Paul and Mike's Building Site
Work Logs Found: 317
Category Work Time: 856 Hours
 Date
Hours
Work Log Summary

Details

 04-12-2011
2.00
Trimmed right flap
     

 04-09-2011
4.00
Trimmed left flap, cut out flap pushrod exit hole
Details
       

 04-08-2011
4.00
Fitted wing root farings
     

 04-08-2011
1.00
Fitted fuel vent connection from fuselage to wing
     

 03-29-2011
1.00
Finish forward top skin
       

 03-26-2011
12.00
Drilled rear spar attach holes
       

 03-13-2011
2.00
Preparing for wing fitting
       

 02-13-2011
10.00
Install baffle seal
       

 12-24-2010
5.00
Finished foward top skin
       

 06-14-2010
0.25
Pictures to date
       

 06-14-2010
0.25
Pictures to date
       

 06-13-2010
10.00
Documentation and ogainization
       

 05-21-2010
10.00
Completed skin install
       

 04-07-2010
30.00
Completed baffle, oil cooler install, cooling tube
       

 02-24-2010
2.00
Created oil cooler reinforcement mount
     

 02-24-2010
2.00
Completed heat shield and installed
     

 02-23-2010
3.00
Completed heater duct
       

 02-21-2010
6.00
Completed oil cooler mount
       

 02-21-2010
2.00
Completed heater inlet
     

 02-21-2010
1.00
Completed fuel lines
       

 02-12-2010
12.00
Fitting spinner. Thanks Hugh!!
       

 02-12-2010
5.00
Completed lower cowl mounting bracket
     

 01-31-2010
2.00
More baffle work
       

 01-24-2010
2.00
More baffle work
     

 01-24-2010
3.00
More baffle work
     

 01-24-2010
10.00
Fitting of air inlet
       

 10-11-2009
5.00
Begin baffle
       

 10-10-2009
5.00
Modified cowl for exhaust
     

 07-19-2009
25.00
Fitted cowl
       

 06-12-2009
6.00
Fitted oil filler door
       

 03-22-2009
4.00
Fiberglass work
       

 03-07-2009
6.00
Fairing work
       

 03-04-2009
6.00
Emp Fairing
       

 01-18-2009
4.00
Installed pitot mount
     

 01-18-2009
1.00
Fitted pitot to mount
     

 11-21-2008
2.00
Canopy latch
       

 11-16-2008
6.00
Finalized winscreen
       

 11-09-2008
5.00
Fitting windscreen
       

 07-19-2008
10.00
Prep and drilled canopy
       

 07-18-2008
4.00
Made the big cut
       

 07-13-2008
1.00
Mount prop extension and flywheel
     

 07-13-2008
4.00
Finalize canopy frame fit
     

 07-09-2008
2.00
Fit spinner bulkhead to prop extension
     

 07-09-2008
4.00
Canopy rail fitting
       

 06-29-2008
4.00
More canopy work
     

 06-24-2008
4.00
More canopy work
       

 06-22-2008
2.00
Started fitting canopy
       

 06-15-2008
2.00
Installed new relay decks for trim motors
       

 06-14-2008
8.50
Completed lens and NAV/strobe install on wing tips
       

 06-13-2008
1.50
Added diodes to new REL-D relay decks
       

 06-04-2008
2.50
Worked on right wing tip lens
     

 06-03-2008
3.50
Elevator tip install
       

 06-02-2008
1.00
Rear stobe and nav light install
     

 06-01-2008
3.00
Finalized rudder control system
       

 05-29-2008
1.00
Trim hinge pin safety
     

 05-28-2008
2.00
Rudder tip re-work
Details
       

 05-26-2008
4.00
Finished rudder install
       

 05-25-2008
3.00
Fiberglass tip work
       

 05-25-2008
3.00
Fiberglass tip work
       

 05-23-2008
4.00
Elevator pushrod install
       

 05-21-2008
2.00
Selective avionics test
       

 05-21-2008
2.50
Elevator install
     

 05-21-2008
3.50
Altitude hold AP servo install
       

 05-18-2008
6.50
Electric aileron and elevator trim
       

 05-10-2008
0.00
Instrument panel wiring reference
       

 05-10-2008
0.00
Instrument panel wiring reference
       

 05-10-2008
0.00
Instrument panel wiring reference
       

 05-09-2008
2.00
Strobe PS install
     

 05-09-2008
4.00
More wiring
       

 05-09-2008
0.00
Engine wiring reference
       

 04-20-2008
3.00
Control stick wiring
       

 04-10-2008
1.00
Received prop
     

 03-30-2008
4.50
Installed HS and VS
     

 03-16-2008
5.00
Aircraft move to hanger
       

 03-16-2008
1.00
Aircraft move to hanger
       

 03-16-2008
1.00
Aircraft move to hanger
       

 03-16-2008
1.00
Aircraft move to hanger
       

 03-16-2008
1.00
Aircraft move to hanger
       

 03-16-2008
1.00
Aircraft move to hanger
       

 03-16-2008
1.00
Aircraft move to hanger
       

 03-16-2008
1.00
Aircraft move to hanger
       

 03-16-2008
1.00
Aircraft move to hanger
       

 03-09-2008
2.00
Hanger prep
       

 03-08-2008
4.00
Hanger grand opening
       

 03-08-2008
2.00
Hanger grand opening
       

 03-08-2008
2.00
Hanger grand opening
       

 03-07-2008
2.00
Hanger prep
       

 03-03-2008
1.00
Got the hanger!
       

 11-06-2007
2.00
Relay deck install
     

 10-27-2007
3.50
Audio mixure install
       

 10-21-2007
1.00
Flap switch, MAP, oil pressure, fuel pressure inst
       

 10-21-2007
2.50
Engine wiring
       

 10-14-2007
3.50
Pitot, static, AOA install
       

 10-07-2007
1.50
Pito, static, AOA plumbing design
     

 10-07-2007
2.50
Ground buss wiring
     

 10-03-2007
2.00
Headset jack install
     

 10-03-2007
2.00
Buss wiring
     

 09-29-2007
3.00
Install switches
       

 09-23-2007
0.50
Transponder antenna install
     

 08-12-2007
1.00
WIG WAG relay install
     

 08-12-2007
5.00
More wiring
       

 08-12-2007
1.00
Dimmer module install
     

 08-11-2007
1.00
Moved Buss
Details
     

 08-11-2007
1.00
EGT and CHT prob install
     

 08-11-2007
0.50
E-bus diode install
     

 08-08-2007
1.00
Main Buss & E-Buss Connection
     

 08-05-2007
2.00
More wiring......
       

 08-05-2007
2.00
More wiring......
       

 08-04-2007
0.10
Visit with Sandy and Bill
       

 08-04-2007
2.00
More wiring......
       

 07-29-2007
1.00
More wiring.....
       

 07-22-2007
2.00
Started working on the wiring
       

 07-22-2007
3.00
Finish exhaust install
       

 07-18-2007
2.00
Exhaust install
       

 07-15-2007
1.00
Installed misc items
       

 07-05-2007
1.00
Right side FW penetration
       

 07-04-2007
0.50
Quality control expert
       

 07-04-2007
1.00
Mounted control cables
       

 07-04-2007
1.00
Alternator install with helper
Details
       

 07-03-2007
2.50
Fuel lines
       

 06-24-2007
2.00
Throttle and mixture cables
       

 06-24-2007
0.50
Oil pressure hose, fuel outlet
       

 06-24-2007
0.75
My first safety wire
Details
     

 06-24-2007
2.50
Hung engine!!
       

 06-23-2007
1.00
Installed Oil and Fuel senders and lines
     

 06-21-2007
1.00
Rearranged shop
     

 06-21-2007
3.00
Picked up engine!!!
       

 06-20-2007
1.00
Back on it's feet!
     

 06-19-2007
0.50
Panel work
     

 06-19-2007
0.50
Mounted engine mount
       

 06-13-2007
1.00
Drilled holes for the engine mount
       

 06-09-2007
3.00
Installed switches and labels
       

 06-09-2007
1.00
Installed shunt and misc wiring
     

 06-09-2007
2.00
Drilled anti rotation holes for the switches
       

 06-08-2007
1.00
Installed more instruments
       

 06-07-2007
1.00
Installed Dynon tray, AS install
       

 06-05-2007
1.00
Mounted Comm Antenna
       

 06-04-2007
2.00
Mounted roll servo, started on pitch servo mount
       

 06-03-2007
1.00
Start EZ Pilot AP Servo install
       

 06-02-2007
2.50
Installed mixture and throttle grommets
       

 05-28-2007
2.00
Wiring conduit install
       

 05-28-2007
1.00
Main fuel line fabrication
     

 03-17-2007
2.00
Fabricated the battery cables
     

 03-07-2007
1.00
Finished landing lights
     

 03-05-2007
1.00
Installed nutplates for lights
       

 03-04-2007
3.00
Made the "BIG" cut for the landing/taxi lights
       

 03-03-2007
4.00
John's visit to help with the airplane
       

 02-28-2007
1.50
Finalize battery box, riveted FW recess
       

 02-26-2007
3.00
Mounted Master and Starter Relays
       

 02-25-2007
2.00
Battery box work with my helper
       

 02-25-2007
2.00
Avionics rear mounting brackets
       

 02-17-2007
1.00
Inventoried FF kit
     

 02-14-2007
2.00
Started on panel
       

 02-14-2007
1.00
Picked up panel from powder coat vendor
     

 02-12-2007
1.00
Replaced one of the fuel pump lines
     

 02-12-2007
0.50
Dropped off panel to the powder coat vendor

 02-12-2007
1.00
Cut sub panel for radio stack
     

 02-11-2007
6.00
Route lines in fuel pump
       

 02-10-2007
4.00
Fuel pump enclosure construction
     

 02-08-2007
1.50
Fuel pump enclosure fitting
     

 02-07-2007
0.25
Mounted strobe power supply
     

 02-07-2007
0.75
Drilled holes for radio stack mounting brackets
     

 02-06-2007
0.50
Started work on fuel boost pump
       

 02-06-2007
0.50
Panel work
       

 02-04-2007
4.00
Radio Stack
Details
       

 01-21-2007
0.50
Finalize Alieron Trim Servo
     

 01-21-2007
2.00
Fabricated Fuse Block Access
       

 01-19-2007
1.50
Headset Jacks and Mounts
       

 01-02-2007
4.00
Map Box
       

 12-20-2006
2.00
Got the panel back from the cutter
       

 12-17-2006
1.00
Fabricated and installed rudder cable farings
       

 12-16-2006
2.00
Designed and installed flap position indicator
       

 11-24-2006
2.00
Mounted elevator trim
       

 11-23-2006
4.00
Fabricated and installed aileron trim
       

 08-13-2006
15.00
Bending canopy frame
Details
     

 07-30-2006
2.00
Installed conduit
     

 07-25-2006
5.00
Canopy frame work
       

 07-23-2006
2.00
Start work on the canopy roller track
       

 07-22-2006
2.00
Riveted rear top skin
       

 07-12-2006
1.00
Installed conduit in tail cone
     

 07-12-2006
2.00
Canopy roll bar brace install
       

 07-09-2006
6.00
Canopy roll bar mount with my brother John
       

 05-26-2006
20.00
Final design of the panel
Details
     

 04-22-2006
2.50
Routing of static line
       

 04-22-2006
1.00
Nutplate install of elevator horn access
       

 04-08-2006
1.50
Installed rear portion of static system.
Details
       

 04-02-2006
1.00
installed vent tubing
       

 03-25-2006
3.00
Seal interior vents, finalize sub panel
       

 03-18-2006
1.50
Prep forward skin for installation
       

 03-11-2006
2.00
Mount interior vents
       

 03-11-2006
2.00
Instrument panel mounts
       

 03-11-2006
2.00
Forward fuselage rib mount
       

 03-08-2006
2.00
More work on the forward fuselage
       

 03-07-2006
2.00
Fit forward fuselage skin
       

 03-04-2006
2.00
Fabricated vent and instrument mounts
     

 03-03-2006
2.00
Started work on forward fuselage
       

 03-02-2006
2.00
Mounted air vent scoops
       

 02-26-2006
2.00
Fabricated rudder stops per plans but did not work
       

 02-26-2006
2.00
Fabricated new rudder stops
       

 02-25-2006
2.00
Fabricated new VS mount
       

 02-19-2006
4.00
Installed brake lines on landing gear
       

 02-12-2006
3.00
Assembled nose wheel
       

 02-11-2006
0.50
Started work on brake caliper
     

 02-11-2006
5.00
Mounted wheels and landing gear
       

 10-02-2005
1.00
Installed rudder cables
     

 10-02-2005
1.00
Big mistake!
Details
       

 09-28-2005
0.50
First idea for panel
     

 09-19-2005
1.50
VS mount
       

 09-18-2005
2.00
Started work on VS mount
       

 09-18-2005
1.00
Finished tail cone
       

 09-15-2005
2.00
Fabricated elevator push rods
       

 09-14-2005
2.00
Mounting HS
       

 09-14-2005
0.50
Fabricated mount for VS
     

 09-13-2005
1.00
Fabricated parts for HS install
       

 09-11-2005
1.50
Drilled elevator horn incorrectly
Details
       

 09-07-2005
1.00
Mount fuel vents
       

 09-05-2005
1.00
Mounted fuel selector
       

 09-05-2005
0.50
JB Weld screens to fuel vents
       

 09-05-2005
1.00
Installed brake lines
       

 09-04-2005
2.00
Installed L&R fuel vent lines
       

 09-03-2005
4.00
Installed brake pedal lines
       

 08-28-2005
1.00
Mount brake reservoir
       

 05-20-2005
3.00
Landing gear weldment mount
       

 05-01-2005
1.00
Landing gear to weldment prep
       

 04-27-2005
1.50
Flap Pushrod
     

 04-25-2005
2.00
Flap actuator work
       

 04-16-2005
5.00
Flap actuator work
       

 04-16-2005
2.00
Flap actuator work
       

 04-15-2005
5.00
Access plates and heat baffle
       

 04-10-2005
3.00
Tunnel Cover
       

 04-09-2005
2.00
Finalize baggage floor
       

 04-03-2005
1.00
Finalize steps
     

 03-29-2005
2.00
Finalized rear top skin
     

 03-27-2005
3.00
Bent reinforcing ribs
       

 03-26-2005
2.00
Top Skin Prep
       

 03-26-2005
2.50
Finalize modifications for sliding canopy
       

 03-26-2005
1.50
Elevator bell crank
       

 03-26-2005
2.00
Bottom skin prep for landing gear weldments
       

 03-24-2005
8.00
Steps - overtime
       

 03-24-2005
1.00
Sliding canopy plate mod
     

 03-24-2005
4.00
Seats - over time
     

 03-24-2005
3.00
Fuel Tank Attachment
       

 02-18-2005
1.50
Rudder pedals and brakes
     

 02-17-2005
0.50
Brake pedal assembly
     

 02-13-2005
4.00
Brake Pedal fab and assy
     

 02-13-2005
4.00
Brake pedal fab
     

 02-12-2005
6.00
Seat fabrication
Details
     

 02-12-2005
5.00
Seat fabrication

 02-11-2005
1.50
Start work on right step
       

 02-11-2005
1.50
Start work on right step

 02-11-2005
1.00
Primed and install seat back brackets

 02-11-2005
5.00
Fabricating seat parts

 02-06-2005
4.00
Seat rest brackets
Details
     

 02-05-2005
3.00
Firewall items, control stick
       

 01-24-2005
2.00
Prime and placenut install on bottom ski
       

 01-23-2005
3.00
Dimpled, derbured R&L bottom skins
     

 01-23-2005
1.00
Countersunk Rt Rear spar
     

 01-21-2005
1.00
Countersink Rear Spar (Left)
     

 01-20-2005
1.50
Deburred, dimpled ribs Lt & Rt Wings
       

 01-09-2005
6.00
Finalized Lt Flap, Prep bottom skin
       

 01-09-2005
6.00
Finalized Lt Flap, Prep Bottom Skin
Details
       

 01-08-2005
2.00
Lt Flap Hinge Prep
     

 01-08-2005
2.00
Lt Flap Hinge Prep
     

 01-05-2005
2.00
Rivet flap brace and hinge
       

 01-03-2005
1.50
Right flap hinge prep
       

 01-01-2005
2.00
Installed Ailerons and Pushrods
       

 12-31-2004
4.00
Aileron Pushrods and spacers
     

 12-14-2004
1.50
Aileron Bellcrank install
       

 12-13-2004
1.50
Aileron bellcrank prep

 12-12-2004
1.00
Started work on flap brace
     

 12-12-2004
3.00
Mounted Aileron gap seal
Details
       

 12-11-2004
3.00
Mounted Aileron Brackets
       

 09-30-2004
3.00
Assembled Aileron Brackets
     

 08-21-2004
4.00
Organized QB parts
       

 08-06-2004
6.00
Picked up QB Fuse and Wings
       

 07-25-2004
2.00
Finalize Rudder
     

 07-24-2004
2.00
Rudder work
       

 07-23-2004
1.00
Rudder work
     

 07-20-2003
1.00
Finalize elevator and HS
       

 07-15-2003
1.00
Elevator leading edge
     

 07-13-2003
1.50
Finalize trim tab and elevator
     

 07-10-2003
2.50
Trim tab
       

 07-08-2003
2.00
Elevator work
     

 07-07-2003
1.50
Elevator work
     

 07-06-2003
1.00
Elevator work
     

 06-23-2003
2.50
Elevator work
       

 06-08-2003
2.00
Elevator
     

 06-07-2003
2.00
Elevator Stiffiner install
       

 06-05-2003
1.50
Dimple elevators
       

 06-04-2003
0.75
Dimpled elev stiffeners
     

 06-03-2003
1.00
Debur stiffeners and Elevators
     

 06-01-2003
1.50
Elevator and Stiffener match drill
Details
     

 05-28-2003
2.00
Elevator Stiffener fab
     

 05-25-2003
0.50
Elevator prep
       

 05-22-2003
1.00
Rudder rib and spar prep
       

 05-19-2003
2.00
Rivet Stiffeners
       

 05-18-2003
1.00
Rudder prep
     

 05-17-2003
2.00
Rudder prep, stiffener fab
       

 05-14-2003
2.00
HS assembly complete
     

 05-06-2003
3.00
HS Assembly
       

 05-05-2003
2.00
HS assembly prep
       

 05-04-2003
4.00
VS Assembly complete
     

 05-03-2003
4.00
VS assembly
     

 05-01-2003
2.00
Dimple HS and VS skins
     

 04-29-2003
2.00
HS and VS debur and prime
     

 04-27-2003
4.00
VS work
       

 04-26-2003
4.00
Right HS work w/ Dad
       

 04-24-2003
2.00
Ribs and spar prep
     

 04-24-2003
3.00
Left Stab prep
       

 04-23-2003
1.00
Stab rib work

 04-18-2003
1.50
Rear Spar Work
Details
     

 04-17-2003
2.00
Finish Rear Spar Reinf. Bar (HS609PP)
Details
       

 04-16-2003
2.00
Rear Spar Reinf. Bar (HS609PP)
Details
       

 03-30-2003
2.00
Inventory with Dad and Kendra
       

 03-29-2003
10.00
Prep Shop
       

 03-20-2003
1.75
Verify tool order

 03-20-2003
0.25
Setup Kitlog Pro