KitLog pro

Powered By Kitlog Pro v2.0

BushCaddy ELSA
Work Logs Found: 301
Category Work Time: 738 Hours
 Date
Hours
Work Log Summary

Details

 06-05-2011
0.00
Testing the air cooling
Details

 03-27-2010
3.50
Installation of MC BRKT
Details
       

 09-09-2009
1.00
Checked wheels bearings
Details

 09-02-2009
0.00
Bushcaddy Flight test Manual
Details

 09-01-2009
0.00
Bushcaddy Flight test
Details

 08-24-2009
1.50
DAR visit
Details
       

 08-23-2009
0.00
Monday is the day
Details

 08-01-2009
2.00
Closer
Details
       

 07-26-2009
3.00
Completing the preflight checks of all hardware
Details
       

 07-21-2009
2.00
Moved Carb Heat cable
Details
       

 07-18-2009
0.00
More pictures
       

 07-18-2009
6.00
Finished the wing gap seals
Details
       

 07-17-2009
2.00
Raise fuel lines
Details
       

 07-05-2009
7.00
Worked on right wing gap seal
Details
       

 07-02-2009
2.00
Wing Gap Seal
Details
       

 06-27-2009
5.00
Added 10 gal of 100 LL to fuel tanks.
Details
       

 06-26-2009
3.00
Installed jury struts
Details
       

 06-17-2009
1.50
Elevator deflections
Details

 06-16-2009
2.00
Fuel Guages
Details
       

 06-15-2009
1.00
Aileron limits
Details
       

 06-13-2009
10.00
Aileron control and prop
Details
       

 06-12-2009
5.00
Fuel drain valves
Details
       

 06-06-2009
2.00
Put wings on
Details
       

 05-31-2009
4.00
Navigation light wiring and wing tip on left wing
Details
       

 05-30-2009
8.00
Finishing the little things
Details
       

 05-25-2009
1.50
Paint the struts
Details
       

 05-23-2009
1.00
Primed the struts
Details
       

 05-20-2009
1.50
Fuel system
Details

 05-19-2009
2.50
Matco brakes and tail wheel springs
Details
       

 05-17-2009
2.50
N620MP move to Hanger
Details
       

 05-16-2009
4.00
Ram ducts bleed air to the coils
Details
     

 05-10-2009
2.00
PTT
Details
       

 05-09-2009
5.00
F/W insulation, Parking brake valve
Details
       

 05-03-2009
6.00
Parking Brake, Seat blets navigation lights wiring
Details
       

 04-22-2009
1.00
New attachment on left side
Details
       

 04-18-2009
5.00
Finishing up some wiring connections
Details
       

 04-09-2009
1.50
Securing wiring FWF and parking brake valve
Details
       

 04-07-2009
0.00
Use this web site to order your Electrical supplie
Details

 04-05-2009
3.00
Odds and Ends
Details
       

 04-03-2009
2.00
Brakes and 12 volt outlet
Details

 04-02-2009
3.00
EIS trouble shooting and starter solenoid wiring
Details

 04-01-2009
4.00
Continued wiring of panel
Details
       

 03-31-2009
4.00
Wiring
Details

 03-08-2009
2.50
Engine throttle cable
Details

 02-04-2009
2.00
Magnetometer Installation
Details
       

 02-01-2009
3.00
Wired Magnetos to switch
Details

 01-24-2009
4.00
Continued working on wiring and fuel system
Details
       

 01-22-2009
1.00
Wiring
Details

 01-20-2009
1.50
Wired CHT's
Details
       

 01-18-2009
3.00
Re setting the rudder cables
Details
       

 01-14-2009
1.00
Wings to the hanger
Details
     

 01-04-2009
6.00
Wiring the panel and FWF
Details
       

 12-13-2008
3.00
Worked on elecrical plan
Details

 11-22-2008
4.00
Wnishield install
Details
       

 11-15-2008
3.00
Bolting on all the parts
Details
       

 11-11-2008
1.00
Panel
Details

 10-21-2008
2.00
CHT probes and throtlte cable install
Details
       

 10-04-2008
1.00
Avionics
Details
     

 09-20-2008
4.00
worked on horizontal, rudder, panel and avionics
Details
       

 09-14-2008
2.50
The last of the parts to be painted right now.
Details
       

 09-13-2008
2.50
White Eco-Primer and filler
Details
       

 09-12-2008
2.00
Eco-Fill on fiberglass part
Details
       

 09-07-2008
4.00
Painting
Details
       

 09-06-2008
3.50
To day was a Santa Fe Burgundy Day
Details
       

 09-06-2008
0.50
Moved the air box
Details
       

 09-04-2008
1.50
Fix the little mistakes from last night painting
Details
       

 09-03-2008
4.00
Yellow top coat on fuselage
Details
       

 09-02-2008
1.50
Fuselage primed
Details
       

 09-01-2008
6.00
Pre-pared fuselage for priming
Details
       

 08-31-2008
2.00
Left wing top coat
Details
       

 08-30-2008
3.50
Left wing prime
Details
     

 08-16-2008
4.50
Repaint of small parts
Details
       

 08-15-2008
4.50
Learning curve
Details
     

 08-14-2008
3.00
Well this is why we build
Details

 08-13-2008
5.00
One wing primed
Details
       

 08-12-2008
5.00
Primer on
Details
       

 08-12-2008
3.00
More pictures
Details
       

 08-11-2008
3.00
Paint both
Details
       

 08-10-2008
4.00
Paint Boot set up
Details
       

 08-07-2008
1.50
Cut out openings in panel
Details
     

 08-06-2008
2.00
Setting paint booth
Details
     

 07-28-2008
3.00
Installed aft left side fuel line.
Details
       

 07-21-2008
1.50
Cowling oil door and side doors
Details
       

 07-20-2008
3.00
Fuel system
Details
       

 07-14-2008
1.00
Jim from Jabiru Pacific vist
Details

 07-06-2008
3.00
NACA intake scoops and top cowling
Details
       

 06-28-2008
3.50
Cowling top and engine hatches.
Details
       

 06-22-2008
3.00
Laid up my first fiber glass part and finished the
Details
       

 06-21-2008
2.00
Cowling screws and oil cooler mold
Details
       

 06-16-2008
1.00
Cut out exhaust opening
Details
       

 06-13-2008
3.50
Nut plates
Details

 06-12-2008
1.00
Cowling
Details

 06-11-2008
1.50
Fit up top opening cowls
Details
       

 05-31-2008
4.00
Lower Cowling
Details
       

 05-29-2008
2.00
pattern for cowling
Details
       

 05-24-2008
3.00
Started stabilizing the Nosebowl
Details
       

 05-17-2008
1.00
Oil Cooler
Details
       

 05-17-2008
3.50
Instaled ram air ducts
Details
       

 05-10-2008
3.00
Worked on Cowling and oil coler
Details
       

 05-07-2008
1.50
Mounted air cowlinf for engine
Details
       

 05-03-2008
3.00
Installed Second Engine Mount
Details
       

 03-22-2008
6.50
Set the wings to the fuselage
Details
       

 03-22-2008
0.00
More instructions on setting wings
Details

 03-22-2008
0.00
More instruction on setting the wings
Details

 02-08-2008
2.00
Worked on interior and Rudder limit.
Details
       

 02-02-2008
3.00
Electrical Drawing
Details

 01-15-2008
1.00
Worked on interior coverings
Details
       

 01-13-2008
2.50
Cargo deck covering
Details
     

 01-10-2008
1.00
Aileron pully
Details

 01-05-2008
3.50
Installed fire wall components
Details
       

 01-03-2008
2.00
Checked the engine to thrust line.
Details
       

 12-18-2007
1.00
Heat Muff
Details
       

 12-15-2007
1.00
Heat muff
Details
       

 12-15-2007
3.50
FWF and engine
Details
       

 12-08-2007
2.00
Worked on FWF parts
Details
       

 12-06-2007
1.50
Mounted engine to engine mount then to FW
Details
       

 11-28-2007
1.00
Installed engine mount for fwf setup
Details
     

 11-02-2007
1.00
Shock Cords
Details
       

 10-29-2007
1.00
Static ports
Details
       

 10-22-2007
0.50
The engine has arived.
Details
       

 10-22-2007
0.50
Riveted Vertical stabilizer leading edge.
Details
     

 10-06-2007
2.00
Set winsheild in place and drilled flashing for ri
Details
       

 09-30-2007
0.50
Cable Guide
Details

 09-25-2007
0.50
Nut plates for access pannel on left side of verti
Details

 09-23-2007
1.00
Trim Control
Details
       

 09-16-2007
3.00
Finished Left aileron
Details
       

 09-15-2007
2.00
Left Aieron skin
Details
     

 09-09-2007
1.00
Right side of fuselage
Details
       

 09-08-2007
2.00
Started left Aileron
Details
       

 09-06-2007
1.00
Tail strobe
Details
       

 09-06-2007
0.00
Pictures
       

 09-04-2007
1.00
Elevator deflection set
Details
       

 09-03-2007
3.00
Worked on Aileron cable and pulleys
Details
       

 09-03-2007
2.00
Elevator spring conections
Details
       

 09-02-2007
1.00
Aileron cables
Details
       

 09-01-2007
0.00
Picturs
       

 09-01-2007
3.00
More work on controls
Details
       

 08-29-2007
1.00
Rudder cables
Details
       

 08-28-2007
1.00
Control rod cover
Details
       

 08-27-2007
1.00
Part 297
Details
     

 08-24-2007
1.00
Bead blasted main landing gear
Details
       

 08-23-2007
1.00
Rudder cables
Details

 08-21-2007
0.00
Tip #3
Details

 08-21-2007
2.00
Control rod ends
Details
     

 08-18-2007
3.00
Started installing controls
Details
       

 08-16-2007
4.00
Skin second elevator
Details
       

 08-06-2007
2.00
Aileron bellcrank cover and wing tip
Details
       

 08-05-2007
6.00
Trailing edge and nose skin
Details
       

 08-03-2007
1.00
Riveted K-331
Details

 08-02-2007
0.50
K-331 deburred
Details

 08-01-2007
1.00
Worked on K-331
Details
     

 07-30-2007
2.50
Left wing bottom skin and Pitot tube
Details
       

 07-28-2007
2.00
Leading edge ribs and bottom skin
Details
       

 07-27-2007
1.00
Finished Installing RLI Pitot
Details
     

 07-26-2007
1.50
Worked on installing the Reserve Lift Indicator Pi
Details
       

 07-25-2007
1.50
Worked on left inspection cover for airleron
Details
       

 07-24-2007
2.75
left wing ribs and stringers
Details
       

 07-23-2007
0.75
Left wing bottom skin
Details

 07-22-2007
1.50
Left wing bottom skin
Details
       

 07-21-2007
4.50
Left wing bottom skin
Details

 07-20-2007
5.00
Left wing top skin
Details

 07-19-2007
2.50
Top skin on left wing
Details
       

 07-17-2007
2.50
Left wing top skin
Details
       

 07-16-2007
2.00
Left wing
Details
       

 07-15-2007
1.00
Squared and clecoed rib, spares, nose ribs and tra
Details
       

 07-07-2007
0.50
Glare shield solid rivets completed
Details
     

 07-05-2007
1.00
Completed left side door
Details
       

 07-01-2007
1.00
Mounted the left door
Details

 06-30-2007
4.00
Left wing ribs
Details
       

 06-29-2007
1.00
Left wing ribs
Details

 06-27-2007
1.00
Worked on ribs 7 - 10
Details
     

 06-26-2007
2.00
Started rib for left wing
Details
       

 06-25-2007
2.50
Left wing ribs
Details
       

 06-21-2007
3.00
Right Aileron
Details
     

 06-20-2007
2.00
Worked on skin of Right aileron
Details
       

 06-19-2007
1.00
Aileron skin
Details
     

 06-18-2007
3.00
Drilled and clecoed left Aileron
Details
       

 06-17-2007
2.50
Started the Ailerons
Details
       

 06-14-2007
2.50
Fininshed the wing tonight
Details
       

 06-13-2007
1.50
Finished trailing edge skin
Details
       

 06-11-2007
2.00
Riveted leading edge of right wing
Details
       

 06-10-2007
2.00
Right Wing nose skin
Details

 06-09-2007
5.00
Right wing nose skin
Details
       

 06-08-2007
7.50
Rivet bottom skin
Details
       

 06-07-2007
4.50
Bottom Skin
Details
       

 06-05-2007
2.50
Bottom skin
Details
       

 06-04-2007
4.00
Right wing bottom skin
Details
       

 06-03-2007
0.00
Pictures
       

 06-03-2007
4.00
Bottom of right wing
Details
       

 06-02-2007
6.00
Finished deburring ribs and frames
Details
       

 05-29-2007
0.50
Top Skin
Details

 05-28-2007
2.00
Top skin
Details

 05-25-2007
2.50
Rib to skin rivet line
Details

 05-24-2007
4.50
Top skin
Details
       

 05-23-2007
1.50
Worked on U stringers to RIbs
Details
       

 05-22-2007
1.50
U stringers
Details
       

 05-21-2007
2.50
Primed U stringers
Details
     

 05-19-2007
1.00
Right wing ribs
Details
       

 05-19-2007
5.50
Right Wing
Details
       

 05-18-2007
3.50
RIb on right wing
Details
       

 05-17-2007
1.50
Laid out right wing spars and squared.
Details
       

 05-16-2007
3.00
Primed and Riveted left wing spars
Details
       

 05-15-2007
4.00
Left wing spars
Details
       

 05-14-2007
2.50
Riveting right wing spars
Details
       

 05-13-2007
1.00
Primed the Right wing spars
Details
     

 05-10-2007
1.00
Finished setup on right front wing spar
Details
       

 05-09-2007
2.50
Right wing
Details
       

 05-07-2007
3.00
Started the Right wing
Details
       

 05-06-2007
3.00
Installed rudder pedals
Details
       

 05-05-2007
6.00
Installed landing gear
Details
       

 05-04-2007
1.00
Finished the right seat rail
Details
       

 05-03-2007
1.50
Completed right seat frame
Details
       

 05-02-2007
1.00
worked on vertical stbilizer strobe
Details
     

 05-01-2007
1.50
worked on left seat frame
Details
     

 04-29-2007
2.00
Completed Left seat frame
Details
     

 04-26-2007
1.00
Seat frame
Details

 04-25-2007
1.00
Started seat construction
Details
       

 04-24-2007
1.00
Right Elevator
Details
     

 04-24-2007
2.00
Left door
Details
     

 04-21-2007
6.00
Worked on elevator
Details
       

 04-21-2007
1.00
Change the door skin
Details
       

 04-19-2007
0.50
Installed door handle on right door
Details
       

 04-19-2007
2.00
Cleaned and primed second elevator parts
Details
       

 04-19-2007
0.00
Bolt Torque
Details

 04-18-2007
1.50
Mounted rudder on vertical stabilizer
Details
     

 04-17-2007
1.00
Installed lift strut on right door
Details
       

 04-16-2007
0.50
Worked on the Left door PH-234
Details
       

 04-14-2007
2.50
Worked on right door
Details
       

 04-14-2007
0.00
More door pictures
       

 04-14-2007
1.50
finished attaching landing gear brackets
Details

 04-14-2007
1.50
Drilled holes in glare shield
Details
       

 04-13-2007
1.50
Started spraying out cargo area
Details
       

 04-12-2007
1.50
Installed PG-228
Details
       

 04-09-2007
0.50
Cleaning up loose ends
Details
       

 04-07-2007
4.00
Worked on cabin fuselage top
Details
       

 04-07-2007
0.00
Total picture
     

 04-06-2007
7.00
Worked on cabin to fuselage skin and primed roof p
Details
       

 04-04-2007
0.00
More pictures
Details
       

 04-04-2007
0.00
More cargo door pictures
Details
       

 04-04-2007
2.50
Completed cargo door installation
Details
       

 04-03-2007
2.00
Smoothed out edges of cargo door
Details
       

 04-02-2007
4.00
Curt out for cargo door
Details
       

 04-01-2007
3.00
Attaching cabin to fuselage and side skins
Details
       

 03-28-2007
0.50
Vist by A&P
Details
     

 03-27-2007
4.50
Finished cabin roof
Details
       

 03-26-2007
3.00
Finished the solid rivets on the cabin front skin
Details
       

 03-25-2007
5.00
Workd on cabin skin and glare shield
Details
       

 03-24-2007
7.00
Rudder pedals and front cabin skins
Details
       

 03-23-2007
2.00
Completed landing gear instalation on bottom of ca
Details
     

 03-22-2007
1.50
Landing Gear brackets
Details
     

 03-21-2007
1.00
Continued to work on bottom rivets
Details

 03-20-2007
3.00
Continued to work on cabine
Details
     

 03-19-2007
4.25
Worked on bottom skin
Details
       

 03-19-2007
0.00
Use the rivet spacer gauge for drilling perfict ri
Details
     

 03-17-2007
2.00
Worked on cabin top and Primed bottom panels
Details
     

 03-15-2007
2.00
Installed PF-183, PF-184 & PF-185
Details
       

 03-15-2007
0.00
Bending the flang ends on PF-183 & PF183
Details
       

 03-14-2007
1.25
Riveted front left panel on fuselage
Details
     

 03-14-2007
2.00
Cabin top and front
Details
       

 03-12-2007
2.00
Firewall installation
Details
       

 03-10-2007
2.00
Back of cabin
Details
       

 03-09-2007
4.00
Riveted and installed cabin parts primed
Details
       

 03-08-2007
3.50
Cabin brackets
Details
       

 03-07-2007
3.00
Cabin top framing
Details
       

 03-06-2007
4.50
Left cabin side and ASS-001
Details
       

 03-05-2007
2.50
Riveting the cabins right side
Details
       

 03-04-2007
0.50
Primed Left cabin side parts.
Details

 03-01-2007
1.50
Left cabin side
Details

 02-25-2007
2.50
Started the cabin
Details
       

 02-24-2007
7.00
Bottome Skin work
Details
       

 02-23-2007
4.00
Bottom Skin
Details
     

 02-22-2007
1.50
Left horizontal stabilizer bootm skin
Details
     

 02-22-2007
1.50
Installed bottom stringers
Details
       

 02-21-2007
6.00
Continued working on horizontal stablizer
Details
       

 02-20-2007
3.00
Worked on Left horizontal stabilizer
Details
       

 02-09-2007
6.00
Primed and riveted horizontal stringers in place
Details
       

 02-08-2007
2.00
Worked on horizontal stabilizer
Details
       

 02-07-2007
2.00
Vertical Stabilizer skin on both sides
Details
       

 02-06-2007
0.75
Horizontal Stabilizer alignment
Details
       

 02-06-2007
2.25
Continued fitting up skin on vertical stabilizer
Details

 02-04-2007
4.00
PB-46 & 47 on right side.
Details
       

 02-03-2007
8.00
Time for skin
Details
       

 02-02-2007
4.00
Continued on vertical Stabilizer frame.
Details
       

 02-01-2007
2.00
Started the Vertical Stabilizer
Details
     

 01-25-2007
9.00
PD-89 & PD-90
Details
       

 01-24-2007
1.00
Triming B-29 and B-76
Details
     

 01-24-2007
0.50
PB-24
Details
       

 01-21-2007
2.00
PA-022 Riveted
Details
     

 01-20-2007
6.00
Bulkhead 07, PA-012 & PA-013, Skin work
Details
       

 01-19-2007
2.00
Installed PA-014
Details
       

 01-16-2007
2.50
Top Outside corners
Details
       

 01-15-2007
0.00
Tip #2
Details

 01-15-2007
3.00
Drilled and clecoed PA-011 on left outside corner
Details
       

 01-13-2007
6.50
Installing A-10 inside corner
Details
       

 01-10-2007
3.50
Lower inside cornners
Details
       

 01-08-2007
2.50
Installing A-015 and A-014 & Priming
Details
       

 01-06-2007
6.00
Alignment of bulheads and top U stringer
Details
       

 01-04-2007
1.50
Attaching rudder cable guid blocks
Details
       

 01-03-2007
2.00
Setting up Bulkheads A-001 & A-006
Details
       

 01-02-2007
0.00
Tip #1
Details

 12-29-2006
4.00
Building the rudder at Busscaddy USA
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.