KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
Work Logs Found: 248
Category Work Time: 688 Hours
 Date
Hours
Work Log Summary

Details

 09-23-2024
1.00
Tested Wing Lights From the Wing Root Connector
Details
       

 09-23-2024
0.00
Tested Wing Lights From the Wing Root Connector
Details
       

 09-23-2024
0.00
Tested Wing Lights From the Wing Root Connector
Details
       

 09-23-2024
0.00
Tested Wing Lights From the Wing Root Connector
Details
       

 09-23-2024
3.00
Finished Left Wing Landing Light Installation
Details

 09-22-2024
1.50
Started Installation of the Left Landing Light
Details

 09-20-2024
1.00
Finished Right Landing Light Installation
Details
       

 09-19-2024
1.50
Started installing the Right mounting plate
Details

 09-18-2024
3.00
Fit Right Wing Landing Light Mounting Plate
Details
       

 09-17-2024
4.00
Fabricated Landing Lights Adjustable Mounting Plat
Details
       

 09-17-2024
0.00
Fabricated Landing Lights Adjustable Mounting Plat
Details
       

 09-15-2024
1.00
Wired the Bob Archer VOR/ILS Antenna
Details
       

 09-15-2024
1.50
Installed the Right Wing FlyLED Position/Strobe Li
Details
     

 09-15-2024
3.00
Completed FlyLED 7-Star Landing/Taxi Lights
Details
       

 09-13-2024
4.00
Right Wing Tip Position and Strobe Installation
Details
       

 09-13-2024
1.00
Made Wiring Loom to Connect Tip Lights to Harness
Details
     

 09-12-2024
4.00
Left Wing Tip Position and Strobe Installation
Details
       

 09-12-2024
0.00
Left Wing Tip Position and Strobe Installation
Details
       

 08-23-2024
3.00
Soldered Strobe LEDs to Wing Tip PCBs
Details
       

 08-09-2024
3.00
Installed the Nutplates in the Right Wing Tip Fair
Details

 08-08-2024
1.50
Mounted Bob Archer VOR/ILS Antenna
Details
       

 08-07-2024
2.00
Drilled and Countersunk Left Tip Top Nutplate Hole
Details

 08-06-2024
2.00
Drilled and Countersunk Left Tip Bottom Nutplate H
Details
     

 08-01-2024
1.00
Riveted the Left Wing Tip Aft Rib in Place
Details
       

 07-15-2024
1.50
Riveted the Nutplates to the Left Wing Tip
Details
       

 07-10-2024
3.50
Drilled Wing Skins Holes to #27 and Dimpled
Details
       

 07-09-2024
3.00
Finished Fitting Lens to Right Wing Tip
Details
       

 07-08-2024
1.50
Continued Fitting the Right Wing Tip Lens
Details
       

 07-06-2024
2.50
Trimmed Right Wing Tip to Fit Wing
Details
       

 07-04-2024
4.00
Trimmed and Installed the Left Wing Tip Lens
Details
       

 06-29-2024
2.00
Marked the Left Wing Tip for Trimming
Details

 06-19-2024
4.00
Repositioned the spar gap seal stiffeners
Details
     

 06-18-2024
1.50
Installed the Ailerons on the Wings
Details
     

 06-11-2024
5.00
Fabricated the Right Fwd/Aft Torque Tube Assembly
Details
       

 06-10-2024
2.00
Attached Push/Pull Torque Tube to Aileron Bellcran
Details
       

 06-09-2024
2.00
Installed Left Wing Fwd and Aft Torque Tube Assemb
Details
       

 06-05-2024
2.00
Repair Welded Aileron Torque Tubes
Details
     

 06-02-2024
1.50
Drilled the Aileron Push Tubes to Threaded Ends
Details

 05-30-2024
1.50
Added Rodbearing Ends to Push/Pull Tubes
Details
       

 05-20-2024
1.00
Applied Yellow Paint to Exterior of Push/Pull Tube
Details
       

 05-19-2024
4.00
Fabricated Aileron Push Pull Tubes
Details
       

 05-15-2024
0.00
Finishing Kit Inventoried
Details

 03-22-2024
2.00
Double Riveted the Aft Edges of Both Ailerons
Details

 03-09-2024
6.00
Finished Assembly of the Left Aileron Except Aft E
Details

 03-06-2024
1.00
Removed the Aieron Twist in the Left
Details

 03-03-2024
8.00
Riveted the Right Aileron Bottom Skin to Spar
Details
     

 02-29-2024
2.00
Attached the Left Trailing Edge to the Aileron Ski
Details
     

 02-27-2024
8.00
Finished Riveting the Left Aileron Except Aft Edge
Details
       

 02-17-2024
4.00
Dimpled Aileron Skins and Framework Parts
Details

 02-16-2024
8.00
Primed Aileron Interior Parts
Details
       

 02-15-2024
3.00
Cut, Ground, and Deburred Aileron Stiffeners
Details
     

 02-14-2024
7.00
Drilled the Aileron Counterweights
Details
       

 02-13-2024
8.00
Riveted Aileron Rib Sub-assembles
Details
       

 02-12-2024
4.00
Assembled Both Ailerons' Ribs
Details
     

 02-11-2024
0.50
Separated A-1005/1006/1007/1008 Sub-parts
Details
     

 02-06-2024
4.00
Finished Assembly of the Flaps
Details
       

 01-17-2024
2.00
Installation of the Flap Trailing Edge Wedge-Redo
Details

 01-14-2024
4.00
Clecoed the Flaps Trailing Edge Wedges in Place
Details
       

 01-13-2024
4.00
Blind Riveted the Flaps Nose Skins to the Nose Rib
Details
       

 01-03-2024
4.00
Riveted the Flaps Top Slins and Nose Skin to Spar
Details
       

 01-02-2024
0.00
Routered a Channel for a 6' Cold Rolled Steel Bar
Details
       

 01-01-2024
1.50
Riveted the FlapsTop Skinsto the Ribs
Details
       

 12-26-2023
1.00
Riveted Flap Top Skins to the Ribs
Details
       

 12-22-2023
3.00
Riveted the FlapTop and Nose Skins to the Spar
Details
       

 12-21-2023
5.00
Riveted the Ribs and Hinges to the Flap Spars
Details
       

 12-21-2023
1.50
Clecoed FlapTop Skins and Nose Skins
Details
       

 12-20-2023
6.00
Riveted Flap Hinges and Inboard Nose Ribs
Details
       

 12-20-2023
0.00
Pressed in the wing flap brass hinge bushings.
Details
       

 12-10-2023
2.00
Scuffed Flaps Nose Skins and Flap Skins
Details
       

 12-09-2023
8.00
Scuffed Right Flap Frame Parts with Eko Etch
Details
     

 12-08-2023
4.00
Scuffed Left Flap Frame Parts woth Eko Etch
Details

 12-07-2023
0.00
Built a Spray Table for Spraying Primer on Parts
Details
       

 11-29-2023
4.00
Scuffed and Dimpled All Parts of the Right Flap
Details
       

 11-23-2023
1.00
Deburred the Insides of the Right Flap Skins
Details

 11-17-2023
2.50
Finished Dimpling the Left Flap Frame Attachments
Details
     

 11-16-2023
1.25
Dimpled Left Flap Frame Parts
Details
     

 11-13-2023
4.00
Countersunk the Flap Hinge Pairs' Match Drill Hole
Details
       

 11-10-2023
4.00
Assembled the Right Flap
Details
     

 11-08-2023
3.00
Coutersunk Both Sides of the Aft Flap Skin Wedges
Details
       

 11-07-2023
10.00
Assembled the Left Flap
Details
       

 11-07-2023
0.00
Assembled Left Flap
Details
       

 11-06-2023
5.00
Assembled Frames for the Right & Left Flaps
Details
       

 10-22-2023
2.00
Deburred Left Flap Spar and FL-1007 L&R Hinges
Details
       

 10-21-2023
8.00
Started Flaps Construction
Details
     

 10-13-2023
0.00
Fuselage Inventory Finished
Details

 10-12-2023
0.00
Fuselage Inventory continues
Details

 10-11-2023
0.00
Fuselage Inventory continues
Details

 10-10-2023
0.00
Fuselage Inventory
Details

 10-09-2023
0.00
Checked Inventory for Laser Cut Parts
Details

 10-06-2023
0.00
Uncrated Fuselage Kit
Details

 09-27-2023
2.50
Finished Closing the Left Wing
Details
       

 09-26-2023
2.00
Left Bottom Skins Riveted Except Overlap
Details
     

 09-22-2023
4.00
Essentially Finished Closing Left Bottom Wing
Details
       

 09-20-2023
3.00
Riveted the Aft 1/2 of Lt Wing Outbd Bottom Skin
Details
     

 09-18-2023
2.00
Riveted Inboard Bottom Skin to the Wing
Details
     

 09-15-2023
1.50
Installed Pitot Mast in Left Wing
Details
       

 09-15-2023
25.00
Installed Nutplates on Inboard edge of Right Wing
Details
       

 09-15-2023
0.50
Drilled Holes and Installed Snap Bushings
Details
       

 09-14-2023
8.00
Finished Attaching the Rt Wing Bottom Wing Skins
Details
     

 09-11-2023
4.00
Riveted the Rt Outboard Bottom Skin Aft Half
Details
       

 09-10-2023
2.00
Riveted Rt Bottom J-box Stiffener-Short to the Ski
Details

 08-25-2023
2.00
Riveted Left Wing Top Row of the Gap Seals
Details
       

 08-07-2023
0.50
Clecoed the Ouboard Bottom Skins to the Wings
Details
       

 08-06-2023
4.00
Riveted the Rt Wing Inbd Bottom Wing Skin
Details
       

 08-05-2023
2.50
Riveted the Aft Half of the Inbd Bottom Wing Skin
Details
     

 08-01-2023
1.00
Secured Wires in the Wngs with Zip Ties
Details

 07-31-2023
3.00
Added An Extra Set of Wiring Holes in Both Wings
Details
       

 07-30-2023
2.00
Attached the AHRS Tray to the Lt J-Stiffener-short
Details
     

 07-29-2023
2.50
Riveted the AHRS Tray Together
Details
       

 07-27-2023
3.00
Riveted the Flaps and Aileron Gap Seals to Wings
Details
       

 07-26-2023
3.00
Wash Primed the Inside of the Lower Skins
Details
       

 07-25-2023
3.00
Dimpled the Lower Skins
Details
       

 07-23-2023
3.00
Taper Filed the Inbd and Outbd Skins Lap Joint
Details
       

 07-23-2023
0.00
Primed Lower Skin Lap Joints
Details
       

 07-22-2023
2.50
Assembled the AHRS Tray Per Instructions
Details

 07-20-2023
1.00
Dimpled the Aileron and Flap Gap Seals
Details

 07-19-2023
0.25
Attached Outboard Left Wing Lights Connector
Details

 06-27-2023
0.00
Modified RV-8 Wing Cradle for the RV-14
Details
     

 06-27-2023
0.00
AntiSpat Drill Press Bead Breaker Works Great
Details
     

 06-18-2023
1.50
Ran the Right Wing Lighting Harness
Details
       

 06-15-2023
2.00
Connected the AP Harness Wires to the Connectors
Details
       

 06-14-2023
2.50
Started the Installation of Wing Wiring Harnesses
Details
       

 05-28-2023
1.00
Finished Fuel Tank Bolts and Screws Installation
Details

 05-27-2023
1.50
Bolted the Right Fuel Tank to the Spar
Details

 05-26-2023
1.50
Bolted the Left Fuel Tank to the Spar
Details

 05-25-2023
3.00
Screwed The Left Fuel Tanks ontoThe Spar
Details
       

 05-17-2023
1.00
Sealed the Leak in the Right Fuel Tank
Details
       

 05-17-2023
0.50
Fuel Tanks Don't Leak!
Details

 05-15-2023
1.00
Repeat Leak Checked the Right Fuel Tank
Details

 05-11-2023
0.50
Leak Tested the Right Fuel Tank
Details

 05-10-2023
2.00
Installed Tank Fittings in Both Fuel Tanks
Details

 05-08-2023
2.50
Attached the Z-Brackets to the Fuel Tanks
Details
       

 05-07-2023
4.00
Attached the Rear Baffle to the Left Tank
Details

 05-06-2023
4.00
Attached Rear Baffle to the Right Fuel Tank
Details
       

 03-14-2023
3.00
Installed the Fuel Level Senders in the Tanks
Details
       

 03-11-2023
1.00
Fitted the Fuel Level Senders to the Tanks
Details

 03-09-2023
0.75
Attached Nutplates to the Inboard Tank Edges
Details

 03-05-2023
3.50
Installed the T-1003B L&R In Fuel Tanks
Details
       

 03-05-2023
0.50
Installed Fuel Vent Lines in the L&R Fuel Tanks
Details
       

 02-24-2023
3.00
Inspected Fuel Tanks for Sealant Coverage
Details

 02-22-2023
1.00
Installed Right Tank Attachment Sub-assembly
Details
     

 02-22-2023
3.00
Installed Outbd Tank Rib and J-Channel Stiffener
Details
       

 02-21-2023
2.00
Installed the 5th Internal Rib of Right Tank
Details
       

 02-21-2023
3.00
Installed the 3rd and 4th Internal Ribs of Rt Tank
Details
       

 02-20-2023
1.50
Installed the 2nd Internal Rib of the Right Tank
Details
       

 02-19-2023
1.50
Installed the Outboard Internal Rib of Left Tank
Details
       

 02-18-2023
8.00
Attached Inbd Fwd Rib and Attachment Bracket
Details
       

 02-07-2023
3.50
Installed the 6th and Outboard Ribs in the Lt Tank
Details
       

 02-06-2023
3.00
Installed the 4th and 5th Left Tank Ribs
Details
       

 02-05-2023
5.00
Installed 2 Ribs in the Left Fuel Tank
Details
       

 02-05-2023
1.50
Finished Riveting the Rt. Leading Edge to Spar
Details
       

 02-02-2023
5.00
Riveted Rt Tank Stiffeners, Fuel Flanges & Drains
Details
       

 02-02-2023
5.00
Riveted Lt Tank Stiffeners, Fuel Flanges & Drains
Details
       

 02-01-2023
6.00
Started Assembly of the Left Fuel Tank
Details
       

 01-30-2023
3.00
Prepared to Start Left Fuel Tank Assembly
Details

 01-26-2023
1.00
Prepared For Sealing the Tanks During Assembly
Details

 01-25-2023
4.00
Dimpled Both Fuel Tank Skins
Details
       

 01-23-2023
3.00
Countersunk Rt Fuel Tank Rear Baffle/Skin
Details
       

 01-22-2023
6.00
Started Re-install of the Rt Leading Edge
Details
       

 01-22-2023
3.00
Started Left Fuel Tank Construction
Details
       

 01-15-2023
2.00
Finished Removing the Right Leading Edge
Details

 01-14-2023
4.00
Fabricated the R & L Tank Attachment Assembly
Details
     

 01-12-2023
3.50
Fabricated the Fuel Tank Z-Brackets
Details
     

 01-11-2023
4.00
Rt LE Second Inbd Rib Not Clearing Spar Bar
Details
       

 01-09-2023
3.00
Fabricated the Fuel Tank Stiffeners
Details
       

 01-07-2023
4.00
Fluted the Fuel Tank Ribs
Details

 01-06-2023
4.00
Installed the Right Leading Edge
Details
       

 01-06-2023
3.00
Fabricated the Right Landing Light Lens
Details
       

 01-05-2023
3.00
Finished Left Wing Landing Light Lens Installation
Details
       

 12-28-2022
4.00
Completed Riveting Lt Leading Edge to the Spar
Details
       

 12-22-2022
5.00
Riveted the Left Leading Edge to the Left Spar
Details
       

 12-20-2022
3.00
Installed the Stall Warning Device in the Left Win
Details
       

 12-20-2022
3.00
Installed Left Spar Outboard Aileron Hinge
Details
       

 12-15-2022
4.00
Finished Riveting Right Leaading Edge Skins
Details
       

 12-14-2022
3.00
Riveted the Top of the Right Leading Edge Skin
Details
       

 12-13-2022
5.00
Finished Riveting Left Leading Edge
Details
       

 12-05-2022
1.00
Riveted VA-195C and W-00017 to Lt Leading Edge
Details
       

 12-04-2022
5.00
Riveted Most of the Left Leading Edge Together
Details
       

 12-03-2022
2.50
Installed Nutplates in Leading Edge Parts
Details
       

 12-01-2022
1.00
Painted Outboard Bay Parts Gloss White
Details
       

 11-23-2022
3.00
Primed All Leading Edge Parts
Details

 11-22-2022
5.00
Scratched Lead Edge Parts For Priming
Details

 11-18-2022
0.50
Deburred/Dimpled VA 195 C & D
Details

 11-15-2022
3.00
Riveted the Rear Spar Row of the Right Top Skins
Details
       

 11-13-2022
3.00
Riveted Top Skns of the Right Wing
Details
       

 11-12-2022
4.00
Assembled the Right Leading Edge
Details
     

 11-11-2022
6.00
Started work on the Left Wing Leading Edge
Details
       

 11-10-2022
3.00
Fluted the W-1008 and W-1009 Leading Edge Ribs
Details
       

 11-09-2022
0.25
Riveted the Left Aileron Outboard Hinge to Rear Sp
Details
     

 11-08-2022
2.00
Finished Empennage Kit Inventory
Details

 11-07-2022
6.00
Empennage Inventory Continues
Details

 11-06-2022
2.00
Unpacked the Empennage Crate/Inventoried Parts
Details

 11-05-2022
4.00
Started Riveting the Right Spar Top Skins
Details
       

 10-25-2022
1.50
Riveted Top Skins Forwardmost Rivets/Empennage Arr
Details
       

 10-24-2022
1.00
Drilled Out Bad Rivets in the Left Wing Top Skins
Details

 10-19-2022
1.50
Riveted the Trailing Edge of the Top Skins
Details
     

 10-03-2022
1.50
Drilled Out Bad Rivets In Left Spar Top Skins
Details

 09-30-2022
1.00
Drilled Out Bad Rivets From the Left Spar Top Skin
Details

 09-28-2022
1.00
Clecoed the Right Spar Top Skins to the Ribs
Details
     

 09-27-2022
7.00
Deburred Right Spar Top Skins
Details
       

 09-21-2022
1.00
Countersunk Common Holes of Inbd Top Skin
Details
       

 09-20-2022
3.50
Completed Right Rear Spar Assembly
Details
       

 09-19-2022
3.50
Riveted Inboard Ribs to the Right Spar
Details
       

 09-18-2022
1.00
Inserted Snap Bushings in the Right Wing Ribs
Details

 09-08-2022
4.00
Riveted Most of the Left Wing top Skins
Details
       

 09-07-2022
2.50
Clecoed Ribs to the Rear Spar/Dimpled Ribs
Details

 08-31-2022
1.50
Clecoed Ribs to the Rear Spar/Dimpled Ribs
Details

 08-30-2022
2.00
Started Riveting the Top Aft Skins to the Left Spa
Details

 08-24-2022
0.00
Built A Table Using Adjustable Saw Horses
Details
       

 08-19-2022
3.00
Attached Left Spar Top Skins to Ribs
Details
     

 08-16-2022
2.50
Primed the Top skins/Doublers/J-Channels
Details
     

 08-12-2022
1.00
Dimpled Top Holes in the Ribs
Details

 08-11-2022
2.00
Dimpled the Top Skins of the Left Wing
Details
     

 08-09-2022
4.00
Thinned Forward Overlap of Top Skins
Details
       

 08-05-2022
7.00
Riveted the rear spar to the left spar rib
Details
       

 08-04-2022
7.00
Riveted All Doublers to the Left Rear Spar
Details
       

 08-03-2022
8.00
Fabricated the outboard aileron hinges.
Details
     

 07-23-2022
0.00
Oshkosh through July 30.

 07-22-2022
0.00
Packed Miss L for Oshkosh

 07-20-2022
2.50
Deburred rear spar and attachments
Details

 07-19-2022
3.00
Attached the Rear Spar to the Left Spar Rib
Details
       

 07-18-2022
4.00
Assembled and Drilled W-1007 C/D/E Doublers for th
Details
       

 07-17-2022
2.00
Riveted the Inboard Aileron Hinges together
Details
       

 07-15-2022
2.50
Assembled SB 16-03-28 for Inboard Aileron Hinge Br
Details

 07-09-2022
3.50
Riveted Ribs to Left Spar
Details
       

 07-08-2022
1.00
Inserted Bolt Hardware into the Ribs of the Left S
Details

 07-07-2022
2.50
Clecoed the Ribs to the Left Spar
Details
     

 07-06-2022
2.00
Riveted the Flap Hinges to the #3 and #8 Ribs
Details
     

 07-05-2022
10.00
Scuffed/Washed/Primed Ribs using SW Wash Primer.
Details
       

 06-24-2022
2.50
Attached Ribs to Left Spar
Details
       

 06-23-2022
1.00
Deburred and Smoothed Left Spar Flap Hinge Bracket
Details
       

 06-21-2022
3.00
Drilled Torque Tube Support and Flap Brackets
Details

 06-19-2022
1.50
Dimpled the lower flanges of the right spar ribs.
Details

 06-17-2022
1.50
Dimpled lower flanges of the left spar ribs.
Details

 06-16-2022
2.50
Deburred the edges of the ribs.
Details

 06-15-2022
4.00
Finished Fluting all ribs.
Details

 06-14-2022
1.00
Fluted W-1010 + 1011 + 1012 Ribs
Details

 06-13-2022
1.00
Separated and Processed W1029 C and W1029D
Details

 06-12-2022
0.00
Constructed a Wing Tank Cradle
Details

 06-10-2022
0.00
Removed the RV-8A Left Fuel Tank from RV-8A
Details

 06-09-2022
10.00
Started/Completed Right Spar Preparation.
Details

 06-06-2022
2.50
Countersunk the #8 Tank Attachment Holes
Details
       

 06-04-2022
3.00
Riveted the nutplates to the left spar flanges per
Details

 06-02-2022
3.00
Match drilled the #40 holes of the spar flanges.
Details
       

 06-01-2022
2.00
Fabricated the J-Channels for the Left Spar
Details
       

 05-31-2022
1.00
Reviewed Plans
Details

 05-30-2022
1.00
Started RV-14A Project
Details
     

 04-14-2022
0.00
Wing Kit Arrives
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.