KitLog pro

Powered By Kitlog Pro v2.0

Zenith 601 HDS N219BD
Work Logs Found: 117
Category Work Time: 471 Hours
 Date
Hours
Work Log Summary

Details

 04-18-2024
2.50
Removed and installed new headphone jacks
Details

 04-17-2024
2.00
Insalled new pitot/static lines
Details
       

 04-04-2024
7.50
Fabricated a switch panel
Details
       

 02-02-2024
5.00
Installed and balanced engine and mount.
Details
       

 01-26-2024
10.00
Reassembled Inspected Viking 110 Engine
Details
       

 01-05-2024
10.00
Engine teardown and inspection
Details
       

 12-31-2023
3.50
Purchased new engine core
Details
     

 11-15-2023
1.00
Compression tested engine
Details
       

 11-11-2023
4.00
Engine electrical wires traced for GRT 6000
Details
       

 10-27-2023
3.00
Oil Inlet Air Vent Added to Cowling
Details
       

 10-11-2023
4.00
Added hinges to the Cowling
Details
       

 10-10-2023
10.00
Fitting & Shaping Cowling
Details
       

 09-20-2023
1.00
Drilled firewall passthru for engine harness
Details
       

 09-07-2023
1.50
Added bolster to mini fuel tank
Details
       

 09-06-2023
16.00
Fabricated a battery access for the avionics bay c
Details
       

 08-28-2023
2.50
Fabricated L angles as the back stop for the new 1
Details
     

 08-26-2023
2.00
Installed Left Fuel sender
Details
       

 08-21-2023
6.00
Installed the main engine electrical
Details
       

 08-14-2023
2.00
Traced engine harness lines
Details
       

 08-05-2023
2.00
Fabricated two 3/8" hard fuel lines
Details
       

 08-04-2023
2.00
Installed weatherproof 12 pin electrical connector
Details
     

 08-04-2023
0.50
Installed new pitot and static PEX lines
Details
     

 08-04-2023
5.00
Closed wing after installing 10 gal tank
Details
       

 08-03-2023
0.50
Installed -6 braded fuel line to wing tank
Details
     

 08-02-2023
2.00
Fabricated a new Plexiglass light cover
Details
       

 08-01-2023
1.00
Replaced landing and taxi lights
Details
       

 07-31-2023
3.00
Prepared Left 10 gal Wing Tank for installation
Details
       

 07-27-2023
2.50
Opened wing to install L 10 gal Wing Tank
Details
       

 07-26-2023
1.00
Removed existing Left WIng Locker tank
Details
       

 07-16-2023
5.00
Re-made Engine electrical panel
Details
       

 07-15-2023
2.00
Attached Engine and Mount
Details
       

 07-11-2023
5.50
Painted the wing after a small amount of filler wo
Details
       

 07-06-2023
4.00
Tested right wing tank sender and gauge
Details
       

 07-03-2023
4.00
Installed fuel sender
       

 06-29-2023
1.00
Corked 10 gal fuel tanks
Details
       

 06-28-2023
26.00
Installed new 10 gal wing tanks & removed wing loc
Details
       

 06-09-2023
4.00
Installed high pressure fuel lines
Details
       

 06-07-2023
2.00
Coolant lines (moved and replaced)
Details
       

 06-05-2023
2.00
Reconfingured Firewall
Details
       

 06-05-2023
0.25
Oil Filter
Details
     

 06-05-2023
2.00
Center console
Details
       

 06-04-2023
1.50
Ran fuel lines to mini header tank
Details
       

 06-03-2023
2.50
Gearbox removal/update and installation
Details
       

 06-02-2023
4.50
Installed header fuel tank
Details
       

 06-02-2023
0.25
Air Filter
Details
     

 06-02-2023
4.50

Details
       

 05-30-2023
1.00
Ran shielded wires to the headset jacks.
Details
       

 04-26-2023
0.25
Test fit and loosly installed new Lemke seats
Details
       

 04-25-2023
1.00
Romoved blades from Warp Drive 3 bladed prop
Details
       

 04-22-2023
1.00
Unloaded Viking 110 HP
Details
       

 04-22-2023
1.00
Cleaned the Viking 110 HP Engine
Details
       

 04-18-2023
2.00
Removed Corvair 120 HP
Details
       

 04-12-2023
1.00
Removed MGL A16/V16
Details

 03-31-2023
1.00
Tested wing and panel lights
Details
       

 03-31-2023
4.00
Finished switch sub panel
Details
       

 03-28-2023
1.50
Trial install of AV-20E.
Details
       

 03-28-2023
5.00
Final Avionics Placements and Bolt down
Details
       

 03-26-2023
3.50
Tested avionincs
Details

 03-26-2023
1.50
MAJOR SET-BACK - Trial fit of Azalea Aviation Exha
Details
       

 03-22-2023
1.45
Mounted fuel pumps and electrical
Details
       

 03-22-2023
3.50
Installed coil electrical wires to + battery
Details
       

 03-22-2023
0.50
Changed battery to ground negative (-) wire from 4
Details
     

 03-21-2023
5.00
Installed and tested TCW IBBS battery
Details

 03-20-2023
3.50
Fabricated opening in avionics tray
Details
       

 03-18-2023
2.50
Worked on the starter power lines and test
Details
       

 03-18-2023
5.00
Added Essential Bus Relay + Tested
Details
       

 03-17-2023
4.50
Spent the day checking circuits and reviewing sche
Details
       

 03-16-2023
1.00
Continued labeling circuits.
Details
     

 03-14-2023
4.00
Completed Crowbar (40A) install.
Details
       

 03-13-2023
2.50
Installed ANL 40A in line circuit breaker
Details
     

 03-12-2023
1.00
Fabricated Crowbar electrical device stand/holder
Details
       

 03-12-2023
5.00
Continued working on aircraft electrical
Details
       

 03-11-2023
8.00
Installed Primary Power Circuit
Details
       

 03-09-2023
1.50
Spent time planning tasks and parts
Details
     

 03-07-2023
2.00
Pre-oiled engine and fogged
Details
     

 03-06-2023
4.50
planning the electrical layout
Details
       

 03-04-2023
6.00
Installed BRS chute harnesses
Details
       

 03-01-2023
2.00
Reinstall turtle deck cover
Details
       

 02-28-2023
2.00
Blind drilled baggage compartment cover
Details
       

 02-26-2023
8.00
BRS Rocket installation
Details
       

 02-24-2023
4.00
Fabricated fuel lines for fuel selector forward
Details
       

 02-24-2023
2.50
Fabricated fuel filter bracket
Details
       

 02-21-2023
6.00
Fabricated Avionics Tray
Details
       

 02-17-2023
8.00
Painted and Installed Center Console and Instrume
Details
     

 02-16-2023
24.00
Fabricated new center console
Details
       

 02-15-2023
2.00
Adding new Mil Spec wiring for Voltage Regulator
Details
       

 02-10-2023
4.00
Fabricated oil lines to remote MSD mount
Details
       

 02-08-2023
5.00
Installed remote oil filter MSD mount
Details
       

 01-30-2023
2.00
Painted rudder pedals
Details
       

 01-23-2023
8.00
Installed Zenair Nose Gear Rod Covers
Details
       

 01-22-2023
1.50
Fabricated new coil wire
Details
       

 01-21-2023
3.50
Installed Rocket Emergency Activation Handle
Details
       

 01-20-2023
4.50
Installed Corvair 120 HP flight conversion engine
Details
       

 01-17-2023
3.00
Installed pass-through and dual coils
Details
       

 01-12-2023
1.50
Cut hole in baggage deck for BRS rocket
Details
     

 01-03-2023
1.50
Firewall upgrades (intumecent paint)
Details
       

 12-12-2022
6.00
Removed and repainted nose gear
Details
       

 11-21-2022
1.00
Tested Viking 110 (original)
Details
       

 11-21-2022
14.00
Add rear BRS 1350 chute harness brackets
Details
       

 11-18-2022
8.00
Installed rear BRS 1350 harness brackets
Details
       

 11-11-2022
1.50
Removed VOR / NAV antenna
Details
       

 11-10-2022
14.50
BRS Chute front harness brackets
Details
       

 11-03-2022
24.00
Fabricated and installed new Instrument Panel
Details
       

 10-25-2022
2.00
Removed electrical panel "brow"
Details
     

 10-21-2022
8.00
Remove and organize wiring
Details
       

 10-19-2022
4.00
Remove Header Fuel Tank
Details
       

 10-18-2022
4.50
Remove upper and lower motor mount brackets
Details
       

 10-12-2022
2.50
Remove baggage compartment top skin.
Details
       

 08-17-2022
2.50
Rudder pedal steering rods and Nyloil lower bearin
Details
     

 08-15-2022
4.00
Installed NyLoil lower nose gear bushing
Details
       

 08-04-2022
4.00
The Viking "Steel Bungee" Shock
Details
       

 08-04-2022
2.00
6B8-6 UPPER BEARING (75F9-6, C75F9-6
Details
       

 07-06-2022
2.00
ELT
Details
       

 07-05-2022
2.00
Removed 6 pack
Details
       

 07-03-2022
1.00
Removed GRT EIS 4000
Details
       

 06-30-2022
1.00
Weather strip / canopy trim
Details
       

 05-27-2022
0.75
Fogged/Sprayed entire inner fuselage with CORROSIO
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.