KitLog pro

Powered By Kitlog Pro v2.0

GOTTFRIED'S WEB SITE
Work Logs Found: 329
Category Work Time: 984 Hours
 Date
Hours
Work Log Summary

Details

 05-01-2021
3.00
Weight and CG
Details
     

 04-11-2021
2.00
electrcalharness mounts
Details
       

 03-31-2021
1.00
blade hanger refinement
Details
     

 03-27-2021
3.00
harness mounting
Details
       

 03-25-2021
2.00
head set hook
Details
       

 03-22-2021
3.00
horizontal tail fin
Details
       

 03-20-2021
5.00
Installation of protective wrap on harnesses
Details
       

 03-19-2021
2.00
pitot tube cover
Details
       

 03-15-2021
2.00
Placards
Details
       

 03-12-2021
2.00
cabin door hinges installation
Details
     

 03-11-2021
2.00
Final assembly of cabin
Details
       

 03-10-2021
2.00
adjusting tail rotor angles
Details
       

 03-06-2021
2.00

     

 03-04-2021
2.00
adjustingi swash plate angles
Details
       

 03-02-2021
2.00
tank leak adhesive trials on fuel tank
Details
     

 02-26-2021
2.00
Fixing tank leaks
Details
       

 02-25-2021
2.00
Rotor blade balancing
Details
       

 02-24-2021
2.00
tail rotor slider modification
Details
     

 02-23-2021
3.00
support bracket for fuel filter
Details
       

 02-22-2021
2.00
painting blade support rig
Details
       

 02-19-2021
2.00
boots for terminals
Details
       

 02-18-2021
2.00
Instrument pod final installation
Details
       

 02-11-2021
2.00
Rotor blade installation and blade hangers
Details
       

 02-02-2021
2.00
Blade hanger fabrication
Details
     

 02-01-2021
2.00
Engine oil system test
Details
     

 01-29-2021
4.00
Blade hanger fabrication
Details
       

 01-28-2021
3.00
Blade holders
Details
       

 01-27-2021
2.00
Collective permanent installation
Details
       

 01-26-2021
2.00
rotor hub installation
Details
       

 01-25-2021
2.00
Rotor hub assembly
Details
     

 01-24-2021
2.00
Seat installation
Details
     

 01-23-2021
2.00
Back-up battery charge port; Base plate hook up
Details
       

 01-22-2021
3.00
Back-up battery external charge port
Details
     

 01-21-2021
1.00
Fuel tank leaks
Details
     

 01-20-2021
2.00
Fuel tank leaks
Details
       

 01-18-2021
3.00
Fuel flow testing
Details
       

 01-15-2021
4.00
Checking fuel system
Details
       

 01-11-2021
2.00
Voltage regulator hook up
Details
       

 01-08-2021
3.00
Back-up battery hook up
Details
       

 01-02-2021
2.00
Fuel selector valve
Details
     

 12-27-2020
1.00
Fuel selector valve installation
Details
       

 12-23-2020
4.00
Engine ground bracket
Details
       

 12-09-2020
3.00
Exciter and EXT probe
Details
       

 12-02-2020
2.00
voltage regulator/rectifier installation
Details
     

 11-30-2020
2.00
Rotor head painting
Details
       

 11-27-2020
3.00
Main battery tray
Details
       

 11-25-2020
4.00
Main batterytrray
Details
       

 11-17-2020
4.00
Main battery tray
Details
       

 11-15-2020
3.00
Main battery tray
Details
       

 11-11-2020
5.00
Main Battery tray
Details
       

 11-10-2020
2.00
Battery tray for new and larger B/U battery
Details
       

 05-01-2020
1.00
rotor shaft plug installation
Details
       

 04-30-2020
2.00
Hang test
Details
       

 04-28-2020
3.00
control cable attachments
Details
     

 04-26-2020
3.00
control cable clamps
Details
       

 04-24-2020
3.00
Fitting of the retension bolts for the blade gripp
Details
       

 04-21-2020
4.00
finishing cabin
Details
       

 04-20-2020
3.00
retension bolt fitting
Details
     

 04-19-2020
4.00
trimming and finishing bottom covers
       

 04-16-2020
2.00
Making hardware to lift Helicycle
Details
       

 04-13-2020
2.00
Instrment pod installation
Details
     

 04-11-2020
3.00
airspeed and Altimeter and ROC
Details
       

 04-09-2020
1.00
COM radio hook up
Details
     

 04-08-2020
3.00
governor to throttle pot hook-up
Details
       

 04-05-2020
3.00
cyclic stick grip and harness
Details
       

 04-03-2020
3.00
Cyclic stick finishing and hook-up.
Details
     

 04-02-2020
3.00
function check of gauges
Details
     

 04-01-2020
3.00

Details
       

 03-31-2020
5.00
hooking up upper instrument panel
Details
       

 03-27-2020
3.00
Radio harness, antenna installation
Details
       

 03-25-2020
3.00
more wiring of bus bars and instrument panels
Details
       

 03-18-2020
5.00
Battery tray
Details
       

 03-17-2020
2.00
Finishing bus bar panel hook-up
Details
       

 03-16-2020
3.00
position and strobe lights
Details
       

 03-15-2020
5.00
connecting governor to engine and instruments pane
Details
       

 03-12-2020
3.00
.and more wiringto governor and sensors
     

 03-06-2020
3.00
EGT hook up
Details
       

 03-05-2020
2.00
Wiring to upper instrument panel
Details
     

 03-03-2020
3.00
wiring and more wiring
Details
       

 02-28-2020
4.00
Lower panel hook-up and bus bar bundle mounts
Details
     

 02-27-2020
3.00
Lower panel hook-up
Details
       

 02-17-2020
2.00
Aux battery mount
Details
     

 02-16-2020
2.00
Bus bar panel installation
Details
       

 02-14-2020
3.00
Bus bar lay-out
Details
       

 02-12-2020
2.00
making bus bars
Details
     

 02-10-2020
2.00
wire routing and clutch limit switch
       

 02-09-2020
4.00
wiring schematics
Details
       

 02-09-2020
1.00
Wiring clutch limit swithes
     

 02-07-2020
1.00
Lower panel wiring completed
Details
     

 02-06-2020
4.00
electrical system layot
Details
       

 02-05-2020
2.00
electrical system layout
       

 02-03-2020
3.00
electrical system layout
Details
       

 01-25-2020
3.00
finishing cabin shell
Details
     

 01-18-2020
3.00
upper rotor bearing alignment
Details
       

 01-12-2020
2.00
pitot tube fabrication
Details
       

 01-11-2020
2.00
Fitting cabin halves
Details
     

 01-10-2020
5.00
Fuel line routing to engine and aux tank
Details
       

 01-05-2020
2.00
Final installation of tail rotor drive shaft
Details
       

 01-03-2020
6.00
readying engine for installation in frame
Details
       

 01-01-2020
1.00
Fuel tank vent hose mounting
Details
     

 12-30-2019
2.00
Drive pulley installation
Details
       

 12-29-2019
2.00
fixing oil tank
Details
     

 12-27-2019
2.00
Tank final installation
Details
       

 12-26-2019
3.00
oil cooler final installation and check
Details
       

 12-22-2019
1.00
Safety wiring tail rotor controls
Details
       

 12-20-2019
6.00
Final assembly
Details

 12-19-2019
2.00
finishing transmission oil cooler
Details
       

 12-19-2019
4.00
Final assembly
Details

 12-15-2019
1.00
Prep tank for final install
Details
     

 12-13-2019
3.00
transmission cooler vent
Details
       

 12-12-2019
3.00
transmission oil cooler
Details
       

 12-12-2019
2.00
preping cyclic/collective control for final instal
Details
       

 12-11-2019
3.00
preping control rods
Details
       

 12-08-2019
2.00
Cyclic stick boot
Details
       

 12-01-2019
2.00
testing transmission
Details
       

 11-25-2019
1.00
transmissin vent
Details
       

 11-24-2019
5.00
transmission oil cooler
Details
       

 11-23-2019
1.00
final upper tank installation
Details
       

 10-24-2019
4.00
Transmission oil cooler
Details
       

 10-21-2019
4.00
wiring lower instrument panel
Details
       

 10-14-2019
3.00
wiing upper instrument panel
Details
     

 10-12-2019
3.00
ballancing engine pulley
Details
       

 10-11-2019
6.00
Harley Davidson Magnet ring
Details
       

 09-08-2019
2.00
wiring lower panel D-Sub connector
Details
       

 09-07-2019
3.00
wiring lower panel
Details
       

 08-18-2019
3.00
wiring upper panel
Details
       

 07-23-2019
2.00
wiring lower panel
Details
       

 07-22-2019
2.00
lower panel wiring
Details
       

 06-23-2019
2.00
connector for lower panel
Details
       

 06-20-2019
2.00
wiring clutch operarion module
Details
     

 06-16-2019
3.00
wiring of lower panel
Details
       

 06-15-2019
10.00
wiring diagrams and wiring of lower panel
Details
       

 05-29-2019
2.00
range limitations on gauges
Details
       

 05-28-2019
3.00
instrument labeling
Details
       

 04-23-2019
3.00
Decals for lower instrument panel
Details
       

 04-18-2019
4.00
Instrument panel decals
Details
       

 04-15-2019
1.00
painted tail feather braces
Details
       

 03-26-2019
3.00
tail feather braces
Details
       

 03-25-2019
4.00
braces for tail feathers
Details
       

 03-16-2019
2.00
collective potentiometer housing
Details
       

 03-03-2019
3.00
limit swith brackets
Details
       

 02-28-2019
6.00
limit switch bracket engaged position
Details
     

 02-27-2019
2.00
rotor shaft sensor bracket
Details
     

 02-26-2019
4.00
rotorshaft speed sensor installtion
Details
       

 02-14-2019
6.00
fuel vale installation
Details
       

 02-09-2019
3.00
installation of slider bracket
Details
       

 02-08-2019
5.00
Installation of slider
Details
       

 02-06-2019
2.00
Corrosion on cyclic beam2
Details
       

 02-02-2019
4.00
First engine installation in fuselage
Details
       

 01-23-2019
6.00
transmission and controls all aligned and adjusted
Details
       

 01-22-2019
6.00
swash plate installation
Details
     

 01-20-2019
2.00
Tail rotor drive shaft alignmeng
Details
     

 01-19-2019
3.00
Tail rotor drive shaft assembling
Details
       

 01-17-2019
5.00
Tail rotor shaft drilling and asembling
Details
       

 01-16-2019
3.00
Rotor shaft bearing alignment
Details
       

 01-14-2019
2.00
painting and transmission assembling
Details
       

 01-13-2019
3.00
Painting transmission and swash plate
Details
       

 01-09-2019
4.00
preparing transmission for painting
Details
     

 01-08-2019
3.00
transmission installation
Details
       

 01-05-2019
3.00
TR drive shaft installation
Details
     

 01-04-2019
4.00
TR transmission alignment
Details
       

 12-27-2018
4.00
Installing transmission to Frame support
Details
       

 12-26-2018
6.00
planning installation of TR drive shaft
Details
       

 12-24-2018
4.00
Fitting the main transmission
Details
       

 12-22-2018
4.00
Installation of rotor shaft head bearing
Details
       

 12-19-2018
4.00
Lower Instrument panel
Details
       

 12-18-2018
3.00
lower instrument panel ( try #2)
Details
     

 12-17-2018
4.00
redoing lower instrument panel
Details
     

 12-16-2018
3.00
Lower Instrument panel decals
Details
     

 12-10-2018
8.00
Rotor blade finishing
Details

 12-06-2018
10.00
sanding and buffing blades
Details
     

 12-01-2018
7.00
sanding and polishing rotor blades
Details
       

 11-26-2018
7.00
sanding of rotor blades
Details
     

 11-24-2018
6.00
polishing rotor blades
Details
       

 11-10-2018
6.00
finishing rotor blade drag link brakets installati
Details
       

 11-04-2018
5.00
drilling rotor tip holes for later balancing
Details
       

 10-09-2018
4.00
Instrument panel
Details
       

 10-06-2018
5.00
instrument panel layout
Details
       

 08-16-2018
5.00
enngine controler
Details
       

 08-01-2018
4.00
engine controler wiring
Details
       

 06-21-2018
1.00
engine speed sensor
Details
       

 06-20-2018
3.00
wiring of engine controler
Details
       

 06-15-2018
1.00
engine speed sensoe
Details
     

 05-14-2018
2.00
thottle potentiometer
Details
       

 04-24-2018
5.00
building box for rotor blades
Details
       

 04-22-2018
5.00
building a box for otor lades
Details
       

 04-20-2018
3.00
installn rag lnk brackets
Details
       

 04-17-2018
4.00
drilling drag link brackets
Details
       

 04-15-2018
3.00
drilling drag link brackets
Details
       

 04-13-2018
1.00
filling the tail rotor gear box
Details
       

 04-08-2018
3.00
drag links
Details
       

 04-03-2018
3.00
endplugs
Details
       

 03-31-2018
3.00
end plugs
Details
       

 03-30-2018
2.00
end plug installation
Details
       

 03-29-2018
3.00
plugs for rotor tips
Details
       

 03-27-2018
2.00
engine plumbing
Details
       

 03-26-2018
2.00
end plugs for rotor blades
Details
       

 03-24-2018
2.00
oil tank mounting brackets
Details
     

 03-23-2018
5.00
instrument panel
Details
       

 03-21-2018
3.00
fuel drain line for injection unit
Details
       

 12-20-2017
4.00
tail rotor transmission
Details
       

 12-17-2017
2.00
egulator bracket
Details
       

 12-16-2017
2.00
regulator mounting
Details
       

 12-11-2017
2.00
instrument pane fabrication
Details
       

 12-07-2017
2.00
instrument panel fabrication
Details
       

 12-04-2017
1.00
Instrument panel fabrication
Details
       

 11-30-2017
1.00

Details
       

 11-29-2017
2.00
instument panelfabrication
Details
       

 11-23-2017
2.00
governor box finishing
Details
       

 11-21-2017
2.00
Governor box finishing
Details
       

 10-24-2017
2.00
governor housing assembly
Details
       

 10-21-2017
1.00
hook for governor spring
Details
     

 10-19-2017
3.00
oil tank hook-up
Details
       

 10-18-2017
3.00
oil tank hydraulic hook-up
Details
       

 08-18-2017
4.00
oil tank mounting
Details
       

 08-17-2017
1.00
oil tank mounting
Details
       

 08-04-2017
1.00
oil tank assembly
Details
       

 08-03-2017
2.00
oil tank assembly
Details
       

 04-17-2017
3.00
TR mounting
Details
       

 04-15-2017
3.00
assembling TR
Details
       

 04-14-2017
2.00
TR scissors fabrication
Details
       

 04-12-2017
2.00
Making TR scissors
Details
       

 04-07-2017
3.00
Fitting TR to shaft
Details
       

 04-06-2017
2.00
fitting tail rotor
Details
       

 03-03-2017
2.00
fuel hose routing
Details
       

 03-01-2017
2.00
fuel filter and hoses
Details
       

 02-26-2017
4.00
Fixing fuel leak on 2nd lower tank
Details
     

 02-25-2017
3.00
Fuel filter installation
Details
       

 02-24-2017
2.00
fixing fuel tank leaks
Details
     

 02-23-2017
2.00
Auxilary fuel tank installation
Details
     

 02-18-2017
3.00
Engine wiring and watching video
Details
       

 02-16-2017
4.00
Bending oil lines and component reinstallation
Details
       

 02-15-2017
3.00
Installing oil lines
Details
       

 02-09-2017
1.00
installing starter and fuel system
     

 02-08-2017
2.00
Safety wiring engine
Details
       

 02-08-2017
3.00
Painting engne case
Details
       

 02-07-2017
2.00
oil filter bracket
Details
       

 02-07-2017
2.00
Engine painting
Details
       

 02-06-2017
2.00
Tank leak tests
Details
       

 02-02-2017
4.00
Installing fuel level sending unit
Details
       

 01-23-2017
3.00
Installin tank cover plates
Details
       

 01-22-2017
3.00
preparing tanks for cover plate installation
Details
       

 01-22-2017
2.00
assembling the clutch
Details
     

 12-25-2016
2.00
Drllng tank access hole cover plate
Details
       

 12-16-2016
3.00
Clutch assembly
Details
       

 12-14-2016
7.00
Aux. tank installation
Details
       

 12-12-2016
2.00
Machining tank cover backing plates
Details
       

 12-10-2016
4.00
preparing engine for painting
Details
       

 12-08-2016
4.00
lower tank installation
Details
       

 12-05-2016
4.00
lower tank installation
Details
       

 12-04-2016
1.00
lower tank installation
Details
       

 12-02-2016
2.00
tank mounting
Details
       

 12-01-2016
1.00

Details
       

 11-25-2016
1.00
heel protectors and tank support
Details
       

 11-25-2016
3.00
familiarization with engine finishing
Details

 11-24-2016
2.00
upper fuel tank prep
Details
       

 11-24-2016
2.00
preparing tanks for installaton
Details
       

 11-23-2016
2.00
Preparing fuel tanks for installation
Details
       

 11-23-2016
2.00
aux. tank preparation
Details
       

 11-22-2016
2.00
door installation, hinges
Details
       

 11-21-2016
4.00
door installation, door hinges
Details
       

 11-20-2016
3.00
door installation, latches
Details
       

 11-19-2016
2.00
door installation
Details
       

 11-17-2016
3.00
door installation
Details
       

 09-06-2016
3.00
Rotor tip weights
Details
       

 09-05-2016
3.00
Rotor tip weights
Details
       

 08-24-2016
4.00
Bonding last set of doublers
Details
       

 08-18-2016
3.00
Bonding doublers on 2nd blade
Details
     

 08-15-2016
3.00
bonded top side doublers
Details
       

 08-12-2016
3.00
bonding doublers
Details
     

 08-11-2016
4.00
preparing for doubler bonding
Details
       

 07-07-2016
3.00
familiarization with rotor blade construction
Details
       

 06-23-2016
5.00
control rod finishing
Details
       

 05-06-2016
4.00
machining and assembly of door locks
Details
       

 04-18-2016
2.00
Installation of right side half door
Details
       

 04-16-2016
2.00
finishing the half doors for installation
Details
     

 04-15-2016
1.00
half door glueing
Details
     

 04-14-2016
3.00
half door preparation for glueing
Details
     

 04-13-2016
2.00
collective friction device
Details
     

 04-11-2016
3.00
cleaning and zinc chromating controls
Details
       

 04-10-2016
4.00
cabin covers and more nut plates installed
Details
       

 04-09-2016
2.00
cabin door hinges
Details
       

 04-03-2016
3.00
leftt side half door
Details
       

 04-02-2016
2.00
Tail fin adjustment
Details
     

 03-31-2016
4.00
Half door; right side
Details
       

 03-29-2016
2.00
half doors frame
Details
       

 03-28-2016
3.00
cabin assembly and overall check
Details

 03-27-2016
5.00
attaching cabin shells to seat pan. Installing nut
Details
       

 03-25-2016
2.00
cabin to seat pan attachment
Details
     

 03-24-2016
3.00
installin nut plates on windows frames
Details
       

 03-23-2016
3.00
chin window installation
Details
       

 03-21-2016
5.00
cabin winshield installation
Details
       

 03-20-2016
3.00
chin windscreen fitting to cabin frame
Details
       

 03-18-2016
2.00
cabin windscreen installaion prep
Details
     

 03-17-2016
3.00
cabin halves clecoed together
Details
     

 03-15-2016
8.00
mounting seat pan and working on cabin halves
Details
       

 03-06-2016
3.00
Fitting Cabin halves toseat pan
Details
       

 03-03-2016
5.00
tail fin assembly. Horizontal fin
Details
       

 02-27-2016
4.00
tail fin assembly.
Details
       

 02-27-2016
2.00
tail fin assembly, horizontal fin
Details
       

 02-25-2016
3.00
tail fin assembly
Details
       

 02-22-2016
6.00
Tail fin assembly
Details
       

 02-17-2016
5.00
Tail fin assembly, spar drilling
Details
       

 02-16-2016
4.00
Tail fin assembly
Details
       

 02-15-2016
3.00
tail fin assembly
Details
       

 02-10-2016
6.00
Tail fin assembly
Details
       

 02-08-2016
3.00
Instrument pod installation
Details
       

 02-07-2016
3.00
Floor pan installation and Instument pod
Details
       

 01-13-2016
3.00
push pull control tubes
Details
       

 01-07-2016
6.00
push pull rod assembly
Details
       

 01-04-2016
5.00
floor pan cut out for directional control & Collec
Details
       

 01-03-2016
5.00
mixer
Details
       

 01-02-2016
6.00
cyclic control assembling
Details
       

 12-30-2015
2.00
Collective installation
Details
       

 12-29-2015
3.00
collective and throttle assembly
Details
       

 12-28-2015
0.50
sealing frame tubes
Details

 12-22-2015
2.00
collective controls parts machining
Details
       

 12-16-2015
4.00
fitting and assembling of directional controls
Details
       

 12-13-2015
2.00
fitting controls of directional controls
Details
     

 12-12-2015
2.00
skid plugs installation
Details
       

 12-06-2015
4.00
preparing cabin shells
Details
       

 12-05-2015
3.00
clean up of fuselage parts
Details
       

 12-04-2015
1.00
skid nose piece
Details

 12-03-2015
5.00
attaching landing gear to frame
Details
       

 12-02-2015
1.00
landing gear/fuselage alignment
Details

 12-01-2015
2.00
landing gear assembly
Details

 11-27-2015
2.00
Fitting the gear
Details
     

 11-23-2015
1.00
watching the construction video
Details

 11-16-2015
3.00
Helicycle kit arrives
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.