Date
|
Hours
|
Work Log Summary
|
Details
|
04-12-2011
|
2.00
|
Trimmed right flap
|
|
|
|
04-09-2011
|
4.00
|
Trimmed left flap, cut out flap pushrod exit hole
|
Details
|
|
|
04-08-2011
|
4.00
|
Fitted wing root farings
|
|
|
|
04-08-2011
|
1.00
|
Fitted fuel vent connection from fuselage to wing
|
|
|
|
03-29-2011
|
1.00
|
Finish forward top skin
|
|
|
|
03-26-2011
|
12.00
|
Drilled rear spar attach holes
|
|
|
|
03-13-2011
|
2.00
|
Preparing for wing fitting
|
|
|
|
02-13-2011
|
10.00
|
Install baffle seal
|
|
|
|
12-24-2010
|
5.00
|
Finished foward top skin
|
|
|
|
06-14-2010
|
0.25
|
Pictures to date
|
|
|
|
06-14-2010
|
0.25
|
Pictures to date
|
|
|
|
06-13-2010
|
10.00
|
Documentation and ogainization
|
|
|
|
05-21-2010
|
10.00
|
Completed skin install
|
|
|
|
04-07-2010
|
30.00
|
Completed baffle, oil cooler install, cooling tube
|
|
|
|
02-24-2010
|
2.00
|
Created oil cooler reinforcement mount
|
|
|
|
02-24-2010
|
2.00
|
Completed heat shield and installed
|
|
|
|
02-23-2010
|
3.00
|
Completed heater duct
|
|
|
|
02-21-2010
|
6.00
|
Completed oil cooler mount
|
|
|
|
02-21-2010
|
2.00
|
Completed heater inlet
|
|
|
|
02-21-2010
|
1.00
|
Completed fuel lines
|
|
|
|
02-12-2010
|
12.00
|
Fitting spinner. Thanks Hugh!!
|
|
|
|
02-12-2010
|
5.00
|
Completed lower cowl mounting bracket
|
|
|
|
01-31-2010
|
2.00
|
More baffle work
|
|
|
|
01-24-2010
|
2.00
|
More baffle work
|
|
|
|
01-24-2010
|
3.00
|
More baffle work
|
|
|
|
01-24-2010
|
10.00
|
Fitting of air inlet
|
|
|
|
10-11-2009
|
5.00
|
Begin baffle
|
|
|
|
10-10-2009
|
5.00
|
Modified cowl for exhaust
|
|
|
|
07-19-2009
|
25.00
|
Fitted cowl
|
|
|
|
06-12-2009
|
6.00
|
Fitted oil filler door
|
|
|
|
03-22-2009
|
4.00
|
Fiberglass work
|
|
|
|
03-07-2009
|
6.00
|
Fairing work
|
|
|
|
03-04-2009
|
6.00
|
Emp Fairing
|
|
|
|
01-18-2009
|
4.00
|
Installed pitot mount
|
|
|
|
01-18-2009
|
1.00
|
Fitted pitot to mount
|
|
|
|
11-21-2008
|
2.00
|
Canopy latch
|
|
|
|
11-16-2008
|
6.00
|
Finalized winscreen
|
|
|
|
11-09-2008
|
5.00
|
Fitting windscreen
|
|
|
|
07-19-2008
|
10.00
|
Prep and drilled canopy
|
|
|
|
07-18-2008
|
4.00
|
Made the big cut
|
|
|
|
07-13-2008
|
1.00
|
Mount prop extension and flywheel
|
|
|
|
07-13-2008
|
4.00
|
Finalize canopy frame fit
|
|
|
|
07-09-2008
|
2.00
|
Fit spinner bulkhead to prop extension
|
|
|
|
07-09-2008
|
4.00
|
Canopy rail fitting
|
|
|
|
06-29-2008
|
4.00
|
More canopy work
|
|
|
|
06-24-2008
|
4.00
|
More canopy work
|
|
|
|
06-22-2008
|
2.00
|
Started fitting canopy
|
|
|
|
06-15-2008
|
2.00
|
Installed new relay decks for trim motors
|
|
|
|
06-14-2008
|
8.50
|
Completed lens and NAV/strobe install on wing tips
|
|
|
|
06-13-2008
|
1.50
|
Added diodes to new REL-D relay decks
|
|
|
|
06-04-2008
|
2.50
|
Worked on right wing tip lens
|
|
|
|
06-03-2008
|
3.50
|
Elevator tip install
|
|
|
|
06-02-2008
|
1.00
|
Rear stobe and nav light install
|
|
|
|
06-01-2008
|
3.00
|
Finalized rudder control system
|
|
|
|
05-29-2008
|
1.00
|
Trim hinge pin safety
|
|
|
|
05-28-2008
|
2.00
|
Rudder tip re-work
|
Details
|
|
|
05-26-2008
|
4.00
|
Finished rudder install
|
|
|
|
05-25-2008
|
3.00
|
Fiberglass tip work
|
|
|
|
05-25-2008
|
3.00
|
Fiberglass tip work
|
|
|
|
05-23-2008
|
4.00
|
Elevator pushrod install
|
|
|
|
05-21-2008
|
2.00
|
Selective avionics test
|
|
|
|
05-21-2008
|
2.50
|
Elevator install
|
|
|
|
05-21-2008
|
3.50
|
Altitude hold AP servo install
|
|
|
|
05-18-2008
|
6.50
|
Electric aileron and elevator trim
|
|
|
|
05-10-2008
|
0.00
|
Instrument panel wiring reference
|
|
|
|
05-10-2008
|
0.00
|
Instrument panel wiring reference
|
|
|
|
05-10-2008
|
0.00
|
Instrument panel wiring reference
|
|
|
|
05-09-2008
|
2.00
|
Strobe PS install
|
|
|
|
05-09-2008
|
4.00
|
More wiring
|
|
|
|
05-09-2008
|
0.00
|
Engine wiring reference
|
|
|
|
04-20-2008
|
3.00
|
Control stick wiring
|
|
|
|
04-10-2008
|
1.00
|
Received prop
|
|
|
|
03-30-2008
|
4.50
|
Installed HS and VS
|
|
|
|
03-16-2008
|
5.00
|
Aircraft move to hanger
|
|
|
|
03-16-2008
|
1.00
|
Aircraft move to hanger
|
|
|
|
03-16-2008
|
1.00
|
Aircraft move to hanger
|
|
|
|
03-16-2008
|
1.00
|
Aircraft move to hanger
|
|
|
|
03-16-2008
|
1.00
|
Aircraft move to hanger
|
|
|
|
03-16-2008
|
1.00
|
Aircraft move to hanger
|
|
|
|
03-16-2008
|
1.00
|
Aircraft move to hanger
|
|
|
|
03-16-2008
|
1.00
|
Aircraft move to hanger
|
|
|
|
03-16-2008
|
1.00
|
Aircraft move to hanger
|
|
|
|
03-09-2008
|
2.00
|
Hanger prep
|
|
|
|
03-08-2008
|
4.00
|
Hanger grand opening
|
|
|
|
03-08-2008
|
2.00
|
Hanger grand opening
|
|
|
|
03-08-2008
|
2.00
|
Hanger grand opening
|
|
|
|
03-07-2008
|
2.00
|
Hanger prep
|
|
|
|
03-03-2008
|
1.00
|
Got the hanger!
|
|
|
|
11-06-2007
|
2.00
|
Relay deck install
|
|
|
|
10-27-2007
|
3.50
|
Audio mixure install
|
|
|
|
10-21-2007
|
1.00
|
Flap switch, MAP, oil pressure, fuel pressure inst
|
|
|
|
10-21-2007
|
2.50
|
Engine wiring
|
|
|
|
10-14-2007
|
3.50
|
Pitot, static, AOA install
|
|
|
|
10-07-2007
|
1.50
|
Pito, static, AOA plumbing design
|
|
|
|
10-07-2007
|
2.50
|
Ground buss wiring
|
|
|
|
10-03-2007
|
2.00
|
Headset jack install
|
|
|
|
10-03-2007
|
2.00
|
Buss wiring
|
|
|
|
09-29-2007
|
3.00
|
Install switches
|
|
|
|
09-23-2007
|
0.50
|
Transponder antenna install
|
|
|
|
08-12-2007
|
1.00
|
WIG WAG relay install
|
|
|
|
08-12-2007
|
5.00
|
More wiring
|
|
|
|
08-12-2007
|
1.00
|
Dimmer module install
|
|
|
|
08-11-2007
|
1.00
|
Moved Buss
|
Details
|
|
|
08-11-2007
|
1.00
|
EGT and CHT prob install
|
|
|
|
08-11-2007
|
0.50
|
E-bus diode install
|
|
|
|
08-08-2007
|
1.00
|
Main Buss & E-Buss Connection
|
|
|
|
08-05-2007
|
2.00
|
More wiring......
|
|
|
|
08-05-2007
|
2.00
|
More wiring......
|
|
|
|
08-04-2007
|
0.10
|
Visit with Sandy and Bill
|
|
|
|
08-04-2007
|
2.00
|
More wiring......
|
|
|
|
07-29-2007
|
1.00
|
More wiring.....
|
|
|
|
07-22-2007
|
2.00
|
Started working on the wiring
|
|
|
|
07-22-2007
|
3.00
|
Finish exhaust install
|
|
|
|
07-18-2007
|
2.00
|
Exhaust install
|
|
|
|
07-15-2007
|
1.00
|
Installed misc items
|
|
|
|
07-05-2007
|
1.00
|
Right side FW penetration
|
|
|
|
07-04-2007
|
0.50
|
Quality control expert
|
|
|
|
07-04-2007
|
1.00
|
Mounted control cables
|
|
|
|
07-04-2007
|
1.00
|
Alternator install with helper
|
Details
|
|
|
07-03-2007
|
2.50
|
Fuel lines
|
|
|
|
06-24-2007
|
2.00
|
Throttle and mixture cables
|
|
|
|
06-24-2007
|
0.50
|
Oil pressure hose, fuel outlet
|
|
|
|
06-24-2007
|
0.75
|
My first safety wire
|
Details
|
|
|
06-24-2007
|
2.50
|
Hung engine!!
|
|
|
|
06-23-2007
|
1.00
|
Installed Oil and Fuel senders and lines
|
|
|
|
06-21-2007
|
1.00
|
Rearranged shop
|
|
|
|
06-21-2007
|
3.00
|
Picked up engine!!!
|
|
|
|
06-20-2007
|
1.00
|
Back on it's feet!
|
|
|
|
06-19-2007
|
0.50
|
Panel work
|
|
|
|
06-19-2007
|
0.50
|
Mounted engine mount
|
|
|
|
06-13-2007
|
1.00
|
Drilled holes for the engine mount
|
|
|
|
06-09-2007
|
3.00
|
Installed switches and labels
|
|
|
|
06-09-2007
|
1.00
|
Installed shunt and misc wiring
|
|
|
|
06-09-2007
|
2.00
|
Drilled anti rotation holes for the switches
|
|
|
|
06-08-2007
|
1.00
|
Installed more instruments
|
|
|
|
06-07-2007
|
1.00
|
Installed Dynon tray, AS install
|
|
|
|
06-05-2007
|
1.00
|
Mounted Comm Antenna
|
|
|
|
06-04-2007
|
2.00
|
Mounted roll servo, started on pitch servo mount
|
|
|
|
06-03-2007
|
1.00
|
Start EZ Pilot AP Servo install
|
|
|
|
06-02-2007
|
2.50
|
Installed mixture and throttle grommets
|
|
|
|
05-28-2007
|
2.00
|
Wiring conduit install
|
|
|
|
05-28-2007
|
1.00
|
Main fuel line fabrication
|
|
|
|
03-17-2007
|
2.00
|
Fabricated the battery cables
|
|
|
|
03-07-2007
|
1.00
|
Finished landing lights
|
|
|
|
03-05-2007
|
1.00
|
Installed nutplates for lights
|
|
|
|
03-04-2007
|
3.00
|
Made the "BIG" cut for the landing/taxi lights
|
|
|
|
03-03-2007
|
4.00
|
John's visit to help with the airplane
|
|
|
|
02-28-2007
|
1.50
|
Finalize battery box, riveted FW recess
|
|
|
|
02-26-2007
|
3.00
|
Mounted Master and Starter Relays
|
|
|
|
02-25-2007
|
2.00
|
Battery box work with my helper
|
|
|
|
02-25-2007
|
2.00
|
Avionics rear mounting brackets
|
|
|
|
02-17-2007
|
1.00
|
Inventoried FF kit
|
|
|
|
02-14-2007
|
2.00
|
Started on panel
|
|
|
|
02-14-2007
|
1.00
|
Picked up panel from powder coat vendor
|
|
|
|
02-12-2007
|
1.00
|
Replaced one of the fuel pump lines
|
|
|
|
02-12-2007
|
0.50
|
Dropped off panel to the powder coat vendor
|
|
|
|
02-12-2007
|
1.00
|
Cut sub panel for radio stack
|
|
|
|
02-11-2007
|
6.00
|
Route lines in fuel pump
|
|
|
|
02-10-2007
|
4.00
|
Fuel pump enclosure construction
|
|
|
|
02-08-2007
|
1.50
|
Fuel pump enclosure fitting
|
|
|
|
02-07-2007
|
0.25
|
Mounted strobe power supply
|
|
|
|
02-07-2007
|
0.75
|
Drilled holes for radio stack mounting brackets
|
|
|
|
02-06-2007
|
0.50
|
Started work on fuel boost pump
|
|
|
|
02-06-2007
|
0.50
|
Panel work
|
|
|
|
02-04-2007
|
4.00
|
Radio Stack
|
Details
|
|
|
01-21-2007
|
0.50
|
Finalize Alieron Trim Servo
|
|
|
|
01-21-2007
|
2.00
|
Fabricated Fuse Block Access
|
|
|
|
01-19-2007
|
1.50
|
Headset Jacks and Mounts
|
|
|
|
01-02-2007
|
4.00
|
Map Box
|
|
|
|
12-20-2006
|
2.00
|
Got the panel back from the cutter
|
|
|
|
12-17-2006
|
1.00
|
Fabricated and installed rudder cable farings
|
|
|
|
12-16-2006
|
2.00
|
Designed and installed flap position indicator
|
|
|
|
11-24-2006
|
2.00
|
Mounted elevator trim
|
|
|
|
11-23-2006
|
4.00
|
Fabricated and installed aileron trim
|
|
|
|
08-13-2006
|
15.00
|
Bending canopy frame
|
Details
|
|
|
07-30-2006
|
2.00
|
Installed conduit
|
|
|
|
07-25-2006
|
5.00
|
Canopy frame work
|
|
|
|
07-23-2006
|
2.00
|
Start work on the canopy roller track
|
|
|
|
07-22-2006
|
2.00
|
Riveted rear top skin
|
|
|
|
07-12-2006
|
1.00
|
Installed conduit in tail cone
|
|
|
|
07-12-2006
|
2.00
|
Canopy roll bar brace install
|
|
|
|
07-09-2006
|
6.00
|
Canopy roll bar mount with my brother John
|
|
|
|
05-26-2006
|
20.00
|
Final design of the panel
|
Details
|
|
|
04-22-2006
|
2.50
|
Routing of static line
|
|
|
|
04-22-2006
|
1.00
|
Nutplate install of elevator horn access
|
|
|
|
04-08-2006
|
1.50
|
Installed rear portion of static system.
|
Details
|
|
|
04-02-2006
|
1.00
|
installed vent tubing
|
|
|
|
03-25-2006
|
3.00
|
Seal interior vents, finalize sub panel
|
|
|
|
03-18-2006
|
1.50
|
Prep forward skin for installation
|
|
|
|
03-11-2006
|
2.00
|
Mount interior vents
|
|
|
|
03-11-2006
|
2.00
|
Instrument panel mounts
|
|
|
|
03-11-2006
|
2.00
|
Forward fuselage rib mount
|
|
|
|
03-08-2006
|
2.00
|
More work on the forward fuselage
|
|
|
|
03-07-2006
|
2.00
|
Fit forward fuselage skin
|
|
|
|
03-04-2006
|
2.00
|
Fabricated vent and instrument mounts
|
|
|
|
03-03-2006
|
2.00
|
Started work on forward fuselage
|
|
|
|
03-02-2006
|
2.00
|
Mounted air vent scoops
|
|
|
|
02-26-2006
|
2.00
|
Fabricated rudder stops per plans but did not work
|
|
|
|
02-26-2006
|
2.00
|
Fabricated new rudder stops
|
|
|
|
02-25-2006
|
2.00
|
Fabricated new VS mount
|
|
|
|
02-19-2006
|
4.00
|
Installed brake lines on landing gear
|
|
|
|
02-12-2006
|
3.00
|
Assembled nose wheel
|
|
|
|
02-11-2006
|
0.50
|
Started work on brake caliper
|
|
|
|
02-11-2006
|
5.00
|
Mounted wheels and landing gear
|
|
|
|
10-02-2005
|
1.00
|
Installed rudder cables
|
|
|
|
10-02-2005
|
1.00
|
Big mistake!
|
Details
|
|
|
09-28-2005
|
0.50
|
First idea for panel
|
|
|
|
09-19-2005
|
1.50
|
VS mount
|
|
|
|
09-18-2005
|
2.00
|
Started work on VS mount
|
|
|
|
09-18-2005
|
1.00
|
Finished tail cone
|
|
|
|
09-15-2005
|
2.00
|
Fabricated elevator push rods
|
|
|
|
09-14-2005
|
2.00
|
Mounting HS
|
|
|
|
09-14-2005
|
0.50
|
Fabricated mount for VS
|
|
|
|
09-13-2005
|
1.00
|
Fabricated parts for HS install
|
|
|
|
09-11-2005
|
1.50
|
Drilled elevator horn incorrectly
|
Details
|
|
|
09-07-2005
|
1.00
|
Mount fuel vents
|
|
|
|
09-05-2005
|
1.00
|
Mounted fuel selector
|
|
|
|
09-05-2005
|
0.50
|
JB Weld screens to fuel vents
|
|
|
|
09-05-2005
|
1.00
|
Installed brake lines
|
|
|
|
09-04-2005
|
2.00
|
Installed L&R fuel vent lines
|
|
|
|
09-03-2005
|
4.00
|
Installed brake pedal lines
|
|
|
|
08-28-2005
|
1.00
|
Mount brake reservoir
|
|
|
|
05-20-2005
|
3.00
|
Landing gear weldment mount
|
|
|
|
05-01-2005
|
1.00
|
Landing gear to weldment prep
|
|
|
|
04-27-2005
|
1.50
|
Flap Pushrod
|
|
|
|
04-25-2005
|
2.00
|
Flap actuator work
|
|
|
|
04-16-2005
|
5.00
|
Flap actuator work
|
|
|
|
04-16-2005
|
2.00
|
Flap actuator work
|
|
|
|
04-15-2005
|
5.00
|
Access plates and heat baffle
|
|
|
|
04-10-2005
|
3.00
|
Tunnel Cover
|
|
|
|
04-09-2005
|
2.00
|
Finalize baggage floor
|
|
|
|
04-03-2005
|
1.00
|
Finalize steps
|
|
|
|
03-29-2005
|
2.00
|
Finalized rear top skin
|
|
|
|
03-27-2005
|
3.00
|
Bent reinforcing ribs
|
|
|
|
03-26-2005
|
2.00
|
Top Skin Prep
|
|
|
|
03-26-2005
|
2.50
|
Finalize modifications for sliding canopy
|
|
|
|
03-26-2005
|
1.50
|
Elevator bell crank
|
|
|
|
03-26-2005
|
2.00
|
Bottom skin prep for landing gear weldments
|
|
|
|
03-24-2005
|
8.00
|
Steps - overtime
|
|
|
|
03-24-2005
|
1.00
|
Sliding canopy plate mod
|
|
|
|
03-24-2005
|
4.00
|
Seats - over time
|
|
|
|
03-24-2005
|
3.00
|
Fuel Tank Attachment
|
|
|
|
02-18-2005
|
1.50
|
Rudder pedals and brakes
|
|
|
|
02-17-2005
|
0.50
|
Brake pedal assembly
|
|
|
|
02-13-2005
|
4.00
|
Brake Pedal fab and assy
|
|
|
|
02-13-2005
|
4.00
|
Brake pedal fab
|
|
|
|
02-12-2005
|
6.00
|
Seat fabrication
|
Details
|
|
|
02-12-2005
|
5.00
|
Seat fabrication
|
|
|
|
02-11-2005
|
1.50
|
Start work on right step
|
|
|
|
02-11-2005
|
1.50
|
Start work on right step
|
|
|
|
02-11-2005
|
1.00
|
Primed and install seat back brackets
|
|
|
|
02-11-2005
|
5.00
|
Fabricating seat parts
|
|
|
|
02-06-2005
|
4.00
|
Seat rest brackets
|
Details
|
|
|
02-05-2005
|
3.00
|
Firewall items, control stick
|
|
|
|
01-24-2005
|
2.00
|
Prime and placenut install on bottom ski
|
|
|
|
01-23-2005
|
3.00
|
Dimpled, derbured R&L bottom skins
|
|
|
|
01-23-2005
|
1.00
|
Countersunk Rt Rear spar
|
|
|
|
01-21-2005
|
1.00
|
Countersink Rear Spar (Left)
|
|
|
|
01-20-2005
|
1.50
|
Deburred, dimpled ribs Lt & Rt Wings
|
|
|
|
01-09-2005
|
6.00
|
Finalized Lt Flap, Prep bottom skin
|
|
|
|
01-09-2005
|
6.00
|
Finalized Lt Flap, Prep Bottom Skin
|
Details
|
|
|
01-08-2005
|
2.00
|
Lt Flap Hinge Prep
|
|
|
|
01-08-2005
|
2.00
|
Lt Flap Hinge Prep
|
|
|
|
01-05-2005
|
2.00
|
Rivet flap brace and hinge
|
|
|
|
01-03-2005
|
1.50
|
Right flap hinge prep
|
|
|
|
01-01-2005
|
2.00
|
Installed Ailerons and Pushrods
|
|
|
|
12-31-2004
|
4.00
|
Aileron Pushrods and spacers
|
|
|
|
12-14-2004
|
1.50
|
Aileron Bellcrank install
|
|
|
|
12-13-2004
|
1.50
|
Aileron bellcrank prep
|
|
|
|
12-12-2004
|
1.00
|
Started work on flap brace
|
|
|
|
12-12-2004
|
3.00
|
Mounted Aileron gap seal
|
Details
|
|
|
12-11-2004
|
3.00
|
Mounted Aileron Brackets
|
|
|
|
09-30-2004
|
3.00
|
Assembled Aileron Brackets
|
|
|
|
08-21-2004
|
4.00
|
Organized QB parts
|
|
|
|
08-06-2004
|
6.00
|
Picked up QB Fuse and Wings
|
|
|
|
07-25-2004
|
2.00
|
Finalize Rudder
|
|
|
|
07-24-2004
|
2.00
|
Rudder work
|
|
|
|
07-23-2004
|
1.00
|
Rudder work
|
|
|
|
07-20-2003
|
1.00
|
Finalize elevator and HS
|
|
|
|
07-15-2003
|
1.00
|
Elevator leading edge
|
|
|
|
07-13-2003
|
1.50
|
Finalize trim tab and elevator
|
|
|
|
07-10-2003
|
2.50
|
Trim tab
|
|
|
|
07-08-2003
|
2.00
|
Elevator work
|
|
|
|
07-07-2003
|
1.50
|
Elevator work
|
|
|
|
07-06-2003
|
1.00
|
Elevator work
|
|
|
|
06-23-2003
|
2.50
|
Elevator work
|
|
|
|
06-08-2003
|
2.00
|
Elevator
|
|
|
|
06-07-2003
|
2.00
|
Elevator Stiffiner install
|
|
|
|
06-05-2003
|
1.50
|
Dimple elevators
|
|
|
|
06-04-2003
|
0.75
|
Dimpled elev stiffeners
|
|
|
|
06-03-2003
|
1.00
|
Debur stiffeners and Elevators
|
|
|
|
06-01-2003
|
1.50
|
Elevator and Stiffener match drill
|
Details
|
|
|
05-28-2003
|
2.00
|
Elevator Stiffener fab
|
|
|
|
05-25-2003
|
0.50
|
Elevator prep
|
|
|
|
05-22-2003
|
1.00
|
Rudder rib and spar prep
|
|
|
|
05-19-2003
|
2.00
|
Rivet Stiffeners
|
|
|
|
05-18-2003
|
1.00
|
Rudder prep
|
|
|
|
05-17-2003
|
2.00
|
Rudder prep, stiffener fab
|
|
|
|
05-14-2003
|
2.00
|
HS assembly complete
|
|
|
|
05-06-2003
|
3.00
|
HS Assembly
|
|
|
|
05-05-2003
|
2.00
|
HS assembly prep
|
|
|
|
05-04-2003
|
4.00
|
VS Assembly complete
|
|
|
|
05-03-2003
|
4.00
|
VS assembly
|
|
|
|
05-01-2003
|
2.00
|
Dimple HS and VS skins
|
|
|
|
04-29-2003
|
2.00
|
HS and VS debur and prime
|
|
|
|
04-27-2003
|
4.00
|
VS work
|
|
|
|
04-26-2003
|
4.00
|
Right HS work w/ Dad
|
|
|
|
04-24-2003
|
2.00
|
Ribs and spar prep
|
|
|
|
04-24-2003
|
3.00
|
Left Stab prep
|
|
|
|
04-23-2003
|
1.00
|
Stab rib work
|
|
|
|
04-18-2003
|
1.50
|
Rear Spar Work
|
Details
|
|
|
04-17-2003
|
2.00
|
Finish Rear Spar Reinf. Bar (HS609PP)
|
Details
|
|
|
04-16-2003
|
2.00
|
Rear Spar Reinf. Bar (HS609PP)
|
Details
|
|
|
03-30-2003
|
2.00
|
Inventory with Dad and Kendra
|
|
|
|
03-29-2003
|
10.00
|
Prep Shop
|
|
|
|
03-20-2003
|
1.75
|
Verify tool order
|
|
|
|
03-20-2003
|
0.25
|
Setup Kitlog Pro
|
|
|