KitLog pro

Powered By Kitlog Pro v2.0

JOHANN'S WEB SITE
Work Logs Found: 230
Category Work Time: 1038 Hours
 Date
Hours
Work Log Summary

Details

 07-08-2024
7.00
Painted fuselage stripes
Details
       

 07-06-2024
7.00
Fuselage preparation
Details
       

 06-30-2024
8.00
Painting wings
Details
       

 06-28-2024
8.00
Paint preparation
Details
       

 06-26-2024
6.00
paint preparation
Details
       

 06-20-2024
7.00
Paint preparation
Details
     

 06-12-2024
6.00
Documentation
Details

 06-12-2024
2.00
Application for proving flight
Details

 05-25-2024
3.00
Return fuel pipe clamp
Details
       

 05-25-2024
4.00
Fix Leak on tank seal
Details
       

 05-25-2024
2.00
Engine runs and tests
Details
     

 05-25-2024
1.00
control stick covers
Details
     

 05-25-2024
2.00
Canopy finishes
Details
     

 05-19-2024
6.00
Inspections and dual inspections
Details

 05-19-2024
7.00
Final settings
Details

 05-12-2024
2.00
Weight
Details
       

 05-12-2024
3.00
Seats and seat mechanisms
Details
       

 05-12-2024
2.00
Record serial numbers
Details
     

 05-12-2024
3.00
Fuel calibration
Details
       

 05-12-2024
4.00
Engine run
Details
       

 05-11-2024
6.00
Seat rails, lights, inspections
Details
       

 05-05-2024
9.00
Inspection and snags
Details
     

 04-28-2024
3.00
Nose wheel adjustment
Details
       

 04-28-2024
3.00
Canopy Hatch adjusments
Details
       

 04-27-2024
3.00
oil inspection hatch adjustment
Details
       

 04-27-2024
4.00
Mounting ELT antenna bracket
Details
     

 04-27-2024
2.00
Cowling screws fitted
Details
     

 04-27-2024
1.50
Brake bleeding and inspection
Details
     

 04-22-2024
3.00
Painting seat frames
Details
       

 04-21-2024
8.00
Finalise and checks
Details
     

 04-14-2024
4.00
Inspection started inside
Details

 04-14-2024
5.00
cowling fit and engine inspection
Details
       

 04-13-2024
4.00
Installed pitot system
Details
       

 04-13-2024
4.00
installation of outside air butterfly valve
Details
     

 04-13-2024
3.00
Installation of air-vent switches
Details
       

 04-13-2024
3.00
Inspections and cowling fitment
Details
       

 04-13-2024
4.00
Final engine inspections
Details
     

 03-29-2024
4.00
Install light covers
Details
       

 03-29-2024
5.00
Door mechanism fix
Details
       

 03-27-2024
2.00
second coat painting - wing light space
Details

 03-24-2024
3.00
Wing lights connect
Details
       

 03-24-2024
3.00
some small finishes
Details
       

 03-24-2024
2.00
Connect outside temp sensor
Details
     

 03-24-2024
4.00
Connect headset jacks
Details
       

 03-24-2024
3.00
change connection cofniguration for the lights
Details
     

 03-18-2024
3.00
work area clean and other maintenance
Details

 03-17-2024
3.00
Purge engine oil
Details
       

 03-17-2024
3.00
Fuel line selectory switch
Details
     

 03-17-2024
4.00
Fitting of wing flairings
Details
     

 03-17-2024
2.00
Elevator rigging complete
Details

 03-17-2024
3.00
Attach flap rods
Details
     

 03-15-2024
6.00
Paint wing light area
Details
     

 03-12-2024
5.00
Painted Cowling and canopy hinge covers
Details
       

 03-09-2024
6.00
Installation of Prop
Details
       

 03-09-2024
7.00
Fitting and tightening engine parts
Details
       

 03-09-2024
2.00

Details
     

 03-03-2024
7.00
Mounting the empennage
Details
       

 03-02-2024
8.00
installation of left wing, flaps and ailerons
Details
       

 03-02-2024
4.00
Elevator trim tab and empennage flairing
Details
       

 02-25-2024
12.00
mounted wings and empennage work
Details
       

 02-23-2024
7.00
Painted both wings
Details
       

 02-21-2024
8.00
Wings - primer and prep
Details
       

 02-15-2024
8.00
Prepped and painted fusellage
Details
       

 02-12-2024
6.00
Prep and painting - ailerons and flaps
Details
     

 02-09-2024
4.00
peparation and painting - Cowlings
Details
       

 01-28-2024
6.00
Tightened engine pipes
Details
     

 01-28-2024
4.00
removal of torque tube
Details
     

 01-28-2024
8.00
Mounting tail parts
Details
       

 01-27-2024
7.00
Installed Avionics
Details
       

 01-27-2024
2.00
Bought the main battery

 01-25-2024
3.00
Paint cowling inside
Details
       

 01-24-2024
3.00
Painting small parts
Details
       

 01-23-2024
4.00
undercoat preparation for small parts
Details
     

 01-21-2024
7.00
Avionaics install
Details
       

 01-20-2024
4.00
Throttle cable replacement
Details
     

 01-20-2024
4.00
Installed heat insulating pipes
Details
     

 01-20-2024
2.00
Garmin CHF antenna install
Details
       

 01-20-2024
7.00
Avionic install
Details
       

 01-19-2024
8.00
preparations for undercoat
Details
     

 01-17-2024
3.00
Oxygen system
Details
       

 01-14-2024
7.00
Installation of Panel - day 2
Details
     

 01-14-2024
5.00
Installation of Garmin monitoring box and harness
Details
     

 01-14-2024
7.00
Engine Heat Sleaves and pipes.
Details
       

 01-13-2024
8.00
Undercoat Paint - control surfaces
Details
     

 01-13-2024
6.00
Correct Torque on all nuts and bolts
Details

 01-13-2024
3.00
Brake pad disassembled and reassemble
Details
     

 01-13-2024
7.00
Avionics Panel install
Details
     

 01-12-2024
8.00
Undercoat painting - wing parts
Details
     

 01-12-2024
7.00
Engine pipes replace and new Heat Sleaves
Details
       

 01-11-2024
6.50
Undercoat painting - smaller parts
Details
     

 01-10-2024
8.00
Hanger cleanup and prep work for paint
Details
       

 01-06-2024
8.00
Engine pipes remove and servo motors
Details
       

 01-05-2024
6.00
Avionics panel inspection and unboxing
Details
     

 01-04-2024
8.00
Surface preparation for painting
Details
       

 01-03-2024
8.00

Details
     

 01-02-2024
8.00
Paint preparation and undercoat
Details
       

 12-23-2023
5.00
Painting the Canopy
Details
       

 12-22-2023
3.00
Canpoy paint preparation
Details
     

 12-18-2023
5.00
Relocate parts to Wonderboom airport
Details
       

 12-17-2023
4.00
Hanger preparation
Details

 12-04-2023
3.00
General cleaning and maintenance
Details

 12-03-2023
3.00
Remove throttle cable
Details

 12-03-2023
4.00
Bleed brakes
Details

 12-02-2023
5.00
correction to engine mounts
Details
       

 12-02-2023
8.00
Build inspection
Details
       

 11-26-2023
5.50
fitment of Empennage
Details
       

 11-26-2023
5.50
Aileron stops and work on the firewall
Details
       

 11-18-2023
7.00
Finalised door latches
Details
       

 11-18-2023
7.00
Completed Spats
Details
       

 11-15-2023
5.00
General cleaning and preparation
Details

 11-12-2023
5.00
Side panels - final installation
Details
     

 11-12-2023
8.00
Installed the Windscreen
Details
       

 11-12-2023
5.00
Fitting spats
Details
       

 11-05-2023
3.00
Spats prep
Details
       

 11-04-2023
5.00
Interior side panels
Details
       

 11-04-2023
6.00
Cowling adjustments
Details
       

 10-28-2023
4.00
Spray painted loose interior parts
Details

 10-28-2023
6.00
cowling fitting
Details
       

 10-27-2023
8.00
Interior pocket alignement and side panel
Details
       

 10-21-2023
8.00
Cowling fit
Details
       

 10-11-2023
5.00
Cleaning and maintenance
Details

 10-10-2023
3.00
Dash cover riveting
Details
     

 10-09-2023
3.00
Exhaust
Details
     

 10-08-2023
4.00
More carpeting
Details
       

 10-08-2023
6.00
Dashboard install
Details
       

 10-07-2023
5.00
Under seat inspection area
Details
       

 10-07-2023
5.00
Cowling preparation
Details
       

 10-01-2023
7.00
Panel leather
Details
       

 10-01-2023
2.00
Paint discussion
Details
     

 09-30-2023
7.00
Carpeting
Details
       

 09-29-2023
6.00
Filling rivet holes
Details

 09-24-2023
7.00
Canopy latches - right door
Details
     

 09-23-2023
3.00
Rudder pedal covers and side panel strips
Details
       

 09-23-2023
5.00
Fuel selector lever and fuel pipes
Details
       

 09-22-2023
4.00
Throttle cable install
Details
     

 09-22-2023
2.00
Fuel pump electric cable
Details

 09-17-2023
4.00
Side panel sound proofing and fitting
Details
     

 09-16-2023
5.00
Luggage area carpeting
Details
     

 09-15-2023
4.00
Mounting ECU and connectin cables
Details
     

 09-13-2023
6.00
Flatten Rivet hole filler
Details
     

 09-11-2023
6.00
Coolant pipes and fittings
Details
     

 09-10-2023
7.00
More oil pipes andheat shield
Details
       

 09-10-2023
4.00
Connected oil pipes
Details
     

 09-04-2023
3.00
installation - fuel pipes to and from engine
Details
     

 09-04-2023
4.00
Fuel line pipes - insulation
Details
     

 09-04-2023
3.00
fuel booster pump
Details
     

 09-02-2023
3.00
side panels insulation
Details
     

 09-02-2023
4.00
Intercooler installation
Details
       

 09-02-2023
3.00
Cabin Heater - footwell and defrost
Details
     

 09-01-2023
4.00
Heat Shield
Details
     

 09-01-2023
3.00
Engine to fusebox cables
Details
     

 08-30-2023
5.00
Control arms and linkages
Details

 08-27-2023
2.00
Insulation
Details
       

 08-27-2023
5.00
Fuel line pipes and planning
Details
       

 08-27-2023
1.00
Fitting of booster pump
Details
     

 08-26-2023
2.00
Mounting items on Firewall
Details
     

 08-26-2023
7.00
Fuel pump and filter
Details
       

 08-25-2023
6.00
Mounting the Engine fusebox and radiator
Details
     

 08-24-2023
2.00
Water reservoir
Details
     

 08-24-2023
5.00
Oxygen central mount
Details
       

 08-24-2023
2.50
Control rod boots
Details
     

 08-21-2023
5.00
Collect engine and upholstery kit
Details
       

 08-09-2023
6.00
Linkages and cables
Details
       

 08-09-2023
6.00
Brake line install
Details
       

 08-02-2023
8.00
Pushrod assembly
Details
       

 07-31-2023
1.00
Fuel management system inpection
Details
     

 07-30-2023
5.00
Center Console installation
Details
     

 07-29-2023
4.00
Center Console
Details
       

 07-26-2023
3.00
General maintenance and cleaning
Details

 07-13-2023
4.00
Seal rivets
Details
       

 07-12-2023
3.00
Heater assembly
Details
       

 07-10-2023
1.00
Heater vent channel seal
Details
     

 07-07-2023
7.00
Seat assembly back
Details
       

 07-06-2023
5.00
Front seat assembly
Details
       

 07-05-2023
4.00
Heater channels seal
Details
       

 07-04-2023
2.00
Undercarriage skin install
Details
     

 07-03-2023
4.00
Cabin Heater installation
Details
       

 07-02-2023
6.00
Assemble center console controls
Details
       

 07-01-2023
1.00
Install Seatbelt bracket - front
Details
     

 07-01-2023
5.00
Install cabin heater pump
Details
       

 06-28-2023
4.00
Installed the cowling fastening bracket
Details
       

 06-28-2023
3.00
Battery and brake fluid holding bracket
Details
       

 06-28-2023
5.00
Aludyne Fusellage parts
Details
     

 06-27-2023
5.00
Aludyne Fusellage parts
Details
     

 06-23-2023
8.00
Flap motor
Details
     

 06-19-2023
1.00
Underside Rivets
Details

 06-16-2023
2.00
Wing tip - left wing
Details
     

 06-16-2023
3.00
left wing aileron and flap assembly
Details
       

 06-14-2023
3.00
Attach Wing tips - Right wing
Details
       

 06-14-2023
2.00
Aileron assembly
Details
     

 06-14-2023
3.00
Aileron and flap attachment to the wing
Details
       

 06-11-2023
3.00
Rudder pedal assembly
Details
     

 06-11-2023
4.00
Flaps and elevator control assembly
Details
       

 06-11-2023
1.00
Flap brackets
Details

 06-10-2023
2.50
Wings - assembly of inspection hatches
Details
     

 06-10-2023
2.50
Fuselage - Rudder cable brackets
Details
     

 06-10-2023
1.50
Fuselage - Rear seat stops
Details
     

 06-10-2023
0.50
Fuselage - Fitting baggage lock
Details
     

 06-09-2023
2.00
Project preparation
Details
     

 06-07-2023
3.00
Install Control sticks
Details
       

 06-04-2023
4.00
Fuel tank installation - left wing
Details
       

 06-03-2023
3.00
Flap assembly - finalization
Details
       

 05-27-2023
4.00
Wing parts - unwrap and stock take
Details
       

 05-27-2023
5.00
Aileron and flaps - unwrap parts
Details
     

 05-27-2023
3.00
Aileron and Flap parts - Aludyne
Details
       

 05-22-2023
5.00
Elevator skin
Details
       

 05-20-2023
4.00
Vertical Stabilizer skin
Details
       

 05-20-2023
3.00
Rudder strucutre assembly
Details
     

 05-20-2023
2.00
Inspection by AMO
Details

 05-19-2023
2.00
Vertical stabilizer structure complete
Details
     

 05-18-2023
6.00
Vertical Stabilizer structure assembly
Details
       

 05-17-2023
6.00
Elevator structure assembly
Details
       

 05-15-2023
4.00
Horizontal stabilizer skin
Details
       

 05-15-2023
2.00
Horizontal stabilizer assembly
Details

 05-14-2023
8.00
Assemble horizontal stabilizer
Details
       

 05-12-2023
2.00
Sorting and preparing
Details
     

 05-10-2023
4.00
Aludyning and preparing
Details
       

 05-10-2023
4.00
aludyning and preparing
Details
       

 05-09-2023
2.00
Remove last film from Empennage parts
Details

 05-08-2023
3.00
Removing film
Details

 05-08-2023
6.00
Preparing parts for aludyning
Details
       

 05-08-2023
2.00
Prepare parts for aludyne
Details
     

 05-07-2023
5.00
Undercarriage assembly
Details
       

 05-07-2023
5.00
Install front wheel
Details
       

 05-06-2023
8.00
landing gear assembly
Details
       

 05-06-2023
8.00
Aludyne parts
Details
       

 05-05-2023
2.00
Front Wheel Assembly
Details
       

 05-03-2023
6.00
Building support frames
Details

 04-26-2023
3.00
unload boxes, check manuals and inventory
Details
       

 04-26-2023
0.00
Fetched quickbuild kit from TAF (SLING)
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.