KitLog pro

Powered By Kitlog Pro v2.0

Bob's 601XLb
Work Logs Found: 40
Category Work Time: 126 Hours
 Date
Hours
Work Log Summary

Details

 01-20-2018
0.00
Current Pictures
Details
       

 10-25-2009
4.00
Finish Left Aileron & Trim Tab
Details
       

 10-04-2009
1.50
Repair Aileron Trim Tab Wiring
Details

 08-09-2009
2.00
Work on Left Alieron
Details

 05-31-2009
2.50
Attached wiring to servo, drilled holes to full si
Details

 03-08-2009
3.00
Installed Trim Tab & Servo
Details
       

 02-01-2009
3.00
Completed Left Flap
       

 11-02-2008
1.00
Worked on Left Flap
Details

 10-26-2008
3.00
Completed Right Flap
Details
       

 10-19-2008
4.00
Started the left aileron trim
Details
       

 10-18-2008
4.00
Completed Right Aileron
Details
       

 09-14-2008
4.00
Completed Horozontal Stabilizer
Details
       

 08-30-2008
3.00
Rivited Elevator
Details
       

 08-30-2008
3.00
Drilled Port Stabilizer Tip
Details
       

 08-09-2008
3.00
Drilled Starboard Stabilizer Tip
Details
       

 07-27-2008
1.00
Unpack wings and mount in rolling rack
Details

 02-10-2008
3.00
Trimmed Skins to fit Hinge
Details
       

 02-03-2008
2.00
Prepped Horozontal Stab for mating
Details

 11-04-2007
4.00
Completed Trim Servo Install
Details
       

 07-09-2007
0.00
Project on hold for passing of wife
Details

 06-17-2007
2.00
Fit & Drill Trim Tab Hindge
Details

 06-16-2007
3.00
Cut, Prep & Paint 2x2 square steel tube
Details

 06-03-2007
4.00
Trim Tab rough fitting
Details

 05-20-2007
4.00
Start Elevator assembly
Details
       

 05-06-2007
4.00
Parts Inventory and put away

 04-22-2007
3.00
Parts Inventory and put away

 03-31-2007
3.00
Painted Table

 03-25-2007
5.00
Finish Assy Build Table
Details
       

 03-11-2007
3.00
Work on table legs
Details

 03-10-2007
3.00
Started Verticals on table

 03-10-2007
2.00
EAA Tech Councelor Meeting
Details

 02-24-2007
6.00
Weld bottom of build table

 02-18-2007
7.00
Tack bottom of build Table
Details

 01-19-2007
1.00
Loaded kit into trailer
       

 01-19-2007
6.00
Completion of rudder
Details
       

 01-18-2007
8.00
Zenith Rudder Workshop
Details
       

 12-28-2006
0.50
Received & Inspected Grove Gear
Details
       

 12-28-2006
4.00
Continue Table Frame

 12-27-2006
5.00
Assemble Build Table
Details
       

 12-26-2006
1.00
Received Plans
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.