KitLog pro

Powered By Kitlog Pro v2.0

Todd's Web Site
Work Logs Found: 116
Category Work Time: 1222 Hours
 Date
Hours
Work Log Summary

Details

 10-16-2024
4.00
Airworthiness Inspection
Details
     

 10-09-2024
3.00
Drill stop & Patch Panel
Details
       

 10-08-2024
3.00
Torque seal on pull tube ends.
Details
       

 10-04-2024
5.00
Tail Numbers & Rondell
Details
       

 10-01-2024
4.00
Install Placards, & Wing Treads
Details
       

 09-16-2024
4.00
Final fitment of cowl.
Details
       

 09-15-2024
4.50
Fit nose and mail spats
Details
       

 09-08-2024
1.50
Torque seal all landing gear components
Details
       

 09-06-2024
3.75
Bolt Torque Tubes, Adjust Flaps
Details
       

 09-03-2024
1.75
Torque Seal Empinage
Details
       

 09-02-2024
2.50
Install Prop
Details
     

 08-31-2024
10.00
Attach Wings
Details
       

 08-29-2024
1.50
Air Pressure and Cotter Pins
Details
     

 08-27-2024
2.00
Add oil and Presurize System
Details
     

 08-26-2024
2.25
Add Coolant and Circulate
Details
       

 08-22-2024
9.00
Install V. Stab, Rudder and Elevator
Details
       

 08-20-2024
3.50
Adjust Cooling & Oil Lines, Misc. Prep
Details
       

 08-19-2024
2.00
Attach Brakelines
Details
       

 08-18-2024
6.00
Assemble Intertior
Details
       

 08-17-2024
2.75
Horizontal Stab
Details
       

 08-13-2024
2.00
Staging for Final Assembly
Details
       

 08-12-2024
3.00
Loady body and move to airport
Details
       

 08-05-2024
6.00
Paint Body
Details
       

 08-03-2024
2.00
Paint black on Front
Details
     

 06-21-2024
5.00
Prime Body
Details
     

 06-15-2024
9.00
Prep Body and Tape
Details
       

 02-24-2024
8.00
Install Windscreen & Latch
Details
       

 02-21-2024
7.00
Install Dash
Details
       

 02-19-2024
3.50
Recover center consule plate
Details
     

 02-11-2024
4.00
Troubleshoot EMS Sensors
Details
     

 01-25-2024
7.00
Setup Dynon settings
Details
       

 11-12-2023
3.75
Troubleshooting Network Cables
Details
       

 10-30-2023
6.00
Replace Static PortTube
Details
     

 10-15-2023
4.50
Remove handles, patch mounting holes
Details

 09-28-2023
5.00
Drill holes and mount handles for step up.
Details

 09-20-2023
6.00
Re-paint Wings
Details

 09-18-2023
5.00
Sand Wings
Details

 09-16-2023
5.00
Paint Wings
Details

 09-15-2023
6.00
Prep Wings for Paint
Details

 09-13-2023
4.00
Windscreen Install
Details
       

 08-15-2023
4.25
Reinstall Warranty Repaired Dynon Screen
Details
       

 08-12-2023
2.00
Roemove Dynon Screen for Warranty Work
Details
       

 08-07-2023
2.50
InstaBolt on Radar Altimeterll
Details
     

 08-06-2023
3.00
Install raer cabin windows
Details
       

 08-04-2023
5.00
Install Dash Electrical
Details
       

 08-02-2023
2.25
Install Caopy on Plane
Details
     

 08-01-2023
1.00
Installl Fuel Selector Switch
Details
       

 07-29-2023
2.50
Touchup on Horizontal Stab., & Vert. Stab, Rudder
Details

 07-28-2023
4.50
Install Sliding Canopy
Details
     

 07-22-2023
5.50
Painting & Touchup on Elevator, Horizontal Stab.,
Details

 07-19-2023
4.50
Painting the Elevator, Horizontal Stab....
Details

 07-16-2023
7.75
Primiming & Prep the Elevator, Horizontal Stab....
Details
       

 06-04-2023
4.00
Recover Dash Wrap & New Placards
Details
       

 06-02-2023
3.00
Preped Dash for Modifications
Details
       

 05-28-2023
2.00
Rewired Interior Lights
Details
       

 05-24-2023
1.50
Installed Garmin GPS Antenna
Details
     

 05-22-2023
8.00
Filled Rivets
Details
     

 05-21-2023
6.50
Install GTN 650 Harness
Details
       

 05-20-2023
3.00
Run Fuel Lines
Details
       

 05-19-2023
2.00
Fairing the Main Gear
Details
     

 04-19-2023
5.00
Dry Fitting the Cowling
Details
       

 04-11-2023
3.50
Installed Dimmer Switch and Beacon Switch
Details
       

 04-10-2023
8.50
Intsalled Garmin GTN 650
Details
       

 03-27-2023
0.01
Noticed Main Wheel Spat Bracket
Details
       

 03-26-2023
7.00
Installed Heated Dynon Pitot
Details
       

 03-11-2023
6.00
Wiring Dynon Panel Connector
Details
     

 03-07-2023
2.00
Review of SB 0020 - 08062022
Details
       

 03-05-2023
4.00
Testing and adding more dash wiring.
Details
       

 03-04-2023
3.00
Testing dash connectors and making a few correctio
Details
       

 03-03-2023
3.50
Repaired minor surface rust on nose gear.
Details
       

 02-26-2023
7.00
Painted main gear, reinstalled tire, repacked bear
Details
       

 02-25-2023
3.00
Nose gear and shock absorber inspected.
Details
       

 01-29-2023
6.00
Prepping access plates, fairings, tail, airlerons,
Details
       

 01-28-2023
4.00
Install lower radio antennae, ELT horn & remote Dy
Details
       

 01-21-2023
5.00
Install ELT
Details
       

 01-08-2023
9.00
Wiring the back of dash board.
Details
       

 01-07-2023
2.00
Testing and inspection of the servo for the elevat
Details
     

 12-23-2022
3.00
Remove Wiring toTail & Replace w/ Aviation Wire.
Details
       

 12-20-2022
5.00
Test Fit Canopy Frames and Front Windshield
Details
     

 12-18-2022
7.00
Prep Fuselage for Paint
Details

 12-17-2022
7.50
Fit and Install Panels Aft of Firewall to Dash
Details
       

 12-04-2022
1.50
Install Tee to Run Pitot/Static/AOA Lines to Prima
Details
     

 12-04-2022
5.00
Install Sound Proofing in Cabin
Details
       

 11-12-2022
8.00
Install Coolant & Oil Hoses, Heatshielding on Hose
Details
     

 11-11-2022
2.00
Build shelf and Install Secondary ADAHRS
Details
     

 10-28-2022
2.00
Measure Spinner, Order Prop
Details
     

 10-15-2022
6.00
Muffler and Cabin Heat
Details
       

 10-12-2022
9.00
Wired Back of Panel
Details

 10-11-2022
6.00
Cover Dash Panel, Install Dynon Modules, Switches
Details

 10-09-2022
10.00
Build Dash Shelf and Install Dynon Components-Pilo
Details

 10-08-2022
12.00
Wire Engine Sensors to Dash
Details
       

 10-07-2022
9.00
Run Fuel Lines, Install Fireproof Cover
Details
       

 10-06-2022
8.25
Carburator Air Filter Assembly, Cables
Details
       

 10-02-2022
7.00
Rewire Tail Nav/Strobe & Pitch Trim
Details
       

 10-01-2022
9.00
Identify and Install Exhaust
Details
       

 09-30-2022
2.00
Prep Flange, Test Fit Prop Extension
Details
       

 09-25-2022
5.00
Cabin Interior
Details
       

 09-24-2022
5.00
Covered Brake & Throttle Contols w/Carbon Fiber
Details
       

 09-18-2022
2.50
Remove Control Sticks, Test & Reinstall
Details
       

 09-17-2022
4.50
Build Serial Cables-Dynon
Details

 09-14-2022
3.50
Upholstery on Seats
Details
       

 09-12-2022
3.00
Paint Interior
Details
     

 09-11-2022
1.50
Mounted Transmotec Trim Actuator
Details
       

 09-11-2022
1.50
Install Rear Cabin Bulkhead
Details

 09-10-2022
2.00
Torqued and Marked Fuselage Nuts and Bolts
Details
       

 09-10-2022
1.50
Installed Dynon Pitch Servo
Details
       

 09-09-2022
2.50
Prep Cabin Interior for Paint
Details
       

 08-28-2022
4.00
Cleaning, Inspection & Inventory of Parts
Details

 08-28-2022
1.75
Cleaning and Inspection
Details
     

 08-27-2022
2.50
Cleaning and Inspection
Details

 08-27-2022
2.00
Cleaning and Inspection
Details
     

 08-27-2022
4.00
Cleaning and Inspection
Details
       

 08-22-2022
5.75
Unloading the Aircraft and Parts at our Residence
Details

 08-21-2022
6.50
Packing and Loading Airplane Components and Parts
Details

 08-20-2022
7.50
Inspection of Airframe, Disassembly for Moving
Details
       

 12-31-2019
705.00
Work Completed by Doug Worley
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.