work
|
Details
|
|
|
10-30-2013
|
2.00
|
Left seat work
|
Details
|
|
|
10-25-2013
|
1.00
|
Seat back hinge work
|
Details
|
|
|
10-22-2013
|
0.50
|
Started on seat backs
|
Details
|
|
|
10-19-2013
|
2.00
|
Primed aft fuse top skins and parts
|
Details
|
|
|
10-17-2013
|
2.00
|
Aft top fuse skin dimpling
|
Details
|
|
|
10-16-2013
|
1.50
|
Started dimpling aft fuse skin holes
|
Details
|
|
|
10-15-2013
|
1.00
|
Aft skin and parts deburring
|
Details
|
|
|
10-14-2013
|
1.50
|
Aft fuse prep
|
Details
|
|
|
10-11-2013
|
1.00
|
Aft bulkhead prep
|
Details
|
|
|
10-08-2013
|
1.00
|
F-706 bulkhead covers removed for prep
|
Details
|
|
|
10-07-2013
|
1.50
|
Bellcrank channel work
|
Details
|
|
|
10-06-2013
|
1.00
|
Upper baggage bulkhead work
|
Details
|
|
|
10-05-2013
|
2.00
|
Finished, painted angle for rotisserie
|
Details
|
|
|
10-03-2013
|
1.00
|
Installed angle for rotisserie
|
Details
|
|
|
09-30-2013
|
2.00
|
F-706 bulkhead work
|
Details
|
|
|
09-18-2013
|
2.00
|
Completed rotisserie, F-706 bulkhead
|
Details
|
|
|
09-15-2013
|
1.00
|
F-706 nutplate work
|
Details
|
|
|
09-14-2013
|
0.00
|
Picked up engine stand from Kent
|
Details
|
|
|
09-08-2013
|
2.00
|
Baggage bulkhead work.
|
Details
|
|
|
09-04-2013
|
3.50
|
Worked on rotisserie
|
Details
|
|
|
09-02-2013
|
3.00
|
Painted baggage covers, started rotisserie.
|
Details
|
|
|
08-31-2013
|
2.00
|
Baggage covers and floor work.
|
Details
|
|
|
08-29-2013
|
2.00
|
Baggage side cover work.
|
Details
|
|
|
08-27-2013
|
1.00
|
Painted aft baggage side covers.
|
Details
|
|
|
08-25-2013
|
4.00
|
Aft fuselage skin prep
|
Details
|
|
|
08-22-2013
|
3.00
|
Aft top skin and skeleten work.
|
Details
|
|
|
08-21-2013
|
0.50
|
Drilled J stringers to bulkhead
|
Details
|
|
|
08-20-2013
|
2.00
|
Top fuselage stringer work.
|
Details
|
|
|
08-19-2013
|
2.00
|
F-656 gusset work
|
Details
|
|
|
08-18-2013
|
2.00
|
Elevator bell crank work
|
Details
|
|
|
08-15-2013
|
1.00
|
F-706 bulkhead work
|
Details
|
|
|
07-31-2013
|
0.25
|
Riveted bell crank components
|
Details
|
|
|
07-30-2013
|
2.00
|
F-706 bulkhead work
|
Details
|
|
|
07-29-2013
|
1.50
|
Baggage floor rib work.
|
Details
|
|
|
07-28-2013
|
0.75
|
Baggage floor rib work
|
Details
|
|
|
07-25-2013
|
1.50
|
Elevator bell crank work
|
Details
|
|
|
07-24-2013
|
1.50
|
Finished installing F-695 gussets.
|
Details
|
|
|
07-22-2013
|
0.50
|
Prepped shoulder harness anchors
|
Details
|
|
|
07-12-2013
|
4.00
|
Canopy side rail work.
|
Details
|
|
|
07-11-2013
|
0.00
|
Picked up anodized parts
|
Details
|
|
|
07-08-2013
|
1.00
|
F-695 gusset work
|
Details
|
|
|
07-07-2013
|
1.50
|
Forward fuse gusset work
|
Details
|
|
|
07-06-2013
|
1.50
|
F-695 gusset work
|
Details
|
|
|
07-05-2013
|
2.00
|
Finishing fab work on canopy side rails
|
Details
|
|
|
07-03-2013
|
2.50
|
Canopy side rail work
|
Details
|
|
|
07-02-2013
|
2.00
|
F-757 work
|
Details
|
|
|
07-01-2013
|
1.50
|
Deburred F-757 gussets
|
Details
|
|
|
06-30-2013
|
0.75
|
Recovering from vacation
|
Details
|
|
|
06-10-2013
|
1.50
|
Riveted F-714 aft deck.
|
Details
|
|
|
06-09-2013
|
1.50
|
More aft deck work
|
Details
|
|
|
06-08-2013
|
0.75
|
Match drilled aft fuse deck F-714
|
Details
|
|
|
06-06-2013
|
1.50
|
Leveled fuselage
|
Details
|
|
|
05-29-2013
|
3.00
|
"Rolled the Canoe"
|
Details
|
|
|
05-28-2013
|
2.00
|
More forward fuse skin riveting
|
Details
|
|
|
05-27-2013
|
3.00
|
Forward fuse skin riveting
|
Details
|
|
|
05-26-2013
|
0.25
|
Bottom fuse skin rivet stuff
|
Details
|
|
|
05-25-2013
|
2.00
|
Drilled out some bad rivets
|
Details
|
|
|
05-24-2013
|
1.00
|
Forward fuse skin rivets
|
Details
|
|
|
05-23-2013
|
1.00
|
Left forward fuse skin riveting
|
Details
|
|
|
05-22-2013
|
0.75
|
Left forward fuse riveting
|
Details
|
|
|
05-21-2013
|
1.50
|
Backriveted the left forward fuse skin.
|
Details
|
|
|
05-20-2013
|
1.50
|
More backriveting on right forward skin.
|
Details
|
|
|
05-18-2013
|
1.00
|
Installed left side skin rivets
|
Details
|
|
|
05-17-2013
|
1.00
|
Right forward skin riveting continued....
|
Details
|
|
|
05-16-2013
|
0.50
|
Forward cockpit floor clecoed in place
|
Details
|
|
|
05-15-2013
|
1.00
|
Aft fuse skin riveting
|
Details
|
|
|
05-14-2013
|
0.75
|
F-711 bulkhead rivets
|
Details
|
|
|
05-13-2013
|
0.50
|
Riveted on aft end of tail cone
|
Details
|
|
|
05-12-2013
|
0.50
|
Inserted rivets in forward fuse
|
Details
|
|
|
05-11-2013
|
3.00
|
Backriveted right forward fuse skin
|
Details
|
|
|
05-05-2013
|
0.00
|
Rearranged shop
|
Details
|
|
|
05-01-2013
|
1.00
|
Inserted right fuselage skin rivets
|
Details
|
|
|
04-23-2013
|
1.50
|
Applied 3M Firebarrier 2000+ to firewall.
|
Details
|
|
|
04-21-2013
|
1.50
|
Inserted rivets for right forward side skin.
|
Details
|
|
|
04-15-2013
|
1.50
|
Firewall gusset bolts torqued.
|
Details
|
|
|
04-14-2013
|
2.00
|
Worked on F-7114 gussets
|
Details
|
|
|
04-13-2013
|
1.00
|
F-7114 gusset work
|
Details
|
|
|
04-11-2013
|
1.50
|
Forward fuse misc work
|
Details
|
|
|
04-05-2013
|
2.00
|
Forward fuse misc work
|
Details
|
|
|
03-31-2013
|
2.50
|
Clecoed fuselage side skins to skeleton
|
Details
|
|
|
03-29-2013
|
2.50
|
Clecoed center section to aft fuselage
|
Details
|
|
|
03-27-2013
|
1.50
|
Riveted stiffeners to firewall
|
Details
|
|
|
03-26-2013
|
3.00
|
Started riveting the forward fuse
|
Details
|
|
|
03-25-2013
|
2.00
|
More forward fuse parts painting
|
Details
|
|
|
03-24-2013
|
3.00
|
F-705 bulkhead painting
|
Details
|
|
|
03-21-2013
|
0.00
|
Purchased Toshiba laptop
|
Details
|
|
|
03-21-2013
|
1.00
|
Finished deburring right fuse skin.
|
Details
|
|
|
03-17-2013
|
3.00
|
Started painting side skin.
|
Details
|
|
|
03-16-2013
|
2.00
|
Finished dimpling left fuse side skin.
|
Details
|
|
|
03-15-2013
|
1.00
|
Started dimpling left side skin, finally.
|
Details
|
|
|
03-12-2013
|
0.50
|
Still deburring left forward fuse skin.....
|
Details
|
|
|
03-11-2013
|
1.50
|
Deburred left forward side skin
|
Details
|
|
|
03-11-2013
|
0.00
|
Bought double offset back rivet set.
|
Details
|
|
|
03-05-2013
|
1.50
|
Finished countersinking forward fuse parts.
|
Details
|
|
|
03-04-2013
|
2.50
|
Started painting inside fuselage parts....
|
Details
|
|
|
03-03-2013
|
4.00
|
Priming fuse parts.
|
Details
|
|
|
02-17-2013
|
1.50
|
Dimpling and deburring
|
Details
|
|
|
02-16-2013
|
4.00
|
More forward fuse prep......
|
Details
|
|
|
02-15-2013
|
1.00
|
More finish work on longerons.
|
Details
|
|
|
02-13-2013
|
1.50
|
Finished countersinking longerons.
|
Details
|
|
|
02-12-2013
|
1.50
|
Started countersinking the longerons
|
Details
|
|
|
02-11-2013
|
0.75
|
Deburred both longerons
|
Details
|
|
|
02-10-2013
|
4.00
|
Started priming forward fuse parts.
|
Details
|
|
|
02-09-2013
|
4.00
|
Disassembled forward fuse and removed center secti
|
Details
|
|
|
02-05-2013
|
2.00
|
Riveted right side F-684 gusset.
|
Details
|
|
|
01-31-2013
|
2.00
|
Removed left side forward skin.
|
Details
|
|
|
01-30-2013
|
2.00
|
Match drilled all remaining holes in fuselage.
|
Details
|
|
|
01-29-2013
|
1.50
|
Fit and match drilled right side baggage area ribs
|
Details
|
|
|
01-28-2013
|
1.25
|
Fit baggage area side skin ribs.
|
Details
|
|
|
01-27-2013
|
2.00
|
Matched drilled forward fuse floor stiffeners.
|
Details
|
|
|
01-26-2013
|
1.00
|
Match drilled forward fuselage bottom skin.
|
Details
|
|
|
01-21-2013
|
4.00
|
Mounted rudder and brake assy in fuselage
|
Details
|
|
|
01-15-2013
|
2.00
|
Drilled and mounted bottom of master cylinders.
|
Details
|
|
|
01-13-2013
|
1.50
|
Installed split collars, bushings and springs for
|
Details
|
|
|
01-12-2013
|
0.50
|
Mounted last of the four brake pedals
|
Details
|
|
|
01-11-2013
|
2.00
|
Installed long bolts to mount brake pedals.
|
Details
|
|
|
01-07-2013
|
2.00
|
Assembled brake pedal components
|
Details
|
|
|
01-06-2013
|
1.00
|
Painted brake pedals.
|
Details
|
|
|
01-05-2013
|
3.00
|
Finished deburring and priming rudder/brake pedal
|
Details
|
|
|
01-04-2013
|
0.00
|
Visited Grand Rapids Technologies
|
Details
|
|
|
01-01-2013
|
1.00
|
Studied rudder pedal and brake assy drawings
|
Details
|
|
|
12-29-2012
|
2.00
|
F-796B angles, Gerry stopped by
|
Details
|
|
|
12-27-2012
|
3.00
|
Fabbed F-796 spacers and reinforcement angles
|
Details
|
|
|
12-26-2012
|
4.00
|
Match drilled F-902 forward bulkheads.
|
Details
|
|
|
12-20-2012
|
1.00
|
Fabricated other F-684 gusset.
|
Details
|
|
|
12-17-2012
|
1.00
|
Match drilled both F-717 lower longerons
|
Details
|
|
|
12-16-2012
|
2.00
|
Fabricated new F-717-L lower longeron
|
Details
|
|
|
12-10-2012
|
1.25
|
Fabbed and drilled F-684-L gusset.
|
Details
|
|
|
12-09-2012
|
1.50
|
Worked on F-717's again.....
|
Details
|
|
|
12-05-2012
|
0.00
|
Salvaged drawing cabinets from work for the shop.
|
Details
|
|
|
12-04-2012
|
0.00
|
Tail wheel steering link arrived from Flyboy Acces
|
Details
|
|
|
12-03-2012
|
0.50
|
More work on F-717 lower longerons
|
Details
|
|
|
11-13-2012
|
1.50
|
More fitting of F-719B angle clips.
|
Details
|
|
|
11-12-2012
|
1.50
|
Match drilled F-719 skin stiffeners.
|
Details
|
|
|
11-11-2012
|
1.50
|
Fit and drilled F-713's to side skins
|
Details
|
|
|
11-05-2012
|
0.00
|
Put retractable gear on work bench
|
Details
|
|
|
10-30-2012
|
0.00
|
Mounted new band saw on stand.
|
Details
|
|
|
09-27-2012
|
1.00
|
Drilled skins to the fire wall
|
Details
|
|
|
09-24-2012
|
0.50
|
Started clamping skin, longerons and WD-602's
|
Details
|
|
|
09-23-2012
|
1.00
|
Set fire wall in place.
|
Details
|
|
|
09-19-2012
|
1.25
|
Fabbed F-704-L
|
Details
|
|
|
09-15-2012
|
1.50
|
Matched drilled right longeron and trimmed.
|
Details
|
|
|
09-14-2012
|
0.75
|
Started match drilling longerons.
|
Details
|
|
|
09-13-2012
|
1.50
|
Installed F-623 baggage outside ribs.
|
Details
|
|
|
09-13-2012
|
0.00
|
Bell tail wheel arrived.
|
Details
|
|
|
09-10-2012
|
1.50
|
Made conical bend on F-770 forward skins.
|
Details
|
|
|
09-09-2012
|
1.25
|
Reinforced and clecoed arm rests.
|
Details
|
|
|
09-08-2012
|
2.00
|
Installed F-770 forward fuselage skins.
|
Details
|
|
|
09-03-2012
|
6.00
|
Joined aft fuse to center section
|
Details
|
|
|
09-02-2012
|
1.50
|
Drilled and dimpled F-706 bulkhead holes
|
Details
|
|
|
09-01-2012
|
4.00
|
Screwed down cabin floors.
|
Details
|
|
|
08-31-2012
|
1.00
|
Finished cabin bottom skin.
|
Details
|
|
|
08-30-2012
|
1.00
|
More riveting on fuse center bottom skin.
|
Details
|
|
|
08-27-2012
|
1.50
|
Started riveting fuse center bottom skin.
|
Details
|
|
|
08-26-2012
|
7.00
|
Finished riveting seat and baggage ribs to bulkhea
|
Details
|
|
|
08-25-2012
|
3.00
|
Finished riveting seat pan floor nutplates.
|
Details
|
|
|
08-23-2012
|
1.50
|
Starting installing seat ribs.
|
Details
|
|
|
08-19-2012
|
3.00
|
Baggage floor nutplates installed.
|
Details
|
|
|
08-18-2012
|
1.50
|
Started installing center section floor nutplates
|
Details
|
|
|
08-05-2012
|
0.00
|
Colorado vacation.
|
Details
|
|
|
07-30-2012
|
0.00
|
Oshkosh 2012
|
Details
|
|
|
07-04-2012
|
0.50
|
Started deburring fuse center section
|
Details
|
|
|
07-03-2012
|
0.50
|
Finished match drilling right seat and baggage flo
|
Details
|
|
|
06-25-2012
|
1.25
|
Riveted and bolted doublers for seat ribs.
|
Details
|
|
|
06-24-2012
|
3.00
|
Worked on seat rib top covers
|
Details
|
|
|
06-21-2012
|
0.00
|
Nut plate jig, edge marker, sheet deburring tool,.
|
Details
|
|
|
06-17-2012
|
0.00
|
Flew the R/C cub with Colten, went to the range.
|
Details
|
|
|
06-17-2012
|
1.00
|
Clecoed center fuse ribs and floors.
|
Details
|
|
|
06-16-2012
|
3.00
|
Installed crotch strap brackets and seat ribs.
|
Details
|
|
|
06-14-2012
|
0.00
|
Visited a couple new airports, bought an R/C Cub
|
Details
|
|
|
06-12-2012
|
1.00
|
Painted crotch strap brackets.
|
Details
|
|
|
06-11-2012
|
1.50
|
Right side crotch strap bracket prep.
|
Details
|
|
|
06-10-2012
|
4.00
|
Started crotch strap bracket installation.
|
Details
|
|
|
06-09-2012
|
5.00
|
More work on F-704 area.
|
Details
|
|
|
06-08-2012
|
2.50
|
Finished priming center fuse parts.
|
Details
|
|
|
06-07-2012
|
0.00
|
Visited Woolsley Airport tonight.
|
Details
|
|
|
06-07-2012
|
2.50
|
Cleaned and started priming center fuse parts.
|
Details
|
|
|
06-05-2012
|
2.50
|
Finished deburring and started dimpling center fus
|
Details
|
|
|
06-04-2012
|
0.50
|
Deburred some baggage ribs.
|
Details
|
|
|
06-03-2012
|
1.50
|
Deburred center fuse parts.....
|
Details
|
|
|
06-02-2012
|
6.00
|
Started deburring fuse center section
|
Details
|
|
|
05-30-2012
|
2.00
|
Match drilled F-704H's and all seat ribs.
|
Details
|
|
|
05-29-2012
|
2.00
|
Bolted F-704 bulkhead halves together.
|
Details
|
|
|
05-28-2012
|
0.00
|
Selected paint scheme.
|
Details
|
|
|
05-28-2012
|
1.50
|
Made steel F-704 bulkhead spacers to replace woode
|
Details
|
|
|
05-27-2012
|
2.00
|
Fluted F-715 end seat ribs, fabbed attach straps.
|
Details
|
|
|
05-25-2012
|
0.00
|
Visited Gerry and saw his R/C Waco
|
Details
|
|
|
05-25-2012
|
1.00
|
Fluted F-715 end seat ribs.
|
Details
|
|
|
05-21-2012
|
0.75
|
Starting fitting F-623 corner ribs.
|
Details
|
|
|
05-20-2012
|
5.00
|
Started assembly of fuselage center section.
|
Details
|
|
|
05-20-2012
|
0.00
|
Rearranged shop for fuselage assembly.
|
Details
|
|
|
05-17-2012
|
2.50
|
Seat rib and access plate fab
|
Details
|
|
|
05-16-2012
|
0.00
|
Tested four colors for cockpit interior paint.
|
Details
|
|
|
05-16-2012
|
4.25
|
Center fuse seat ribs continued.....
|
Details
|
|
|
05-15-2012
|
3.00
|
Started on fuselage center section.
|
Details
|
|
|
05-12-2012
|
1.50
|
Finished riveting the aft fuse left skin.
|
Details
|
|
|
05-11-2012
|
2.00
|
Finished riveting aft right fuselage skin.
|
Details
|
|
|
05-09-2012
|
2.00
|
Started back riveting aft fuse side skins
|
Details
|
|
|
05-06-2012
|
3.00
|
Started riveting tail cone skin to bulkheads.
|
Details
|
|
|
05-03-2012
|
2.00
|
Drilled out more rivets.
|
Details
|
|
|
05-02-2012
|
0.50
|
Riveted a few more for bottom skin.
|
Details
|
|
|
04-29-2012
|
3.00
|
Riveted aft bottom skin.
|
Details
|
|
|
04-28-2012
|
5.00
|
Finished tail cone, clecoed aft fuse
|
Details
|
|
|
04-26-2012
|
2.00
|
Rivets tail cone parts together.
|
Details
|
|
|
04-25-2012
|
3.00
|
Started clecoing the aft fuselage for final time.
|
Details
|
|
|
04-24-2012
|
0.50
|
Dimpled bulkheads, leveled saw horses.
|
Details
|
|
|
04-23-2012
|
1.00
|
Prepped J-channel stringers
|
Details
|
|
|
04-22-2012
|
4.00
|
Finished tail cone parts prep.
|
Details
|
|
|
04-21-2012
|
0.50
|
Drilled socket access hole in tail cone skin.
|
Details
|
|
|
04-17-2012
|
1.50
|
Match drilled tail cone skin to bulkheads.
|
Details
|
|
|
04-16-2012
|
2.00
|
F-779 spring opening, fitting bulkheads
|
Details
|
|
|
04-14-2012
|
2.00
|
Finished fitting F-779 tail cone skin
|
Details
|
|
|
03-27-2012
|
1.50
|
New F-779 tail cone skin arrived.
|
Details
|
|
|
03-26-2012
|
1.50
|
Finished deburring aft skins, rolled skin edges.
|
Details
|
|
|
03-24-2012
|
1.50
|
Most aft skin deburring
|
Details
|
|
|
03-22-2012
|
1.50
|
Deburred aft fuse skins.
|
Details
|
|
|
03-19-2012
|
1.50
|
Finished deburring aft fuse bottom skin
|
Details
|
|
|
03-18-2012
|
2.00
|
Finished match drilling aft fuse, disassembled it.
|
Details
|
|
|
03-17-2012
|
2.00
|
Match drilled aft fuse J-stringers with Kevin
|
Details
|
|
|
03-13-2012
|
0.00
|
Clecos, baggage tie-downs, F-727 Ribs arrived.
|
Details
|
|
|
03-10-2012
|
1.50
|
Started Fuse Center Section
|
Details
|
|
|
02-19-2012
|
2.00
|
Final fit of tail cone assembly.
|
Details
|
|
|
02-18-2012
|
3.00
|
Finished fitting tail cone assembly to aft fuse.
|
Details
|
|
|
02-16-2012
|
0.25
|
Started to fit tail cone skin to aft fuse.
|
Details
|
|
|
02-12-2012
|
4.00
|
Start work of tail wheel mount and spring
|
Details
|
|
|
02-11-2012
|
2.00
|
Started assembling aft fuselage
|
Details
|
|
|
02-05-2012
|
4.50
|
Finished bends and twists for longerons
|
Details
|
|
|
02-04-2012
|
4.00
|
Finished bulkhead, started longerons
|
Details
|
|
|
02-01-2012
|
1.00
|
Deburred and primed F-709 and F-710
|
Details
|
|
|
01-29-2012
|
2.50
|
Finished F-711 bulkhead
|
Details
|
|
|
01-28-2012
|
1.50
|
Deburred and primed F-711
|
Details
|
|
|
01-26-2012
|
2.00
|
Started Bulkhead F-711
|
Details
|
|
|
01-23-2012
|
1.50
|
Finished 706, 707 and 708
|
Details
|
|
|
01-22-2012
|
3.50
|
More F-706 bulkhead
|
Details
|
|
|
01-19-2012
|
1.00
|
Match drilled F-706
|
Details
|
|
|
01-16-2012
|
2.00
|
Started drilling bell crank support ribs
|
Details
|
|
|
01-16-2012
|
0.00
|
Organized tools on peg board
|
Details
|
|
|
01-15-2012
|
1.50
|
Started F-706 bulkhead
|
Details
|
|
|
01-14-2012
|
2.00
|
F-705 Flap Bearing Blocks Fitted
|
Details
|
|
|
01-09-2012
|
1.50
|
Finished riveting F-705.
|
Details
|
|
|
01-08-2012
|
2.00
|
Started riveting F-705 together.
|
Details
|
|
|
01-07-2012
|
4.50
|
Finished fab and then prepped all F-705 parts
|
Details
|
|
|
01-06-2012
|
1.50
|
Worked on top parts for F-705J
|
Details
|
|
|
01-05-2012
|
1.50
|
More work of F-705....
|
Details
|
|
|
01-04-2012
|
0.00
|
Tools from Brown Tool arrived
|
Details
|
|
|
01-04-2012
|
1.50
|
F-705 bulkhead work....
|
Details
|
|
|
01-03-2012
|
2.00
|
Riveting F-704D's
|
Details
|
|
|
01-02-2012
|
0.00
|
Parts from Vans arrived
|
Details
|
|
|
12-29-2011
|
1.50
|
Riveting F-704D's....
|
Details
|
|
|
12-28-2011
|
0.00
|
Visited Harbor Freight today....
|
Details
|
|
|
12-28-2011
|
1.50
|
F-704 work continues....
|
Details
|
|
|
12-28-2011
|
1.50
|
F-704 Spacer Blocks
|
Details
|
|
|
12-24-2011
|
0.50
|
F-605C doubler issue
|
Details
|
|
|
12-23-2011
|
4.00
|
Started work on F-704 Bulkhead
|
Details
|
|
|
12-22-2011
|
0.50
|
Located parts for F-705 Bulkhead
|
Details
|
|
|
12-19-2011
|
2.00
|
Finished cover support ribs.
|
Details
|
|
|
12-18-2011
|
1.50
|
Started riveting cover support ribs.
|
Details
|
|
|
12-15-2011
|
1.50
|
Support rib prep and prime...
|
Details
|
|
|
12-14-2011
|
1.50
|
Cover support ribs prep and riveting
|
Details
|
|
|
12-13-2011
|
0.50
|
F-704 cover support ribs
|
Details
|
|
|
12-12-2011
|
1.25
|
F-704 bulkhead nutplates
|
Details
|
|
|
12-11-2011
|
3.00
|
F-704 Bulkhead control column mount
|
Details
|
|
|
12-10-2011
|
2.00
|
Started F-704 Bulkhead
|
Details
|
|
|
12-07-2011
|
1.50
|
Finished the firewall, finally....
|
Details
|
|
|
12-06-2011
|
1.50
|
Riveted F-601Z fuel pump doubler
|
Details
|
|
|
12-05-2011
|
1.50
|
Continued backriveting firewall....
|
Details
|
|
|
12-04-2011
|
3.50
|
Riveting firewall....
|
Details
|
|
|
12-02-2011
|
0.50
|
Started riveting firewall
|
Details
|
|
|
12-01-2011
|
0.50
|
Primed firewall parts
|
Details
|
|
|
11-30-2011
|
2.00
|
Finished countersinking firewall parts
|
Details
|
|
|
11-29-2011
|
2.00
|
Dimpled firewall and started countersinking
|
Details
|
|
|
11-28-2011
|
1.50
|
Firewall deburring.......
|
Details
|
|
|
11-27-2011
|
0.00
|
Purchased a drill press clamp and some allen wrenc
|
Details
|
|
|
11-23-2011
|
1.50
|
Finished fuel pump doubler (F-601Z)
|
Details
|
|
|
11-22-2011
|
1.00
|
Final F-601TD angle fit
|
Details
|
|
|
11-21-2011
|
1.00
|
Fabbed F-601TD Brake Line Bracket
|
Details
|
|
|
11-13-2011
|
3.00
|
Started match drilling fire wall.....
|
Details
|
|
|
11-11-2011
|
2.00
|
Fabbed F-601J angles
|
Details
|
|
|
11-10-2011
|
1.50
|
Located Fire Wall Components
|
Details
|
|
|
11-05-2011
|
0.00
|
Inventoried all fuselage hardware
|
Details
|
|
|
11-04-2011
|
0.00
|
Started unpacking and inventorying fuselage kit
|
Details
|
|
|
11-04-2011
|
0.00
|
Fuselage Arrives!
|
Details
|
|
|
10-30-2011
|
0.00
|
Mounted counter top shelf for fuselage skins
|
Details
|
|
|
10-06-2011
|
0.00
|
Moved back into the shop
|
Details
|
|
|
10-03-2011
|
0.00
|
Applied a second coat to some of the floor
|
Details
|
|
|
10-02-2011
|
0.00
|
Epoxy coated the shop floor today
|
Details
|
|
|
10-01-2011
|
0.00
|
Prepped shop floor for epoxy coating
|
Details
|
|
|
09-12-2011
|
0.00
|
9/11/01 Ten Year Anniversary
|
Details
|
|
|
09-09-2011
|
0.00
|
Wing tip attach kit arrived
|
Details
|
|
|
09-02-2011
|
0.00
|
Ordered fuselage kit today
|
Details
|
|
|
07-31-2011
|
0.00
|
Oshkosh 2011 continued
|
Details
|
|
|
07-31-2011
|
0.00
|
Oshkosh 2011
|
Details
|
|
|
07-29-2011
|
0.00
|
Gathering of Eagles after party 2
|
Details
|
|
|
07-28-2011
|
0.00
|
Gathering of Eagles after party 1
|
Details
|
|
|
07-27-2011
|
0.00
|
Bought a rivet cutter and bucking bar at Oshkosh
|
Details
|
|
|
07-24-2011
|
0.00
|
Bought engine stand
|
Details
|
|
|
07-17-2011
|
0.50
|
Trimmed flap outboard hinge pins
|
Details
|
|
|
07-12-2011
|
2.00
|
Installed Left flap hinge pin retainer
|
Details
|
|
|
07-10-2011
|
3.00
|
Fabbed hinge pin retainer, installed flap
|
Details
|
|
|
07-09-2011
|
1.00
|
Worked on Right Flap piano hinge
|
Details
|
|
|
06-29-2011
|
0.00
|
Wider flange flap hinge arrived from Vans
|
Details
|
|
|
06-22-2011
|
0.00
|
Visited Cleaveland Tools in Boone, IA
|
Details
|
|
|
06-13-2011
|
0.00
|
Visited site of B-17 Liberty Belle fire
|
Details
|
|
|
06-13-2011
|
0.50
|
Deburred R flap brace, top side
|
Details
|
|
|
06-07-2011
|
0.50
|
Removed R flap from wing
|
Details
|
|
|
06-05-2011
|
1.50
|
Mounted R wing flap.
|
Details
|
|
|
06-04-2011
|
1.50
|
Mounted R wing aileron
|
Details
|
|
|
06-01-2011
|
1.00
|
Swapped wings between cradle and bench
|
Details
|
|
|
05-31-2011
|
1.00
|
Installed pitot tubing to bay location
|
Details
|
|
|
05-29-2011
|
2.50
|
Mounted pitot tube mount
|
Details
|
|
|
05-26-2011
|
1.50
|
Clecoed L wing bottom skins and match drilled to h
|
Details
|
|
|
05-23-2011
|
1.00
|
Matched drilled L flap hinge to flap brace
|
Details
|
|
|
05-22-2011
|
1.50
|
Adjusted L aileron push rods and torqued
|
Details
|
|
|
05-21-2011
|
0.00
|
Vans order arrived. W-730 jig, rod end bearing, pa
|
Details
|
|
|
05-21-2011
|
2.00
|
Mounted L aileron
|
Details
|
|
|
05-19-2011
|
1.00
|
Fabbed bushing spacers for ailerons
|
Details
|
|
|
05-16-2011
|
1.00
|
Took L wing out of cradle and set on bench.
|
Details
|
|
|
05-15-2011
|
2.50
|
Fabbed W-818 push tubes
|
Details
|
|
|
05-13-2011
|
1.00
|
Assembled aileron push tubes
|
Details
|
|
|
05-12-2011
|
0.00
|
Rudder pedals from Aeromold arrived
|
Details
|
|
|
05-12-2011
|
1.50
|
Cleaned and Primed aileron push rod parts
|
Details
|
|
|
05-11-2011
|
0.50
|
Finished deburring aileron push rod parts
|
Details
|
|
|
05-08-2011
|
0.50
|
Did a little deburring on threaded rod ends
|
Details
|
|
|
05-07-2011
|
1.00
|
Drilled #30 push rod tube holes
|
Details
|
|
|
05-05-2011
|
1.00
|
Started fabbing aileron push rods
|
Details
|
|
|
05-02-2011
|
0.00
|
Flap parts from Vans arrived
|
Details
|
|
|
05-01-2011
|
5.00
|
Finished Left Flap, both flaps now complete.
|
Details
|
|
|
04-30-2011
|
4.00
|
Completed right flap
|
Details
|
|
|
04-26-2011
|
3.00
|
Started riveting the right flap
|
Details
|
|
|
04-25-2011
|
1.00
|
Cleaned and primed R flap parts.
|
Details
|
|
|
04-24-2011
|
1.50
|
Dimpled all R flap parts.
|
Details
|
|
|
04-23-2011
|
4.00
|
Almost finished L flap, started R flap prep.
|
Details
|
|
|
04-22-2011
|
0.00
|
Installed screen for 16' x 7' garage door.
|
Details
|
|
|
04-22-2011
|
2.00
|
Dimpling and riveting L flap
|
Details
|
|
|
04-17-2011
|
3.00
|
Dimpled, cleaned, primed L flap parts.
|
Details
|
|
|
04-16-2011
|
2.50
|
R flap skin prep and 706A fab.
|
Details
|
|
|
04-15-2011
|
2.00
|
Fitted skins and hinge for left flap
|
Details
|
|
|
04-13-2011
|
1.00
|
Match drilled bottom flap skins to ribs
|
Details
|
|
|
04-10-2011
|
1.50
|
Clecoed flap skeletons together
|
Details
|
|
|
04-09-2011
|
3.00
|
Started making the flaps
|
Details
|
|
|
04-08-2011
|
1.00
|
Completed Ailerons!
|
Details
|
|
|
04-07-2011
|
1.00
|
Worked on Aileron leading edge
|
Details
|
|
|
04-06-2011
|
2.50
|
Finished riveting aileron top skins to spar
|
Details
|
|
|
04-04-2011
|
2.00
|
Started riveting ailerons
|
Details
|
|
|
04-03-2011
|
1.50
|
Primed aileron parts.
|
Details
|
|
|
03-31-2011
|
0.50
|
Dimpled and deburred aileron parts
|
Details
|
|
|
03-28-2011
|
1.25
|
Almost finished dimpling aileron parts.
|
Details
|
|
|
03-27-2011
|
4.00
|
Match drilled and deburred aileron parts
|
Details
|
|
|
03-22-2011
|
0.75
|
Match drilled aileron #30 holes
|
Details
|
|
|
03-21-2011
|
1.50
|
Prepped aileron skeletons
|
Details
|
|
|
03-20-2011
|
2.00
|
Aileron bracket prep
|
Details
|
|
|
03-16-2011
|
0.00
|
L-39 Flight with my friend Mike
|
Details
|
|
|
03-13-2011
|
2.50
|
Back riveted aileron stiffeners, bent skins
|
Details
|
|
|
03-11-2011
|
1.50
|
Primed Ailerons
|
Details
|
|
|
03-10-2011
|
1.00
|
Prepped ailerons
|
Details
|
|
|
03-07-2011
|
3.00
|
Started on the ailerons
|
Details
|
|
|
03-06-2011
|
1.50
|
Aileron stiffeners
|
Details
|
|
|
03-05-2011
|
2.50
|
Flap braces
|
Details
|
|
|
03-04-2011
|
1.50
|
Riveted aileron gap seals
|
Details
|
|
|
02-28-2011
|
1.00
|
Primed Aileron gap seals
|
Details
|
|
|
02-27-2011
|
3.00
|
Riveted aileron brackets on wing rear spar
|
Details
|
|
|
02-21-2011
|
1.50
|
Started riveting aileron brackets.
|
Details
|
|
|
02-20-2011
|
3.00
|
Primed and riveted aileron brackets.
|
Details
|
|
|
02-19-2011
|
1.50
|
Prepped aileron brackets
|
Details
|
|
|
02-12-2011
|
0.00
|
Mark T picked up wing jig today
|
Details
|
|
|
02-11-2011
|
1.00
|
Put wings in cradle and tore down wing jig
|
Details
|
|
|
02-05-2011
|
3.00
|
Built the cradle for the wings.
|
Details
|
|
|
01-31-2011
|
1.00
|
Prepped bottom skins
|
Details
|
|
|
01-24-2011
|
1.00
|
Installed R wing conduit hangers
|
Details
|
|
|
01-21-2011
|
1.00
|
Pitot (pee-toe) bracket
|
Details
|
|
|
01-17-2011
|
3.50
|
Completed top skins on R wing
|
Details
|
|
|
01-16-2011
|
2.00
|
Finished L wing top skins, started on R wing
|
Details
|
|
|
01-13-2011
|
1.50
|
Misc wing stuff
|
Details
|
|
|
01-09-2011
|
2.50
|
L wing top skin riveting
|
Details
|
|
|
01-08-2011
|
2.00
|
Riveted L wing top skins.
|
Details
|
|
|
01-07-2011
|
0.75
|
Torqued R tank attach screws
|
Details
|
|
|
01-06-2011
|
1.00
|
Installed wing tank screws to spar
|
Details
|
|
|
01-04-2011
|
0.00
|
Visited Airparts, Inc in Kansas City
|
Details
|
|
|
01-02-2011
|
0.10
|
Torqued some tank attach bolts
|
Details
|
|
|
01-01-2011
|
2.00
|
Started bolting on tanks.
|
Details
|
|
|
12-31-2010
|
15.00
|
Tank Work
|
Details
|
|
|
12-30-2010
|
1.50
|
R Leading Edge Riveting and R Tank
|
Details
|
|
|
12-29-2010
|
1.00
|
R Leading Edge Riveting
|
Details
|
|
|
12-28-2010
|
1.50
|
R Leading Edge Riveting
|
Details
|
|
|
12-22-2010
|
2.00
|
Finished L leading edge riveting
|
Details
|
|
|
12-19-2010
|
1.50
|
Finished riveting L leading edge rib rivets.
|
Details
|
|
|
12-12-2010
|
2.00
|
Aileron Bell Crank install
|
Details
|
|
|
12-05-2010
|
1.50
|
Started riveting leading edge to main spar
|
Details
|
|
|
11-24-2010
|
1.50
|
Leak tested fuel tanks
|
Details
|
|
|
11-24-2010
|
1.00
|
Installed some hangers for wing conduit.
|
Details
|
|
|
11-17-2010
|
0.00
|
Bought pipe hangers for wing conduit
|
Details
|
|
|
10-31-2010
|
2.00
|
Sealed tank end plates
|
Details
|
|
|
10-30-2010
|
1.50
|
Safety wired fuel pick up tubes
|
Details
|
|
|
10-29-2010
|
0.00
|
Proseal, tank test kit, bolt and nut drill jigs ar
|
Details
|
|
|
10-24-2010
|
2.00
|
Mounted fuel pick up tubes and torqued
|
Details
|
|
|
10-23-2010
|
0.50
|
Worked on fuel level floats
|
Details
|
|
|
10-18-2010
|
0.50
|
Sent pics to Vans of wallowed out hole.
|
Details
|
|
|
10-17-2010
|
3.50
|
Installed conduit, AOA and Pitot tubing
|
Details
|
|
|
10-16-2010
|
0.00
|
Visited local RV-6A builder, Jim B
|
Details
|
|
|
10-15-2010
|
0.00
|
Tubing kits and misc tools from Avery arrived
|
Details
|
|
|
09-19-2010
|
0.75
|
Mounted the Dynon roll servo bracket in right wing
|
Details
|
|
|
09-12-2010
|
1.00
|
Colten finished the spare light lens
|
Details
|
|
|
09-11-2010
|
3.00
|
Finished L Wing Landing Light Lens Install
|
Details
|
|
|
09-11-2010
|
0.00
|
Dynon Autopilot Roll Servo arrived from Avery.
|
Details
|
|
|
09-08-2010
|
0.00
|
Visited the boys at Lees Summit again.
|
Details
|
|
|
09-06-2010
|
3.50
|
Installed mount and lens in right wing
|
Details
|
|
|
09-05-2010
|
1.00
|
Installed nutplates on L wing light mount
|
Details
|
|
|
09-01-2010
|
0.00
|
Flew formation with some new friends from Lees Sum
|
Details
|
|
|
08-29-2010
|
0.00
|
Hardware kits arrived from Duckworks
|
Details
|
|
|
08-27-2010
|
1.00
|
Cut hole in left leading edge
|
Details
|
|
|
08-24-2010
|
0.00
|
Flew formation with several RV's
|
Details
|
|
|
08-23-2010
|
1.00
|
Continued on L wing landing light mount
|
Details
|
|
|
08-22-2010
|
2.00
|
Started Left landing light mount installation
|
Details
|
|
|
08-07-2010
|
1.00
|
Clecoed Left inboard skin
|
Details
|
|
|
07-28-2010
|
0.00
|
Oshkosh 2010 Cont.
|
Details
|
|
|
07-26-2010
|
0.00
|
Oshkosh 2010!
|
Details
|
|
|
07-12-2010
|
1.00
|
Installed conduit in L wing
|
Details
|
|
|
03-16-2010
|
0.00
|
Visited San Diego and toured USS Midway
|
Details
|
|
|
03-16-2010
|
0.00
|
More pictures of the USS Midway
|
Details
|
|
|
03-15-2010
|
0.00
|
Marines practicing helicopter/water operations.
|
Details
|
|
|
03-14-2010
|
0.00
|
Visited USS Midway in San Diego, CA
|
Details
|
|
|
03-12-2010
|
1.00
|
Mounted parts drawers, removed tank and leading ed
|
Details
|
|
|
09-19-2009
|
4.00
|
Constructed wings stands and mounted spars
|
Details
|
|
|
09-12-2009
|
0.00
|
Purchased partially completed wing kit
|
Details
|
|
|
07-21-2009
|
0.00
|
Oshkosh 2009, second entry
|
Details
|
|
|
07-20-2009
|
0.00
|
Oshkosh 2009
|
Details
|
|
|
07-09-2009
|
0.00
|
Colten flys RC with Gerry
|
Details
|
|
|
05-13-2009
|
0.00
|
Misc family stuff
|
Details
|
|
|
05-02-2009
|
0.00
|
Justine's Prom, pheasant hunting, paintballing
|
Details
|
|
|
08-03-2008
|
0.00
|
Oshkosh 08, second log entry
|
Details
|
|
|
08-02-2008
|
0.00
|
Oshkosh 2008!
|
Details
|
|
|
04-06-2008
|
0.00
|
Tanner and I went fishing and did some shooting
|
Details
|
|
|
04-06-2008
|
0.00
|
Project Update
|
Details
|
|
|
03-27-2008
|
0.00
|
Family trip to Maui
|
Details
|
|
|
01-27-2008
|
1.50
|
Trimmed right HS skin and mounted elevators.
|
Details
|
|
|
01-25-2008
|
0.75
|
Trimmed left HS skin for elevator clearance.
|
Details
|
|
|
01-21-2008
|
1.00
|
Installed rod end bearings in to horizontal stabil
|
Details
|
|
|
01-20-2008
|
1.00
|
Rolled leading edges of both elevators and riveted
|
Details
|
|
|
01-19-2008
|
2.00
|
Finished riveting trim tab.
|
Details
|
|
|
01-18-2008
|
1.50
|
Match drilled trim tab hinge.
|
Details
|
|
|
01-17-2008
|
1.50
|
Riveted ends of elevator and trim tabs.
|
Details
|
|
|
01-15-2008
|
1.00
|
Riveted bottom flange of trim tab spar to skin.
|
Details
|
|
|
01-14-2008
|
1.00
|
Finished countersinking and edge prepped trim tab.
|
Details
|
|
|
01-13-2008
|
1.00
|
Match drilled trim tab.
|
Details
|
|
|
01-12-2008
|
1.50
|
Bent both inboard and outboard tabs on trim tab.
|
Details
|
|
|
01-08-2008
|
0.50
|
Bent trailing edge of trim tab.
|
Details
|
|
|
01-06-2008
|
2.50
|
Finished riveting L elevator skin.
|
Details
|
|
|
01-05-2008
|
2.00
|
Riveted L elevator skeleton, started on skin.
|
Details
|
|
|
01-04-2008
|
1.00
|
Bent tabs on L elevator, riveted ribs.
|
Details
|
|
|
01-03-2008
|
1.00
|
Marked elevator tabs for bending, made blocks.
|
Details
|
|
|
01-02-2008
|
1.00
|
Mounted elevator trim servo to access plate.
|
Details
|
|
|
01-01-2008
|
1.00
|
Dimpled and countersunk spars, ribs, skins,.....
|
Details
|
|
|
12-30-2007
|
2.50
|
Deburred and primed left elevator components......
|
Details
|
|
|
12-29-2007
|
0.00
|
No-hole yoke arrived.
|
Details
|
|
|
12-29-2007
|
3.50
|
Finished riveting the R elevator.
|
Details
|
|
|
12-29-2007
|
3.00
|
Clecoed and match drilled left elevator skeleton.
|
Details
|
|
|
12-28-2007
|
2.00
|
Riveted R elevator skeleton
|
Details
|
|
|
12-27-2007
|
0.50
|
Riveted Ribs E-703 and 704 together.
|
Details
|
|
|
12-26-2007
|
0.75
|
Cleaned R elevator parts with MEK and primed.
|
Details
|
|
|
12-18-2007
|
1.25
|
Finished dimpling and deburring all R elevator par
|
Details
|
|
|
12-15-2007
|
3.50
|
Dimpled and countersunk R elevator holes
|
Details
|
|
|
12-14-2007
|
2.00
|
Repoured lead counterweights (twice)
|
Details
|
|
|
12-13-2007
|
2.00
|
Prepped the ribs for R elevator
|
Details
|
|
|
12-13-2007
|
1.00
|
Bent trailing edges of elevator skins.
|
Details
|
|
|
12-11-2007
|
2.00
|
Riveted stiffeners to skin.
|
Details
|
|
|
12-11-2007
|
1.00
|
Back riveted E-615 PP servo mount.
|
Details
|
|
|
12-10-2007
|
3.00
|
Finished deburring and primed parts.
|
Details
|
|
|
12-09-2007
|
1.00
|
Deburred some more.....
|
Details
|
|
|
12-07-2007
|
1.25
|
Deburred......
|
Details
|
|
|
12-06-2007
|
1.00
|
Deburred skins and trimmed more plastic.
|
Details
|
|
|
12-04-2007
|
1.25
|
Deburred and trimmed blue plastic.
|
Details
|
|
|
12-03-2007
|
1.25
|
Made stiffeners, match drilled left skin
|
Details
|
|
|
11-26-2007
|
1.25
|
Finished right elevator skin.
|
Details
|
|
|
11-21-2007
|
1.25
|
Match drilled stiffeners to right elevator skin.
|
Details
|
|
|
11-20-2007
|
1.25
|
Continued cleaning up edges of stiffeners.
|
Details
|
|
|
11-19-2007
|
0.50
|
Cleaned up edges on right elevator stiffeners.
|
Details
|
|
|
11-16-2007
|
1.25
|
Trimmed elevator stiffeners.
|
Details
|
|
|
11-12-2007
|
0.25
|
Pulled elevator pieces out of box.....
|
Details
|
|
|
11-04-2007
|
1.50
|
Completed the rudder leading edge.
|
Details
|
|
|
11-01-2007
|
1.25
|
Rolled leading edge of one skin partially.
|
Details
|
|
|
10-30-2007
|
1.50
|
Riveted rudder trailing edge.
|
Details
|
|
|
10-28-2007
|
1.50
|
Used proseal to bond rudder trailing edge.
|
Details
|
|
|
10-26-2007
|
1.25
|
Started on the rudder trailing edge preperation.
|
Details
|
|
|
10-23-2007
|
1.00
|
Finished rudder rib end rivets.
|
Details
|
|
|
10-22-2007
|
1.25
|
Finished all rudder skin - skeleton rivets.
|
Details
|
|
|
10-19-2007
|
1.50
|
Continued riveting rudder skin.
|
Details
|
|
|
10-18-2007
|
1.25
|
Finished counter balance skin.
|
Details
|
|
|
10-17-2007
|
1.50
|
Rudder counter balance rib completed.
|
Details
|
|
|
10-13-2007
|
1.50
|
Finished Rudder reinforce plates, rib, assoc parts
|
Details
|
|
|
10-09-2007
|
1.25
|
Started riveting rudder spar and nut plates.
|
Details
|
|
|
10-07-2007
|
3.50
|
Finished rudder prep and primed everything.
|
Details
|
|
|
10-06-2007
|
2.00
|
Deburred holes for rudder......
|
Details
|
|
|
10-05-2007
|
2.00
|
Match drilled rudder skins, made bottom tip strips
|
Details
|
|
|
10-05-2007
|
1.25
|
Continued on rudder skeleton prep, fluting, match
|
Details
|
|
|
10-04-2007
|
1.25
|
Started building rudder skeleton.
|
Details
|
|
|
10-03-2007
|
1.25
|
Back riveted rudder stiffeners to the skins.
|
Details
|
|
|
10-02-2007
|
1.25
|
Primed stiffeners and skins.
|
Details
|
|
|
10-01-2007
|
1.25
|
Finished stiffeners prep, cleaned and primed three
|
Details
|
|
|
09-30-2007
|
1.00
|
Deburred stiffeners with a little help from Tan Ma
|
Details
|
|
|
09-29-2007
|
0.00
|
Attended "Gathering of RV's" at Poplar Grove
|
Details
|
|
|
09-27-2007
|
1.25
|
Deburred and dimpled rudder skins and stiffeners.
|
Details
|
|
|
09-24-2007
|
1.25
|
Match drilled stiffeners to skins.
|
Details
|
|
|
09-23-2007
|
3.00
|
Trimmed blue plastic and worked on stiffeners.
|
Details
|
|
|
09-22-2007
|
0.00
|
Installed Back Rivet Plate in bench top.
|
Details
|
|
|
09-21-2007
|
1.50
|
Finished VS and made a "flying bench"
|
Details
|
|
|
09-16-2007
|
2.00
|
Started riveting the rear spar.
|
Details
|
|
|
09-15-2007
|
2.00
|
Started riveting the VS skin.
|
Details
|
|
|
09-15-2007
|
2.00
|
Drilled out rivets that I messed up last night.
|
Details
|
|
|
09-14-2007
|
1.00
|
Prepped, cleaned, and primed all VS parts.
|
Details
|
|
|
09-14-2007
|
0.50
|
Clecoed VS skeleton back together.
|
Details
|
|
|
09-13-2007
|
1.00
|
Finished deburring the VS and started dimpling.
|
Details
|
|
|
09-12-2007
|
1.00
|
Disassembled VS and started deburring holes and ed
|
Details
|
|
|
09-07-2007
|
1.00
|
Clecoed on skin and match drilled holes to size #4
|
Details
|
|
|
09-06-2007
|
2.50
|
Drilled VS skeleton holes to size and clecoed skin
|
Details
|
|
|
09-05-2007
|
0.00
|
Received longeron yoke and flush set with boot.
|
Details
|
|
|
09-05-2007
|
0.50
|
Prepped VS ribs
|
Details
|
|
|
09-04-2007
|
0.50
|
Started vertical stabilizer (VS)
|
Details
|
|
|
09-04-2007
|
0.50
|
Drilled holes for VS hinge brackets.
|
Details
|
|
|
09-03-2007
|
3.00
|
Finished the horizontal stabilizer!
|
Details
|
|
|
09-02-2007
|
2.00
|
Made good progress on HS right side.
|
Details
|
|
|
08-26-2007
|
1.00
|
Finished up the HS left side and started on the ri
|
Details
|
|
|
08-25-2007
|
1.00
|
Gerry stopped by and gave some advice and tips.
|
Details
|
|
|
08-23-2007
|
3.00
|
Worked on left HS skeleton and skin.
|
Details
|
|
|
08-23-2007
|
0.00
|
Flood of '07
|
Details
|
|
|
08-22-2007
|
0.00
|
The kids had their first day of school today.
|
Details
|
|
|
08-21-2007
|
1.50
|
Riveted HS 404 and 405 to front spar.
|
Details
|
|
|
08-16-2007
|
2.00
|
Started riveting HS 404 and 405 to front spar.
|
Details
|
|
|
08-15-2007
|
1.50
|
Drilled out rivet and primed rear spar.
|
Details
|
|
|
08-14-2007
|
1.50
|
Finished cleaning and priming HS parts.
|
Details
|
|
|
08-12-2007
|
1.50
|
Started priming the HS parts for corrosion protect
|
Details
|
|
|
08-10-2007
|
0.00
|
Finished stapling carpet to Big D table.
|
Details
|
|
|
08-08-2007
|
1.50
|
Started dimpling the HS skins....
|
Details
|
|
|
08-06-2007
|
2.50
|
More deburring and edge finishing.
|
Details
|
|
|
08-03-2007
|
1.50
|
More deburring HS ribs and skins.
|
Details
|
|
|
08-02-2007
|
1.50
|
Marked all HS pieces and started deburring.
|
Details
|
|
|
07-31-2007
|
1.00
|
Pulled skin off skeleton and pulled off blue plast
|
Details
|
|
|
07-30-2007
|
0.00
|
Oshkosh Pics 3
|
|
|
|
07-30-2007
|
0.00
|
Oshkosh Pics 2
|
|
|
|
07-30-2007
|
0.00
|
Attended Oshkosh Airventure
|
Details
|
|
|
07-25-2007
|
2.50
|
Drilled rib flange holes to spar and match drilled
|
Details
|
|
|
07-23-2007
|
1.00
|
Drilled and clecoed HS-405 ribs, called Van's
|
Details
|
|
|
07-19-2007
|
1.00
|
Fluted and straightened ribs for horizontal stab
|
Details
|
|
|
07-15-2007
|
2.00
|
Prepared and clecoed HS skin to skeleton.
|
Details
|
|
|
07-13-2007
|
1.00
|
Assembled horizontal stabilizer skeleton
|
Details
|
|
|
07-09-2007
|
2.00
|
Dimpled/countersunk front spar, worked on ribs.
|
Details
|
|
|
07-08-2007
|
0.00
|
Visited the Veterans Memorial in my home town.
|
Details
|
|
|
07-08-2007
|
2.00
|
Front spar tabs and modifications
|
Details
|
|
|
07-06-2007
|
1.50
|
Started on the empennage front spar.
|
Details
|
|
|
07-02-2007
|
2.50
|
Clecoed rear spar back together and started riveti
|
Details
|
|
|
06-30-2007
|
3.00
|
Began fabricating the rear spar for the horizontal
|
Details
|
|
|
06-25-2007
|
0.00
|
Cleaned and rearranged the shop.
|
Details
|
|
|
06-23-2007
|
0.00
|
Fabricated table for the DRDT-2 Dimpler
|
Details
|
|
|
06-22-2007
|
2.00
|
Completed inventory of entire tail kit
|
Details
|
|
|
06-20-2007
|
0.00
|
Finished building the work table.
|
Details
|
|
|
06-19-2007
|
0.00
|
Started building a 3' X 8' Work Table
|
Details
|
|
|
06-17-2007
|
0.00
|
Fathers Day Weekend
|
Details
|
|
|
06-13-2007
|
0.00
|
Visited Burley, Idaho and took some pictures of th
|
Details
|
|
|
06-11-2007
|
0.00
|
Finished Major Portion of Shed
|
Details
|
|
|
05-06-2007
|
0.00
|
Toured around EAA's Pioneer Field in Oshkosh
|
Details
|
|
|
05-06-2007
|
0.00
|
Attended a SportAir RV construction workshop.
|
Details
|
|
|
05-03-2007
|
0.00
|
Worked on the practice tool box and finished it up
|
Details
|
|
|
05-01-2007
|
0.00
|
Put some siding on the shed.
|
Details
|
|
|
04-22-2007
|
0.00
|
Framed walls and hung plywood sheeting for storage
|
Details
|
|
|
04-18-2007
|
0.00
|
Messed around with the tool box project.
|
Details
|
|
|
04-15-2007
|
0.00
|
Laid out sill and hung storage area ceiling
|
Details
|
|
|
03-16-2007
|
0.00
|
Gerry came over today to check out my tail kit and
|
Details
|
|
|
03-15-2007
|
0.00
|
Dimpled tool box and drove my first rivet!
|
Details
|
|
|
03-14-2007
|
0.00
|
The DRDT-2 Dimpler arrived and was assembled
|
Details
|
|
|
03-14-2007
|
0.00
|
Started on practice tool box kit
|
Details
|
|
|
03-10-2007
|
0.00
|
Put together toolbox/cart and inventoried tools fr
|
Details
|
|
|
03-08-2007
|
0.00
|
Tailkit Arrived
|
Details
|
|
|
03-03-2007
|
0.00
|
Ordered DRDT-2 Dimpler
|
Details
|
|
|
03-01-2007
|
0.00
|
Took a demo flight in the RV-7A
|
Details
|
|
|
02-28-2007
|
0.00
|
Ordered Empennage Kit
|
Details
|
|
|
02-27-2007
|
0.00
|
Why I'm building an RV-7
|
Details
|
|
|
09-03-2006
|
0.00
|
Flew on EAA's B-17G
|
Details
|
|
|
09-03-2006
|
0.00
|
B-17G ride and pictures
|
Details
|
|
|
07-30-2006
|
0.00
|
Camped at Oshkosh AirVenture with Jim and Jack
|
Details
|
|