KitLog pro

Powered By Kitlog Pro v2.0

Adams RV-7A Build
Work Logs Found: 191
Category Work Time: 1318 Hours
 Date
Hours
Work Log Summary

Details

 11-07-2024
7.50
Bond Windshield Frame, Wiring
Details

 10-31-2024
7.50
Configuring Magic
Details

 10-24-2024
6.50
Continue wiring and Canopy Prep
Details

 10-21-2024
7.00
Wiring Airplane
Details

 10-16-2024
7.00
Wiring
Details

 10-09-2024
7.00
Wiring airplane
Details

 10-03-2024
6.00
Wiring Panel
Details
     

 10-02-2024
7.50
Finish Windsheild Ring, Start panel installation
Details
       

 09-30-2024
3.50
Remove, trim windshield ring
Details
       

 09-24-2024
6.00
Layup Windscreen
Details
       

 09-19-2024
7.00
Skirt, prepping windshield
Details
       

 09-18-2024
7.00
Canopy Skirt, handles, front fairing
Details

 09-17-2024
7.50
Trim Skirt, Make skirt handles
Details
       

 09-16-2024
2.00
Sand Skirt
Details

 09-11-2024
7.00
Canopy Skirt
Details
       

 09-09-2024
7.00
Working on Track Extensions and Windshield Sika
Details
       

 09-05-2024
6.75
Sanding Canopy, fitting latch
Details
       

 09-04-2024
7.00
Canopy Pin Blocks
Details
       

 09-03-2024
6.50
Prep and bond Windshield
Details
       

 09-02-2024
6.25
AlCantara Glareshield
Details
       

 08-29-2024
6.00
Fitting and prepping windshield
Details
       

 08-27-2024
7.00
Trim and fit windsheild
Details
       

 08-26-2024
6.00
Fitting Canopy, Trimming Windsheild
Details
       

 08-13-2024
6.50
Canopy Cleanup, install avionics tray
Details
       

 08-12-2024
6.50
Canopy Filets, reveting front deck
Details
       

 08-05-2024
3.75
Sikaflex Canopy to frame
Details
       

 08-01-2024
7.00
Prep for sikaflex
Details
       

 07-31-2024
7.00
Fitting canopy Skirts, Prepping for glueing
Details
       

 07-30-2024
7.00
Canopy Fitting
Details
       

 07-25-2024
7.00
Wheel Pants remount, fuselage nutplates, misc fibe
Details
       

 07-24-2024
7.00
Work on fixing wheel pants and brake interferrance
Details
       

 07-23-2024
65.00
Gear Cuffs, Modify Brake Plate
Details
       

 07-18-2024
7.00
Gear root fairings
Details
       

 07-17-2024
7.25
Landing Gear Root Fairings
Details
       

 07-16-2024
6.50
Assmeble airplane to make landing gear leg fairing
Details
       

 07-15-2024
7.00
Fuel Tank Test, Sand Fiberglass, fitting wing to f
Details
     

 07-11-2024
6.50
Fiberglass finishing, nutplates on firewall for wi
Details
       

 07-09-2024
6.50
Firewall Recess, Battery tray, Fill fiberglass par
Details
       

 07-08-2024
6.75
Fuel Tank, Fiberglass, Wiring
Details
       

 07-04-2024
4.00
Parking Brake
Details
       

 07-01-2024
6.50
Fuel Tank Leak Management
Details
       

 06-28-2024
5.25
Front Covers/GPS mounts
Details
       

 06-27-2024
6.50
Air/Oil Sep istall, make covers for GPS
Details
       

 06-25-2024
5.50
Vernier cable support, drill glareshield, plan lar
Details
       

 06-24-2024
6.50
Fuel Tank and Behind Firewall prep
Details
       

 06-20-2024
7.50
Fuel Tank Closeout, Quadrant test assembly
Details
       

 06-19-2024
3.75
Prepping Tank, Firewall penetrations
Details

 06-18-2024
5.00
Building Fuel Tank
Details
       

 06-17-2024
7.00
Buliding Fuel Tank
Details
       

 06-13-2024
7.50
Building fuel tank
Details
       

 06-12-2024
7.50
Building Fuel Tabk
Details
       

 06-10-2024
4.50
FLG Pants, Wing Tank
Details
       

 06-06-2024
6.00
FLG Wheel Pants and work on fuel tank
Details
       

 06-05-2024
6.00
Fuel Tank
Details
       

 06-04-2024
6.00
Working on Fuel Tank
Details
       

 06-03-2024
6.00
Front landing gear fairings
Details
       

 05-31-2024
6.50
Fuel Tank
Details
     

 05-30-2024
5.50
Fairing Cowling and FLG fiberglass
Details
       

 05-29-2024
6.25
Fiberglass work, fuel tank
Details
       

 05-28-2024
7.50
Misc Cowl Glass, Working on LE fuel tank
Details
       

 05-14-2024
5.25
Oil Door and Front sytrut cuff
Details
       

 05-13-2024
3.00

Details
       

 05-09-2024
6.00
Riveting Cowl, Fitting wheel pants and cuff
Details
       

 05-08-2024
5.50
Front Wheel Pants
Details
       

 05-07-2024
6.25
Front Wheel Pants, Rivet Firewall
Details
       

 05-02-2024
6.00
FLG, Cowl, and FLG Fairing
Details
     

 05-01-2024
3.00
Cowl and Front Landing Gear
Details
       

 04-30-2024
7.00
Cowling installation
Details
       

 04-25-2024
6.50
Attaching Cowling
Details
       

 04-24-2024
5.50
Attaching Cowling
Details
       

 04-23-2024
7.00
Fitting Cowling, installing fastener tabs
Details
     

 04-22-2024
8.00
Installing Cowling
Details
       

 04-17-2024
7.25
Fitting Cowling
Details
       

 04-16-2024
7.00
Start Cowl Instalation
Details
     

 03-28-2024
6.50
Wiring Tail, Front Wheel Pants
Details

 03-26-2024
7.00
Rivet Fwd Fuselage
Details
       

 03-20-2024
6.25
Front Landing Gear assembly
Details
       

 03-19-2024
7.00
Pain rivet rack supports, mount engine mount to fu
Details
       

 03-18-2024
7.00
Tank Mounts, Ground Blocks, Front Gear
Details
       

 03-14-2024
7.50
Flap Torque Tube
Details

 03-13-2024
7.50
Steps, Baggage floor
Details
       

 03-07-2024
7.00
Mounting Trays
Details
       

 03-06-2024
7.50
Antenna and panel installation
Details
       

 03-05-2024
7.00
Fairing, Firewall, Antenna
Details
       

 02-29-2024
7.50
Tail Nutplates
Details

 02-28-2024
7.25
Empennage fairing, Firewall
Details
       

 02-27-2024
7.00
Empennage Fairing
Details
       

 02-23-2024
7.50
Prep parts for paint, Installing tail fairing
Details
     

 02-22-2024
5.00
routing wires
Details
     

 02-21-2024
7.50
Tailcone Systems
Details
       

 02-20-2024
5.25
Tailcone Work
Details

 02-15-2024
6.00
Roll Trim, Control sticks, flap pushrods, seat bac
Details
       

 02-14-2024
5.25
Wing Root Fairings, Roll trim, Control stick shims
Details

 02-13-2024
5.50
Remove Fuel tank, do Nutplates
Details
       

 02-12-2024
7.75
Wing Root Fairings.
Details
       

 02-08-2024
7.25
Vent and Fuel lines, Root fairings, wiring
Details
       

 02-07-2024
7.50
Mount Wings, Clearance Flaps, Start vents
Details
       

 02-06-2024
7.25
Flap Installation
Details

 02-05-2024
7.50
Fitting and rigging Ailerons and flaps
Details
       

 02-01-2024
7.50
Assembling wings to Fuselage
Details
     

 01-31-2024
7.25
Control Sticks, Roll Bar
Details
       

 01-30-2024
7.00
Brake Vent and Fuel Lines
Details
       

 01-29-2024
7.00
Rudder Pedals, Brakes, Unpack Panel
Details
       

 01-16-2024
7.25
Brake, Fuel and Vent lines
Details
       

 01-15-2024
6.50
Install Seats, Start mounting avionics
Details
       

 01-12-2024
7.00
Interior, Inspection Covers
Details
       

 01-11-2024
7.00
Interior, Pain Prep
Details
     

 01-10-2024
7.50
CAnopy, Skirts, Paint prep
Details
       

 01-08-2024
7.00
Riveting Turtle Deck
Details

 01-05-2024
7.00
Cutting Canopy
Details
       

 01-04-2024
7.00
Canopy Installation
Details
       

 01-03-2024
5.00
Fittin Canopy
Details
       

 01-02-2024
7.50
Canopy Frame installation
Details
       

 12-29-2023
6.50
Wingtips, Wheel Pants, Roll Bar
Details
       

 12-28-2023
7.00
Wingtips
Details
       

 12-27-2023
7.50
Wingtip reinforcements, Wheel Pants
Details
       

 12-26-2023
7.00
Wingtip Glass, Canopy inventory
Details
       

 12-21-2023
6.50
Riveting Turtle Deck
Details
       

 12-19-2023
7.50
Wingtip installation
Details

 12-13-2023
7.50
Wingtip Installation
Details
       

 12-12-2023
6.25
Wing Tip Installation
Details
       

 12-11-2023
6.00
Wingtips
Details
       

 12-06-2023
8.00
Wing Tips Version2
Details
       

 11-28-2023
6.00
Riveting Turtle Deck
Details
       

 11-27-2023
7.00
Landing gear mounts
Details
       

 11-08-2023
5.25
Wingtips
Details
       

 11-02-2023
7.00
Wing Tips
Details
     

 10-26-2023
7.00
Wheel Pants, Prep for paint
Details

 10-25-2023
7.00
Wheel Pants and Disassembly of fuselage
Details
       

 10-24-2023
7.50
Wheel Pants
Details
     

 10-23-2023
7.50
Wheeo Pants Cuffs
Details
       

 10-12-2023
2.00
Wheel Pants
Details

 10-09-2023
7.00
Flap Position Sensor install, Wheel Pants
Details
       

 09-15-2023
5.00
Disassembly, Wheel Pants layup
Details

 09-12-2023
4.00
Wheel Pants Cuffs
Details
       

 09-08-2023
7.00
Modeling Sub-Panel Avionics Placement
Details

 09-07-2023
7.00
Continue fiberglass work on gear legs
Details
       

 09-06-2023
7.00
Wheel Pants and Gear Leg fairings
Details
       

 09-05-2023
6.00
Wheel Pants cuffs
Details

 08-30-2023
7.00
Wheel Pants and cuffs
Details
       

 08-29-2023
7.00
Wheel Pants
Details
       

 08-28-2023
7.50
Fitting Wheel PAnts
Details
     

 08-25-2023
7.50
Brakes, Panel, Wheel Fairings
Details
       

 08-23-2023
7.50
Brake Lines
Details
     

 08-22-2023
7.00
Installed main gear, retrofitted Brake Masters
Details
       

 08-21-2023
7.50
Assemble brakes and wheels
Details
       

 08-17-2023
7.00
Landing Gear Fairings
Details
       

 08-16-2023
7.50
Landing gear and panel design
Details
     

 08-10-2023
6.00
Rudder Stops, Fiberglass, clearance Rudder
Details
       

 08-09-2023
7.50
Electrical Planning, elevator fiberglass, Rudder s
Details
       

 08-07-2023
7.50
Planning Avionics/Wiring Add foam to elevator, HS
Details

 08-03-2023
7.25
ELT and Stobe mounts, ADAHRS Mount, Tie Down
Details
       

 08-02-2023
7.25
Fairings, Seat Belt Mounts, ELT Mounts
Details
       

 08-01-2023
6.00
Fuselage steps, fiberglass continued...
Details
       

 07-31-2023
7.00
Landing gear mount and LS wing step
Details
       

 07-27-2023
7.00
Fiberglass tips and Landing gear mount
Details
     

 07-26-2023
7.50
Fiberglassing and Landing gear
Details
       

 07-25-2023
6.50
Elevator and H-Stab fiberglass tips
Details
       

 07-24-2023
6.50
Install V-Stabilizer
Details
       

 07-21-2023
6.50
Installing H-Stabilizer
Details
       

 07-17-2023
7.00
Fiberglass Fairings
Details
       

 07-13-2023
7.00
Fiberglass Fairings
Details
       

 07-12-2023
7.00
Mounting V Stabilizer, rudder fairing
Details
     

 07-11-2023
7.00
Antenna reinforcements
Details
       

 07-10-2023
7.25
Lower Skin, Light Plate
Details
       

 07-07-2023
7.50
Riveting Lower Skin on RS Wing
Details
     

 07-06-2023
7.00
RS wing riveting
Details
     

 07-05-2023
7.50
Riveting bottom skin on LS Wing
Details
     

 06-29-2023
7.00
Riveting Lower Skin on
Details
     

 06-28-2023
7.50
Antenna Plates, Nutplates, Bottom Wing Skin
Details
       

 06-27-2023
7.00
Avionics Planning, Antenna Plates
Details
       

 06-26-2023
7.50
Make Filler Inspection Plate
Details
       

 06-22-2023
6.50
Trim Tab
Details
       

 06-21-2023
7.50
Avionics Planning, Assembling trim tab
Details
     

 06-20-2023
7.00
Inspection Holes
Details

 06-19-2023
6.00
Wingtip LED Light Cut Landing Gear Holes
Details

 06-15-2023
6.00
Misc, Fuel Tank, wiring
Details

 06-14-2023
8.00
Fuel Pump Mount and Cover
Details
       

 06-13-2023
6.50
Roll Trim, Inspection holes
Details
       

 06-12-2023
7.50
Wing Systems Install
Details

 06-08-2023
7.00
Pitot Controller, Magnetometer
Details
       

 06-07-2023
3.50
Planning, wing pitot and wiring
Details

 06-07-2023
4.00
Adding Pitot Tube
Details
       

 06-06-2023
6.50
Added Roll and Pitch Srvos
Details
       

 06-05-2023
6.25
Install Flap
Details

 06-01-2023
7.00
Attach LS Flap
Details
       

 05-30-2023
8.00
Front Deck Holes and Dimpling
Details

 05-29-2023
7.25
Pushrods
Details
       

 05-24-2023
7.00
Modifying Trim
Details
     

 05-23-2023
6.00
Firewall Prep
Details
       

 05-15-2023
6.00
Unpacking, inventory
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.