Date
|
Hours
|
Work Log Summary

|
Details

|
08-06-2007
|
3.00
|
Dimpling and riveting rudder skins and stiffeners
|
Details
|
  |
|
08-05-2007
|
4.00
|
Riveting stiffeners to Rudder skin
|
Details
|
|
|
07-31-2007
|
4.00
|
Finished metal work for vertical stabilizer
|
Details
|
 |
|
07-27-2007
|
6.00
|
Completed Horizontal Stabilizer subassembly.
|
Details
|
 |
|
07-21-2007
|
5.00
|
Riveting HS
|
Details
|
 |
|
07-18-2007
|
6.00
|
Joined the two horizontal stabilizers.
|
Details
|
|
|
07-08-2007
|
2.00
|
Councelor Tom Hunter does magic with bad rivets.
|
Details
|
  |
|
07-06-2007
|
4.00
|
New technical advisor Tom Hunter
|
Details
|
  |
|
07-01-2007
|
3.00
|
Rudder stiffeners
|
Details
|
  |
|
06-30-2007
|
2.00
|
Riveting
|
Details
|
  |
|
06-23-2007
|
4.00
|
Riveting aft VS spar and spar doubler. Riveting ri
|
Details
|
  |
|
06-23-2007
|
5.00
|
EAA Technical Advisor Mike Laubach's visit.
|
Details
|
  |
|
06-20-2007
|
8.00
|
Started on Vertical Stabilizer
|
Details
|
  |
|
06-14-2007
|
6.00
|
Getting ready to rivet HS skeleton and skin
|
Details
|
|
|
06-06-2007
|
2.50
|
Match drill all 3/32 holes in Rt. HS and dissasemb
|
|
  |
|
06-05-2007
|
6.00
|
repeating left horizontal stabilizer tasks on Rt.
|
Details
|
  |
|
05-22-2007
|
3.00
|
Countersinking
|
Details
|
|
|
04-25-2007
|
2.00
|
Finish platform for dimpler. Dimple ribs and skin
|
Details
|
|
|
04-23-2007
|
5.00
|
table for dimpler
|
Details
|
|
|
04-16-2007
|
0.50
|
Fixing the DRDT-2
|
Details
|
  |
|
04-05-2007
|
4.00
|
Possible problem with dimpler. Worked on "table" f
|
Details
|
|
|
04-03-2007
|
3.00
|
Deburring and vinyl stripping
|
Details
|
  |
|
04-02-2007
|
5.00
|
Disassemble L HS, deburr, remove vinly strips
|
Details
|
|
|
03-30-2007
|
3.00
|
Match drill (#40) of skins to spars and ribs
|
Details
|
  |
|
03-29-2007
|
3.00
|
Cleco the skin to the skeleton of L Hor. Sabilizer
|
Details
|
|
|
03-28-2007
|
4.00
|
Cleco spar to doubler, ribs to spar, skin, left
|
Details
|
|
|
03-23-2007
|
3.00
|
Match dilled the fibricated attach angles. Made ji
|
Details
|
|
|
03-22-2007
|
3.00
|
Attach angle fabrication
|
Details
|
  |
|
03-17-2007
|
1.00
|
Technical Advisor visit
|
Details
|
|
|
03-16-2007
|
4.00
|
Fabricating attach angles; second try.
|
Details
|
|
|
03-13-2007
|
2.00
|
Deburring and descratching
|
Details
|
  |
|
03-09-2007
|
4.00
|
Deburred, fluted, clecoed, and match drilled HS ri
|
Details
|
|
|
03-08-2007
|
2.00
|
Deburred ribs
|
Details
|
  |
|
03-07-2007
|
3.00
|
Match drilled 8 brackets; fabricated and drilled s
|
Details
|
  |
|
03-05-2007
|
4.00
|
New vise, rear spar & doubler match drilled
|
Details
|
 |
|
03-04-2007
|
3.00
|
Fabrication of HS attach angle
|
Details
|
  |
|
03-03-2007
|
2.00
|
Cut aluminum angle with hacksaw
|
Details
|
|
|
03-02-2007
|
2.00
|
Tecnical Councellor Visit
|
Details
|
  |
|
02-28-2007
|
3.00
|
In persuit of a bandsaw
|
Details
|
  |
|
02-26-2007
|
1.00
|
Match drill forward spars to doubler
|
Details
|
 |
|
02-23-2007
|
4.00
|
Bench Grinder, Drill Press, Shop Vacuum
|
Details
|
|
|
02-08-2007
|
4.00
|
Avery RV Builders Tool Kit
|
Details
|
|
|
02-06-2007
|
1.00
|
DRDT-2 Hand Dimpling Tool
|
Details
|
 |
|
02-01-2007
|
12.00
|
Craftsman Oil lubricated Air compressor
|
Details
|
 |
|
01-30-2007
|
22.00
|
Garage preparation
|
Details
|
|