Date
|
Hours
|
Work Log Summary
|
Details
|
10-16-2024
|
4.00
|
Airworthiness Inspection
|
Details
|
|
|
10-09-2024
|
3.00
|
Drill stop & Patch Panel
|
Details
|
|
|
10-08-2024
|
3.00
|
Torque seal on pull tube ends.
|
Details
|
|
|
10-04-2024
|
5.00
|
Tail Numbers & Rondell
|
Details
|
|
|
10-01-2024
|
4.00
|
Install Placards, & Wing Treads
|
Details
|
|
|
09-16-2024
|
4.00
|
Final fitment of cowl.
|
Details
|
|
|
09-15-2024
|
4.50
|
Fit nose and mail spats
|
Details
|
|
|
09-08-2024
|
1.50
|
Torque seal all landing gear components
|
Details
|
|
|
09-06-2024
|
3.75
|
Bolt Torque Tubes, Adjust Flaps
|
Details
|
|
|
09-03-2024
|
1.75
|
Torque Seal Empinage
|
Details
|
|
|
09-02-2024
|
2.50
|
Install Prop
|
Details
|
|
|
08-31-2024
|
10.00
|
Attach Wings
|
Details
|
|
|
08-29-2024
|
1.50
|
Air Pressure and Cotter Pins
|
Details
|
|
|
08-27-2024
|
2.00
|
Add oil and Presurize System
|
Details
|
|
|
08-26-2024
|
2.25
|
Add Coolant and Circulate
|
Details
|
|
|
08-22-2024
|
9.00
|
Install V. Stab, Rudder and Elevator
|
Details
|
|
|
08-20-2024
|
3.50
|
Adjust Cooling & Oil Lines, Misc. Prep
|
Details
|
|
|
08-19-2024
|
2.00
|
Attach Brakelines
|
Details
|
|
|
08-18-2024
|
6.00
|
Assemble Intertior
|
Details
|
|
|
08-17-2024
|
2.75
|
Horizontal Stab
|
Details
|
|
|
08-13-2024
|
2.00
|
Staging for Final Assembly
|
Details
|
|
|
08-12-2024
|
3.00
|
Loady body and move to airport
|
Details
|
|
|
08-05-2024
|
6.00
|
Paint Body
|
Details
|
|
|
08-03-2024
|
2.00
|
Paint black on Front
|
Details
|
|
|
06-21-2024
|
5.00
|
Prime Body
|
Details
|
|
|
06-15-2024
|
9.00
|
Prep Body and Tape
|
Details
|
|
|
02-24-2024
|
8.00
|
Install Windscreen & Latch
|
Details
|
|
|
02-21-2024
|
7.00
|
Install Dash
|
Details
|
|
|
02-19-2024
|
3.50
|
Recover center consule plate
|
Details
|
|
|
02-11-2024
|
4.00
|
Troubleshoot EMS Sensors
|
Details
|
|
|
01-25-2024
|
7.00
|
Setup Dynon settings
|
Details
|
|
|
11-12-2023
|
3.75
|
Troubleshooting Network Cables
|
Details
|
|
|
10-30-2023
|
6.00
|
Replace Static PortTube
|
Details
|
|
|
10-15-2023
|
4.50
|
Remove handles, patch mounting holes
|
Details
|
|
|
09-28-2023
|
5.00
|
Drill holes and mount handles for step up.
|
Details
|
|
|
09-20-2023
|
6.00
|
Re-paint Wings
|
Details
|
|
|
09-18-2023
|
5.00
|
Sand Wings
|
Details
|
|
|
09-16-2023
|
5.00
|
Paint Wings
|
Details
|
|
|
09-15-2023
|
6.00
|
Prep Wings for Paint
|
Details
|
|
|
09-13-2023
|
4.00
|
Windscreen Install
|
Details
|
|
|
08-15-2023
|
4.25
|
Reinstall Warranty Repaired Dynon Screen
|
Details
|
|
|
08-12-2023
|
2.00
|
Roemove Dynon Screen for Warranty Work
|
Details
|
|
|
08-07-2023
|
2.50
|
InstaBolt on Radar Altimeterll
|
Details
|
|
|
08-06-2023
|
3.00
|
Install raer cabin windows
|
Details
|
|
|
08-04-2023
|
5.00
|
Install Dash Electrical
|
Details
|
|
|
08-02-2023
|
2.25
|
Install Caopy on Plane
|
Details
|
|
|
08-01-2023
|
1.00
|
Installl Fuel Selector Switch
|
Details
|
|
|
07-29-2023
|
2.50
|
Touchup on Horizontal Stab., & Vert. Stab, Rudder
|
Details
|
|
|
07-28-2023
|
4.50
|
Install Sliding Canopy
|
Details
|
|
|
07-22-2023
|
5.50
|
Painting & Touchup on Elevator, Horizontal Stab.,
|
Details
|
|
|
07-19-2023
|
4.50
|
Painting the Elevator, Horizontal Stab....
|
Details
|
|
|
07-16-2023
|
7.75
|
Primiming & Prep the Elevator, Horizontal Stab....
|
Details
|
|
|
06-04-2023
|
4.00
|
Recover Dash Wrap & New Placards
|
Details
|
|
|
06-02-2023
|
3.00
|
Preped Dash for Modifications
|
Details
|
|
|
05-28-2023
|
2.00
|
Rewired Interior Lights
|
Details
|
|
|
05-24-2023
|
1.50
|
Installed Garmin GPS Antenna
|
Details
|
|
|
05-22-2023
|
8.00
|
Filled Rivets
|
Details
|
|
|
05-21-2023
|
6.50
|
Install GTN 650 Harness
|
Details
|
|
|
05-20-2023
|
3.00
|
Run Fuel Lines
|
Details
|
|
|
05-19-2023
|
2.00
|
Fairing the Main Gear
|
Details
|
|
|
04-19-2023
|
5.00
|
Dry Fitting the Cowling
|
Details
|
|
|
04-11-2023
|
3.50
|
Installed Dimmer Switch and Beacon Switch
|
Details
|
|
|
04-10-2023
|
8.50
|
Intsalled Garmin GTN 650
|
Details
|
|
|
03-27-2023
|
0.01
|
Noticed Main Wheel Spat Bracket
|
Details
|
|
|
03-26-2023
|
7.00
|
Installed Heated Dynon Pitot
|
Details
|
|
|
03-11-2023
|
6.00
|
Wiring Dynon Panel Connector
|
Details
|
|
|
03-07-2023
|
2.00
|
Review of SB 0020 - 08062022
|
Details
|
|
|
03-05-2023
|
4.00
|
Testing and adding more dash wiring.
|
Details
|
|
|
03-04-2023
|
3.00
|
Testing dash connectors and making a few correctio
|
Details
|
|
|
03-03-2023
|
3.50
|
Repaired minor surface rust on nose gear.
|
Details
|
|
|
02-26-2023
|
7.00
|
Painted main gear, reinstalled tire, repacked bear
|
Details
|
|
|
02-25-2023
|
3.00
|
Nose gear and shock absorber inspected.
|
Details
|
|
|
01-29-2023
|
6.00
|
Prepping access plates, fairings, tail, airlerons,
|
Details
|
|
|
01-28-2023
|
4.00
|
Install lower radio antennae, ELT horn & remote Dy
|
Details
|
|
|
01-21-2023
|
5.00
|
Install ELT
|
Details
|
|
|
01-08-2023
|
9.00
|
Wiring the back of dash board.
|
Details
|
|
|
01-07-2023
|
2.00
|
Testing and inspection of the servo for the elevat
|
Details
|
|
|
12-23-2022
|
3.00
|
Remove Wiring toTail & Replace w/ Aviation Wire.
|
Details
|
|
|
12-20-2022
|
5.00
|
Test Fit Canopy Frames and Front Windshield
|
Details
|
|
|
12-18-2022
|
7.00
|
Prep Fuselage for Paint
|
Details
|
|
|
12-17-2022
|
7.50
|
Fit and Install Panels Aft of Firewall to Dash
|
Details
|
|
|
12-04-2022
|
1.50
|
Install Tee to Run Pitot/Static/AOA Lines to Prima
|
Details
|
|
|
12-04-2022
|
5.00
|
Install Sound Proofing in Cabin
|
Details
|
|
|
11-12-2022
|
8.00
|
Install Coolant & Oil Hoses, Heatshielding on Hose
|
Details
|
|
|
11-11-2022
|
2.00
|
Build shelf and Install Secondary ADAHRS
|
Details
|
|
|
10-28-2022
|
2.00
|
Measure Spinner, Order Prop
|
Details
|
|
|
10-15-2022
|
6.00
|
Muffler and Cabin Heat
|
Details
|
|
|
10-12-2022
|
9.00
|
Wired Back of Panel
|
Details
|
|
|
10-11-2022
|
6.00
|
Cover Dash Panel, Install Dynon Modules, Switches
|
Details
|
|
|
10-09-2022
|
10.00
|
Build Dash Shelf and Install Dynon Components-Pilo
|
Details
|
|
|
10-08-2022
|
12.00
|
Wire Engine Sensors to Dash
|
Details
|
|
|
10-07-2022
|
9.00
|
Run Fuel Lines, Install Fireproof Cover
|
Details
|
|
|
10-06-2022
|
8.25
|
Carburator Air Filter Assembly, Cables
|
Details
|
|
|
10-02-2022
|
7.00
|
Rewire Tail Nav/Strobe & Pitch Trim
|
Details
|
|
|
10-01-2022
|
9.00
|
Identify and Install Exhaust
|
Details
|
|
|
09-30-2022
|
2.00
|
Prep Flange, Test Fit Prop Extension
|
Details
|
|
|
09-25-2022
|
5.00
|
Cabin Interior
|
Details
|
|
|
09-24-2022
|
5.00
|
Covered Brake & Throttle Contols w/Carbon Fiber
|
Details
|
|
|
09-18-2022
|
2.50
|
Remove Control Sticks, Test & Reinstall
|
Details
|
|
|
09-17-2022
|
4.50
|
Build Serial Cables-Dynon
|
Details
|
|
|
09-14-2022
|
3.50
|
Upholstery on Seats
|
Details
|
|
|
09-12-2022
|
3.00
|
Paint Interior
|
Details
|
|
|
09-11-2022
|
1.50
|
Mounted Transmotec Trim Actuator
|
Details
|
|
|
09-11-2022
|
1.50
|
Install Rear Cabin Bulkhead
|
Details
|
|
|
09-10-2022
|
2.00
|
Torqued and Marked Fuselage Nuts and Bolts
|
Details
|
|
|
09-10-2022
|
1.50
|
Installed Dynon Pitch Servo
|
Details
|
|
|
09-09-2022
|
2.50
|
Prep Cabin Interior for Paint
|
Details
|
|
|
08-28-2022
|
4.00
|
Cleaning, Inspection & Inventory of Parts
|
Details
|
|
|
08-28-2022
|
1.75
|
Cleaning and Inspection
|
Details
|
|
|
08-27-2022
|
2.50
|
Cleaning and Inspection
|
Details
|
|
|
08-27-2022
|
2.00
|
Cleaning and Inspection
|
Details
|
|
|
08-27-2022
|
4.00
|
Cleaning and Inspection
|
Details
|
|
|
08-22-2022
|
5.75
|
Unloading the Aircraft and Parts at our Residence
|
Details
|
|
|
08-21-2022
|
6.50
|
Packing and Loading Airplane Components and Parts
|
Details
|
|
|
08-20-2022
|
7.50
|
Inspection of Airframe, Disassembly for Moving
|
Details
|
|
|
12-31-2019
|
705.00
|
Work Completed by Doug Worley
|
Details
|
|