Jeff Mitchell's RV8 project
Work Logs Found: 1012
Category Work Time: 4061 Hours
 Date
Hours
Work Log Summary

Details

 10-08-2015
1.00
Back from the paint shop - Part 2.
Details
       

 10-08-2015
1.00
Back from the paint shop - Part 1.
Details
       

 11-27-2014
2.10
N883EM FIRST FLIGHT!
Details
       

 10-22-2014
3.60
First taxi test.
Details
       

 10-12-2014
9.00
Various first flight preparations.
Details

 08-21-2014
4.50
Final FAA inspection - Special C of A!
Details
     

 08-20-2014
3.50
Still more work on the Empenage fairing.
Details
     

 08-19-2014
5.50
Fire Extinguisher Installation.
Details
       

 08-18-2014
4.90
Even more work on the empennage fairing.
Details

 08-17-2014
5.00
More work on empennage fairing.
Details

 08-16-2014
6.00
Empenage Fairing.
Details
       

 08-15-2014
4.50
Yet even more various small tasks.
Details
     

 08-14-2014
6.00
More Various Taks.
Details
       

 08-13-2014
5.00
Various Tasks.
Details
     

 08-11-2014
4.50
Empennage Fairing - Continued.
Details
       

 08-09-2014
6.00
Various bits.
Details

 08-08-2014
2.30
Weight and Balance.
Details
     

 08-07-2014
6.20
Weight and Balance preparation.
Details
       

 08-05-2014
9.00
Cowl insulation.
Details
       

 08-04-2014
2.10
Scat tube support
Details
       

 08-02-2014
3.00
Fabricated IGN wires support bracket.
Details
       

 08-01-2014
3.50
MAP and IGN wires secured.
Details
       

 07-31-2014
12.90
Engine Cowl Paint Preparation.
Details
       

 07-29-2014
7.90
Empenage fairing and cowl pinholes.
Details
       

 07-27-2014
5.00
Cowl Bump Out.
Details
       

 07-25-2014
8.10
Various.
Details
       

 07-24-2014
6.50
Cowl pin retainer clips.
Details
       

 07-21-2014
7.90
Various.
Details

 05-26-2014
4.90
Flaps installation.
Details
       

 05-25-2014
5.50
Riveted floor in place.
Details
       

 05-25-2014
1.00
Front seat belt installation.
Details
       

 05-24-2014
5.50
Heat seat wiring and floor install preparation.
Details
       

 05-23-2014
5.00
ADSB Antenna Cables.
Details

 05-14-2014
10.80
NavWorx ADSB600-GB UAT installation.
Details
       

 05-13-2014
5.00
First engine starts!
Details
     

 05-12-2014
3.50
Finished ELT Antenna installation.
Details

 05-11-2014
6.50
Rear seat air vent, cockpit armrests.
Details
       

 05-10-2014
6.00
Aileron pushrod boots and various.
Details
       

 05-09-2014
7.50
Wire bundle secured below pushrods.
Details
       

 05-08-2014
4.30
Secured starter wire and heat box SCAT tube.
Details
     

 05-07-2014
4.20
Power to iPad and battery tray bracket.
Details
       

 05-06-2014
6.10
Fuel system check and iPad mount.
Details
       

 05-05-2014
5.00
Updated Dynon firmware and various other bits.
Details
       

 05-04-2014
5.10
Added third washer to wing bolts.
Details

 05-03-2014
6.00
Wing bolt nut installation.
Details

 05-02-2014
7.10
Final wing installation.
Details
       

 04-29-2014
10.50
Sanded and primed front windshileld fairing.
Details
       

 04-29-2014
8.40
Final tidy up and torquing.
Details

 02-28-2014
3.50
Rudder and tailwheel steering link.
Details
       

 02-27-2014
7.00
Empenage installation.
Details
       

 02-26-2014
4.00
Installed HS and trim cable to trim tab.
Details
     

 02-25-2014
9.00
SB 14-01-31 Horizontal Stabilizer cracks - Part 3.
Details
       

 02-23-2014
7.00
SB 14-01-31 Horizontal Stabilizer cracks - Part 2.
Details
       

 02-22-2014
8.30
SB 14-01-31 Horizontal Stabilizer cracks - Part 1.
Details
       

 02-21-2014
5.20
Secured roll servo wire bundle.
Details
       

 02-20-2014
4.00
Finished wing to fuselage wire connections.
Details

 02-19-2014
5.00
Tailwheel lock mod and bled brakes.
Details

 02-18-2014
6.40
Fuselage to wing Pitot / AofA connections.
     

 02-17-2014
6.10
Fuselage to wing connections.
Details

 02-12-2014
16.30
Wing wiring.
Details
       

 02-11-2014
5.00
Controls installed for good.

 02-10-2014
3.00
Aileron trim and map lights.
Details
       

 02-09-2014
4.00
Pitch Servo Bellcrank.
Details
       

 02-06-2014
3.90
Fixed a wiring error to the Alternator Fail light.

 02-05-2014
10.10
NavWorx ADSB UAT wiring.
Details
     

 02-04-2014
5.00
Oil cooler lines fabricated and installed.
Details
       

 02-01-2014
31.00
Various entries.
Details
       

 12-04-2013
2.00
Windscreen fairing - Part 9.
Details
       

 12-03-2013
1.50
Windscreen fairing - Part 8.
Details
       

 12-02-2013
1.00
Windscreen support brackets riveted.
Details
       

 11-30-2013
9.00
Windscreen fairing - Part 7.
Details
       

 11-29-2013
9.00
Windscreen fairing - Part 6.
Details
       

 11-27-2013
5.50
Windscreen fairing - Part 5.
Details
       

 11-26-2013
6.70
Silicone baffle material - Part 3.
Details
       

 11-24-2013
7.50
Silicone baffle material - Part 2.
Details
       

 11-22-2013
8.20
Windscreen fairing - Part 4.
Details
       

 11-19-2013
6.10
Silicone baffle material - Part 1.
Details
       

 11-18-2013
6.00
Windscreen fairing - Part 3.
Details
       

 11-16-2013
2.00
Amp meter shunt fusible links.
Details
       

 11-14-2013
7.50
Windscreen fairing - Part 2.
Details

 11-09-2013
6.50
Windscreen fairing - Part 1.
Details
       

 11-07-2013
6.50
Alternator / Starter / Shunt Installation
Details
       

 09-10-2013
2.20
P-Mags timed and oil cooler removed.
Details

 09-08-2013
7.80
CHT/EGT/Fuel Flow connections.
Details
       

 09-07-2013
3.80
Various FWF bits.
Details
       

 09-06-2013
4.50
R/H P-Mag and Alternator blast tubes.
Details
       

 09-05-2013
4.00
Engine baffle final installation.
Details
       

 09-04-2013
6.20
Securing wiring firewall forward.
Details
       

 09-02-2013
5.10
Oil cooler problem.
Details
       

 08-30-2013
8.00
Baffle retainer spacers.
Details
       

 08-29-2013
7.00
ADS-B Antennas installed.
Details
       

 08-19-2013
2.00
Prepared engine baffles for Certackote.
Details

 08-17-2013
8.00
GPS / XM Wx Antenna tray.
Details
       

 08-16-2013
7.00
Blast tube flange installation.
Details
       

 08-14-2013
7.00
Breather tube and fuel pump overflow.
Details
       

 06-28-2013
3.00
Oil Cooler and Engine Baffles - Part 10.
Details
       

 06-25-2013
5.00
Oil Cooler and Engine Baffles - Part 9.
Details
       

 06-24-2013
6.50
Oil Cooler and Engine Baffles - Part 8.
Details
       

 06-22-2013
9.50
Oil Cooler and Engine Baffles - Part 7.
Details
       

 06-20-2013
7.00
Oil Cooler and Engine Baffles - Part 6.
Details
       

 06-17-2013
7.50
Oil Cooler and Engine Baffles - Part 5.
Details
       

 06-10-2013
5.50
ELT Installation - Part 4.
Details
       

 06-09-2013
6.50
Oil Cooler and Engine Baffles - Part 4.
Details
       

 06-08-2013
5.50
Oil Cooler and Engine Baffles - Part 3.
Details
     

 06-07-2013
2.50
Replaced Skybolt C-Loks.
Details
     

 06-01-2013
4.00
Oil Cooler and Engine Baffles - Part 2.
Details
     

 05-31-2013
3.50
Bottom baffle retainer pins.
Details
     

 05-30-2013
8.00
Oil Cooler and Engine Baffles - Part 1.
Details
       

 05-25-2013
4.00
ELT Installation - Part 3.
     

 05-21-2013
5.50
ELT Installation - Part 2.
Details
       

 05-20-2013
4.00
ELT Installation - Part 1.
Details
       

 03-30-2013
5.40
Windshield Installation - Part 2.
Details
       

 03-28-2013
5.20
Windshield Installation - Part 1.
Details
       

 03-17-2013
3.90
Cowl Installation continued - Part 8.
Details
       

 03-16-2013
3.20
Front Windscreen Install - Part 1.
Details
       

 03-15-2013
7.00
Pro Sealed Cowl Hinges.
Details
     

 03-13-2013
5.50
Roll Bar Grab Handles.
Details
       

 03-12-2013
5.20
Cowl Installation continued - Part 7.
Details
       

 03-10-2013
7.90
Cowl Installation continued - Part 6.
Details
       

 03-08-2013
3.00
Cowl Installation continued - Part 5.
Details
       

 03-08-2013
3.10
Cowl Installation continued - Part 4.
Details
       

 03-06-2013
4.50
Cowl Installation continued - Part 3.
Details
       

 03-05-2013
3.10
Fwd Baggage Door - Part 3.
Details
       

 03-05-2013
3.00
Cowl Installation continued - Part 2.
Details
       

 03-04-2013
7.00
Spinner / Propeller Installation - Part 2.
Details
       

 03-03-2013
4.00
Spinner / Propeller Installation - Part 1.
Details
       

 03-01-2013
8.00
Fwd Baggage Door - Part 2.
Details
       

 02-28-2013
3.40
Fwd Baggage Door - Part 1.
Details
       

 01-20-2013
4.50
Re-Installed instrument Panel.
Details
       

 01-20-2013
9.00
Forward Top Skin riveted on - Part 1.
Details
       

 01-19-2013
6.00
Zaon antenna and AofA Indicator.
Details
       

 01-18-2013
6.10
Starter Relay warning light and Switch Gaurds.
Details
       

 01-17-2013
5.90
Alternator Field Wire and various tasks.
Details
       

 01-16-2013
4.50
Auto Pilot Servo wiring.
Details

 01-15-2013
7.40
Various tasks and ELT installation.
Details

 01-14-2013
2.00
Instrument Panel removed.
Details

 01-13-2013
5.00
Various tasks prior to top skin riveting.
Details
       

 01-12-2013
5.00
Manifold pressure sensing system- Part 2.
Details
       

 01-11-2013
4.00
Manifold pressure sensing system- Part 1.
Details

 01-10-2013
6.00
Brakes, ELT and various other tasks.
Details

 01-08-2013
4.10
Wiring for the Vx AofA Indicator.
Details
       

 01-07-2013
4.10
AMX-2A adjustment and SL40 test.
Details

 01-06-2013
7.00
Landing / Taxi light / Pitot Heat wiring.
Details

 01-05-2013
5.50
Finished Instrument Panel installation.
Details
       

 01-04-2013
7.80
Installed the instrument panel.
Details
       

 01-03-2013
7.90
Various Instrument Panel tasks.
Details

 01-01-2013
6.00
Various wiring tasks.
Details

 12-31-2012
4.50
Transponder, Landing, Taxi light wiring.
Details

 12-30-2012
4.00
GTX 327 wiring.
Details

 12-29-2012
4.50
Antenna Coax cables.
Details
       

 12-28-2012
8.10
AMX-2A, VHF 2 and Antenna's.
Details
       

 12-27-2012
3.50
Zaon Traffic and AMX-2A Audio Mixer.
Details

 12-26-2012
6.00
SL40 VHF Comm Radio wiring.
Details
       

 12-24-2012
4.50
GPS Electrical connections.
Details

 12-23-2012
3.40
SL40 VHF Com wiring.
Details

 12-22-2012
3.00
More P-Mag wiring.
Details
     

 12-21-2012
4.00
Magneto switch wiring.
Details
     

 12-20-2012
7.50
Instrument panel completed.
Details
       

 12-19-2012
7.50
Painted instrument panel.
Details
       

 12-18-2012
5.90
GPS / SL40 installation - Part 2.
Details
       

 12-17-2012
6.00
GPS / SL40 installation - Part 1.
Details
     

 12-16-2012
8.00
Transponder mounting bracket - Part 2.
Details
       

 12-15-2012
3.00
Transponder mounting bracket - Part 1.
Details
       

 12-14-2012
4.00
Revised VP-50 retension bracket.
Details
     

 12-13-2012
6.00
Zaon MRX and ELT remote switch - Part 1.
Details
     

 12-12-2012
5.50
P-Mag Installation - Part 1.
Details
       

 12-10-2012
91.50
Various tasks; bulk entry.
Details
       

 07-17-2012
7.00
Cowl hinges and Oil Door.
Details
       

 07-16-2012
5.00
Final Engine Installation, mixture bracket etc.
Details
       

 07-05-2012
25.00
Project move from Canda to Phoenix, AZ.
Details
       

 04-11-2012
10.00
Preparation for moving - Part 2.
Details
       

 03-30-2012
4.20
Preparation for moving - Part 1.
Details
       

 01-31-2012
3.00
Various Firewall Forward tasks.
Details
       

 01-29-2012
7.50
Engine baffles - Part 4.
Details
       

 01-28-2012
6.00
Cabin heat Muff installation.
Details
       

 01-26-2012
3.00
More engine pics.
Details
       

 01-26-2012
3.30
Exhaust system installation - Part 1.
Details
       

 01-25-2012
5.50
Engine Installation!
Details
       

 01-23-2012
8.50
Engine Sensor wire pass through.
Details
       

 01-21-2012
6.50
Engine parameter sensors- Part 3.
Details
       

 01-20-2012
1.00
Engine progress update!
Details
       

 01-18-2012
5.50
Engine parameter sensors- Part 2.
Details
       

 01-17-2012
4.50
Throttle / Mixture / Prop Cables.
Details
     

 01-15-2012
3.00
Installed WD-814 Roll Bar.
Details
     

 01-14-2012
7.00
Landing gear and wheels installation - Part 2.
Details
       

 01-06-2012
5.70
Wheel brakes - Part 2.
Details
       

 01-04-2012
5.50
Engine parameter sensors- Part 1.
Details

 01-01-2012
7.00
Various Firewall Forward planning tasks.
Details
       

 12-29-2011
5.20
Engine baffles - Part 3.
Details
       

 12-28-2011
4.00
Engine baffles - Part 2.
Details

 12-27-2011
5.00
Engine baffles - Part 1.
Details
     

 12-26-2011
2.50
Wheel brakes - Part 1.
Details
     

 12-24-2011
9.30
Landing gear and wheels installation - Part 1.
Details
       

 12-23-2011
5.00
Firewall cable penetrations.
Details
       

 12-08-2011
6.50
Heat Box Doubler.
Details
       

 12-02-2011
2.20
Gascolator and Heat Box planning.
Details

 11-30-2011
3.50
Canopy skirt - Part 27.
Details
       

 11-29-2011
3.00
Canopy skirt - Part 26.
Details
     

 11-28-2011
3.50
Canopy skirt - Part 25.
Details
       

 11-27-2011
1.50
Engine Hoist assembly.
Details
     

 11-27-2011
1.50
Canopy skirt - Part 24.
Details
       

 11-26-2011
3.50
Flap fairing improvement - Part 3.
Details
       

 11-24-2011
1.30
Flap fairing improvement - Part 2.
Details
     

 11-24-2011
3.70
Canopy skirt - Part 23.
Details
       

 11-23-2011
5.00
Canopy skirt - Part 22.
Details
       

 11-22-2011
1.30
Primed and installed engine sensor mount.
Details
     

 11-22-2011
3.00
Canopy skirt - Part 21.
Details
       

 11-20-2011
0.10
EC225 Type Rating in Aberdeen.
Details
       

 10-21-2011
3.00
Canopy skirt - Part 20.
Details
       

 10-20-2011
3.50
Canopy skirt - Part 19.
Details
       

 10-19-2011
3.50
Canopy skirt - Part 18.
Details
       

 10-18-2011
2.50
Canopy skirt - Part 17.
Details
       

 10-05-2011
2.00
Engine sensor mount and gascolator planning.
Details
     

 10-04-2011
2.00
Flap fairing improvement - Part 1.
Details
       

 10-04-2011
4.00
Canopy skirt - Part 16.
Details
       

 10-03-2011
2.30
FAB - Part 3.
Details
       

 10-03-2011
2.30
Canopy skirt - Part 15.
Details
       

 10-02-2011
1.20
FAB - Part 2.
Details
     

 10-02-2011
5.00
Canopy skirt - Part 14.
Details
       

 10-01-2011
2.00
Various tasks.
Details

 10-01-2011
2.50
FAB - Part 1.
Details
     

 09-30-2011
5.00
Canopy skirt - Part 13.
Details
       

 09-29-2011
7.00
Canopy skirt - Part 12.
Details
       

 09-28-2011
3.50
Canopy skirt - Part 11.
Details
       

 09-27-2011
5.50
Received Firewall Forward Kit.
Details
       

 09-27-2011
2.00
Canopy skirt - Part 9.
Details
       

 09-27-2011
2.00
Canopy skirt - Part 10.
Details
       

 09-26-2011
5.00
Canopy skirt - Part 8.
Details
       

 09-25-2011
4.00
Canopy skirt - Part 7.
Details
       

 09-25-2011
1.00
Canopy skirt - Part 6.
Details
       

 09-24-2011
5.00
Canopy skirt - Part 5.
Details
       

 09-23-2011
5.00
Canopy skirt - Part 4.
Details
       

 09-20-2011
4.00
Taxi light installtion - Part 4.
Details
       

 09-18-2011
2.00
Canopy skirt - Part 3.
Details
       

 09-17-2011
4.00
Canopy skirt - Part 2.
Details
       

 09-16-2011
2.00
Canopy to frame bonding - Part 6.
Details
       

 09-15-2011
3.00
Canopy to frame bonding - Part 5.
Details
       

 09-14-2011
2.00
Canopy to frame bonding - Part 4.
Details
     

 09-14-2011
2.00
Canopy skirt - Part 1.
Details
     

 09-13-2011
4.70
Canopy to frame bonding - Part 3.
Details
       

 09-11-2011
3.00
Canopy trimming - Part 12.
Details
       

 09-10-2011
5.00
Canopy trimming - Part 11.
Details
       

 09-09-2011
4.50
Canopy to frame bonding - Part 2.
Details
       

 09-08-2011
4.70
Canopy to frame bonding - Part 1.
Details

 09-07-2011
4.50
Canopy trimming - Part 10.
Details
       

 08-28-2011
3.00
Mike Zellers canopy latch.
Details
       

 08-27-2011
2.50
Misc Canopy work - Part 1.
Details
     

 08-23-2011
3.00
Canopy trimming - Part 9.
Details
       

 08-22-2011
2.50
Canopy trimming - Part 8.
Details
     

 08-20-2011
2.00
Canopy trimming - Part 7.
Details
       

 08-19-2011
3.80
Canopy trimming - Part 6.
Details

 08-18-2011
2.50
Canopy trimming - Part 5.
Details
     

 08-17-2011
4.50
Canopy trimming - Part 4.
Details
       

 08-15-2011
2.50
Canopy trimming - Part 3.
Details

 08-14-2011
2.50
Taxi light installtion - Part 3.
Details
       

 08-12-2011
2.00
Firewall battery tray installation - Part 6.
Details
     

 08-11-2011
2.50
Taxi light installtion - Part 2.
Details
       

 08-10-2011
7.00
Taxi light installtion - Part 1.
Details
     

 08-07-2011
5.00
Various bits.
Details

 08-06-2011
3.00
Wing tips - Part 9.
Details
       

 08-05-2011
4.00
Empenage end caps - Part 9.
Details
       

 08-03-2011
4.00
Empenage end caps - Part 8.
Details
     

 08-02-2011
3.00
Empenage end caps - Part 7.
Details
       

 08-01-2011
2.70
Empenage end caps - Part 6.
Details

 07-31-2011
2.30
Empenage end caps - Part 5.
Details
       

 07-30-2011
3.30
Empenage end caps - Part 4.
Details
       

 07-29-2011
3.30
Wing tips - Part 8.
Details
       

 07-28-2011
3.00
Wing tips - Part 7.
Details
     

 07-27-2011
4.50
Wing tips - Part 6.
Details
       

 07-26-2011
5.00
Wing tips - Part 5.
Details
       

 07-25-2011
5.00
Wing tips - Part 4.
Details
       

 07-25-2011
0.30
Empenage end caps - Part 3.
Details
     

 07-24-2011
5.20
Wing tips - Part 3.
Details
     

 07-23-2011
4.00
Wing tips - Part 2.
Details
       

 07-22-2011
3.50
Wing tips - Part 1.
Details
       

 07-22-2011
1.00
Empenage end caps - Part 2.
Details
     

 07-21-2011
2.00
Wing tip lights - Part 1.
Details
       

 07-21-2011
0.10
Misc. pics of me in the shop.
Details
       

 07-20-2011
7.00
Canopy trimming - Part 2.
Details
       

 07-17-2011
8.50
Canopy trimming - Part 1.
Details
       

 07-16-2011
5.00
Canopy frame spacers.
Details
       

 07-15-2011
4.00
Canopy trim preparations.
Details
       

 07-13-2011
4.70
Vertical Stabilizer end cap
Details
       

 07-12-2011
3.00
Rudder counterweight and end cap.
Details
       

 06-28-2011
7.00
Moved airplane parts around.
Details
       

 06-22-2011
2.00
Prepared fuselage for moving into garage.
Details

 06-21-2011
0.10
Grove gear polished!
Details
       

 06-10-2011
1.00
Remade C-661 Canopy slide block.
Details
     

 06-05-2011
7.80
Seat heater wiring - Part 4.
Details
       

 06-04-2011
1.00
Manual elevator trim cable installation.
Details
       

 06-03-2011
2.80
Pitot Static system - Part 2.
Details
       

 06-02-2011
6.80
Pitot Static system - Part 1.
Details
       

 05-09-2011
2.70
Fuel Low warning light.
Details
     

 05-08-2011
5.80
Auxiliary avionics power bus and warning lights.
Details
       

 05-02-2011
4.50
Airspeed installation.
Details
       

 04-29-2011
4.00
Dynon D120 EMS Installation.
     

 04-27-2011
5.00
Altimeter installation - Part I.
Details
     

 04-24-2011
5.00
R/H switch console antirotation plate take two.
Details
       

 04-22-2011
7.00
EMS Ground bus and instrument holes.
Details
       

 04-17-2011
7.00
Utility plug rocker switch installation.
Details
       

 04-16-2011
4.00
D120 Tray installation.
Details
       

 04-05-2011
7.50
Dynon AP-74 Autopilot - Part 3.
Details
       

 04-03-2011
4.00
Dynon AP-74 Autopilot - Part 2.
Details
     

 04-02-2011
5.00
Dynon AP-74 Autopilot - Part 1.
Details
       

 04-01-2011
4.00
Dynon EFIS - Part 2.
Details
       

 03-31-2011
0.50
Fuselage rotating stand counter weights.
Details
     

 03-30-2011
5.00
Map light wiring.
Details
       

 03-29-2011
2.20
Dynon EFIS - Part 1.
Details
       

 03-26-2011
5.00
Instrument panel cutouts - Part 2.
Details
       

 03-24-2011
3.30
Temporary battery tray relocation.
Details
       

 03-22-2011
5.30
Instrument panel cutouts - Part 1.
Details
       

 03-21-2011
5.50
Utility plugs and VP-50 powered up.
Details
       

 03-20-2011
6.00
Fuel boost pump back up circuit.
Details
       

 03-19-2011
7.20
Flap extension protection.
Details
       

 03-17-2011
6.50
Wired flap relay board - Part 3.
Details
     

 03-16-2011
4.50
Wired flap relay board - Part 2.
Details

 03-15-2011
6.00
Stick grip wiring - Part 2.
Details
       

 03-13-2011
3.10
Stick grip wiring - Part 1.
Details
       

 03-12-2011
3.00
Ground busses, master and start relays - Part 3.
Details
       

 03-09-2011
3.00
Ground busses, master and start relays - Part 2.
Details
       

 03-07-2011
4.50
Ground busses, master and start relays - Part 1.
Details
       

 03-04-2011
7.00
Large gauge wires - Part 2.
Details
       

 03-02-2011
4.50
Large gauge wires - Part 1.
Details

 03-01-2011
6.30
Firewall battery tray installation - Part 5.
Details
       

 02-28-2011
4.00
Firewall battery tray installation - Part 4.
Details
     

 02-27-2011
3.00
Grounding options.
Details

 02-26-2011
5.00
Firewall battery tray installation - Part 3.
Details
       

 02-24-2011
2.70
Firewall battery tray installation - Part 2.
Details
       

 02-23-2011
2.50
Firewall battery tray installation - Part 1.
Details
       

 02-21-2011
3.00
Numerous miscelaneous tasks.
Details

 02-19-2011
4.00
Installed fuel boost pump and filter.
Details
       

 02-17-2011
7.30
Intercom System - Part 4.
Details
       

 02-16-2011
5.00
Intercom System - Part 3.
Details
       

 02-15-2011
3.00
Miscellaneous bits.
Details

 02-12-2011
6.00
Interior final painting - Part 3.
Details
       

 01-30-2011
6.30
Interior final painting - Part 2.
Details
       

 01-29-2011
3.50
Interior final painting - Part 1.
Details
       

 01-15-2011
5.00
Seat heater wiring - Part 3.
Details

 01-13-2011
1.00
Installed 14 Volt power outlets.
Details
     

 01-09-2011
4.00
General wiring planning.
Details

 01-08-2011
2.00
Seat heater wiring - Part 2.
Details
       

 01-07-2011
2.00
Seat heater wiring - Part 1.
Details

 01-06-2011
3.00
Cockpit side panels - Part 4.
Details
       

 01-04-2011
3.50
R/H switch console antirotation plate.
Details
       

 01-03-2011
6.00
Aux bus panel - completed.
Details
       

 01-02-2011
4.30
Cockpit side panels - Part 3.
Details
     

 01-01-2011
4.70
Cockpit side panels - Part 2.
Details
     

 12-27-2010
4.50
Cockpit side panels - Part 1.
Details
       

 12-23-2010
3.50
Wired flap relay board - Part 1.
Details
       

 12-18-2010
1.00
VP-50 tray completed.
Details
       

 12-16-2010
5.00
Aux bus panel - second attempt.
Details
       

 12-15-2010
4.80
Infinity grip on new bent stick - Part 2.
Details
       

 12-14-2010
2.30
Infinity grip on new bent stick - Part 1.
Details

 12-13-2010
2.80
Right hand console switches.
Details
     

 12-12-2010
6.60
Aux panel and VP-50 tray - Part 2.
Details
       

 12-11-2010
2.50
Intercom System - Part 2.
Details
     

 12-05-2010
1.00
Intercom System - Part 1.
Details
     

 12-04-2010
3.50
Dynon remote compass - Part 2.
Details
       

 12-01-2010
3.70
Aileron pushrod boots - Part 2.
Details
     

 11-29-2010
5.00
Dynon remote compass - Part 1.
Details
       

 11-28-2010
3.00
Installed Dynon OAT probe.
Details
       

 11-26-2010
6.00
VP-50 tray continued.
Details
       

 11-23-2010
5.00
Aux panel and VP-50 tray - Part 1.
Details
       

 11-22-2010
0.50
Rudder pedals.
Details
     

 11-09-2010
6.00
Aileron pushrod boots - Part 1.
Details
       

 11-08-2010
20.00
Instrument panel planning.
Details
       

 11-06-2010
4.00
Landing light installtion - Part 5.
Details
       

 11-03-2010
4.80
Landing light installtion - Part 4.
Details
       

 11-02-2010
4.30
Landing light installtion - Part 3.
Details
       

 11-01-2010
3.50
Primed misc. parts.
Details
     

 11-01-2010
1.00
Landing light installtion - Part 2.
Details
       

 10-31-2010
1.00
Landing light installtion - Part 1.
Details

 10-18-2010
2.00
Wheels and brakes - Part 2.
Details
       

 10-17-2010
2.70
Wheels and brakes - Part 1.
Details
       

 10-14-2010
1.50
Grove gear priming.
Details
       

 10-13-2010
4.50
Gear alignment and leg fairings.
Details
       

 10-10-2010
4.80
Wheel assembly.
Details
       

 10-08-2010
3.00
Improving fuselage rotisserie - Part 4.
Details
       

 10-07-2010
1.00
Fabricated rudder pedal heel plates.
Details
     

 10-06-2010
7.00
Miscellaneous tasks.
Details

 10-02-2010
3.00
Preparation for fuselage interior painting.
Details

 10-01-2010
4.00
Broke down finish kit shipping crate.
Details

 09-29-2010
6.00
Improving fuselage rotisserie - Part 3.
Details
       

 09-28-2010
4.00
Improving fuselage rotisserie - Part 2.
Details
       

 09-27-2010
2.50
Improving fuselage rotisserie - Part 1.
Details
       

 09-26-2010
4.00
Modified rotating fuselage stand front frame.
Details
     

 09-25-2010
3.50
Engine mount - Part 3.
Details
       

 09-24-2010
2.00
Engine mount - Part 2.
Details
       

 09-23-2010
1.80
Sorted finish kit hardware.
Details

 09-23-2010
2.70
Fitting canopy frame - Part 4.
Details
       

 09-21-2010
3.70
Fitting canopy frame - Part 3.
Details
       

 09-19-2010
3.90
Fitting canopy frame - Part 2.
Details
     

 09-18-2010
4.20
Fitting canopy frame - Part 1.
Details
       

 09-17-2010
2.50
Canopy rails.
Details
       

 09-15-2010
6.80
Canopy center slide rail - Part 5.
Details
       

 09-14-2010
4.50
Canopy center slide rail - Part 4.
Details
       

 09-13-2010
2.00
Canopy center slide rail - Part 3.
Details

 09-11-2010
4.00
Canopy center slide rail - Part 2.
Details

 09-09-2010
4.00
Canopy center slide rail - Part 1.
Details
       

 09-08-2010
2.10
Inventoried finishing kit.
Details
       

 09-07-2010
5.00
Riveted flap fairings to fuselage.
Details
       

 09-06-2010
1.80
Cut bolt slots in T-405 brackets.
Details
       

 09-05-2010
5.20
Finished installing nutplates on wing inboard skin
Details

 09-04-2010
1.50
Riveted nutplates to left inboard wing.
Details

 09-03-2010
5.50
Primed wing to fuselage fairings.
Details
     

 09-02-2010
3.00
Riveted nutplates to right inboard wing.
Details
     

 09-01-2010
6.30
Drilled nutplate attach holes in right wing root.
Details
       

 08-30-2010
4.00
Removed the wings.
Details

 08-29-2010
4.50
Wing to fuselage fairings and interface - Part 5.
Details

 08-27-2010
3.70
Wing to fuselage fairings and interface - Part 4.
Details
       

 08-23-2010
5.00
Wing to fuselage fairings and interface - Part 3.
Details
       

 08-21-2010
4.00
Wing to fuselage fairings - Part 2.
Details

 08-20-2010
3.50
Wing to fuselage fairings - Part 1.
Details
       

 08-19-2010
2.50
Bent last of the fuel lines.
Details
     

 08-17-2010
2.50
Drilled F-863 to T-405 brackets.
Details
     

 08-16-2010
4.00
F-863 left tank attach bracket v2.0.
Details
     

 08-14-2010
5.00
Installed tank support brackets.
Details
       

 08-13-2010
7.00
Aft wing spar bolt holes drilled.
Details
       

 08-12-2010
3.50
Even more preparation for wing aft spar drilling.
Details

 08-11-2010
6.60
More preparation for wing aft spar drilling.
Details
       

 08-10-2010
5.80
Flap installation and rigging - Part 4.
Details
       

 08-09-2010
5.00
Flap installation and rigging - Part 3.
Details
     

 08-06-2010
3.80
Flap installation and rigging - Part 2.
Details
       

 08-05-2010
5.00
Flap installation and rigging - Part 1.
Details
       

 08-01-2010
5.00
Wing alignment and incidence setting.
Details
       

 07-31-2010
1.30
Miscellaneous preparation for wing alignment.
Details

 07-30-2010
3.00
Joined wings to fuselage.
Details
       

 07-27-2010
2.00
Right wing access panels and flap hinge.
Details
     

 07-25-2010
5.00
Bottom wing skin riveting - Part 6.
Details
     

 07-23-2010
1.00
Temporary wing spar attach bolts.
Details
     

 07-16-2010
2.70
F-863 Tank Brackets - Part 2.
Details
     

 07-09-2010
3.00
Bottom wing skin riveting - Part 5.
Details

 07-06-2010
6.00
Bottom wing skin riveting - Part 4.
Details
       

 07-02-2010
4.20
F-863 Tank Brackets - Part 1.
Details
       

 07-01-2010
4.80
Modified fuselage dolly.
Details
       

 06-29-2010
3.00
Bottom wing skin riveting - Part 3.
Details
     

 06-28-2010
1.50
Bottom wing skin riveting - Part 2.
Details
       

 06-17-2010
4.50
Bottom wing skin riveting - Part 1.
Details
       

 06-15-2010
4.00
More bottom wing skin riveting preparation.
Details
       

 06-14-2010
3.30
Bottom wing skin riveting preparation.
Details
       

 06-13-2010
2.50
Primed forward top skin.
Details
     

 06-09-2010
2.50
Wing wiring - Part 1.
Details

 06-08-2010
5.00
Finished Pitot tube and final wing skin prep.
Details
       

 06-06-2010
2.00
Pitot tube installation - Part 4.
Details
       

 06-05-2010
3.00
Pitot tube installation - Part 4.
Details
       

 06-03-2010
4.00
Pitot tube installation - Part 3.
Details
       

 06-02-2010
2.50
Pitot tube installation - Part 2.
Details
       

 05-30-2010
3.00
Pitot tube installation - Part 1.
Details
       

 05-28-2010
1.20
Installed magneto and starter switches.
Details
     

 05-11-2010
3.50
Right wing flap hinge pin retainer clip.
Details
     

 05-10-2010
3.50
Left wing flap hinge pin retainer clip.
Details
     

 05-09-2010
2.50
Wing finishing - Part 7 (C/S flap hinges).
Details

 05-07-2010
3.50
Wing finishing - Part 6 (Drilling L/H flap hinge).
Details

 05-06-2010
3.00
Wing finishing - Part 5 (Drilling R/H flap hinge).
Details
       

 05-05-2010
5.50
Wing finishing - Part 4.
Details
       

 05-04-2010
6.90
Wing finishing - Part 3.
Details

 05-02-2010
5.70
Wing finishing - Part 2.
Details

 05-01-2010
1.00
Installed (temporarily) cockpit interior.
Details
       

 04-29-2010
3.50
Wing finishing - Part 1.
Details
     

 04-28-2010
3.00
Aft Upper Skin and fwd baggage bulkheads done.
Details
       

 04-26-2010
6.00
Infinity control stick grip installation.
Details
       

 04-24-2010
4.00
Baggage access door - Part 4.
Details
       

 04-23-2010
3.00
Top forward skin - Part 3.
Details
     

 04-22-2010
2.00
Top forward skin - Part 2.
Details
       

 04-20-2010
4.50
Instrument sub panels and top fwd skin - Part 1.
Details
       

 04-19-2010
5.80
Manual trim and air vent holes drilled.
Details
       

 04-18-2010
3.30
Tail wheel installation.
Details
       

 04-17-2010
1.50
Baggage access door - Part 3.
Details
       

 04-15-2010
3.00
Baggage access door - Part 2.
Details

 04-14-2010
6.00
Baggage access door - Part 1.
Details
     

 04-13-2010
2.50
Battery access door - Part 5.
Details
       

 04-12-2010
5.70
Battery access door - Part 4.
Details
       

 04-11-2010
6.00
Battery access door - Part 3.
Details
       

 04-10-2010
3.50
Battery access door - Part 2.
Details
       

 04-08-2010
4.00
Battery access door - Part 1.
Details
       

 03-29-2010
1.50
Front Upper Skins - Part 4.
Details

 03-28-2010
4.30
Front Upper Skins - Part 3.
Details
       

 03-27-2010
4.50
Front Upper Skins - Part 2.
Details
     

 03-20-2010
1.00
Front Upper Skins - Part 1.
Details

 03-19-2010
2.50
Classic Aero Designs Interior arrives.
Details
       

 03-18-2010
4.50
Aft Upper Skins and Bulkheads - Part 8.
Details
       

 03-17-2010
4.50
Static system - Part 3 and ADAHRS shelf.
Details
       

 03-16-2010
4.00
Static system - Part 2.
Details
       

 03-15-2010
1.20
Static system - Part 1.
Details
       

 03-14-2010
3.00
Aft Upper Skins and Bulkheads - Part 7.
Details
       

 03-13-2010
1.50
Aft Upper Skins and Bulkheads - Part 6.
Details
       

 03-12-2010
4.00
Aft Upper Skins and Bulkheads - Part 5.
Details
       

 03-10-2010
4.30
Aft Upper Skins and Bulkheads - Part 4.
Details

 03-01-2010
2.00
Aft Upper Skins and Bulkheads - Part 3.
Details

 02-28-2010
5.50
Aft Upper Skins and Bulkheads - Part 2.
Details
       

 02-27-2010
7.00
Aft Upper Skins and Bulkheads - Part 1.
Details
     

 02-24-2010
4.00
Rudder cables and pedals.
Details
       

 02-23-2010
4.10
Rudder Stops and Flap Motor.
Details
     

 02-22-2010
1.50
Rudder Stops - Part 1.
Details
       

 02-21-2010
7.00
Elevator Control System - Part 4.
Details
       

 02-20-2010
5.00
Elevator Control System - Part 3.
Details
       

 02-19-2010
4.10
Elevator Control System - Part 2.
Details
       

 02-15-2010
7.80
Elevator Control System - Part 1.
Details
       

 02-12-2010
1.00
Empennage attach - Part 5.
Details
       

 02-11-2010
4.00
Empennage attach - Part 4.
Details
     

 02-10-2010
5.00
Empennage attach - Part 3.
Details
       

 02-09-2010
4.50
Empennage attach - Part 2.
Details
       

 02-08-2010
5.00
Manual Aileron Trim & Empennage attach - Part 1.
Details
       

 02-07-2010
6.30
Flap blocks - take two.
Details
       

 02-06-2010
3.00
Consoles and Seat Ramps - Part 2.
Details
       

 02-05-2010
6.50
Consoles and Seat Ramps - Part 1.
Details
       

 02-04-2010
3.00
Seat floors - Part 8.
Details
       

 02-03-2010
3.50
Seat floors - Part 7.
Details
       

 02-02-2010
3.00
Seat floors - Part 6.
Details

 02-01-2010
3.30
Seat floors - Part 5.
Details
     

 01-29-2010
4.50
Seat floors - Part 4.
Details
       

 01-24-2010
2.80
Seat floors - Part 3.
Details
     

 01-22-2010
3.00
Seat floors - Part 2.
Details

 01-21-2010
1.00
Seat floors - Part 1.
Details
     

 01-21-2010
1.70
Applied PRC to the cooling ramp.
Details

 01-20-2010
4.30
Odds and ends, lower bottom skins.
Details
       

 01-19-2010
0.10
Misc pics of us building.
Details
       

 01-19-2010
0.10
Hidden signitures.
Details
       

 01-19-2010
5.70
Finished riveting bottom forward skins.
Details
       

 01-18-2010
4.50
Built fuselage rolling dolly.
Details
     

 01-17-2010
3.00
Started riveting forward bottom skins.
Details
       

 01-16-2010
3.50
Dimpled and primed forward bottom skins.
Details

 01-15-2010
3.00
Deburred forward bottom skins.
Details

 01-14-2010
3.30
Forward bottom skins.
Details
       

 01-12-2010
4.50
Grove landing gear installation-Part 4.
Details
       

 01-11-2010
3.40
Grove landing gear installation-Part 3.
Details
       

 01-09-2010
2.00
Grove landing gear installation-Part 2.
Details
       

 01-05-2010
3.50
Grove landing gear installation-Part 1.
Details
       

 01-02-2010
4.00
Installed WD-808 rear seatback support.
Details
       

 01-01-2010
3.00
Riveted F-819 aft deck.
Details
       

 12-31-2009
6.00
Installed cockpit rails and F-817 support plates.
Details
       

 12-30-2009
7.00
Finished riveting fuselage skins.
Details
       

 12-29-2009
4.50
Finished rotating fuselage stand.
Details
       

 12-28-2009
6.70
More work on rotating fuselage stand.
Details
       

 12-27-2009
2.60
Various little jobs.
Details

 12-26-2009
5.80
Finished riveting tailcone.
Details
       

 12-24-2009
3.30
Started work on rotating fuselage stand.
Details
       

 12-23-2009
5.00
Finished riveting F-823 fuselage side skins.
Details
       

 12-22-2009
2.20
Miscellaneous piddling around.
Details

 12-21-2009
4.20
More F-823 fuselage mid side skin riveting.
Details

 12-20-2009
0.30
Installed rudder pedal extensions.
Details
       

 12-20-2009
4.50
Installed Dynon pitch servo brackets.
Details
       

 12-17-2009
1.70
Set rivets at top of F-823 fuselage side skins.
Details

 12-12-2009
2.70
Finished riveting F-820 forward fuselage skin.
Details
     

 12-10-2009
6.60
Fuselage forward side skin riveting.
Details
       

 12-09-2009
4.20
Tail spring mount and tailcone bulkheads.
Details
       

 12-08-2009
0.10
Gear leg and empenage fairings arrived.
Details
     

 12-08-2009
5.40
Final preparations for fuselage skin riveting.
Details
       

 11-29-2009
4.70
Fuselage forward side skins.
Details
       

 11-27-2009
5.40
Completed fuel, vent and brake lines.
Details
       

 11-26-2009
3.20
Moved vent line exit holes.
Details
       

 11-25-2009
3.00
Fabricated flap blocks.
Details

 11-24-2009
0.50
Received my Grove Landing Gear!
Details
       

 11-23-2009
3.70
Seat floors and elevator control system.
Details
       

 11-22-2009
3.30
Installed trim knob and started seat floors.
Details
     

 11-21-2009
1.00
Finished rudder pedal assembly.
Details
       

 11-19-2009
6.50
More work on the rudder pedal assembly.
Details
       

 11-18-2009
4.00
More work on rudder pedal assembly.
Details
       

 11-17-2009
1.70
Rudder pedals.
Details
     

 11-17-2009
1.70
Left tank to selector valve line installed.
Details
     

 11-16-2009
4.20
Right hand fuel tank line installed.
Details
       

 11-15-2009
2.30
More fuel line bending.
Details
       

 11-12-2009
2.00
One fuel line complete.
Details
       

 11-11-2009
1.30
Right hand vent line complete.
Details
     

 11-10-2009
1.50
More fiddling with vent and fuel lines.
Details

 11-09-2009
3.80
Fuel vent lines - Part 1.
Details
     

 11-08-2009
3.00
Set up for fuel line installation.
Details
       

 11-08-2009
2.00
Riveted F-887 upper longeron to firewall brackets.
Details
     

 11-07-2009
2.80
Finished up priming some fuselage parts.
Details

 11-06-2009
4.80
Various fuselage riveting.
Details
       

 11-05-2009
0.50
Platenute installation - various
Details

 11-04-2009
4.00
Riveted arm rests to fuselage bulkheads.
Details
     

 11-02-2009
0.70
Installed platenuts for manual aileron trip cover.
Details

 11-01-2009
4.00
Started fuselage final assembly.
Details
       

 10-31-2009
1.50
Riveted battery tray.
Details
     

 10-30-2009
2.50
Still priming fuselage parts.
Details
     

 10-29-2009
4.50
Primed fuselage parts.
Details

 10-26-2009
5.00
Primed fuselage parts.
Details

 10-25-2009
4.80
Primed fuselage parts.
Details
       

 10-24-2009
8.50
FInished dimple fuselage countersinks.
Details
       

 10-21-2009
4.30
Fuselage skin scuffing and dimpling.
Details

 10-20-2009
3.30
Primed F-887 longerons.
Details
       

 10-19-2009
2.00
Scuffed and dimpled various fuselage parts.
Details
     

 10-10-2009
4.00
Dimple countersunk various fuselage parts.
Details

 10-05-2009
2.50
Finished deburring fuselage skins.
Details

 10-04-2009
3.00
Deburred fuselage skins.
Details

 09-29-2009
3.70
Deburred various fuselage substructure parts.
Details

 09-27-2009
3.00
Countersunk F-888, F-889.
Details

 09-26-2009
2.50
Countersunk various fuselage parts.
Details

 09-23-2009
3.00
Cut notches and trimmed length of F-887.
Details
       

 09-22-2009
4.40
Drilled countersinks and deburred F-887.
Details

 09-16-2009
4.50
Countersinking fuselage longerons - Part 3.
Details

 09-15-2009
3.50
Countersinking fuselage longerons - Part 2.
Details

 09-14-2009
3.00
Countersinking fuselage longerons - Part 1.
Details

 09-11-2009
3.00
Andair fuel valve installation part 3.
Details
       

 09-10-2009
5.00
Andair fuel valve installation part 2.
Details
       

 09-09-2009
4.50
Andair fuel valve installation part 1.
Details
       

 09-07-2009
5.50
Disassembled tail and center section.
Details
     

 09-06-2009
2.00
Began disassembly of tailcone.
Details

 09-05-2009
4.70
WD-808 Front seat support brace - do over.
Details
       

 08-27-2009
4.30
Riveted the rear seat back.
Details
       

 08-26-2009
3.30
Riveted front seat back.
Details
       

 08-25-2009
3.50
Prepared and primed seat back parts.
Details

 08-22-2009
5.70
Front and rear seat backs.
Details
       

 08-21-2009
1.00
Started work on the seatbacks.
Details

 08-20-2009
1.50
Started on battery tray.
Details
     

 08-18-2009
6.50
Tailspring mount installed on aft bulkheads.
Details
       

 08-17-2009
3.00
Match drilled F-808 seatback support (Big mistake)
Details
       

 08-16-2009
1.40
Match drilled F-804 center section to bottom skins
Details
       

 08-15-2009
5.70
Finished drilling cockpit rails to upper longerons
Details
     

 08-14-2009
4.50
Finished drilling tail cone skins to F-887 longero
Details
       

 08-13-2009
2.00
Drilled the L/H F-824 skin to upper longeron.
Details
       

 08-12-2009
3.30
Drilled R/H F-824 skin to upper longeron.
Details

 08-10-2009
5.00
Applied epoxy floor coatings to garage.
Details
       

 07-28-2009
2.50
Drilled tail cone skins.
Details

 07-27-2009
4.60
Drilled F-823 mid fuselage skins.
Details
     

 07-25-2009
5.50
Finished drilling forward side skins.
Details
       

 07-24-2009
4.50
Drilled F-843 / F-844 Longerons.
Details
       

 07-16-2009
2.00
More work on tail cone installation.
Details

 07-15-2009
8.30
Clecoed tail cone onto foward fuselage.
Details
       

 07-14-2009
3.20
Deburred tailcone skins and rail caps.
Details

 07-13-2009
4.30
Rear seat belt attach brackets.
Details
       

 07-13-2009
1.50
Adding Tailcone to fwd fuselage section.
Details
     

 07-12-2009
3.80
Started on Aft Fuselage Assembly.
Details

 07-12-2009
1.00
Riveted tail cone bulkheads.
Details
     

 07-11-2009
3.00
Primed tail cone bulkheads.
Details
     

 07-10-2009
5.00
More work on aft most tailcone bulkheads.
Details
       

 07-09-2009
2.50
Worked on aft tail cone bulkheads.
Details
     

 07-08-2009
2.50
Tail wheel spring mount.
Details
       

 07-07-2009
3.70
Clecoed forward skins.
Details
       

 07-05-2009
2.00
Deburred edges of the tailcone bulkheads.
Details

 07-01-2009
4.30
Deburred forward skin.
Details

 06-24-2009
4.00
More work on manual aileron trim system.
Details
       

 06-23-2009
5.40
Final drilled arm rests and mid skin bulkheads.
Details

 06-22-2009
4.70
Riveted seat rib bottom skins.
Details
       

 06-21-2009
6.30
Rolled F-823-1 aft lower edges.
Details
       

 06-19-2009
4.80
Deburred Mid Fuse skins and structure parts.
Details

 06-18-2009
2.90
Fwd Fuselage Aux Longerons and gussets.
Details
     

 06-17-2009
5.00
Finished drilling F-843 lower longerons.
Details
       

 06-15-2009
3.90
Finished bending longerons.
Details
       

 06-14-2009
6.50
Longeron bending.
Details
       

 06-11-2009
1.50
Radiused and deburred Fwd Fuse gussets.
Details

 06-10-2009
2.00
Forward Fuselage Structure.
Details
       

 06-05-2009
6.00
More work on Seat Rib Subassembly.
Details
       

 06-04-2009
1.70
Riveted Rear Spar Attach Bulkhead.
Details
     

 06-04-2009
5.50
Primed Seat Rib Subassembly.
Details
     

 06-03-2009
5.00
Dimpled center bottom skins.
Details
       

 06-02-2009
3.00
More deburring and surface preparation on Seat Rib
Details

 06-01-2009
4.50
Match drilled seat rib Subassembly.
Details
       

 06-01-2009
4.00
Deburred Seat Rib Subassembly.
Details

 05-30-2009
5.30
Started Seat Rib Subassembly.
Details
     

 05-29-2009
4.50
Finished center sectioin.
Details
       

 05-28-2009
5.00

Details
       

 05-27-2009
4.90
More work on center section.
Details

 05-26-2009
3.00
Riveted Firewall to floor.
Details
       

 05-25-2009
5.00
Started Center Section.
Details
       

 05-24-2009
3.70
Riveted Fwd baggage parts.
Details
       

 05-23-2009
3.00
Primed Forward Fuselage Sub Structure.
Details

 05-21-2009
2.30
Primer and platenuts on F-866B-1 / access plate.
Details
       

 05-17-2009
5.00
Instrument panel rear access modification.
Details
       

 05-14-2009
8.30
Completed landing gear boxes.
Details
       

 05-13-2009
6.00
Priming and platenut riveting.
Details
     

 05-11-2009
5.50
More work on landing gear boxes.
Details
       

 05-10-2009
1.00
Primed some of the landing gear box parts.
Details

 05-10-2009
4.60
Forward fuselage sub structure.
Details

 05-09-2009
0.10
Continue work on landing gear boxes.
Details
       

 05-08-2009
3.00
Started work on the landing gear boxes.
Details
     

 05-08-2009
2.70
Finished work on the forward floor assembly.
Details
       

 05-07-2009
6.00
Prepared and primed forward floor.
Details

 05-06-2009
5.50
Forward floor and cooling air ramp work.
Details

 05-05-2009
4.50
Finished riveting firewall.
Details
     

 05-04-2009
3.80
Firewall riveting.
Details
       

 05-03-2009
4.30
Firewall parts primed.
Details
     

 05-02-2009
3.50
Firewall countersinking.
Details
       

 04-22-2009
2.50
Installed right left hand aileron.
Details
       

 04-21-2009
2.50
Finished W-818 pushrods.
Details
     

 04-20-2009
4.20
Installed right hand aileron.
Details
       

 04-19-2009
4.10
Installed aileron brackets.
Details
       

 04-18-2009
4.50
Finished aileron assembly.
Details
       

 04-17-2009
5.20
Match drilled and deburred firewall parts.
Details
     

 04-15-2009
0.10
Pneumatic rivet puller from Avery.
Details
     

 04-15-2009
1.00
Deburred firewall.
Details

 04-13-2009
1.30
More work on firewall parts.
Details
       

 04-12-2009
3.00
Started fuselage firewall work.
Details

 04-06-2009
1.70
Aileron end ribs riveted to top skins.
Details
     

 04-04-2009
1.50
Wing pre-cover inspection completed.
Details
       

 04-01-2009
3.00
Prepared for wing pre-cover inspection.
Details

 03-31-2009
5.40
Riveted left hand flap.
Details
       

 03-30-2009
3.20
Riveted right hand flap.
Details
       

 03-28-2009
4.00
Wrote an inventory locator utility program.
Details

 03-28-2009
0.30
Installed blind rivets in aileron pushrods.
Details
     

 03-28-2009
3.00
Began riveting left and right hand flaps.
Details
       

 03-27-2009
7.70
Cleaned and primed all flap parts.
Details

 03-26-2009
3.50
Final flap fabrication.
Details
       

 03-25-2009
5.50
Dimpled flap skins and ribs.
Details
       

 03-24-2009
5.00
Countersunk flap spars.
Details
     

 03-10-2009
7.70
F706B v2.0 and deburred flap parts.
Details
       

 03-04-2009
15.00
Inventoried the fuselage kit.
Details
       

 03-02-2009
8.00
Built a loft shelf to store fuselage skins.
Details
       

 02-23-2009
2.00
Fuselage kit arrives!
Details
       

 02-22-2009
2.00
Fabricated 706A and 706B.
Details
     

 02-21-2009
1.00
Sealed small leak in left hand fuel tank.
Details
       

 02-21-2009
3.00
Finished riveting flap brace to right wing.
Details
       

 02-20-2009
4.50
Installed right wing aileron brackets & fairing.
Details
       

 02-19-2009
2.50
Dimpled and primed aileron fairing/flap brace.
Details
       

 02-18-2009
4.20
Right wing aileron / flap brackets and braces.
Details
       

 02-17-2009
4.00
Riveted right wing top skins.
Details
       

 02-17-2009
2.50
Riveted aileron skins to top of spar.
Details
       

 02-16-2009
0.50
Set up for riveting right wing top skin.
Details

 02-16-2009
2.00
Applied RTV to aileron siffeners.
Details
     

 02-15-2009
4.00
Drilled flap hinges.
Details
       

 02-14-2009
4.00
Started work on the flaps.
Details
       

 02-13-2009
3.10
Aileron pushrods.
Details
       

 02-12-2009
3.50
Aileron 408 plates and nose rib to spar riveting.
Details
       

 02-11-2009
5.50
Aileron parts primed.
Details
       

 02-10-2009
3.00
Counterunk left hand aileron spar.
Details
     

 02-03-2009
2.50
Counterunk right hand aileron spar.
Details

 02-01-2009
2.00
Dimpled Aileron skins and skeleton.
Details

 01-30-2009
3.10
Aileron counterbalance countersinking.
Details
       

 01-29-2009
3.50
Right wing top skin final preparations.
Details

 01-29-2009
2.50
Right Aileron deburring etc.
Details

 01-28-2009
3.50
Deburred L/H Aileron, reamed R/H Aileron.
Details
     

 01-27-2009
5.80
Drilled Aileron counterbalance.
Details
       

 01-26-2009
4.30
Aileron parts deburring.
Details
     

 01-25-2009
1.00
Finished Aileron / Flap cradle.
Details
       

 01-25-2009
5.50
Aileron spars and reinforcing plates.
Details
     

 01-24-2009
1.00
Clecoed on the right wing top skins.
Details

 01-24-2009
4.00
Aileron stiffeners, T/E bend and brackets.
Details
       

 01-23-2009
2.80
Primed Aileron stiffeners and skins.
Details
     

 01-23-2009
2.80
Installed right hand fuel tank.
Details
       

 01-22-2009
2.00
Pressure tested right hand fuel tank.
Details
       

 01-22-2009
2.30
Dimpled Aileron skins and stiffeners.
Details
       

 01-21-2009
4.00
Riveted on the R/H Leading Edge assembly.
Details
       

 01-20-2009
2.00
Started to build the flap cradle.
Details
     

 01-20-2009
5.80
Final right wing understructure preparations.
Details
     

 01-19-2009
5.60
Aileron bending brake contruction.
Details
       

 01-18-2009
3.60
Worked on Aileron Bending Brake.
Details

 01-17-2009
4.50
Finished right hand fuel tank.
Details
       

 01-16-2009
1.00
Set up my new drill press.
Details
       

 01-15-2009
2.80
Final preparations for right tank access plate.
Details
     

 01-08-2009
3.50
Sealed right tank span wise shop heads.
Details
       

 01-05-2009
3.50
Right tank access plate.
Details
       

 01-04-2009
6.90
Installed right tank rear baffle and Z-Brackets.
Details
       

 01-03-2009
4.00
Setup right hand fuel sender.
Details
       

 01-02-2009
5.00
Right tank vent and vapour return line.
Details
       

 01-01-2009
5.50
Right tank end ribs and sealed shop heads.
Details
       

 12-31-2008
5.00
Riveted right fuel tank inner ribs.
Details
       

 12-28-2008
4.50
Fay sealed the right tank inner ribs in place.
Details
       

 12-27-2008
4.80
Riveted and sealed right tank stiffeners.
Details
       

 12-26-2008
2.50
Preparation for right hand tank sealing.
Details

 12-26-2008
1.30
Deburred aileron rivet holes of stiffeners and ski
Details

 12-24-2008
5.50
Deburred edges of aileron stiffeners and skins.
Details
       

 12-23-2008
0.40
Began countersinking right wing main spar.
Details

 12-22-2008
5.00
Riveted the right wing leading edge together.
Details
       

 12-21-2008
3.00
Right wing skin priming.
Details
       

 12-19-2008
3.00
Final right wing top skin preparations.
Details
     

 12-17-2008
1.00
Finished dimpling right wing ribs and aft spar.
Details

 12-16-2008
5.10
Various right wing skin preparations.
Details

 12-15-2008
3.80
Deburred right wing ribs and aft spar.
Details

 12-14-2008
3.40
Removed vinyl and deburred right wing skins.
Details
       

 12-13-2008
4.20
Dimpled right hand tank skin.
Details
       

 12-12-2008
4.20
Deburred and dimpled right tank ribs.
Details
       

 12-11-2008
3.80
Countersunk span wise rivet holes in right tank.
Details
     

 12-10-2008
4.60
Match drilled right tank and drilled Z-Brackets.
Details
       

 12-09-2008
3.50
Right tank Z-Brackets
Details
     

 12-08-2008
5.90
Right wing leading edge joint plate.
Details
       

 12-07-2008
4.30
Match drilled right hand wing skins.
Details

 12-06-2008
3.60
Clecoed top and bottom skins to right wing.
Details
     

 12-04-2008
5.00
Wing stand modifications for right hand wing.
Details

 12-03-2008
2.50
Finished riveting flap brace to left wing.
Details
       

 12-02-2008
1.50
Riveted on left aileron gap seal.
Details
       

 12-01-2008
3.00
Drilled and primed flap brace, aileron gap seal.
Details
       

 11-29-2008
7.00
Primed and installed left wing aileron brackets.
Details
       

 11-27-2008
3.50
Drilled and deburred aileron brackets.
Details
       

 11-26-2008
8.30
Riveted left wing top skins.
Details
       

 11-25-2008
9.30
Installed left hand fuel tank.
Details
       

 11-23-2008
6.70
Riveted left hand L/E assembly to main spar.
Details
       

 11-22-2008
5.00
Final left wing preparation for top skins.
Details
       

 11-21-2008
3.30
Finished riveting the left L/E assembly.
Details
       

 11-20-2008
3.60
Riveted skin to left wing leading edge ribs.
Details
       

 11-15-2008
3.80
Primed left wing skins and leading edge parts.
Details
       

 11-13-2008
6.00
Wing cradle construction.
Details
       

 11-09-2008
1.30
Countersinking right hand main spar.
Details
       

 10-11-2008
1.50
Dimpled left wing ribs.
Details

 10-08-2008
1.30
Dimpled left wing leading edge assembly.
Details

 10-07-2008
4.80
Left wing C/S and leading edge preparation.
Details

 10-05-2008
1.30
Pressure tested the left hand fuel tank.
Details
       

 10-05-2008
4.00
Finished left wing splice plate.
Details
       

 10-04-2008
0.10
Me dimpling the wing ribs.
     

 10-04-2008
4.30
Deburred and dimpled left wing ribs and spars.
Details
       

 10-03-2008
4.50
Deburred and dimpled top skins.
Details
       

 10-02-2008
4.80
Left wing top skin preparation.
Details
       

 09-25-2008
2.00
Re-Installed aileron bellcrank assembly.
Details
       

 09-24-2008
4.00
Finished left fuel tank.
Details
       

 09-23-2008
4.90
Riveted left tank rear baffle.
Details
       

 09-22-2008
4.90
Left tank rear baffle and Z-Brackets.
Details
       

 09-21-2008
4.50
Fabricated corner fillers and more prep work.
Details
       

 09-20-2008
5.30
Final preparations for tank baffle installation.
Details
       

 09-18-2008
2.90
Sealed and riveted outer and inner tank ribs.
Details
       

 09-17-2008
5.00
Sealed outer and inner most left hand tank ribs.
Details
       

 09-16-2008
1.60
Left tank vapour return line.
Details
       

 09-15-2008
2.90
Left tank fuel vent line and fittings.
Details
       

 09-14-2008
0.20
Tube bender and Tube Flaring tools.
Details
     

 09-13-2008
2.00
Improved wing fixture aft spar support.
Details
       

 09-12-2008
3.30
Finished left tank Anti-Hang ups.
Details
       

 09-10-2008
2.50
Tank anti hang up and float sender wire.
Details
       

 09-06-2008
3.50
Riveted inner ribs of left hand fuel tank.
Details
       

 09-06-2008
3.60
Finished riveting the left tank inner ribs.
Details
       

 09-04-2008
3.10
Fay sealed left tank inner ribs.
Details
       

 09-03-2008
2.00
Riveted the left fuel cap flange and drain.
Details
       

 09-03-2008
3.30
Back riveted left tank stiffeners.
Details
       

 09-02-2008
1.90
Left tank skin preparations for sealant.
Details
       

 09-01-2008
2.80
Fuel cap flange (again) and vent clip.
Details
       

 08-31-2008
5.70
Deburred and dimpled left tank skins and ribs.
Details
       

 08-30-2008
4.50
Fuel sender doubler, fuel cap and low point drain.
Details
       

 08-29-2008
2.50
Inverted fuel system sender installation.
Details
       

 08-29-2008
5.00
Fuel tank trap door.
Details
       

 08-28-2008
3.10
Worked on Tank Access Plates.
Details
       

 08-27-2008
5.50
Worked on Fuel Tank access plates.
Details
       

 08-26-2008
5.90
Fabricated T-405 and T-410 bracket / plate.
Details
       

 08-25-2008
3.60
T-405 Tank Bracket (Prototype-1).
Details
       

 08-24-2008
4.00
L/H joint plate, baffle and tank screw holes.
Details
       

 08-24-2008
2.50
Fixed the gap between tank and leading edge.
Details
       

 08-22-2008
2.90
Match drilled tank and back drilled 2 Z-Brackets.
Details
       

 08-19-2008
0.70
Fabricated L/H T-405 tank bracket.
Details
       

 08-17-2008
1.00
Cleco left hand tank skin to ribs.
Details
       

 08-15-2008
2.00
Started on T-405 tank attach angle bracket.
Details
       

 08-14-2008
4.00
Cut and deburred T-711 tank stiffeners.
Details
       

 08-13-2008
3.40
Riveted Z-Bracket nut plates.
Details
       

 08-13-2008
2.00
Bolted Z-Brackets to spar and marked stiffeners.
Details
       

 08-12-2008
5.20
Drilled left wing fuel tank Z-Brackets and primed.
Details
       

 08-11-2008
4.50
Drilled left wing fuel tank Z-Brackets.
Details
       

 08-10-2008
1.50
Marked Tank Z-Brackets.
Details
       

 08-10-2008
0.50
Drilled hole for wing tie down ring.
Details
       

 08-09-2008
4.20
Right hand wing walk and match drilled main skins.
Details
       

 08-08-2008
2.00
Drilled Left Hand Wing Walk doubler.
Details
       

 08-07-2008
3.00
Left wing leading edge tank joint plate.
Details
       

 08-06-2008
2.80
Riveted Aft Spar to ribs of right hand wing.
Details
       

 08-05-2008
5.20
More work on wing fixture.
Details
       

 07-22-2008
8.30
More wing spar riveting.
Details
       

 07-21-2008
5.20
Riveted the main ribs to forward wing spar.
Details
       

 07-20-2008
6.20
Prepared and primed remaining wing ribs.
Details
     

 07-17-2008
6.20
Primed main ribs.
Details
       

 07-17-2008
0.50
New 40 gallon parts washer
Details
     

 07-16-2008
7.40
More work on the wing stands.
Details
       

 07-14-2008
7.00
Worked on the wing stands.
Details
       

 07-11-2008
1.00
Deburred leading edges of nose ribs.
Details
       

 07-08-2008
2.00
Conduit holes, engraving and bump removal.
Details
       

 07-05-2008
1.00
Reamed the aileron bellcrank bushings.
Details
       

 07-04-2008
1.00
Tapped the tie down brackets to 3/8".
Details
       

 07-02-2008
3.00
Match drilled & deburred ribs to spars.
Details
       

 07-01-2008
4.00
Finished preparing the right hand ribs.
Details
       

 06-30-2008
2.90
Built the leading edge cradle.
Details
       

 06-29-2008
3.00
Drilled provisions for wiring conduit.
Details
       

 06-28-2008
1.50
Match drilled and deburred ribs to spars.
Details
       

 06-27-2008
6.00
Finished left wing rib prep and assembly.
Details
       

 06-26-2008
4.50
Riveted aft spar components.
Details
       

 06-26-2008
0.10
Picture of me working on the aft wing spar.
Details
     

 06-25-2008
1.00
Painted the work table.
Details
       

 06-25-2008
1.00
Painted the Wing Jig supports.
Details
       

 06-23-2008
2.00
Prepared and primed aft spar components.
Details
       

 06-19-2008
1.00
More work on the aft wing spar.
Details
       

 06-18-2008
0.10
Nibbler tool.
Details
       

 06-18-2008
4.00
Match drilled aft spar doubler plates.
Details
       

 06-16-2008
3.00
Deburred wing ribs and aft spar doubler plates.
Details

 06-11-2008
3.00
Deburring the wing ribs.
Details
       

 06-08-2008
2.00
Finished setting up new work shop.
Details
       

 06-08-2008
3.00
Began setting up my new workshop.
Details
       

 01-19-2008
0.50
Riveted tie down asseblies.
Details
       

 01-14-2008
2.90
Drilled and primed W-726 spacers.
Details
       

 01-13-2008
4.00
Wing tie down assemblies.
Details
       

 01-12-2008
3.00
Started fabrication of wing tie down assembly.
Details
       

 01-11-2008
1.90
Center section platenuts installed.
Details
       

 01-10-2008
3.00
Completed wing spar countersinking.
Details
       

 01-07-2008
3.00
More wing spar countersinking and nutplates.
Details
       

 01-06-2008
2.00
More nutplate screw hole countersinking.
Details
     

 01-05-2008
2.00
More tank skin nut plate screw hole C/S.
Details
     

 01-03-2008
2.60
Riveted nutplates and countersank screw holes.
Details
       

 01-02-2008
2.20
Finished wing spar countersinking and made jig.
Details
       

 01-01-2008
2.80
Riveted tank skin nut plates to wing spar.
Details
       

 01-01-2008
2.00
Countersink tank skin platenuts to wing spar.
Details
       

 12-30-2007
3.00
Improved hardware labeling.
Details
       

 12-28-2007
4.00
Wing kit inventory.
Details
       

 12-27-2007
1.50
Received wing kit.
Details
       

 10-24-2007
5.00
Installed lower rudder fiberglass tip.
Details
       

 10-23-2007
3.00
Riveted Elevator tips.
Details
       

 10-17-2007
4.00
Completed Horizontal Stabilizer Storage Crate.
Details
       

 10-14-2007
7.50
Horizontal Stabilizer Storage Crate.
Details
       

 10-05-2007
4.60
Built storage crate for the VS / Rudder assembly.
Details
       

 10-01-2007
4.10
Installed Elevator Tips.
Details
       

 09-29-2007
2.70
Completed the Elevator Trim Tab.
Details
       

 09-28-2007
3.20
Riveted Trim Tab lower spar / drilled hinge holes.
Details
       

 09-27-2007
2.00
Prepared and primed Elevator Trim Tab.
Details
       

 09-26-2007
4.00
Trim Tab spar countersinking and end riblet.
Details
       

 09-26-2007
0.10
New Longeron Yoke.
Details
     

 09-25-2007
1.00
Trim Tab take two.
Details
       

 09-25-2007
2.00
Drilled control horn & match drilled skin to spar.
Details
       

 09-25-2007
2.00
Clamped and bent the bottom tab up.
Details
       

 09-25-2007
1.00
Bent the top tab down.
Details
       

 08-03-2007
3.50
Built a rolling dolly for the VS/Rudder.
Details
       

 07-27-2007
2.50
Re-installed Elevators and installed connection.
Details
       

 07-27-2007
2.50
Drilled holes in Elevator control horns.
Details
       

 07-26-2007
1.50
Primed and blind riveted Elevator leading edges.
Details
       

 07-26-2007
0.10
New pneumatic nibbler.
Details
     

 07-26-2007
1.50
Installed Elevators and trimmed HS outboard ends.
Details
       

 07-26-2007
1.00
Finished Elevator leading edge blind rivets.
Details
       

 07-26-2007
1.00
Fabricated a drill bushing.
Details
       

 07-25-2007
4.00
Finished rolling Elevator L/E and match drilled.
Details
       

 07-22-2007
5.00
Rolling the Elevator leading edges.
Details
       

 07-21-2007
2.50
Finished Horizontal Stabilizer.
Details
       

 07-20-2007
2.50
Riveted HS-707/708 to both HS skins.
Details
       

 07-20-2007
3.00
Finished bucking remaining rivets on the HS skin.
Details
       

 07-09-2007
1.50
Trim Tab construction (4).
Details
       

 07-09-2007
0.50
Trim Tab construction (3).
Details
       

 07-09-2007
0.20
Trim Tab construction (2).
Details
       

 07-09-2007
4.00
Trim Tab construction (1).
Details
       

 07-08-2007
4.00
Riveted the L/H Elevator skin to understructure.
Details
       

 07-08-2007
2.00
Fabricated a better 'Riblet' for L/H Elevator.
Details
       

 07-07-2007
4.00
Fabricated L/H Elevator 'Riblet'.
Details
       

 07-06-2007
4.00
Riveted the right hand Elevator skin.
Details
       

 07-04-2007
0.50
Made 2 Rod End Bearing wrenches.
Details
       

 07-04-2007
1.00
Attached Rudder to Vertical Stabilizer.
Details
       

 07-03-2007
3.45
Rolled rudder leading edge and set blind rivets.
Details
       

 07-03-2007
3.00
Riveted Rudder skin to understructure.
Details
       

 07-03-2007
1.25
Prepared Rudder leading edge for rolling.
Details
       

 05-15-2007
1.00
Riveted the VS skin on to it's understructure.
Details
       

 05-15-2007
1.00
Removed the vinly from the VS and tidied up.
Details
       

 05-15-2007
2.00
Pre-cover inspection completed on empenage.
Details
       

 05-11-2007
1.20
Set skeleton rivets and attached control horn.
Details
       

 05-11-2007
3.30
Riveted the elevator skeleton.
Details
       

 05-07-2007
3.00
Prepared and primed elevator skeleton.
Details
     

 05-06-2007
1.00
Dimpled E-713 R/H counterweight skin.
Details
       

 05-06-2007
2.50
Dimpled E-713 L/H and countersunk E-606PP.
Details
       

 05-05-2007
2.30
Deburred elevator skins and understructure.
Details
       

 05-03-2007
3.50
Match drilled skin to elevator understructure.
Details
       

 05-02-2007
3.20
Bent the elevator trailing edges.
Details
       

 05-01-2007
1.00
Set remaining rivets on elevator stiffeners.
Details
       

 04-30-2007
2.50
Preparing the right and left elevators.
Details
       

 04-29-2007
4.00
Riveted elevator stiffeners in place.
Details
       

 04-29-2007
2.50
Completed the Trim Servo access plate.
Details
       

 04-28-2007
6.00
Cleaned and primed elevator stiffeners.
Details
       

 04-20-2007
2.50
Dimpled elevator stiffeners and skins.
Details
       

 04-19-2007
7.00
Match drilled elevator stiffeners and deburred.
Details
       

 04-18-2007
5.50
Trimmed and edge finished elevator stiffeners.
Details
       

 04-17-2007
0.20
Torqued the HS-411PP center bearing bolts.
Details
     

 04-16-2007
5.00
Riveted the rudder understructure.
Details
       

 04-16-2007
0.20
Riveted the rudder top rib to the C/W skins.
Details
       

 04-15-2007
5.50
Cleaned and primed rudder components.
Details
       

 04-12-2007
3.00
Dimpled and edge finished Rudder components.
Details
       

 04-11-2007
0.60
Rudder bottom attach strips installed.
Details
       

 04-11-2007
1.00
Match drilled rudder components.
Details
       

 04-10-2007
3.00
Worked on Rudder Horn and Brace.
Details
       

 04-10-2007
1.00
Installed another compressor air filter and drain.
Details
       

 04-10-2007
1.00
Fluted and match drilled top rib R-703.
Details
       

 02-13-2007
0.10
Partially completed Rudder and HS.
Details
       

 02-12-2007
2.50
Started bending the rudder trailing edge.
Details
       

 02-12-2007
2.00
Completed the rudder trailing edge bend.
Details
       

 02-11-2007
4.75
Riveted the Rudder stiffeners.
Details
       

 02-10-2007
2.00
Riveted L/H Rudder skin to skeleton.
Details
       

 02-10-2007
2.00
Finished the Rudder skin riveting.
Details
       

 02-09-2007
1.50
Primed the Rudder stiffeners and skin rivet lines.
Details
       

 02-07-2007
0.50
Fabricated a Trailing Edge bender.
Details
       

 02-07-2007
0.20
Dimpled Rudder stiffeners.
Details
       

 02-06-2007
1.00
Deburred and dimpled the Rudder skin.
Details
       

 02-06-2007
4.00
Cut and finished Rudder stiffeners.
Details
       

 02-05-2007
1.00
Marked and cut the Rudder stiffeners.
Details
     

 02-05-2007
0.75
Angle drilled and riveted HS-810-1 / HS-814.
Details
       

 02-04-2007
2.00
Finished riveting HS-810-1 / 814.
Details
       

 02-04-2007
0.20
Finished dimpling the VS skin.
Details
       

 02-03-2007
4.00
Primed HS-810-1 and riveted it front HS-814/spar.
Details
       

 02-02-2007
3.00
Riveted the VS skeleton.
Details
       

 02-02-2007
2.50
Match drilled / bent replacement HS-810-1.
Details
       

 02-01-2007
3.50
Riveted VS rear spar, doubler and hinge brackets.
Details
       

 02-01-2007
0.50
Dimpled VS skin and clecoed rear doubler and hinge
Details
       

 01-31-2007
3.75
Counter sunk VS doubler, primed skeleton
Details
       

 01-31-2007
3.25
Cleaned and primed all internal VS parts
Details
       

 01-30-2007
5.50
Edge preped, deburrerd and dimpled VS
Details
       

 01-29-2007
5.00
Match drilled VS skeleton and skin
Details
       

 01-28-2007
4.90
Drilled the lightening holes in the VS doubler
Details
       

 01-28-2007
0.10
Completed VS doubler
Details
       

 01-27-2007
0.10
Using my pneumatic rivet squeezer
Details
       

 01-27-2007
5.00
Riveted the HS rear spar
Details
       

 01-27-2007
0.10
Pneumatic squeezer and cleco pliers
Details
     

 01-27-2007
1.00
HS rear spar hinge bracket installation.
Details
       

 01-26-2007
4.00
Primed HS rivet lines and other HS parts
Details
       

 01-24-2007
0.10
Pictures of me building set 1
Details
       

 01-24-2007
4.50
HS skin dimpling and edging
Details
       

 01-23-2007
1.50
Finished preping R/H HS skin
Details
       

 01-23-2007
3.50
Built a table for the DRDT-2
Details
       

 01-22-2007
2.75
HS Skin vinyl removal and hole deburring
Details
       

 01-21-2007
5.00
HS understructure dimpling
Details
       

 01-20-2007
4.00
More right hand side of Horizontal Stabilizer.
Details
       

 01-19-2007
5.00
Continued with Horizontal Stabilizer.
Details
       

 11-25-2006
2.00
Finished priming HS skeleton
Details
       

 11-24-2006
6.00
Match drilled and primed HS skeleton
Details
       

 11-23-2006
2.50
Drilling the Horizontal Stabilizer
Details
       

 11-22-2006
5.00
Deburred and fluted HS skeleton assembly
Details
     

 11-20-2006
3.00
Marked holes for HS-405 ribs
Details
       

 11-19-2006
2.00
Prepared forward spar center section
Details
       

 11-15-2006
2.00
Tungsten Bucking Bar
Details
     

 11-15-2006
0.50
More pictures of completed Aileron Section Kit
Details
       

 11-15-2006
2.00
Completed the Aileron Training Kit
Details
       

 11-14-2006
2.00
Rear spar bracket assemblies.
Details
       

 11-14-2006
0.50
Completed the riveting of the HS-411 hinge.
Details
       

 11-13-2006
4.50
Rear Spar
Details
       

 11-10-2006
5.00
More work on the Aileron section kit
Details
       

 11-09-2006
2.00
Started the Aileron Section Kit
Details
       

 11-09-2006
3.00
Continued work on the Aileron Section Kit
Details
       

 11-08-2006
5.00
Completed the Tool Box kit.
Details
       

 11-07-2006
6.00
Completed the general skills thingy.
Details
       

 11-03-2006
2.50
Built a Plans Cart
Details
       

 10-27-2006
3.00
Completed air compressor setup
Details
       