Powered By Kitlog Pro v2.0
KEVIN'S WEB SITE
Fokker DR1
All
Work Logs Found:
102
Category Work Time:
615 Hours
Date
Hours
Work Log Summary
Details
09-01-2024
8.00
Wing covering
Details
09-01-2024
0.50
Wing covering
Details
08-25-2024
6.00
Preparing the middle wing for covering
Details
08-04-2024
4.00
Seat
Details
07-27-2024
8.00
Seat construction.
Details
07-11-2024
6.00
Aircraft deconstruction
Details
07-09-2024
2.00
Landing gear wing construction continued
07-07-2024
6.00
landing gear wing construction
Details
07-06-2024
8.00
Landing gear wing
Details
06-15-2024
8.00
Pitot tube. wing step and dash
Details
06-15-2024
8.00
Guages
Details
06-01-2024
8.00
Cockpit cover padding
Details
05-26-2024
8.00
Cockpit cover
Details
05-11-2024
5.00
Wheel covers
Details
05-11-2024
8.00
Gauges
Details
03-17-2024
4.00
throttle quadrant
Details
03-11-2024
4.00
Throttle quadrant
Details
02-25-2024
4.00
Wing scalloping
Details
02-24-2024
0.50
Side panels continued
02-24-2024
4.00
Fuselage sides
Details
02-09-2024
8.00
Aileron cable rigging
Details
12-30-2023
0.50
Cable routing continued
12-10-2023
6.00
Cable rigging
Details
12-09-2023
6.00
Shaping the cockpit
Details
12-09-2023
4.00
Cable routing
Details
12-09-2023
6.00
Axe handle brackets
Details
11-25-2023
0.50
Turtledeck and horizontal installed
11-25-2023
6.00
Turtle deck
Details
11-25-2023
4.00
Tail Feathers
Details
11-24-2023
4.00
Machine Gun Brackets
Details
11-22-2023
7.00
Cockpit forming
Details
11-20-2023
8.00
Details
11-19-2023
8.00
More Machine Gun Work
Details
11-05-2023
8.00
Machine gun work
Details
10-22-2023
5.00
Fuel Tank Cover
Details
10-21-2023
7.00
Firewall
10-16-2023
6.00
firewall
10-15-2023
6.50
Firewall
Details
10-13-2023
7.00
Firewall
Details
10-08-2023
8.00
Finished L/E's
Details
10-08-2023
0.50
Additional Leading Edge Progress
Details
09-17-2023
7.00
Upper Wing
Details
09-17-2023
2.50
upper wing
Details
09-17-2023
5.00
Brake Pedal
Details
09-17-2023
4.00
Brake Pedal
Details
09-10-2023
6.00
Seat Install
Details
09-04-2023
6.00
Cockpit Floorboard
Details
09-03-2023
6.00
Aileron Control Cable Install
Details
09-03-2023
8.00
Aileron Control Cable Install
Details
07-04-2023
9.00
Seat
Details
07-04-2023
2.00
Elevator Control Stick Pushrod
Details
07-02-2023
5.00
Mid-Wing Cockpit Cutout
Details
07-02-2023
4.00
Elevator Bell Crank
Details
06-25-2023
6.00
Controls and Fuel Tank
Details
06-10-2023
8.00
Controls
Details
06-03-2023
8.00
Cockpit controls
Details
06-02-2023
12.00
Machine Guns
Details
05-29-2023
4.00
Mid wing
Details
05-21-2023
12.00
Ailerons
Details
05-21-2023
0.00
Aileron
Details
05-14-2023
12.00
Installing Ribs
Details
05-07-2023
16.00
Rib Jig, bending, Coping Riveting
Details
04-29-2023
16.00
Wing Ribs
Details
04-23-2023
12.00
Bracing wires
Details
04-04-2023
10.00
wing struts
Details
04-04-2023
5.00
lift struts and gusset plates
Details
04-02-2023
12.00
shoring up the spar assembies
Details
03-19-2023
8.00
spar work
Details
03-18-2023
10.00
Spare work
Details
03-18-2023
0.00
Spar work instructions
03-18-2023
8.00
Spar wing work
Details
03-11-2023
8.00
Lower wing carry throughr tube installation
Details
03-11-2023
0.00
Carry through tubes continued
Details
03-05-2023
7.00
Continued main axle work
Details
02-28-2023
5.00
New tail wheel
Details
02-25-2023
8.00
Step and handle build and installation
Details
02-19-2023
7.00
tail wheel assy
Details
02-19-2023
8.00
Brake disc assembly
Details
02-18-2023
8.00
landing gear continued
Details
02-18-2023
8.00
continued landing gear axle fitting
02-12-2023
6.50
Landing gear build
Details
02-12-2023
6.00
fitting the gear legs to the fuselage
Details
02-11-2023
4.00
Begining of the wings
Details
01-30-2023
0.00
Tailplane
Details
01-30-2023
2.00
Horizontal fitting
Details
01-29-2023
0.00
Tailplane drawings
01-29-2023
0.00
Tailplane build con't
01-29-2023
8.00
Building the tailpane
Details
12-31-2022
4.00
removed all cross wires, tie downs etc.
Details
12-29-2022
4.00
Rudder Spare Squaring
Details
12-18-2022
6.00
flipped fuselage and work the top gussets
Details
12-16-2022
10.00
continuation of the fuselage build
Details
12-04-2022
10.00
Mated l/h and r/h sides
Details
12-03-2022
6.00
completed the r/h side and prepared to mate r/h to
Details
12-02-2022
8.00
completion of the l/h side
Details
11-28-2022
8.00
L/H side fuselage construction
Details
11-26-2022
8.00
layout of the left hand side of the fuselage
Details
11-24-2022
6.00
Rudder construction
Details
11-24-2022
0.00
drawings for rudder
Details
11-21-2022
5.00
Built a storage Rack
Details
11-17-2022
1.00
Kit Arrives Home
Details
11-17-2022
4.00
Inventory Kit
Details
SITE NAVIGATION
Contact Builder
Fokker DR1 Home
Category
# Logs
# Hours
All
102
613
Cockpit
13
93
Controls
13
64
Empennage
11
30
Firewall
4
26
Fuselage
13
84
Landing gear
9
60
Machine Guns
4
32
Miscellaneous
5
24
Wings
30
200
Copyright © 2001-2024 Matronics. All Rights Reserved.