Date
|
Hours
|
Work Log Summary
|
Details
|
02-04-2023
|
2.00
|
Windshield install
|
Details
|
|
|
02-04-2023
|
0.30
|
Install aircraft data plate
|
Details
|
|
|
02-04-2023
|
1.00
|
Hand held radio mount.
|
Details
|
|
|
01-29-2023
|
4.50
|
Wing Jury Struts
|
Details
|
|
|
01-29-2023
|
1.50
|
Installed tip windshield/ wing center fairing.
|
Details
|
|
|
01-28-2023
|
2.60
|
Final flap installation
|
Details
|
|
|
01-22-2023
|
1.00
|
flap and jury struts
|
Details
|
|
|
01-22-2023
|
1.60
|
Connect ailerons
|
Details
|
|
|
01-22-2023
|
2.00
|
Completed nav/strobe installation.
|
Details
|
|
|
01-21-2023
|
1.50
|
Bolted wings on
|
Details
|
|
|
01-20-2023
|
1.00
|
Installed hour meter.
|
Details
|
|
|
01-15-2023
|
6.20
|
Trim Paint
|
Details
|
|
|
01-14-2023
|
1.50
|
Engine break in.
|
Details
|
|
|
01-09-2023
|
4.00
|
Painted white base coat.
|
Details
|
|
|
01-08-2023
|
1.00
|
Tightened fabric to eliminate any wrinkles.
|
|
|
|
01-08-2023
|
6.20
|
Installed seam tape, fuselage.
|
Details
|
|
|
01-07-2023
|
8.20
|
Covered fuselage.
|
Details
|
|
|
12-30-2022
|
2.20
|
Install differential wheel brake system.
|
Details
|
|
|
12-28-2022
|
2.50
|
Began covering fuselage.
|
Details
|
|
|
12-27-2022
|
2.50
|
Fabricated and installed pitot tube.
|
Details
|
|
|
12-24-2022
|
2.20
|
Installed strobe driver box.
|
Details
|
|
|
12-18-2022
|
0.75
|
Sanded Fiberglass components
|
Details
|
|
|
12-14-2022
|
6.40
|
Fabricated and installed electric elevator trim sy
|
Details
|
|
|
12-11-2022
|
2.60
|
Fuel system
|
Details
|
|
|
12-10-2022
|
1.30
|
Installed forward nose cone and fabric formers
|
Details
|
|
|
12-03-2022
|
4.30
|
fabricated side access panels to rear area
|
Details
|
|
|
11-27-2022
|
3.00
|
Wiring tidy up
|
Details
|
|
|
11-26-2022
|
4.20
|
More wiring
|
Details
|
|
|
11-24-2022
|
1.20
|
Install ELT
|
Details
|
|
|
11-20-2022
|
5.20
|
Installed wiring
|
Details
|
|
|
11-20-2022
|
6.80
|
Fabricate battery tray
|
Details
|
|
|
11-19-2022
|
1.20
|
Changed thrust line upward per mfg recomendations
|
Details
|
|
|
11-13-2022
|
3.30
|
Installed instruments switches and circuit breaker
|
Details
|
|
|
11-10-2022
|
4.20
|
Constructed Instrument panel
|
Details
|
|
|
11-05-2022
|
2.30
|
Install Voltage regulator and starter relay
|
Details
|
|
|
11-04-2022
|
1.40
|
Adjusted throttle cables
|
Details
|
|
|
11-01-2022
|
0.50
|
Installed nose gear assembly
|
Details
|
|
|
10-26-2022
|
1.20
|
Set up Rudder and Elevators in neutral position
|
Details
|
|
|
10-24-2022
|
0.50
|
Install rony brackets and vertical stabilizers
|
Details
|
|
|
10-23-2022
|
4.50
|
Install rotating beacon cover vertical fin.
|
Details
|
|
|
10-11-2022
|
1.00
|
Install Radiators and hoses, engine sensors, and e
|
Details
|
|
|
10-11-2022
|
1.60
|
Install engine to root tube
|
|
|
|
10-10-2022
|
2.50
|
Unboxed Engine and installed starter and gearbox
|
|
|
|
10-10-2022
|
4.20
|
Mounted engine.
|
Details
|
|
|
10-08-2022
|
1.10
|
Mounted front and rear seat harnesses
|
Details
|
|
|
10-02-2022
|
2.60
|
Install front and rear throttle levers.
|
Details
|
|
|
09-30-2022
|
2.20
|
Rear pushrod covers.
|
Details
|
|
|
09-30-2022
|
2.30
|
main landing gear
|
Details
|
|
|
09-30-2022
|
2.60
|
Landing Gear
|
Details
|
|
|
09-27-2022
|
2.00
|
Motor mount, wing mount brackets, flap motor
|
Details
|
|
|
09-26-2022
|
3.20
|
Installed fuel gauge
|
Details
|
|
|
09-24-2022
|
2.50
|
Installed Rudder pushrods and nose steering pushro
|
Details
|
|
|
09-22-2022
|
2.50
|
Install main landing gear legs.
|
Details
|
|
|
08-18-2022
|
1.00
|
Connect upper aileron belcrank to pushrods.
|
Details
|
|
|
08-16-2022
|
3.50
|
Vertical fin finish
|
Details
|
|
|
08-15-2022
|
0.50
|
Installed vertical fin.
|
Details
|
|
|
08-15-2022
|
1.00
|
installed belcranks for elevator pushrods.
|
Details
|
|
|
07-29-2022
|
1.00
|
Installed carburetors
|
Details
|
|
|
07-23-2022
|
2.50
|
Prepared engine for installation
|
Details
|
|
|
07-18-2022
|
2.00
|
painted stripes
|
Details
|
|
|
07-09-2022
|
2.50
|
Painted RH aileron fairing, bolted aileron on
|
Details
|
|
|
07-08-2022
|
2.30
|
Sanded and paint LH wing fairing, construct RH win
|
Details
|
|
|
07-07-2022
|
2.00
|
Permanently fixed aileron fairing in place left wi
|
Details
|
|
|
07-04-2022
|
4.30
|
Fabricated new fairings for aileron push tube exit
|
Details
|
|
|
07-03-2022
|
3.25
|
re- cut aileron push tube exit holes
|
Details
|
|
|
07-02-2022
|
2.50
|
Remove old Aileron push tube fairings.
|
Details
|
|
|
06-28-2022
|
1.00
|
Paint RH wing
|
Details
|
|
|
06-26-2022
|
4.00
|
Paint RH wing
|
Details
|
|
|
06-22-2022
|
2.00
|
Painted on RH wing
|
Details
|
|
|
06-19-2022
|
2.50
|
Attach Control Surfaces LH wing
|
Details
|
|
|
06-18-2022
|
6.00
|
Painted on LH wing
|
Details
|
|
|
06-02-2022
|
2.25
|
Finish seam tapes left wing
|
Details
|
|
|
06-01-2022
|
2.00
|
Beginning leading and trailing edge seam tape
|
Details
|
|
|
05-29-2022
|
2.50
|
Install seam tape to top rib surfaces
|
Details
|
|
|
05-28-2022
|
2.80
|
Rivets in top of left wing
|
Details
|
|
|
05-27-2022
|
2.50
|
Sealing upper covering on left wing
|
Details
|
|
|
05-25-2022
|
1.00
|
worked on sealing left wing lower covering
|
Details
|
|
|
05-24-2022
|
1.00
|
left wing lower covering
|
Details
|
|
|
05-22-2022
|
1.75
|
continuing left wing covering
|
|
|
|
05-21-2022
|
2.00
|
starting left wing lower surface cover
|
Details
|
|
|
05-20-2022
|
2.50
|
sealing up right wing edges
|
Details
|
|
|
05-18-2022
|
1.00
|
Installed seam tape right wing tip
|
Details
|
|
|
05-17-2022
|
4.50
|
Install 2 inch seam tape on top ribs right wing
|
Details
|
|
|
05-16-2022
|
4.50
|
Right wing work
|
Details
|
|
|
05-15-2022
|
5.50
|
Right wing work
|
Details
|
|
|
05-14-2022
|
2.50
|
Install anti-chafe tape flaps and ailerons.
|
Details
|
|
|
05-14-2022
|
5.25
|
Covering left wing bottom
|
Details
|
|
|
05-13-2022
|
3.00
|
Connect pushrods and install strobe wire
|
Details
|
|
|
05-12-2022
|
1.00
|
constructed long aileron pushrods
|
Details
|
|
|
05-11-2022
|
2.00
|
Wing aileron bellcranks
|
Details
|
|
|
05-09-2022
|
1.50
|
left wing bottom anti-chafe tape
|
Details
|
|
|
05-08-2022
|
1.50
|
wing anti-chafe tape
|
Details
|
|
|
05-07-2022
|
4.50
|
left wing ribs and supports
|
Details
|
|
|
05-06-2022
|
2.25
|
Installed root ribs and sheet aluminum on left win
|
|
|
|
05-05-2022
|
1.00
|
Installed front and rear spar transition
|
Details
|
|
|
05-04-2022
|
1.00
|
Installed right wing nutplates
|
Details
|
|
|
05-03-2022
|
4.20
|
Installed wing ribs right wing
|
Details
|
|
|
05-02-2022
|
3.00
|
Install root ribs and sheet metal
|
Details
|
|
|
04-26-2022
|
1.50
|
Install control horns, and hinges
|
Details
|
|
|
04-24-2022
|
2.00
|
Paint Horizontal stab, elevators, rudder
|
Details
|
|
|
04-23-2022
|
1.00
|
Second paint coat on empennage
|
Details
|
|
|
04-21-2022
|
1.00
|
Paint Horizontal stab, elevators, rudder
|
Details
|
|
|
04-20-2022
|
2.00
|
Painting Horizontal Stabilizer and control surface
|
Details
|
|
|
04-19-2022
|
1.50
|
Completion of 3 inch Seam Tape
|
Details
|
|
|
04-17-2022
|
3.25
|
Application of Seam Tape
|
Details
|
|
|
04-16-2022
|
5.75
|
Applied seam tape to tail surfaces
|
Details
|
|
|
04-15-2022
|
1.00
|
Completely worked out air bubbles and wrinkles
|
Details
|
|
|
04-14-2022
|
1.00
|
Worked imperfections out of fabric Empennage
|
Details
|
|
|
04-13-2022
|
3.25
|
Covered top sides of Horizontal, Elevator, rudder
|
Details
|
|
|
04-12-2022
|
4.00
|
Began covering with Superflite cloth
|
Details
|
|
|
04-11-2022
|
2.25
|
Install hinge nutplates and anti-chaf tape
|
Details
|
|