KitLog pro

Powered By Kitlog Pro v2.0

Brad's CH 601XLB
Work Logs Found: 300
Category Work Time: 472 Hours
 Date
Hours
Work Log Summary

Details

 09-13-2024
2.50
Install clipnuts on wingtip.
Details

 09-12-2024
3.25
Install nutplates on wingtips.
Details

 09-11-2024
2.50
Install nutplates on wingtips. Fit wingtip cover.
Details
       

 09-10-2024
4.00
Install nutplates on wingtips. Fit wingtip cover.
Details

 09-09-2024
3.25
Fit wingtip cover panel.
Details

 09-06-2024
2.50
Install nutplates on wingtips.
Details

 09-05-2024
2.00
Install nutplates on wingtips.
Details

 09-03-2024
2.00
Install nutplates on wingtips.
Details

 08-31-2024
2.50
Disassemble front fork and drill drain hole
Details
       

 08-30-2024
2.50
Disassemble front axle and drill cotter pin holes.
Details

 08-29-2024
2.50
Install clip nuts and nutplates on wingtips.
Details
       

 08-28-2024
2.00
Install clip nuts on wingtips.
Details

 08-27-2024
0.50
Install clip nuts on wingtips.
Details

 08-27-2024
1.50
Fit Forward Panel Cover.
Details
     

 08-26-2024
3.50
Fit Forward Panel Cover. Install nutplates.
Details

 08-23-2024
3.25
Fit Forward Panel Cover. Create Forward Sides.
Details
       

 08-22-2024
2.00
Fit Forward Panel Cover. Create Forward Sides.
Details

 08-21-2024
4.00
Fit Forward Panel Cover. Create Forward Sides.
Details

 08-20-2024
4.00
Create and fit forward side covers.
Details
     

 08-16-2024
3.00
Fit Forward Panel Cover. Create Forward Sides.
Details

 08-15-2024
0.50
Test run engine. Adjust RPM fuel settings.
Details

 08-15-2024
2.50
Fit Forward Panel Cover. Create Forward Sides.
Details

 08-13-2024
2.25
Fit Forward Panel Cover and Console
Details

 08-10-2024
2.25
Fit Forward Panel Cover
Details

 08-09-2024
2.25
Fit Access Panels
Details

 07-30-2024
4.00
Install Rivnuts. Fit Access Panel on tail.
Details
       

 07-29-2024
3.00
Install Nutplates. Fit Access Panels
Details
       

 07-23-2024
3.00
Install nutserts to secure front console.
Details
       

 07-22-2024
2.50
Install nutserts to secure center console.
Details
       

 07-20-2024
2.00
Install nutserts to secure center console.
Details

 07-19-2024
1.50
Install rivnuts to secure front console.
Details
     

 07-18-2024
4.00
Install Nutplates. Fit Access Panels
Details
       

 07-17-2024
1.50
Install Nutplates. Fit Access Panels.
Details

 07-15-2024
2.00
Create junction block for 5 low-amp devices
Details
       

 07-13-2024
2.00
Install Nutplates. Fit Access Panels.
Details

 07-11-2024
2.50
Drill and cut slots in center console for wiring.
Details
       

 07-08-2024
3.00
Drill and cut slots in center console for wiring.
Details

 06-25-2024
2.00
Test run engine using 100LL with Decalin.
Details

 06-22-2024
2.00
Install Nutplates. Fit Access Panels.
Details

 06-21-2024
2.00
Install Nutplates. Fit Access Panels.
Details

 06-15-2024
3.00
Install Nutplates. Fit Access Panels.
Details

 06-10-2024
3.00
Install spiral loom around wiring.
Details

 06-04-2024
3.00
Fit Access Panels. Wire trim servo.
Details
     

 06-03-2024
3.00
Install Rivnuts. Fit Access Panels.
Details

 05-28-2024
1.00
Install spiral loom around wiring.
Details

 05-28-2024
2.00
Install Rivnuts. Fit Access Panels.
Details

 05-20-2024
2.00
Work on riveting nutplates
Details

 05-17-2024
2.00
Install grommets for trim motor wiring. Fit Access
Details

 05-16-2024
3.00
Install Rivnuts. Fit Access Panels.
Details

 05-15-2024
2.00
Install Fuel Filters in Wings. Fit Access Panels.
Details
       

 05-14-2024
3.00
Install Fuel Filters in Wings
Details
     

 05-13-2024
2.00
Install Fuel Filters in Wings
Details

 05-13-2024
2.00
Fix Low Battery Indicator Circuit Board
Details

 05-09-2024
3.00
Repair Low Battery Indicator
Details

 05-08-2024
2.00
Install Fuel Pressure Gauge
Details
       

 05-01-2024
2.00
Work on wiring
Details

 04-30-2024
3.00
Work on wiring. Move or remove some gauges.
Details

 04-25-2024
2.00
Work on ECU settings.
Details

 04-23-2024
2.00
Work on ECU settings.
Details

 04-22-2024
2.00
Rewire engine and fuel pumps directly to battery
Details

 04-17-2024
2.00
Remount Low Battery indicator to fix it.
Details
       

 04-16-2024
1.00
Test fit Instrument Panel cover
Details

 04-16-2024
2.00
Create template for glare sheild extensions
Details
       

 04-15-2024
2.00
Install potentiometer and LED control for panel
Details
       

 04-09-2024
5.00
Install potentiometer and LED control for panel
Details

 04-06-2024
1.00
Install potentiometer for panel lighting
Details

 04-04-2024
1.00
Test run engine to adjust ECU fuel injector settin
Details

 04-04-2024
2.00
Install potentiometer for panel lighting
Details

 04-03-2024
2.00
Test fit Instrument Panel cover
Details

 03-28-2024
1.00
Test run engine. Adjust ECU fuel settings.
Details

 03-28-2024
2.50
Route Pitot, Static, and AOA tubing
Details

 03-22-2024
1.50
Test weigh airplane and wings with all options add
Details

 03-21-2024
1.00
Test run engine. Adjust ECU fuel settings.
Details

 03-21-2024
2.00
Measure distances from datum for nose and mains.
Details

 03-18-2024
2.00
Test weigh airplane and wings with all options
Details

 03-18-2024
1.00
Test run engine. Adjust ECU fuel settings.
Details

 03-13-2024
1.50
Test weighed the airplane without wings attached
Details

 03-11-2024
3.50
Work on wiring
Details

 03-09-2024
1.00
Work on wiring
Details

 03-09-2024
0.50
Test run engine
Details

 03-06-2024
3.00
Replace 1 turbo hose. Add heat sheilding to both.
Details
       

 03-04-2024
2.00
Work on instrument wiring
Details

 02-29-2024
2.00
Work on wire routing
Details

 02-29-2024
1.50
Test run engine. Adjust throttle position.
Details

 02-28-2024
2.00
Work on wire routing
Details

 02-26-2024
3.00
Reconnect wiring. Prep Engine for test run.
Details

 02-23-2024
2.00
Work on wire routing
Details

 02-20-2024
3.00
Mount the electronic circuit breaker board
Details
       

 02-19-2024
3.00
Mount the electronic circuit breaker board
Details

 02-15-2024
2.50
Create mount for electronic circuit breaker board
Details
     

 02-14-2024
2.00
Create mount for electronic circuit breaker board
Details

 02-13-2024
2.50
Create mount for electronic circuit breaker board
Details

 02-12-2024
2.00
Create mount for electronic circuit breaker board
Details

 02-08-2024
3.00
Create mount for electronic circuit breaker board
Details

 02-06-2024
3.00
Create mount for electronic circuit breaker board
Details

 02-05-2024
2.00
Create mount for electronic circuit breaker board
Details

 02-02-2024
2.00
Install ANL Fuse
Details
       

 02-01-2024
2.50
Install ANL Fuse
Details

 01-31-2024
2.50
Work on wire extensions
Details

 01-30-2024
3.00
Work on wire extensions
Details

 01-02-2024
2.00
Work on wire extensions
Details

 12-21-2023
2.00
Work on avionics grounding and wiring
Details

 12-20-2023
2.00
Work on avionics grounding and wiring
Details

 12-19-2023
2.00
Work on avionics grounding
Details

 12-16-2023
1.00
Work on avionics grounding
Details

 12-15-2023
2.50
Work on avionics grounding
Details

 12-11-2023
2.50
Work on avionics grounding
Details

 12-07-2023
2.00
Work on wire extensions
Details

 12-06-2023
2.00
Work on wire extensions
Details

 12-05-2023
2.00
Work on wire routing
Details

 12-04-2023
2.00
Work on wire routing
Details

 11-29-2023
1.50
Work on wire routing
Details

 11-28-2023
1.00
Work on wire routing
Details

 11-22-2023
2.00
Work on wire routing and soldering
Details

 11-21-2023
1.50
Work on wire routing and grounding
Details

 11-17-2023
2.00
Work on wire routing and grounding
Details

 11-16-2023
2.00
Route Pitot, Static, and AOA tubing
Details

 11-15-2023
2.00
Work on wire routing and grounding
Details
       

 11-15-2023
1.00
Route Pitot, Static, and AOA tubing
Details
     

 11-14-2023
3.00
Work on wire routing and grounding
Details

 11-13-2023
2.00
Work on wire routing and grounding
Details

 11-11-2023
2.00
Work on wire routing and grounding
Details

 11-09-2023
1.00
Work on wire routing from the panel to the back
Details

 11-09-2023
1.00
Work on wing attachment issues

 11-07-2023
2.00
Work on wing attachment issues
Details

 10-31-2023
2.00
Rearrange strobe, taxi, and landing light switches
Details

 10-30-2023
1.00
Run air tubes for AOA indicator
Details

 10-28-2023
2.00
Replace bolts on nose gear with proper hardware
Details

 10-26-2023
1.50
Rewire Tach Signal. Remove old tank select wiring
Details

 10-24-2023
2.00
Adjust steering alignment and secure with cotter p
Details

 10-19-2023
2.00
Reconnect ECU. Reroute wiring.
Details

 10-18-2023
2.00
Reconnect ECU.
Details

 10-16-2023
4.00
Rewire gauges to ground to block. Reconnect ECU.
Details

 10-14-2023
2.00
Rewire temperature gauges to ground to block
Details

 10-12-2023
2.00
Rewire temperature gauges to ground to block
Details

 10-10-2023
2.00
Rewire temperature gauges to ground to block
Details

 10-10-2023
2.00
Remove prop to test engine at high RPM
Details

 10-03-2023
4.00
Work on wiring and heater installation
Details
       

 09-25-2023
4.00
Rewire to convert fuses to breakers on the panel
Details

 09-21-2023
2.00
Create Transponder Antenna Extension
Details

 09-16-2023
1.00
Rereoute transponder antenna cable
Details
     

 09-16-2023
1.00
Replace bad rivet in fuselage
Details
       

 09-14-2023
2.00
Reroute wiring through center console
Details

 09-06-2023
1.00
Run engine to test idle and high RPMs
Details

 09-06-2023
2.00
Rewire fuel selector lights
Details

 09-05-2023
3.00
Secure wiring in engine compartment
Details

 09-01-2023
3.00
Reroute Com and Intercom wiring
Details

 08-29-2023
2.00
Reroute Com and Intercom wiring
Details

 08-25-2023
1.00
Work on tuning engine
Details

 08-25-2023
1.00
Reroute wiring in center console
Details

 08-22-2023
1.00
Reroute wiring in center console
Details

 08-17-2023
2.00
Lubricate joints and re-attach canopy
Details

 08-15-2023
2.00
Lubricate joints and re-attach canopy
Details

 08-14-2023
2.00
Modify main battery for vertical support
Details
     

 08-08-2023
1.00
Loosen and Retorque Cylinder Head
Details

 08-08-2023
1.00
Flap Indicator Potentiometer & Rear Battery
Details

 08-07-2023
3.00
Flap Indicator Potentiometer & Rear Battery
Details
     

 08-04-2023
3.00
Remove defective flap potentiometer
Details
       

 08-03-2023
3.00
Remove flap position potentiometer
Details
       

 08-02-2023
2.00
Install flexible grommets
Details

 07-30-2023
3.00
Check torque
Details

 07-21-2023
0.50
Test run the engine
Details

 07-18-2023
1.00
Rewire for Aux Power
Details

 07-18-2023
1.00
Retorque cylinder head
Details

 07-17-2023
2.00
Rewire for Aux Power
Details

 07-11-2023
3.00
Rewire for Aux Power
Details

 07-08-2023
2.00
Rewire fuel pump switches
Details

 07-01-2023
3.00
Rewire Fuel pump switches
Details

 06-29-2023
2.00
Wiring issues
Details

 06-28-2023
1.00
Run engine
Details

 06-24-2023
2.00
Flap indicator, Head phones mic wiring
Details

 06-22-2023
2.00
Wiring Flap Motor, Aux power
Details

 06-20-2023
3.50
Aux Battery and Ammeter
Details

 06-19-2023
3.00
Fit backup battery box
Details
     

 06-17-2023
1.00
Test fit rear battery box
Details

 06-16-2023
1.00
Check amperages, work on wire routing
Details

 06-14-2023
1.50
Test run the engine
Details

 06-10-2023
3.00
Rewire Bus Connections
Details

 06-08-2023
3.00
Rewire Bus Connections
Details

 06-06-2023
3.00
Trace wiring. Test fuel pumps and selector
Details

 06-05-2023
2.50
Trace wiring. Hook up Fuel selector unit
Details

 06-03-2023
2.00
Install new gas struts, trace wiring for fuel rela
Details
       

 06-01-2023
2.00
Trace wiring, battery contactor, fuel selector
Details

 05-30-2023
3.00
Review wiring of various systems
Details

 05-25-2023
1.50
Prep engine for startup
Details

 05-23-2023
2.00
Prep engine for startup
Details

 05-22-2023
2.00
Prep Engine for startup
Details

 04-06-2015
0.00
Mount Right Wing
       

 04-06-2015
0.00
Mount Right Wing
       

 04-06-2015
0.00
Battery/Solenoid
     

 01-26-2015
0.00
Paint Scheme
       

 01-26-2015
0.00
Interior
       

 01-25-2015
0.00
Radiator and Duct
       

 01-05-2015
0.00
Engine Test
       

 01-05-2015
0.00
Engine test
       

 07-23-2014
0.00
Output module mounted
       

 07-23-2014
0.00
Output module mounted
       

 07-10-2014
0.00
Prop flange
       

 05-06-2014
0.00
Fuse Complete
       

 05-06-2014
0.00
Fuse and Wings
       

 12-16-2013
0.00
Firewall Forward
       

 12-07-2012
0.00
Prop Mounted
       

 12-04-2012
0.00
Engine Mounted
       

 11-19-2012
0.00
Engine Fuel
       

 11-15-2012
0.00
Engine Mount
       

 09-25-2012
0.00
Engine Mount
       

 09-14-2012
0.00
Engine Mount and machined part
       

 09-14-2012
0.00
Engine Mount
       

 07-17-2012
0.00
Parking Brake
       

 05-28-2012
0.00
Stab Tip
       

 05-28-2012
0.00
Flap Control
       

 10-07-2011
0.00
Canopy
       

 09-05-2011
0.00
Canopy Mount
       

 09-05-2011
0.00
Canopy Mount
       

 08-17-2011
0.00
In Hangar
       

 07-11-2011
0.00
Canopy
       

 07-11-2011
0.00
Cabin
       

 05-05-2011
0.00
Control Cables
       

 05-04-2011
0.00
Center Spar
       

 05-04-2011
0.00
Center Spar
       

 08-19-2010
20.00
Reworked left wing per Zenith plans
Details
       

 08-19-2010
9.00
Rebuild left wing
Details
       

 11-05-2009
0.00
Fuse mostly complete
       

 10-24-2009
0.00
Shoulder Harness Attach
       

 10-23-2009
0.00
Seats
       

 10-23-2009
0.00
Antenna Routing
       

 10-21-2009
0.00
Seat Belt Attach
       

 10-21-2009
0.00
Seat Belt Attach
       

 08-24-2009
0.00
Panel
     

 06-21-2009
0.00
BNC Cable
       

 06-03-2009
0.00
Fuel Injectors
       

 06-02-2009
0.00
Battery Box Rear
       

 05-05-2009
0.00
Servo Attach
       

 11-18-2008
0.00
Panel
       

 09-10-2008
0.00
Instrument panel
       

 09-07-2008
0.00
Instrument panel
       

 06-10-2008
0.00
Prop Hub Adapter
       

 04-16-2008
0.00
Fuselage
       

 08-26-2007
0.00
NACA Air Intake
       

 08-26-2007
0.00
NACA Air Intake
       

 08-18-2007
0.00
Rudder & Stab
       

 08-15-2007
0.00
Fuse skins
       

 08-15-2007
0.00
Fuse inside
       

 08-15-2007
0.00
Fuse inside
       

 08-15-2007
0.00
Flap Motor
       

 08-15-2007
0.00
Controls
       

 08-14-2007
0.00
Landing Gear Mount
     

 05-26-2007
0.00
Fusalage bows
       

 05-25-2007
0.00
Fusalage bows
       

 05-19-2007
0.00
Rear Top Skin
       

 03-04-2007
0.00
Landing gear mount and Under Bagage shelf
       

 03-04-2007
0.00
Fuselage seat parts
       

 03-04-2007
0.00
Bagage shelf
       

 02-20-2007
0.00
Fuselage front parts assembled
       

 02-20-2007
0.00
Fuselage front parts assembled
       

 02-20-2007
0.00
Fuselage front parts assembled
       

 02-19-2007
0.00
Fuselage front parts primed
       

 02-17-2007
0.00
Fuselage front
       

 02-17-2007
0.00
Fuselage front
       

 02-10-2007
0.00
Fuselage Center
       

 02-01-2007
0.00
Water Level
       

 01-27-2007
0.00
fusalage forward
       

 01-27-2007
0.00
fusalage forward
       

 10-25-2006
0.00
Firewall
     

 10-24-2006
0.00
Fuselage Front Assembly
       

 09-21-2006
0.00
Fuselage Rear Assembly
       

 09-17-2006
0.00
Fuselage Cutting Side Skins
       

 09-16-2006
0.00
Fuselage extrusion splice
       

 09-14-2006
0.00
Fuselage bottom
       

 09-14-2006
0.00
Fuselage bending extrusions
       

 09-06-2006
0.00
Aileron Stop
       

 09-04-2006
0.00
Left wing tip cleco and rivet
       

 09-04-2006
0.00
Left wing tip back plates
       

 09-02-2006
0.00
Left wingtip mold
       

 09-02-2006
0.00
Left wing tip wiring
     

 08-26-2006
0.00
Left wingtip mold
       

 08-26-2006
0.00
Fuse horizontal tail frames
     

 08-04-2006
0.00
Left wing tip
       

 07-21-2006
0.00
Left wing tip
       

 07-06-2006
0.00
Left wing closing
       

 07-06-2006
0.00
Left wing closing
       

 06-10-2006
0.00
Landing Light Bracket
       

 05-28-2006
0.00
left wing assembly
       

 05-27-2006
0.00
left wing assembly
       

 05-19-2006
0.00
right wing tip glass
       

 05-19-2006
0.00
right wing tip glass
       

 05-04-2006
0.00
right wing tip mold
       

 04-21-2006
0.00
right wing tip mold
       

 04-02-2006
0.00
right wing tip mold
       

 02-22-2006
0.00
right wing tip mold
       

 02-21-2006
0.00
right wing tip
       

 01-03-2006
4.00
Make Lift Reserve Indicator.
       

 08-14-2005
6.00
drill pilot holes in tanks
       

 04-11-2005
4.00
Drill lightening holes in ribs.
       

 03-29-2005
4.00
cut out rear wing rib blanks.
       

 03-19-2005
6.00
Assemble left aileron
     

 01-31-2005
2.00
Pulled rivets on elevator.
       

 11-21-2004
2.00
Cut more material for tail.

 11-17-2004
4.00
Cut out rib patterns
       

 11-17-2004
6.00
Cut out Alum blanks for Tail.
     










Copyright © 2001-2024 Matronics. All Rights Reserved.