KitLog pro

Powered By Kitlog Pro v2.0

Buds Web Site
Work Logs Found: 45
Category Work Time: 183 Hours
 Date
Hours
Work Log Summary

Details

 08-06-2007
3.00
Dimpling and riveting rudder skins and stiffeners
Details

 08-05-2007
4.00
Riveting stiffeners to Rudder skin
Details
       

 07-31-2007
4.00
Finished metal work for vertical stabilizer
Details
     

 07-27-2007
6.00
Completed Horizontal Stabilizer subassembly.
Details
     

 07-21-2007
5.00
Riveting HS
Details
     

 07-18-2007
6.00
Joined the two horizontal stabilizers.
Details
       

 07-08-2007
2.00
Councelor Tom Hunter does magic with bad rivets.
Details

 07-06-2007
4.00
New technical advisor Tom Hunter
Details

 07-01-2007
3.00
Rudder stiffeners
Details

 06-30-2007
2.00
Riveting
Details

 06-23-2007
4.00
Riveting aft VS spar and spar doubler. Riveting ri
Details

 06-23-2007
5.00
EAA Technical Advisor Mike Laubach's visit.
Details

 06-20-2007
8.00
Started on Vertical Stabilizer
Details

 06-14-2007
6.00
Getting ready to rivet HS skeleton and skin
Details
       

 06-06-2007
2.50
Match drill all 3/32 holes in Rt. HS and dissasemb

 06-05-2007
6.00
repeating left horizontal stabilizer tasks on Rt.
Details

 05-22-2007
3.00
Countersinking
Details
       

 04-25-2007
2.00
Finish platform for dimpler. Dimple ribs and skin
Details
       

 04-23-2007
5.00
table for dimpler
Details
       

 04-16-2007
0.50
Fixing the DRDT-2
Details

 04-05-2007
4.00
Possible problem with dimpler. Worked on "table" f
Details
       

 04-03-2007
3.00
Deburring and vinyl stripping
Details

 04-02-2007
5.00
Disassemble L HS, deburr, remove vinly strips
Details
       

 03-30-2007
3.00
Match drill (#40) of skins to spars and ribs
Details

 03-29-2007
3.00
Cleco the skin to the skeleton of L Hor. Sabilizer
Details
       

 03-28-2007
4.00
Cleco spar to doubler, ribs to spar, skin, left
Details
       

 03-23-2007
3.00
Match dilled the fibricated attach angles. Made ji
Details
       

 03-22-2007
3.00
Attach angle fabrication
Details

 03-17-2007
1.00
Technical Advisor visit
Details
       

 03-16-2007
4.00
Fabricating attach angles; second try.
Details
       

 03-13-2007
2.00
Deburring and descratching
Details

 03-09-2007
4.00
Deburred, fluted, clecoed, and match drilled HS ri
Details
       

 03-08-2007
2.00
Deburred ribs
Details

 03-07-2007
3.00
Match drilled 8 brackets; fabricated and drilled s
Details

 03-05-2007
4.00
New vise, rear spar & doubler match drilled
Details
     

 03-04-2007
3.00
Fabrication of HS attach angle
Details

 03-03-2007
2.00
Cut aluminum angle with hacksaw
Details
       

 03-02-2007
2.00
Tecnical Councellor Visit
Details

 02-28-2007
3.00
In persuit of a bandsaw
Details

 02-26-2007
1.00
Match drill forward spars to doubler
Details
     

 02-23-2007
4.00
Bench Grinder, Drill Press, Shop Vacuum
Details
       

 02-08-2007
4.00
Avery RV Builders Tool Kit
Details
       

 02-06-2007
1.00
DRDT-2 Hand Dimpling Tool
Details
     

 02-01-2007
12.00
Craftsman Oil lubricated Air compressor
Details
     

 01-30-2007
22.00
Garage preparation
Details
       










Copyright © 2001-2025 Matronics. All Rights Reserved.