Powered By Kitlog Pro v2.0
Darrel's Kitfox - SS7
H-5
All
Work Logs Found:
160
Category Work Time:
550 Hours
Date
Hours
Work Log Summary
Details
09-17-2024
6.00
Instrument shelf design and installation
Details
08-12-2024
1.50
Completed fuel tank access panel parts
Details
08-11-2024
1.80
Final cut the fuselage instrument shelf
Details
08-08-2024
3.40
Rough install nose skin
Details
08-07-2024
3.10
Skinned top left wing panel
Details
08-06-2024
5.90
Left wing panel
Details
08-03-2024
4.10
Begin assembly of the left wing panel
Details
08-02-2024
2.30
Completed shelf template
Details
08-01-2024
3.10
Layout transponder install concept
Details
07-30-2024
4.60
Design and prototype the instrument shelf
Details
07-28-2024
2.20
Position the rear spar
Details
07-25-2024
1.90
Installe AoA pick up probe
Details
07-22-2024
4.10
Align aileron bellcrank
Details
07-21-2024
2.80
Install pitot-static tubes
Details
07-19-2024
6.10
A special design and build project
Details
07-15-2024
7.20
Installed C2 bulkhead
Details
07-09-2024
4.40
Move elevator pushrod bulkhead passthru hole
Details
07-04-2024
4.10
Rudder drive and travel set up
Details
07-03-2024
2.00
Fabricated and installed rudder mount brace
Details
07-01-2024
2.90
Fabricated and rough install elevator fences
Details
06-30-2024
1.80
Installed rudder control assemblly
Details
06-29-2024
2.80
Rudder bar push rod assembly
Details
06-24-2024
3.50
Rudder bar assembly
Details
06-17-2024
1.60
Install control stick and aileron belcrank
Details
05-23-2024
4.20
Completed fitting the lower wing skin fit
Details
05-16-2024
2.10
Rough mount lower center wing skins
Details
04-25-2024
4.30
Center wing section installation
Details
04-12-2024
1.10
Sealed rear cockpit bulkhead
Details
04-11-2024
6.10
Install center wing spar
Details
03-31-2024
8.00
Debur center wing panel skin and prime ribs
Details
03-16-2024
2.40
Rough mount control stick assembly
Details
02-28-2024
4.20
Rough install aileron belcranks
Details
02-24-2024
2.30
Machined one aileron bell crank
Details
02-22-2024
8.00
Skinning center wing panel
Details
01-25-2024
3.60
Finished match drilling the bottom skin
Details
01-23-2024
2.60
Began installing the skins on the right side
Details
01-21-2024
2.60
More skin install activity
Details
01-18-2024
3.90
Modified nose ribs
Details
01-17-2024
3.60
Attempt to install the nose skin
Details
01-16-2024
1.10
Installed the rib stiffeners
Details
01-15-2024
2.20
Fabricated rig stiffeners
Details
01-12-2024
3.10
Attempted to install nose ribs and skins
Details
01-08-2024
2.50
Match drilled the center wing section
Details
01-07-2024
1.80
Match drilled the bottom skin
Details
01-06-2024
4.10
Fine tuned the landing gear
Details
01-04-2024
3.00
Assemble landing gear
Details
12-27-2023
1.90
Installed more mouting brackets
Details
12-26-2023
4.00
Finished installing the brackets
Details
12-23-2023
2.90
Begin installing more brackets
Details
12-21-2023
6.10
Lower right spar mounting bracket installation
Details
12-18-2023
8.00
Continued opening the center spar pass thru holes
Details
12-11-2023
2.90
Finished passthrough holes for spar in fuselage
Details
12-10-2023
3.50
Cut out center spar holes in fuselage
Details
12-08-2023
2.30
Received additional parts
Details
12-06-2023
2.30
Add landing load reinforcement to rib
Details
12-05-2023
1.10
Added more ribs on center section
Details
12-03-2023
2.50
Added more ribs on the center wing section
Details
12-02-2023
1.50
Begin rough installation of ribs
Details
11-29-2023
1.50
Finished taper pin hole
Details
10-19-2023
1.00
Primed landing gear
Details
10-16-2023
3.80
Beginning setting wing dihedral
Details
10-06-2023
4.20
Remade the left wing panel spar caps
Details
09-27-2023
0.90
Dihedral validation
Details
09-26-2023
1.90
Spar fitting
Details
09-12-2023
1.80
Installed wing panel mounting tabs
Details
09-07-2023
1.50
Readied right spar for final rivet
Details
09-05-2023
1.10
Primed wing panel spar components
Details
08-31-2023
2.00
Tapered right wing spar cap
Details
08-16-2023
3.60
Begin left panel spar
Details
08-15-2023
6.30
Wing panel attach brackets
Details
08-14-2023
3.50
Started riveting the center panel
Details
08-13-2023
2.00
Installed the wing mounting plates
Details
08-07-2023
5.70
Mounted landing gear
Details
07-20-2023
4.10
Finished drilling holes in center section of wing
Details
07-11-2023
5.10
Finished HT and started the end of the canopy
Details
07-09-2023
1.30
Primed and de-burred HT
Details
07-06-2023
3.10
Final size rivet holes drilled
Details
06-30-2023
2.00
SED issues
Details
06-25-2023
3.00
Set up HS for final riveting
Details
06-24-2023
3.50
Fitted the skins to the HS and fuselage
Details
06-23-2023
1.10
Verified and rough installed HS forward spars
Details
06-22-2023
2.20
Installed HS spar
Details
06-21-2023
2.10
HS spar rough mounted
Details
06-20-2023
4.00
Do over on HT inside ribes
Details
06-03-2023
2.00
Right side canopy fitting work
Details
05-30-2023
2.00
More port side of canopy
Details
05-29-2023
2.00
Restart on canopy
Details
02-26-2023
8.00
Started work on the wing
Details
02-19-2023
1.00
Finished canopy latch
Details
02-04-2023
8.00
Canopy locking mechanism
Details
01-22-2023
4.00
More work on the canopy frame
Details
01-21-2023
5.10
New canopy side rail design and installation
Details
01-20-2023
1.80
More final fitting
Details
01-19-2023
2.50
Rear canopy skin rough install
Details
01-18-2023
3.50
Drilled the canopy to final hole size(s)
Details
01-17-2023
5.00
Begin installation of rear canopy skin
Details
01-15-2023
2.10
Installed the hinge and restraing cable
Details
01-13-2023
3.30
Marked and made first cut to size the canopy
Details
01-11-2023
1.50
Fitted the mid-canopy frame
Details
01-10-2023
8.00
Canopy frame
Details
12-27-2022
4.50
Begin fitting the canopy frame
Details
12-26-2022
1.00
HT Twist issue
Details
12-24-2022
3.20
Finished the Horizontal Stabilizer
Details
12-22-2022
3.70
Rough install the elevator drive weldment assembly
Details
12-20-2022
2.90
Rough install elevators
Details
12-19-2022
1.50
Begin fitting the elevator
Details
12-14-2022
4.10
Intitial assembly right elevator
Details
12-13-2022
4.20
HT riveting completed
Details
12-12-2022
4.70
Primer, fitting and aligning
Details
12-11-2022
4.60
Deburring and more fitting
Details
12-09-2022
3.00
Bracket fabrication
Details
12-06-2022
5.50
Finished rough install of HT skins
Details
12-04-2022
5.30
Began rough fitting the full HT
Details
12-03-2022
4.10
Completed HT spar and rough installed
Details
12-02-2022
2.10
Began fitting HT spar components
Details
12-01-2022
2.00
HT Progress
Details
11-30-2022
3.00
Began work on the horizontal stabilizer
Details
11-29-2022
6.20
Begin Fuse Final Riveting
Details
11-28-2022
4.60
Dorsal fin installation
Details
11-27-2022
5.80
Finish turtle deck and begin dorsal fin
Details
11-26-2022
6.50
Begin turtle deck install
Details
11-25-2022
8.00
Completed (almost) the fuselage
Details
10-29-2022
5.50
More details added on and in the firewall forward
Details
10-18-2022
2.30
Began installing engine box components
Details
10-16-2022
0.75
Finished instalationl of turtledeck bow
Details
10-15-2022
5.10
Turtle deck frame
Details
10-13-2022
2.50
Fuselage - replaced most clecos with final rivets
Details
10-02-2022
5.80
Completed rudder plus more
Details
09-28-2022
2.30
Began assembly of the rudder
Details
09-23-2022
3.00
Completed rough install of the motor box arms
Details
09-22-2022
4.30
Motor box component assembly
Details
09-15-2022
2.00
Rough install of foot rests and floor support angl
Details
09-02-2022
1.50
Completed the seat back
Details
08-30-2022
1.50
Installed the seat bottom support and seat floor
Details
08-21-2022
12.00
Completed the seat back
Details
08-20-2022
1.50
Installed bottom rails
Details
08-12-2022
1.30
Installed bottom rudder rib
Details
08-11-2022
3.10
Began assembling the rudder
Details
08-10-2022
4.00
Installed the firewall
Details
08-09-2022
6.20
Reformed firewall
Details
08-08-2022
3.50
Rudder started
Details
08-07-2022
1.00
Located and begin assemblying firewall
Details
08-06-2022
3.50
Started fitting the next skin section
Details
08-05-2022
2.00
Completed another skin install
Details
07-29-2022
0.50
Assembled a fuselage stand
Details
07-26-2022
7.00
More work fitting the VS skin and install
Details
07-25-2022
6.00
Fitting the VS skin
Details
07-24-2022
3.00
Began installation of bulkhead "C"
Details
07-23-2022
8.00
Completed fuselage aft of "C" bulkhead
Details
07-19-2022
2.00
Finished E bulkhead and fitted skin
Details
07-17-2022
8.00
Finished the main bulkheads
Details
05-08-2022
1.90
Completed tail cone assembly
Details
05-07-2022
2.30
Begin debur, prime and final rivet operation
Details
04-29-2022
2.10
Enlarged rivet holes in tail cone
Details
04-16-2022
3.50
More on tail cone
Details
04-14-2022
2.80
Fitted banjo to tail cone
Details
04-05-2022
1.10
More detail work on VT spar
Details
04-04-2022
1.10
Starting to rivet
Details
04-03-2022
2.00
More spar progress
Details
04-01-2022
2.80
Began assembly of VS main spar
Details
SITE NAVIGATION
Contact Builder
H-5 Home
Category
# Logs
# Hours
All
214
2235
Avionics
2
154
Controls
9
33
Empennage
40
214
Fuselage
51
701
Kitfox Avionics
2
154
Kitfox Undercarriage
3
45
Kitfox wings
49
389
Miscellaneous
6
111
Undercarriage
3
45
Wings
49
389
DEW2 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.