Date
|
Hours
|
Work Log Summary
|
Details
|
11-24-2024
|
1.50
|
Rivnuts & More...
|
Details
|
|
|
11-22-2024
|
2.80
|
Reassembly & Interior Installation...
|
Details
|
|
|
11-19-2024
|
1.50
|
Some Assembly Required....
|
Details
|
|
|
11-15-2024
|
10.00
|
Interior Touch-Up...
|
Details
|
|
|
10-25-2024
|
2.00
|
Pitch Swing, etc.
|
Details
|
|
|
10-18-2024
|
3.00
|
Registration Numbers Applied...
|
Details
|
|
|
10-15-2024
|
2.50
|
Wrapped Up the Venting Installation....
|
Details
|
|
|
10-08-2024
|
3.50
|
Cabin Fresh Air Vents...
|
Details
|
|
|
09-29-2024
|
1.00
|
Breakout Force Reset....
|
Details
|
|
|
09-28-2024
|
2.80
|
Nutplates & Paint Prep...
|
Details
|
|
|
09-22-2024
|
2.50
|
QB Fuselage Production Oversight...
|
Details
|
|
|
09-15-2024
|
4.00
|
New Motor - Same Issue...
|
Details
|
|
|
09-11-2024
|
2.00
|
Miscellaneous Works...
|
Details
|
|
|
09-04-2024
|
1.20
|
Control Sticks...
|
Details
|
|
|
09-03-2024
|
1.30
|
Update to Previous Post...
|
Details
|
|
|
09-02-2024
|
1.50
|
Notches & Calibrations...
|
Details
|
|
|
09-01-2024
|
1.50
|
Flap Motor Box Assembled...
|
Details
|
|
|
08-30-2024
|
3.00
|
It's Nearly a Wrap...
|
Details
|
|
|
08-29-2024
|
3.30
|
It's Frustrating...
|
Details
|
|
|
08-23-2024
|
2.50
|
Replacement of the "Tango Uniform" Flap Motor...
|
Details
|
|
|
08-13-2024
|
1.00
|
Secured Drains Lines...
|
Details
|
|
|
08-11-2024
|
1.50
|
Static Lines & Rudder Gust Lock....
|
Details
|
|
|
08-10-2024
|
2.50
|
Out With the Old...
|
Details
|
|
|
08-07-2024
|
0.80
|
Actuator - Tango Uniform...
|
Details
|
|
|
08-04-2024
|
2.30
|
Repaired Leaks & Re-Bled the Brakes...
|
Details
|
|
|
08-03-2024
|
0.80
|
Two Minor Leaks.., Bummer...
|
Details
|
|
|
08-01-2024
|
1.50
|
Bleed Until You're Stiff...
|
Details
|
|
|
07-31-2024
|
0.80
|
Installation of Fuel Selector Valve's Handle...
|
Details
|
|
|
07-30-2024
|
1.50
|
Sealing the Wall...
|
Details
|
|
|
07-27-2024
|
3.80
|
Glareshield Install + LED Light Strip...
|
Details
|
|
|
07-26-2024
|
2.50
|
Parking Brake Control - Good to Go...
|
Details
|
|
|
07-15-2024
|
1.30
|
Mount w/Indicator Light...
|
Details
|
|
|
07-11-2024
|
2.80
|
Parking Brake Cabling & Mount...
|
Details
|
|
|
07-08-2024
|
0.75
|
Comm 2 Okay, as is G3X Ammeter Indicator...
|
Details
|
|
|
07-06-2024
|
2.00
|
Comm Radios Issue Resolved...
|
Details
|
|
|
07-05-2024
|
0.75
|
3D Printing of a Switch Mounting Assembly, Part Tw
|
Details
|
|
|
06-30-2024
|
2.50
|
3D Printing of a Switch Mounting Assembly
|
Details
|
|
|
05-04-2024
|
2.50
|
Sweet...
|
Details
|
|
|
05-03-2024
|
0.50
|
UPDATE: PFD Configuration Module...
|
Details
|
|
|
05-02-2024
|
4.50
|
Chip Gone Bad Replacement...
|
Details
|
|
|
04-30-2024
|
2.40
|
Magnetometer Calibration, etc...
|
Details
|
|
|
04-28-2024
|
2.80
|
The Beat Goes On...
|
Details
|
|
|
04-19-2024
|
4.80
|
Fairings, Vents, Seals & Seats...
|
Details
|
|
|
04-10-2024
|
4.20
|
The Beat Goes On...
|
Details
|
|
|
04-04-2024
|
2.10
|
Wing Root Fairings...
|
Details
|
|
|
04-01-2024
|
1.80
|
Next...
|
Details
|
|
|
03-31-2024
|
4.00
|
Glare Shield Lighting...
|
Details
|
|
|
03-30-2024
|
3.50
|
Canopy Unlock Warning & Defrost Fans...
|
Details
|
|
|
03-26-2024
|
2.20
|
Strip Lighting...
|
Details
|
|
|
03-25-2024
|
2.30
|
Flat Tire...
|
Details
|
|
|
03-12-2024
|
2.30
|
Seat Back Support Rail & More...
|
Details
|
|
|
03-09-2024
|
1.00
|
Putzing About...
|
Details
|
|
|
03-08-2024
|
3.50
|
Finally...
|
Details
|
|
|
03-07-2024
|
1.00
|
It's a Rap...
|
Details
|
|
|
03-06-2024
|
1.80
|
Almost There...
|
Details
|
|
|
03-05-2024
|
1.80
|
Wrapping Up the Right - Now for the Left Stick...
|
Details
|
|
|
03-04-2024
|
4.30
|
Iteration # 19...
|
Details
|
|
|
03-03-2024
|
6.30
|
Pain in the Butt...
|
Details
|
|
|
03-02-2024
|
3.20
|
Well - That Didn't Work...
|
Details
|
|
|
02-28-2024
|
3.50
|
Redo Days Gone Bye...
|
Details
|
|
|
02-26-2024
|
1.90
|
Something Doesn't Look Quite Right...
|
Details
|
|
|
02-23-2024
|
2.60
|
Finished Seat Heat Wiring...
|
Details
|
|
|
02-21-2024
|
1.40
|
2nd Harness Rework + CROW...
|
Details
|
|
|
02-20-2024
|
2.30
|
Harness Re-Work...
|
Details
|
|
|
02-19-2024
|
0.50
|
Clean-Up...
|
Details
|
|
|
02-18-2024
|
2.30
|
Lets Mix Some Epoxy...
|
Details
|
|
|
02-17-2024
|
3.00
|
Fresh Air Vents Modification...
|
Details
|
|
|
02-16-2024
|
2.80
|
Seat Heat Circuitry...
|
Details
|
|
|
02-14-2024
|
2.80
|
It's a Wrap...
|
Details
|
|
|
02-13-2024
|
2.30
|
The Fix...
|
Details
|
|
|
02-12-2024
|
2.30
|
Wow - That Hurt...
|
Details
|
|
|
02-10-2024
|
6.00
|
Button Switch Gone Bad...
|
Details
|
|
|
02-04-2024
|
2.80
|
Pitot Tube Installation & Captain, We've Got Press
|
Details
|
|
|
02-03-2024
|
7.00
|
Exterior Lighting Wrap-Up...
|
Details
|
|
|
02-01-2024
|
2.50
|
We Have Rotation...
|
Details
|
|
|
01-31-2024
|
1.80
|
Unwrapped Canopy...
|
Details
|
|
|
01-30-2024
|
2.50
|
Landing Light Wing Cavity Covers...
|
Details
|
|
|
01-28-2024
|
5.50
|
Strobe, Position, Taxi & Landing Lights...
|
Details
|
|
|
01-24-2024
|
2.50
|
Flyleds Strobe Controller Wire-Up...
|
Details
|
|
|
01-22-2024
|
3.00
|
Landing & Taxi Lighting Connections...
|
Details
|
|
|
01-16-2024
|
2.30
|
Cold Snap Slow Down....
|
Details
|
|
|
01-12-2024
|
1.50
|
Garmin G3X Update, 9.31...
|
Details
|
|
|
01-09-2024
|
3.00
|
Panel Power-Up...
|
Details
|
|
|
01-04-2024
|
3.00
|
Out with the Old...
|
Details
|
|
|
01-02-2024
|
1.00
|
Sniffle Valve....
|
Details
|
|
|
12-29-2023
|
1.50
|
Fuel Tank to Fuselage Plumbing...
|
Details
|
|
|
12-28-2023
|
17.00
|
Flaps, Ailerons, R&D, etc...
|
Details
|
|
|
12-03-2023
|
1.50
|
Vic - I Believe my Nuts are Tight...
|
Details
|
|
|
11-25-2023
|
3.50
|
Right Wing Flight Controls...
|
Details
|
|
|
11-20-2023
|
5.50
|
Left Wing Flight Controls...
|
Details
|
|
|
11-12-2023
|
3.00
|
Left Wing Installation...
|
Details
|
|
|
11-11-2023
|
2.50
|
Hangar Clean-out & Up...
|
Details
|
|
|
11-10-2023
|
3.50
|
A Rewarding Day...
|
Details
|
|
|
11-09-2023
|
1.50
|
Right Wing Pre-Positioned for Attachment...
|
Details
|
|
|
11-08-2023
|
1.80
|
Wing Spar's Doubler Mis-Alignment....
|
Details
|
|
|
11-05-2023
|
19.00
|
Closing Things Up....
|
Details
|
|
|
10-26-2023
|
3.00
|
Left Wing Access Panel Correction, etc...
|
Details
|
|
|
10-25-2023
|
2.50
|
Wrapped-Up Right Wing Access Panel Work...
|
Details
|
|
|
10-24-2023
|
4.00
|
Ops & Ahhs...
|
Details
|
|
|
10-22-2023
|
10.50
|
Hangar Lighting Rework...
|
Details
|
|
|
10-01-2023
|
3.00
|
Access Cover & Doublers....
|
Details
|
|
|
09-30-2023
|
2.00
|
Right Wing's Bottom Skin Attachment C/W...
|
Details
|
|
|
09-29-2023
|
3.30
|
Right Wing's Optional Third Bay Access Panel...
|
Details
|
|
|
09-28-2023
|
2.50
|
Wing's Third Bay Inward Access Panels...
|
Details
|
|
|
09-26-2023
|
3.80
|
Left Wing Rotisserie Mounts....
|
Details
|
|
|
09-25-2023
|
1.50
|
Rotisserie Height Extension...
|
Details
|
|
|
09-23-2023
|
18.00
|
Attaching Bottom Wing Panels....
|
Details
|
|
|
09-06-2023
|
1.30
|
Wing Rotisserie Complered...
|
Details
|
|
|
08-31-2023
|
3.50
|
Wing Rotisserie - Continued...
|
|
|
|
08-30-2023
|
4.00
|
Rotisserie Stands...
|
Details
|
|
|
08-25-2023
|
1.50
|
Aileron Servo Harness Adjustment...
|
Details
|
|
|
08-15-2023
|
2.50
|
Finished Pitot Tube Installation...
|
Details
|
|
|
08-09-2023
|
2.30
|
Wired the GAP-26 Remote...
|
Details
|
|
|
08-08-2023
|
3.30
|
GAP-26 Pitot Installation...
|
Details
|
|
|
08-06-2023
|
2.30
|
Adjusting the Wing Cradle...
|
Details
|
|
|
08-05-2023
|
2.80
|
Magnetometer's CPC Mounting Bracket...
|
Details
|
|
|
08-03-2023
|
5.50
|
Wing Conduits...
|
Details
|
|
|
07-30-2023
|
1.30
|
Flyled Wing Tip Looms...
|
Details
|
|
|
07-29-2023
|
2.80
|
Primary Alternator Blast Tube installation...
|
Details
|
|
|
07-28-2023
|
3.50
|
It's a Blast...
|
Details
|
|
|
07-23-2023
|
3.00
|
Stall Warning & Aileron Trim Control...
|
Details
|
|
|
07-21-2023
|
1.00
|
Installed Pitot Tube Support Bracket...
|
|
|
|
07-17-2023
|
1.50
|
Fuel Tank Leak Checks C/W...
|
Details
|
|
|
07-15-2023
|
1.50
|
Successful Leak Check of Left Fuel Tank...
|
Details
|
|
|
07-14-2023
|
3.30
|
Fuel Tanks ready for Leak Check...
|
Details
|
|
|
07-12-2023
|
1.50
|
Classic Aero Design Inventory...
|
Details
|
|
|
07-07-2023
|
2.00
|
Wing Back in its Cradle...
|
Details
|
|
|
07-05-2023
|
6.00
|
Fuel Tank & Other Misc. Tasks...
|
Details
|
|
|
06-26-2023
|
2.50
|
Rivets & Nutplates...
|
Details
|
|
|
06-24-2023
|
5.00
|
Back to Work...
|
Details
|
|
|
05-20-2023
|
2.50
|
Left Fuel Tank Repair...
|
Details
|
|
|
05-16-2023
|
1.00
|
Nut Plate Added to Rib...
|
Details
|
|
|
04-28-2023
|
5.50
|
Back to It - Vacation is Over...
|
Details
|
|
|
04-15-2023
|
3.50
|
It's a Wing Ding...
|
Details
|
|
|
04-13-2023
|
3.00
|
Ops.., A Repair is in Order...
|
Details
|
|
|
03-31-2023
|
2.50
|
Bottom Cowling Close Out C/W....
|
Details
|
|
|
03-29-2023
|
1.00
|
Bottom Cowl Close-Out...
|
Details
|
|
|
03-28-2023
|
1.30
|
Re-Work Jack Point Fit...
|
Details
|
|
|
03-23-2023
|
4.00
|
Jack Point Upgrade...
|
Details
|
|
|
03-21-2023
|
2.00
|
Yaw Damper Rigging...
|
Details
|
|
|
03-19-2023
|
3.40
|
Simple Task Gone South...
|
Details
|
|
|
03-17-2023
|
2.50
|
Repair & Routing of Elevator Trim Wiring...
|
Details
|
|
|
03-14-2023
|
4.50
|
Stops Installed...
|
Details
|
|
|
03-03-2023
|
4.50
|
It's Not Van's Fault...
|
Details
|
|
|
02-24-2023
|
3.30
|
Flight Controls Attachment....
|
Details
|
|
|
02-19-2023
|
5.50
|
Vertical & Horizonal....
|
Details
|
|
|
02-13-2023
|
2.30
|
Back to the Assembly...
|
Details
|
|
|
02-10-2023
|
5.00
|
Transport & Setup of Tooling, etc. to/at Hangar
|
Details
|
|
|
02-02-2023
|
3.50
|
After 4 Years, She Has Found Her Way Home...
|
Details
|
|
|
01-31-2023
|
3.50
|
Moving Day Arriving Soon...
|
Details
|
|
|
01-29-2023
|
5.50
|
Rework C/W...
|
Details
|
|
|
01-26-2023
|
7.50
|
Re-Work... It Happens.
|
Details
|
|
|
01-18-2023
|
3.50
|
Prepping for the Move...
|
Details
|
|
|
01-18-2023
|
40.00
|
Moving to KAKR...
|
Details
|
|
|
01-13-2023
|
2.80
|
Magnetometer....
|
Details
|
|
|
01-07-2023
|
0.80
|
Trim & Sand Gear Leg Fairings...
|
Details
|
|
|
01-07-2023
|
1.00
|
Connected VOR Antenna...
|
Details
|
|
|
01-06-2023
|
3.50
|
Gear Leg Fairings...
|
Details
|
|
|
01-05-2023
|
3.00
|
It's Fairing to Say...
|
Details
|
|
|
01-04-2023
|
1.30
|
Back to the Gear Legs Fairings...
|
Details
|
|
|
01-03-2023
|
1.50
|
Magnetometer or Bust...
|
Details
|
|
|
01-02-2023
|
9.00
|
Just About Ready for Power-Up...
|
Details
|
|
|
12-27-2022
|
1.30
|
Brace for It...
|
Details
|
|
|
12-26-2022
|
3.50
|
Completed EMAG Installation...
|
Details
|
|
|
12-23-2022
|
11.50
|
E-Mags Reinstalled, etc.
|
Details
|
|
|
12-14-2022
|
3.50
|
Stuffing, Wrapping & Tying. Season Greetings..!
|
Details
|
|
|
12-12-2022
|
8.50
|
An Inconvenience...
|
Details
|
|
|
12-06-2022
|
4.00
|
More Wire Routing - Getting There...
|
Details
|
|
|
12-04-2022
|
1.30
|
Keyed Switch Added...
|
Details
|
|
|
12-02-2022
|
4.00
|
Hurdle Cleared...
|
Details
|
|
|
12-01-2022
|
1.50
|
8 Gauge Tie-In
|
Details
|
|
|
11-30-2022
|
2.30
|
Tie it Together...
|
Details
|
|
|
11-26-2022
|
3.50
|
Installation of FlyLed's Control Board...
|
|
|
|
11-24-2022
|
11.80
|
It's Not Over - Until It's Over...
|
Details
|
|
|
11-01-2022
|
0.00
|
Blame it on AirVenture 2022...
|
Details
|
|
|
10-30-2022
|
3.20
|
Installation of VOR Antenna in Right Wing Tip.
|
Details
|
|
|
10-26-2022
|
2.20
|
OAT Probe...
|
Details
|
|
|
10-21-2022
|
4.20
|
Antenna Installation Wrap-Up...
|
Details
|
|
|
10-16-2022
|
6.30
|
Antenna Coaxial Cable Runs & Connections...
|
Details
|
|
|
10-12-2022
|
2.50
|
Mating BNC Connectors to RG400 Coax...
|
Details
|
|
|
10-10-2022
|
5.70
|
CHT, EGT, Oil Temperature & Flow Flow Transducer..
|
Details
|
|
|
10-09-2022
|
2.50
|
Plan B - Shrink Wrap Shortage...
|
Details
|
|
|
10-08-2022
|
7.50
|
Panel Organizing & CHT/EGT Probe Wiring...
|
Details
|
|
|
10-02-2022
|
2.50
|
G3X 100-amp Shunt
|
Details
|
|
|
10-01-2022
|
5.80
|
GPS Antenna Installation...
|
Details
|
|
|
09-28-2022
|
2.50
|
Alternate Air Door...
|
Details
|
|
|
09-26-2022
|
3.30
|
Throttle, Mixture Prop...
|
Details
|
|
|
09-25-2022
|
3.80
|
Added Some Colors...
|
Details
|
|
|
09-24-2022
|
2.50
|
Loop It...
|
Details
|
|
|
09-22-2022
|
1.80
|
Antenna Mounting & SteinAir Feedback Update...
|
Details
|
|
|
09-21-2022
|
3.50
|
Moving Forward...
|
Details
|
|
|
09-20-2022
|
0.80
|
Too Much of a Good Thing...
|
Details
|
|
|
09-18-2022
|
8.30
|
It's a Wrap. Well, Not Really...
|
Details
|
|
|
09-15-2022
|
6.80
|
67% There...
|
Details
|
|
|
09-07-2022
|
7.50
|
Stuffing Wires - The Battle Continues...
|
Details
|
|
|
09-02-2022
|
11.00
|
Return To Panel Installation...
|
Details
|
|
|
08-26-2022
|
2.50
|
Control Cable Routing & Connection - Left
|
Details
|
|
|
08-25-2022
|
2.00
|
Control Cable Routing & Connection - Right
|
Details
|
|
|
08-22-2022
|
9.50
|
Wiring Continues...
|
Details
|
|
|
08-12-2022
|
2.20
|
Final.., The Navigator is Fitted...
|
Details
|
|
|
08-09-2022
|
2.30
|
Fitting GTN750Xi's Rack...
|
Details
|
|
|
08-06-2022
|
1.30
|
Garmin's GTN750Xi
|
Details
|
|
|
08-05-2022
|
4.50
|
A Fairly Productive Day...
|
Details
|
|
|
08-04-2022
|
4.00
|
More Remote Installations...
|
Details
|
|
|
08-03-2022
|
3.50
|
Plan C...
|
Details
|
|
|
08-02-2022
|
3.80
|
Back From Vacation - The Assembly Continues...
|
Details
|
|
|
07-23-2022
|
5.50
|
It's Sometimes a Slow Road to Progress...
|
Details
|
|
|
07-13-2022
|
5.30
|
IBBS Installation & Re-Fab of Vertical Mount
|
Details
|
|
|
07-11-2022
|
9.20
|
Remote Box Stack w/Hinge Modification
|
Details
|
|
|
07-06-2022
|
4.50
|
The Beatings Will Continue Until Morale Improves..
|
Details
|
|
|
07-05-2022
|
3.70
|
GTX45, GDL51 & GAD29 Remote Box Works...
|
Details
|
|
|
07-04-2022
|
14.70
|
Fabrication Trials & Errors....
|
Details
|
|
|
06-24-2022
|
8.20
|
Glove Box Hinged Panel Mod
|
Details
|
|
|
06-22-2022
|
14.80
|
Remote Avioic Box Layout
|
Details
|
|
|
06-14-2022
|
4.00
|
Begin Instrument Panel Installation
|
Details
|
|
|
06-13-2022
|
8.50
|
Installation of Parking Brake Valve
|
Details
|
|
|
06-02-2022
|
2.50
|
Brake/Rudder Pedal Assembly Modifiaction #2
|
Details
|
|
|
06-01-2022
|
9.30
|
Nose Gear Pant & Fairing Wrap-Up...
|
Details
|
|
|
05-22-2022
|
2.00
|
Countersink & Rivet Hinge to Nose Gear Fairing
|
|
|
|
05-20-2022
|
5.50
|
Nose Whee Pant & Fairing...
|
Details
|
|
|
05-04-2022
|
2.30
|
Nose Gear Wheel Pant & Fairing
|
Details
|
|
|
04-28-2022
|
3.50
|
Vendor Screws Customer...
|
Details
|
|
|
04-27-2022
|
2.00
|
Phase Inspection #2 - N418BV RV14A
|
Details
|
|
|
04-26-2022
|
2.30
|
Install ELT + Components
|
|
|
|
04-23-2022
|
0.50
|
Stein Air Panel Arrives
|
|
|
|
04-21-2022
|
2.30
|
Installed Steps...
|
Details
|
|
|
04-20-2022
|
5.00
|
Flap Position Sensor Installion - See Notes to Rig
|
Details
|
|
|
04-17-2022
|
4.50
|
Rivet & Countersinking Wrap-Up
|
|
|
|
04-10-2022
|
2.00
|
Countersink & Attach Nose Gear Wheel Pant
|
Details
|
|
|
04-09-2022
|
4.30
|
Final Fit, Riveting & Assembly of Nose Gear Pant
|
|
|
|
04-05-2022
|
1.80
|
Riveted Tug Guards to Nose Gear Wheel Pant
|
Details
|
|
|
04-04-2022
|
2.50
|
Hole Enlargement Day...
|
Details
|
|
|
04-03-2022
|
2.50
|
Continue Tweaking Nose Gear Wheel Pant
|
Details
|
|
|
03-31-2022
|
3.50
|
Wheel Pants Continued - See Details.
|
Details
|
|
|
03-30-2022
|
0.00
|
Stein Air Update - See Details...
|
Details
|
|
|
03-29-2022
|
2.50
|
Extended Nose Notch & Took Aircraft off Jacks
|
|
|
|
03-28-2022
|
3.30
|
Working Nose Gear Pant...
|
Details
|
|
|
03-27-2022
|
4.00
|
Raise Aircraft on Jacks. Work Nose Pant Assembly
|
Details
|
|
|
03-26-2022
|
4.50
|
Jack Aircraft to Level Flight Attiude
|
Details
|
|
|
03-25-2022
|
3.00
|
Work Right & Nose Wheel Pants Alignments.
|
|
|
|
03-24-2022
|
4.00
|
Moved Tail Feathers, etc. to Hangar - KAKR
|
|
|
|
03-17-2022
|
5.50
|
Nut Plates Added to Left Wheel Pant - Start Right
|
Details
|
|
|
03-13-2022
|
5.00
|
Final Clearance & Alignment of L&R Wheel Pants
|
Details
|
|
|
02-28-2022
|
1.50
|
Multitude of On & Off Adjustmens to R. Wheel Pant
|
|
|
|
02-27-2022
|
1.75
|
Setup & Layout of Nose Gear Wheel Pant
|
|
|
|
02-26-2022
|
2.75
|
Continue Refining Wheel Pants 5/8" Clearance
|
|
|
|
02-25-2022
|
1.50
|
Apply Final Layers of 10oz Fiberglass to Pants
|
|
|
|
02-24-2022
|
2.50
|
Wheel Pant Mounting Area Reinforcement Layup
|
Details
|
|
|
02-20-2022
|
2.50
|
Cut Both Pants for Gear Legs & Attach for Initial
|
|
|
|
02-19-2022
|
2.75
|
Working Left Wheel Pant
|
Details
|
|
|
02-17-2022
|
2.75
|
Align, Drill, Mark & Prep for Right Gear Leg Cutou
|
|
|
|
02-16-2022
|
2.00
|
Sand/Align Right Wheel Pant Mating Sections
|
|
|
|
02-15-2022
|
2.00
|
Plan B- secuinge Main Fuselage Harness in Tunnel
|
|
|
|
02-15-2022
|
2.25
|
Begin Wheel Pants Assembly
|
|
|
|
02-13-2022
|
2.75
|
Cleanup Up & Miscellaneous Task
|
|
|
|
02-12-2022
|
2.00
|
Attach D-Sub Connectors to Yoke Wiring (L&R)
|
|
|
|
02-11-2022
|
2.50
|
Completed Common Fuselage Harness Installation
|
|
|
|
02-10-2022
|
3.50
|
Wire Splice & Routing of Common Fuselage Harness
|
|
|
|
02-08-2022
|
4.25
|
Work Common Fuselage Harness. See Notes...
|
Details
|
|
|
02-06-2022
|
3.00
|
Rough Route L&H Common Fuselage Harnesses
|
|
|
|
02-05-2022
|
2.25
|
Complete Installation of Yaw & Pitch Servos
|
Details
|
|
|
02-05-2022
|
1.00
|
Begin Installation of Common Fuselage Harness (L)
|
|
|
|
02-04-2022
|
2.00
|
Rivet Servo Support Bracket, Install Yaw Servo
|
|
|
|
02-03-2022
|
2.25
|
Yaw Damp Assembly & Installation
|
|
|
|
02-02-2022
|
0.25
|
Installed Oil Temperature Sensor
|
|
|
|
02-02-2022
|
0.75
|
Installed Final ADEL Clamps to Scat Tubing
|
|
|
|
02-01-2022
|
2.50
|
See Details/Notes...
|
Details
|
|
|
01-30-2022
|
1.75
|
Installation of CHT & EGT Probes
|
|
|
|
01-30-2022
|
2.00
|
Adjustment of Muffs & Install of T-Vent Tube
|
|
|
|
01-29-2022
|
2.50
|
Tighten, Pinned and/or Torqued Exhaust Hardware
|
|
|
|
01-29-2022
|
3.00
|
Deburred, Assembled & Installed Heat Muffs
|
|
|
|
01-28-2022
|
4.00
|
Installation of Exhaust Pipes to Tailpipe
|
|
|
|
01-26-2022
|
1.50
|
Tailpipe Installation. See Notes.
|
Details
|
|
|
01-26-2022
|
1.30
|
Complete Riveting/Installation of the Baffle Seals
|
|
|
|
01-26-2022
|
0.75
|
Attempt to fit into place Forward Left Exhaust.
|
Details
|
|
|
01-25-2022
|
0.60
|
Begin Riveting/Installation of the Baffle Seals
|
|
|
|
01-25-2022
|
3.00
|
Assembly of 1 Ton Engine Hoist
|
|
|
|
01-24-2022
|
3.80
|
Exhaust Works - See Notes to Right
|
Details
|
|
|
01-24-2022
|
1.00
|
Cut to Length & Install Magneto Cooling Tubes
|
|
|
|
01-21-2022
|
1.00
|
Position Baffling Sections for Riveting
|
|
|
|
01-20-2022
|
1.80
|
Continue Routing Plug Wiring. Modify Standoffs.
|
|
|
|
01-19-2022
|
2.50
|
Connection of P-Mags. See Note.
|
Details
|
|
|
01-16-2022
|
2.25
|
Complete Installation of Dipsptick Access Cover
|
|
|
|
01-15-2022
|
2.25
|
Begin Installation of Oil Dip Stick Access Door
|
Details
|
|
|
01-14-2022
|
2.50
|
Finish Application of Heat Shielding to Lower Cowl
|
|
|
|
01-13-2022
|
2.25
|
Sand & Apply Final Fill Expoy Layer to Upper Cowl
|
|
|
|
01-13-2022
|
1.50
|
Begin Application of Heat Shielding to Lower Cowl
|
|
|
|
01-09-2022
|
0.50
|
Prep & Apply Bead of RTV to Oil Cooler Hose
|
|
|
|
01-09-2022
|
2.00
|
Prep & Add Fairing Filler to Upper Cowl
|
|
|
|
01-08-2022
|
2.25
|
Smoothing Transition of Upper Cowl Ramps
|
Details
|
|
|
01-06-2022
|
1.25
|
Installation of 5" Scat Tube to Oil Cooler
|
Details
|
|
|
01-06-2022
|
0.75
|
Began Install of Dual P-Mag Plumbing
|
|
|
|
01-04-2022
|
1.75
|
Installed Oil Line Hoses. Added RTV to Oil Cooler
|
|
|
|
01-03-2022
|
2.75
|
Oil Cooler Assembly - See Notes to Right...
|
Details
|
|
|
01-03-2022
|
0.75
|
Countersink & Installing Nutplates for Bottom Cowl
|
|
|
|
01-03-2022
|
0.75
|
Begin Epoxy Micro Flare Out of Left Cowl Ramp
|
Details
|
|
|
01-02-2022
|
2.75
|
Contimue Assembly of Oil Cooler Support Rack
|
|
|
|
01-02-2022
|
1.25
|
Begin Epoxy Micro Flare Out of Right Cowl Ramp
|
|
|
|
01-01-2022
|
1.75
|
Prep, Clean & Epoxy Ramps to Upper Cowling
|
|
|
|
01-01-2022
|
1.00
|
Prep & Rivet FF-01406E to FF-01406C
|
|
|
|
12-31-2021
|
0.50
|
Match Drill Lower Cowl Fuselage Nutplate Holes
|
|
|
|
12-31-2021
|
0.75
|
Final Fit & Cleco of Ramps to Upper Cowl
|
|
|
|
12-30-2021
|
1.75
|
Final Trim C-00003R & Rough Cut Cowl-00003L
|
|
|
|
12-30-2021
|
1.00
|
Cleco & Tape Cowl Ramps For Intial Fit Check
|
Details
|
|
|
12-29-2021
|
1.75
|
Rough Cut & Trim Out of Cowl-00003R
|
|
|
|
12-27-2021
|
1.25
|
Rivet L&R Horizontal Hinges to Bottom Cowl
|
|
|
|
12-27-2021
|
1.75
|
Countersink L&R Hinge Rivet Points of Bottom Cowl
|
|
|
|
12-26-2021
|
2.25
|
Coutersink then Rivet Hinges to Buttom Rear Cowl
|
|
|
|
12-26-2021
|
1.25
|
Coutersink & Rivet Right Hinge to Buttom Cowl
|
|
|
|
12-25-2021
|
3.00
|
Rivet Hinges to Top Cowling
|
|
|
|
12-24-2021
|
1.25
|
Begin Countersinking Top Cowl for Hinge Rivets
|
|
|
|
12-24-2021
|
1.75
|
Add Nutplates to Buttom Cowl
|
|
|
|
12-23-2021
|
0.75
|
Prep Lower Cowling for Skim Coat of Epoxy Resin
|
|
|
|
12-23-2021
|
1.00
|
Clean Excess Resin from Lower Cowl Rivet Holes
|
|
|
|
12-23-2021
|
1.25
|
Apply Thin Layer of Resin to Lower Cowl Interior
|
|
|
|
12-22-2021
|
0.75
|
Prepare Upper Cowl for Resin Application
|
|
|
|
12-22-2021
|
1.00
|
Apply Thin Layer of Resin to Upper Cowl Interior
|
|
|
|
12-21-2021
|
1.75
|
Countersink & Paint Cowl Close-Out & FF-00003B
|
|
|
|
12-19-2021
|
0.85
|
Remove Polyfiber Cloth & Left Hinge Pin Blank
|
|
|
|
12-18-2021
|
1.50
|
Deburr & Prep Bottom Cowl Close-Out & FF-00003B
|
|
|
|
12-18-2021
|
2.50
|
Add Microballoons & Fiberglass cloth to Pin Covers
|
|
|
|
12-16-2021
|
1.00
|
Adjust Linkage to Fuel Control & Bellcrank
|
|
|
|
12-15-2021
|
1.00
|
Prep Blanks for Fiberglass Lay-Up
|
|
|
|
12-14-2021
|
0.75
|
Install Mixture Bellcrank & Throttle Bracket
|
|
|
|
12-14-2021
|
2.50
|
Assemble Mixture Bellcrank & Throttle Bracket
|
|
|
|
12-10-2021
|
2.50
|
Moving Day... See Notes to Right
|
Details
|
|
|
11-19-2021
|
1.00
|
Cut Out Pin Cover Hole on Left Side
|
|
|
|
11-18-2021
|
3.00
|
Back to the Cowling. Inlet Sanding & Pin Cover
|
|
|
|
11-16-2021
|
1.75
|
Position & Celco in Place Baffle Seals
|
|
|
|
11-15-2021
|
1.50
|
Final Installation of Air Filter & Snorkel Assembl
|
|
|
|
11-14-2021
|
0.40
|
Rivet Right Ramp to Baffle
|
|
|
|
11-14-2021
|
1.25
|
Prep & Rivet Nutplate for Air Filter Lid
|
|
|
|
11-14-2021
|
1.20
|
Paint Snorkel
|
|
|
|
11-14-2021
|
1.50
|
Cut Out & Quick Fit Baffle Seals to Baffling
|
|
|
|
11-13-2021
|
2.00
|
Bend/ShapeRight & Left Ramps. Match Drill Right
|
|
|
|
11-12-2021
|
0.75
|
Sand & Prime Snorkel
|
|
|
|
11-12-2021
|
0.75
|
Practice Bending/Shaping CB-00034
|
|
|
|
11-11-2021
|
1.50
|
Sand & Apply Final Micro Balloon Coat to Snorkel
|
|
|
|
11-11-2021
|
0.75
|
RTV Left & Right Heat Vent Assemblies
|
|
|
|
11-10-2021
|
0.50
|
Fabricate Gasket for Snorkel to Fuel Injector
|
|
|
|
11-10-2021
|
2.50
|
Alt. Ait Installation & Micro Ballooning
|
|
|
|
11-06-2021
|
1.00
|
Complete Micro Balloon Applications to Snorkel
|
|
|
|
11-05-2021
|
1.20
|
Prep Work & Apply Resin to Snorkel/Filterbox
|
|
|
|
11-04-2021
|
1.25
|
Snorkel Works Continues...
|
|
|
|
11-03-2021
|
1.25
|
Complete VA-192A. Cut & Drill Snorkel
|
|
|
|
11-01-2021
|
1.75
|
Snorkel Works
|
|
|
|
10-30-2021
|
3.00
|
Fabricate Stainless Wire Rope Tension Rods
|
Details
|
|
|
10-30-2021
|
0.75
|
Begin Fitting of the Air Filter Box Snorkel
|
|
|
|
10-29-2021
|
2.00
|
Complete the Installation of Enigne Engine Baffles
|
|
|
|
10-28-2021
|
4.00
|
Begin the Installation of Engine Baffles
|
|
|
|
10-27-2021
|
2.75
|
Apply RTV to Specific Area of Engine Baffels
|
|
|
|
10-26-2021
|
2.00
|
Prep Baffles for RTV
|
|
|
|
10-25-2021
|
1.25
|
Remove Slick Mag & Add EMag #2
|
|
|
|
10-23-2021
|
1.50
|
Mount B&S Backup Alternator to Accessory Drive
|
|
|
|
10-20-2021
|
2.25
|
Remove Cowling, Deburr & Install Nutplates
|
|
|
|
10-19-2021
|
2.25
|
Drill & Match Drill Upper Cowl's Horizontal Hinges
|
|
|
|
10-18-2021
|
1.00
|
Mark Horizontal Upper Cowl Rivet Lines
|
|
|
|
10-17-2021
|
1.00
|
Narrowing Down Alignment Issue. Mark Upper Cowl
|
|
|
|
10-16-2021
|
2.25
|
Continue Working Hinge Pin Issues/Alignment
|
|
|
|
10-15-2021
|
1.00
|
Continue Working Hinge Pin Issues/Alignment
|
|
|
|
10-14-2021
|
1.25
|
Cowl Works Continue. Hinge Alignment
|
|
|
|
10-11-2021
|
1.00
|
Match Drill Horizontal Hinge Pins, Bottom Cowling
|
|
|
|
10-10-2021
|
1.50
|
Begin Bottom Cowl Left Horizontal Hinge Lay-up
|
|
|
|
10-09-2021
|
2.00
|
Match Drill Bottom Cowl Fuselage Side Hinges
|
|
|
|
10-08-2021
|
2.00
|
Final Fit of Bottom Cowl - Drill Hinges Tomorrow
|
|
|
|
10-07-2021
|
2.50
|
More Bottom Cowl Works...Final Trimming..?
|
Details
|
|
|
10-04-2021
|
1.75
|
More Bottom Cowl Works...
|
|
|
|
10-03-2021
|
1.00
|
Final Fitting of Bottom Cowl. Cut ExcessFrom Sides
|
|
|
|
10-01-2021
|
3.25
|
Lower Cowl Work Continues, but Getting There...
|
|
|
|
09-29-2021
|
1.50
|
Lower Cowl Work Continues...
|
|
|
|
09-28-2021
|
1.50
|
Lower Cowl Work Continues...
|
|
|
|
09-26-2021
|
2.25
|
Begin Lower Cowl Works
|
|
|
|
09-23-2021
|
2.25
|
Match Drill Upper Cowl to Hinges
|
|
|
|
09-21-2021
|
1.50
|
Upper Cowl Work Continues...
|
|
|
|
09-16-2021
|
6.50
|
Build Jack Stands
|
|
|
|
09-07-2021
|
0.00
|
Vacation Note...
|
Details
|
|
|
09-05-2021
|
2.50
|
Installation of Roll Servo Assembly
|
|
|
|
09-03-2021
|
2.00
|
FineTune Hinge Assembly Connections
|
|
|
|
09-01-2021
|
1.00
|
Cowl Work Continues...
|
|
|
|
08-29-2021
|
1.50
|
Sanding/Adjusting Aft Edge of Top Cowl
|
|
|
|
08-25-2021
|
1.25
|
Continue Adjusting Cowl Halves Rough Matching
|
|
|
|
08-24-2021
|
1.00
|
Continue Cowl Works; Sanding & Alignment
|
|
|
|
08-22-2021
|
1.75
|
Continue Working Forward Cowl Alignment
|
|
|
|
08-21-2021
|
1.00
|
Continue Cowl Works - Chat w/Vans Support
|
|
|
|
08-18-2021
|
1.25
|
Rough Cut for Trimming of Upper Cowl
|
|
|
|
08-18-2021
|
1.25
|
Rough Cut for Trimming of Lower Cowl
|
|
|
|
08-18-2021
|
0.75
|
Attach Yaw Arm & Bridle Harness to Servo
|
|
|
|
08-17-2021
|
2.75
|
Cutout, Deburr & Polish Oil Cooler Door
|
|
|
|
08-17-2021
|
0.75
|
Cutout Oil Cooler Access From Top Cowling
|
|
|
|
08-17-2021
|
0.50
|
Cut Slats & Support Sheets for Forward Flooring
|
|
|
|
08-16-2021
|
1.00
|
Trace Scribe Line for Trimming - Top & Bottom Cowl
|
|
|
|
08-16-2021
|
1.00
|
Redo Top Cowling Hinge Pins. See Remarks
|
Details
|
|
|
08-15-2021
|
2.00
|
Complete Cowling Hinge & Pin Fabrications
|
|
|
|
08-14-2021
|
0.75
|
Begin Cowling Hinge & Pin Fabrications
|
|
|
|
08-13-2021
|
1.50
|
Fabricate FF-01408A & FF-0148C Hinge Assemblies
|
|
|
|
08-12-2021
|
0.25
|
Rivet Yaw Damper
|
|
|
|
08-11-2021
|
3.50
|
Yaw Damper Kit Deburring, Polish, Prime & Paint
|
|
|
|
08-10-2021
|
3.25
|
Spinner Closeout - See notes to Right...
|
Details
|
|
|
08-09-2021
|
2.25
|
Installed Spinner Bulkhead Nutplates
|
|
|
|
08-09-2021
|
1.00
|
Drilled #40 holes in Spinner Plate for Nutplates
|
|
|
|
08-09-2021
|
1.00
|
Complete Pitch & Roll Servo Pushrod Assemblies
|
|
|
|
08-08-2021
|
3.75
|
See Notes to Right...
|
Details
|
|
|
08-07-2021
|
0.75
|
Match Drill #30 Spinner Bulkhead Assy.
|
|
|
|
08-07-2021
|
2.25
|
Continue Backer Plate Assy. & Drill Spinner Plate
|
|
|
|
08-06-2021
|
2.25
|
Apply Resin to Spinner Interior + See Right...
|
Details
|
|
|
08-05-2021
|
1.50
|
Continue to Prep Spinner for Assembly
|
|
|
|
08-04-2021
|
2.50
|
Prep Spinner for Assembly
|
|
|
|
08-02-2021
|
0.50
|
Inventory Aileron & Yaw Damper Servo Kits
|
|
|
|
08-02-2021
|
0.25
|
Finish Safety Wiring Alternator, 2nd Bolt
|
|
|
|
08-02-2021
|
2.30
|
Begin Propeller Spinner Assembly
|
|
|
|
08-01-2021
|
0.75
|
Torque Propeller Bolts & Install Front Plate
|
Details
|
|
|
08-01-2021
|
1.50
|
Safety Wired Propeller & Tighten Alternator Belt
|
Details
|
|
|
07-31-2021
|
4.00
|
Install Propeller
|
|
|
|
07-30-2021
|
1.25
|
Remove Crankcase Plug
|
|
|
|
07-29-2021
|
0.75
|
Remove Crankcase Expansion Plug
|
|
|
|
07-29-2021
|
1.25
|
Install Avstar Fuel Injection Servo
|
|
|
|
07-29-2021
|
0.40
|
Install & Safety Wire Oil Dip Stick Assembly
|
|
|
|
07-28-2021
|
1.50
|
Prep. Fuel Injector Servo for Installation
|
Details
|
|
|
07-25-2021
|
0.50
|
Unpack & Table Propeller
|
|
|
|
07-25-2021
|
1.75
|
Complete Installation of Remote Oil Filter
|
|
|
|
07-24-2021
|
4.50
|
Airwolf Remote Oil Filter Assembly & Installation
|
Details
|
|
|
07-23-2021
|
0.50
|
Rivet Doubler to Spinner Plate
|
|
|
|
07-21-2021
|
2.25
|
Install Alternator & Wire Starter & Alternator
|
|
|
|
07-18-2021
|
2.00
|
Install Fuel Flow Transducer w/Hoses
|
|
|
|
07-17-2021
|
1.00
|
Prep, RTV & Install Right Vent Modification
|
|
|
|
07-17-2021
|
3.50
|
Hang Engine to Mount
|
|
|
|
07-17-2021
|
0.50
|
Fininsh Riveting Left Aft & Right Forward Baffles
|
|
|
|
07-17-2021
|
0.75
|
Check Engine Mount Torque & Nose Gear Points
|
|
|
|
07-16-2021
|
1.50
|
Complete Assembly of Right Air Ramp Baffling
|
|
|
|
07-15-2021
|
0.75
|
Installed Manifold, Fuel & Oil Pressure Sensors
|
|
|
|
07-15-2021
|
1.75
|
Completed Air Filter Frame Assmbly
|
|
|
|
07-14-2021
|
2.75
|
Begin Assemly of Air Filter Frame
|
|
|
|
07-13-2021
|
2.75
|
Continue Working Baffling Assembly.
|
|
|
|
07-12-2021
|
2.25
|
Assemble Right Aft Baffle
|
|
|
|
07-11-2021
|
4.50
|
Begin Baffling Assemblies
|
|
|
|
07-10-2021
|
0.75
|
Assemble & Install Prop Governor Bracket Assy.
|
|
|
|
07-06-2021
|
0.75
|
Mount Propeller Governor to Engine
|
|
|
|
07-05-2021
|
1.75
|
Complete Plumbing of Engine, Attach Fittings
|
|
|
|
07-04-2021
|
0.75
|
Finish Installation of FlyLeds Tail Light
|
|
|
|
07-04-2021
|
1.50
|
Begin Plumbing of Engine, Attach Fittings
|
|
|
|
07-02-2021
|
1.00
|
Grind, Deburr & Polish Spacer Ring for Tail Light
|
|
|
|
06-26-2021
|
1.00
|
Deburr B/O Baffling Parts
|
|
|
|
06-26-2021
|
1.00
|
Continue Installation of Firewall Forward
|
|
|
|
06-25-2021
|
2.50
|
Begin Firewall Component Installations
|
Details
|
|
|
06-20-2021
|
1.75
|
Unpack & Lift Engine from Packaging Crate
|
|
|
|
06-16-2021
|
2.50
|
Finish Deburring In Stock Parts to be Anodized
|
|
|
|
06-15-2021
|
1.50
|
Finish Deburring & Polishing Spinner Assembly
|
|
|
|
06-14-2021
|
4.00
|
Continue Working Spinner Assembly
|
|
|
|
06-04-2021
|
0.80
|
Match Drill Spinner Plate Assembly
|
|
|
|
06-04-2021
|
0.40
|
Engine Arrives, Albeit Six Weeks Late...
|
|
|
|
06-03-2021
|
6.25
|
Finish Deburring Baffelling
|
|
|
|
05-29-2021
|
3.20
|
Continue Deburring Baffelling
|
|
|
|
05-26-2021
|
3.00
|
Begin Deburring Baffelling
|
|
|
|
05-24-2021
|
2.00
|
Modify/Attach FlyLed's Tail Light Assy.
|
|
|
|
05-17-2021
|
1.00
|
Deburr & Buff FF-00009A&B Governor Bracket
|
|
|
|
05-15-2021
|
2.25
|
Finish Shaping/Aligning PC Boards. Attach Lens
|
|
|
|
05-10-2021
|
2.25
|
Continue Installation of Left Flyleds Nav/Strobes
|
|
|
|
05-10-2021
|
0.50
|
Begin Installation of Right Flyleds Nav/Strobes
|
|
|
|
05-09-2021
|
1.25
|
File, Debur & Install Battery Box Components
|
|
|
|
05-07-2021
|
2.00
|
Working Installation of Left Flyleds Nav/Strobes
|
|
|
|
05-07-2021
|
1.25
|
Completed Inventory of Firewall Forward Kit
|
|
|
|
05-06-2021
|
1.50
|
Cut Out Right Wing Tip for Flyled's Nav/Strobe
|
|
|
|
05-06-2021
|
2.50
|
Begin Inventory of Firewall Forward Kit
|
|
|
|
05-04-2021
|
1.50
|
Cut Out Left Wing Tip for Flyled's Nav/Strobe
|
|
|
|
05-04-2021
|
1.25
|
Bend & Attach new float rods to Fuel Senders
|
Details
|
|
|
05-01-2021
|
0.75
|
Mount FlyLeds Seven Star Landing Lights
|
|
|
|
04-28-2021
|
1.50
|
Rivet Landing Lamp Holders to Wings
|
|
|
|
04-27-2021
|
0.75
|
Countersink Right Landing Light Lens
|
|
|
|
04-26-2021
|
1.50
|
Dimple Right Landing Light Lens Well
|
|
|
|
04-22-2021
|
1.00
|
Debur & Prep Right Landing Light Well for Paint
|
|
|
|
04-17-2021
|
1.50
|
Prep, Tape & Paint Left Landing Light Well
|
|
|
|
04-17-2021
|
0.50
|
Final Countersinking of Left Landing Light Lens
|
|
|
|
04-17-2021
|
1.50
|
Cut, Trim & Polish Right Landing Light Lens
|
|
|
|
04-15-2021
|
2.75
|
Rough Trim Left Landing Light Lens
|
|
|
|
04-13-2021
|
1.50
|
Modify Landing Light Holders for FlyLeds
|
|
|
|
04-13-2021
|
1.00
|
Debur & Prep Landing Light well for Lens
|
|
|
|
04-10-2021
|
2.50
|
Begin Assembly of FlyLeds Seven Stars Landing
|
|
|
|
03-30-2021
|
1.15
|
Trim L&R Trailing Edges of Wing Tips
|
|
|
|
03-30-2021
|
0.75
|
Bend & Mount Float Arm to Sending Unit
|
|
|
|
03-29-2021
|
0.50
|
Mount Wing Tips on Wings & Mark Edges to Trim
|
|
|
|
03-29-2021
|
2.00
|
Drill, Rivet & Mount Wing Tip Lenes
|
|
|
|
03-28-2021
|
2.00
|
Rivet W-1016L&R to Wing tips. Final Fit VA-193L&R
|
|
|
|
03-27-2021
|
3.50
|
Sand, & Fit Right Wing Tip Nav Light Cover
|
|
|
|
03-26-2021
|
1.50
|
More Sand, & Fit Wing Tip Right Nav Light Cover
|
|
|
|
03-25-2021
|
2.00
|
Cut, Sand, & Fit Wing Tip Right Nav Light Cover
|
|
|
|
03-24-2021
|
1.00
|
Begin Prepping Wing Tip Nav Light Covers
|
|
|
|
03-23-2021
|
2.75
|
Match Drill & Prime W1016-L. Countersink Right Tip
|
|
|
|
03-23-2021
|
0.75
|
Add Additional Resin Layer to Each Wing Tip Edge
|
|
|
|
03-22-2021
|
2.50
|
Match Drill & Prime W1016-R. Countersink Right Tip
|
|
|
|
03-21-2021
|
3.00
|
Consider, Design & Fabricate Template for W-1016
|
|
|
|
03-20-2021
|
1.50
|
Final Trimming of Both Wing Tips for W-1016L&R
|
|
|
|
03-16-2021
|
1.50
|
Trimming & Fitting Right W-1016
|
|
|
|
03-14-2021
|
2.00
|
Completed Right Wing - See Notes to Right...
|
Details
|
|
|
03-13-2021
|
2.75
|
Right Wing Tip Works: See Notes to Right...
|
Details
|
|
|
03-12-2021
|
1.00
|
Debur & Polish W-1016L&R & Trim Right Wing Tip
|
|
|
|
03-11-2021
|
1.25
|
Continue Triming & Fitting Right Wing Tip to Wing
|
|
|
|
03-08-2021
|
3.75
|
Wing Tip Works Continued: See Notes to Right...
|
Details
|
|
|
03-08-2021
|
0.25
|
Modify Countersink Mirco Stop
|
|
|
|
03-07-2021
|
2.50
|
Wing Tip Works: See Notes to Right...
|
Details
|
|
|
03-06-2021
|
2.00
|
Continue Triming & Fitting Left Wing Tip to Wing
|
|
|
|
03-05-2021
|
2.50
|
Adjust Skin Reveal for Left Wing Tip Alignment
|
|
|
|
03-03-2021
|
1.50
|
Begin Triming & Fitting Right Wing Tip to Wing
|
|
|
|
03-02-2021
|
2.50
|
Continue Triming & Fitting Left Wing Tip to Wing
|
|
|
|
03-01-2021
|
1.25
|
Install Left Aileron & Mark Wings Tips for Trimmin
|
|
|
|
03-01-2021
|
0.50
|
Cut VA-193 for VA-193 Left & Right
|
|
|
|
03-01-2021
|
1.50
|
Begin Triming & Fitting Left Wing Tip to Wing
|
|
|
|
02-27-2021
|
2.50
|
Shortened Wing Cart to Ease Wing Tip Work
|
|
|
|
02-27-2021
|
1.00
|
SB-500-6 for Pitot & AOA lines Installed Left Wing
|
Details
|
|
|
02-25-2021
|
1.50
|
Fine Tune & Fit Getz Pitot Mask to Left Bottom Ski
|
|
|
|
02-25-2021
|
1.00
|
Clean, Prime & Attach Nutplates to Pitot Mast
|
|
|
|
02-24-2021
|
0.50
|
Install AeroSport Rudder Pedal Extension, Pilot's
|
|
|
|
02-24-2021
|
3.50
|
Continue Pitot Mast Work - See Notes to Right
|
Details
|
|
|
02-23-2021
|
0.75
|
Torque & Seal Inboard Aileron Pushrods Assembly
|
|
|
|
02-23-2021
|
0.50
|
Remove Assembly for Spring Modifications
|
|
|
|
02-23-2021
|
1.50
|
Install Spring Modification to Brake Assembly
|
|
|
|
02-23-2021
|
1.75
|
Fabricate Pitot Mast Gusset, .032" Aluminum
|
|
|
|
02-22-2021
|
3.50
|
Swaped Out all 437-4 Snap Bushings for 500-6
|
|
|
|
02-22-2021
|
0.50
|
Re-Wrap AHRS Wire Bundles (Bushing Swap)
|
|
|
|
02-21-2021
|
1.00
|
Remove Right Aileron Pushrod, Install Spring Clips
|
Details
|
|
|
02-21-2021
|
1.00
|
Modify Spad Extention Bit for Snap Bushing Use
|
|
|
|
02-17-2021
|
0.75
|
Attached 16ea K1100-8D Nutplates to Left Skin
|
|
|
|
02-16-2021
|
0.50
|
Dimple Lower Wing Root Fairings, F-14118 L&R
|
|
|
|
02-16-2021
|
0.75
|
Buff, Polish & Attach Bearings, CS-00005 Pushrods
|
Details
|
|
|
02-15-2021
|
3.00
|
Wing Fairing Works. See Notes to Right...
|
Details
|
|
|
02-15-2021
|
0.50
|
Break Edges on F-14118A&B, L&R
|
|
|
|
02-14-2021
|
1.50
|
Debur F-14118B-L&R. Enlarge #8 Screw Holes
|
|
|
|
02-13-2021
|
2.00
|
Finish F-14122 Wing Root Fairing Stiffeners Debur
|
|
|
|
02-11-2021
|
1.75
|
Cut & Deburr F-14122 Wing Root Fairing Stiffeners
|
|
|
|
02-10-2021
|
1.00
|
Rework & Countersink Servo Bracket for #* Screws
|
Details
|
|
|
02-10-2021
|
0.50
|
Press Fit 4eaBushings to W-1025A L&R
|
|
|
|
02-10-2021
|
0.75
|
Attached 16ea K1100-8D Nutplates to Right Skin
|
Details
|
|
|
02-09-2021
|
3.00
|
Deburr & Dimple Left Wing Bottom Skin Panel
|
|
|
|
02-08-2021
|
3.50
|
Deburr & Dimple Right Wing Bottom Skin Panel
|
|
|
|
02-07-2021
|
1.25
|
Rework Aileron Trim Wiring & Molex Connector
|
|
|
|
02-07-2021
|
0.50
|
Remove Bottom Skins After Match Drilling
|
|
|
|
02-07-2021
|
1.25
|
Match Drill Right Wing J-Stiffener
|
|
|
|
02-06-2021
|
4.00
|
Cut, Deburr, Fit & Match Drill Left Wing J-Stiffen
|
|
|
|
02-05-2021
|
1.15
|
Debur 4ea Access Plates & Match Drill Holes
|
|
|
|
02-04-2021
|
2.50
|
Debur Components of Aileron Trim Assembly
|
|
|
|
02-04-2021
|
2.00
|
Begin Assembly of Aileron Trim Actuation Assy.
|
|
|
|
02-03-2021
|
1.00
|
Rivet Right Wing Skin to Gap Fairings
|
|
|
|
02-03-2021
|
1.50
|
Rivet Right Wing Gap Fairings to Aft Spar
|
|
|
|
02-03-2021
|
1.00
|
Rivet Left Wing Skin to Gap Fairings
|
|
|
|
02-02-2021
|
1.25
|
Dimple Flap & Aileron Gap Fairings
|
|
|
|
02-02-2021
|
1.00
|
Debur Flap Gap Fairings
|
|
|
|
02-02-2021
|
0.75
|
Countersink Rear Spar for CR3212-4-6 Rivets
|
|
|
|
02-02-2021
|
2.00
|
Cleco Fairings & Begin Riviting to Aft Spar
|
|
|
|
02-01-2021
|
0.50
|
Removed & Stowed Ailerons
|
|
|
|
02-01-2021
|
0.75
|
Debur Aileron Gap Fairings
|
|
|
|
01-30-2021
|
1.25
|
Unpacked, Cleaned & Temporarily Mounted Flaps
|
Details
|
|
|
01-30-2021
|
0.25
|
Installed Missing Snap Bushings SB-187-2
|
|
|
|
01-30-2021
|
0.75
|
Fabricate Pitot & AOA Tubing Standoff Prototype
|
|
|
|
01-30-2021
|
2.00
|
Cleaned & Organized Work Space
|
|
|
|
01-29-2021
|
0.80
|
Complete Molex Connection of Autopilot Wiring
|
|
|
|
01-28-2021
|
0.80
|
Left Aileron to Wing Neutral Rigging Adjustments
|
|
|
|
01-28-2021
|
1.50
|
Attach Ailerons to Wings for Rigging
|
|
|
|
01-27-2021
|
1.50
|
Tighten & Torgue Aileron Pushrod Assemblies
|
|
|
|
01-27-2021
|
1.50
|
Complete Routing & Lacing Wing Wiring
|
|
|
|
01-26-2021
|
1.50
|
Final Paint Push Rods & Unpack Ailerons
|
|
|
|
01-26-2021
|
1.00
|
Begin Lacing Wiring Harnesses
|
|
|
|
01-25-2021
|
3.00
|
Route Wiring Harnesses for Right Wing - See Notes
|
Details
|
|
|
01-24-2021
|
2.50
|
Route Wiring Harnesses for Left Wing - See Notes
|
Details
|
|
|
01-24-2021
|
0.40
|
Prime Torque Tube Connection Rods
|
|
|
|
01-24-2021
|
1.50
|
Install Torque Tube Collers
|
|
|
|
01-23-2021
|
1.25
|
Ream & Rivet V-146 to Wing Spars, x2
|
|
|
|
01-23-2021
|
0.70
|
Prep & Tape Off Torgue Tube Assemblies for Priming
|
|
|
|
01-23-2021
|
2.50
|
Complete L&R Torque Tube Assemblies
|
|
|
|
01-22-2021
|
2.00
|
Complete Assembly & Install Aileron Bellcranks
|
|
|
|
01-22-2021
|
2.50
|
Begin Assembly of WD-1014 Torque Tubes
|
|
|
|
01-21-2021
|
1.50
|
Sand, Clean & Prime Exterior of Torque Tubes
|
|
|
|
01-21-2021
|
0.50
|
Prep Torgue Tube Pushrodss for Priming
|
|
|
|
01-21-2021
|
1.75
|
Lace Wing's Main Wiring Harness
|
|
|
|
01-20-2021
|
4.50
|
Prep, Prime, Rivet & More - See Notes to Right.
|
Details
|
|
|
01-19-2021
|
2.00
|
Cut, Debur, Assemble, Begin Riveting Pushrods
|
|
|
|
01-18-2021
|
2.50
|
Layout & Label Wiring Harness. Clean Wing Skins.
|
|
|
|
01-17-2021
|
2.00
|
Riveting & More. See Notes to Right.
|
Details
|
|
|
01-16-2021
|
2.50
|
Buff, Clean, Prime & More. See Notes to Right.
|
Details
|
|
|
01-15-2021
|
2.75
|
Cut, Trim, Debur, Countersink & Rivet Canopy Clips
|
Details
|
|
|
01-13-2021
|
0.75
|
Install Defrost Fans
|
|
|
|
01-12-2021
|
1.00
|
Placed Canopy Back Onto Airframe
|
|
|
|
01-11-2021
|
3.25
|
See Notes to Right
|
Details
|
|
|
01-09-2021
|
2.50
|
Remove Aft Tape Line. See Notes to Right.
|
Details
|
|
|
01-08-2021
|
1.75
|
Sand Filled Areas. 1 More Fill Required
|
|
|
|
01-01-2021
|
1.50
|
Sand & Fill Low Spots in Canopy Fairing
|
|
|
|
12-31-2020
|
1.50
|
Continue Sanding Canopy Fairing
|
|
|
|
12-28-2020
|
0.75
|
Install Rear Canopy Seal & Tighten Area 3 Screws
|
|
|
|
12-27-2020
|
0.75
|
Applied Top Coat of Resin to Canopy Front Edge
|
|
|
|
12-26-2020
|
0.50
|
Prep Canopy for Resin Skim Coat
|
|
|
|
12-24-2020
|
1.00
|
Continue Sanding Canopy Fairing - Getting Close
|
|
|
|
12-22-2020
|
1.75
|
Sanding then Removed Forward Tape to Feather
|
|
|
|
12-19-2020
|
1.50
|
Continue Sanding Canopy Fairing
|
|
|
|
12-18-2020
|
1.00
|
Continue Sanding Canopy Fairing
|
|
|
|
12-17-2020
|
1.50
|
Continue Sanding Canopy Fairing
|
|
|
|
12-16-2020
|
1.00
|
Continue Sanding Canopy Fairing
|
|
|
|
12-15-2020
|
1.00
|
Remove Peel Ply & Begin Sanding Canopy Fairing
|
|
|
|
12-13-2020
|
2.50
|
Install Fiberglass Panels A & D
|
|
|
|
12-13-2020
|
3.00
|
Complete Buildup of Canopy 4" Lip w/Fiberglass
|
|
|
|
12-11-2020
|
2.50
|
Cut all Remaining Fiberglass Strips & Shapes +
|
Details
|
|
|
12-10-2020
|
1.75
|
Completd Fabrication of Wear Strips & Installed
|
Details
|
|
|
12-09-2020
|
1.50
|
Sand Canopy & Began Fabricating Wear Strips
|
|
|
|
12-07-2020
|
2.15
|
Canopy Works - See Notes to Right.
|
Details
|
|
|
12-05-2020
|
3.00
|
Final Sanding of Gap Filler - See Notes to Right
|
Details
|
|
|
12-04-2020
|
0.75
|
Mix & Apply Light 2nd Filler Coat to Gap Fill Area
|
|
|
|
12-04-2020
|
4.00
|
Begin Sanding of Gap Filler
|
|
|
|
12-03-2020
|
1.00
|
Apply 1st Layer of Filler to Canopy Gap
|
|
|
|
12-02-2020
|
1.50
|
Completed Scuffing Canopy for Fiberglasss Work
|
|
|
|
12-01-2020
|
0.75
|
Sand Down Left Side of Canopy
|
|
|
|
12-01-2020
|
1.00
|
Begin Scuffing Up Canopy for Fiberglasss Work
|
|
|
|
11-30-2020
|
1.00
|
Sand Down Right Side of Canopy
|
|
|
|
11-29-2020
|
3.50
|
Attach 7ea. Canopy Clips. Prep Canopy for Sanding
|
|
|
|
11-27-2020
|
1.50
|
Tighten Canopy Hardware - See Notes to Right
|
Details
|
|
|
11-22-2020
|
1.75
|
Install (not tighten) Canopy Hardware
|
|
|
|
11-20-2020
|
2.50
|
Fit & Notch Aft Canopy Seal. Gather Fastenings
|
|
|
|
11-19-2020
|
2.00
|
Finish Countersinking Aft Canopy Edge
|
|
|
|
11-16-2020
|
2.75
|
Performed SB-00027 As Directed
|
Details
|
|
|
11-15-2020
|
2.00
|
Began Countersinking Aft Canopy Edge
|
|
|
|
11-13-2020
|
3.50
|
Remove Canopy - See Notes to Right
|
Details
|
|
|
11-11-2020
|
2.50
|
Remove Canopy - See Notes to Right
|
Details
|
|
|
11-09-2020
|
1.00
|
Prep Canopy & Frame for Final Attachment
|
|
|
|
11-06-2020
|
0.00
|
Paint Shop Returns
|
Details
|
|
|
11-01-2020
|
2.00
|
Deburr, Polish, Dimple & Rivet Flap Motor Box
|
Details
|
|
|
10-29-2020
|
1.75
|
Completed Countersinking Canopy Rails Edges
|
|
|
|
10-28-2020
|
0.75
|
Began Countersinking Canopy Rails Edges for #6.
|
|
|
|
10-15-2020
|
0.00
|
Delay - Canopy Frame, etc. to Paint Shop...
|
Details
|
|
|
10-12-2020
|
0.50
|
Fabricate Canopy Transition Curve Gauge
|
|
|
|
10-11-2020
|
2.50
|
Canopy Works. See Notes to Right.
|
Details
|
|
|
10-10-2020
|
1.50
|
Canopy Misc. See Notes to Right.
|
Details
|
|
|
10-09-2020
|
4.00
|
Canopy Works. See Notes to Right.
|
Details
|
|
|
10-08-2020
|
0.75
|
Hinge Cover Works. See Notes to Right...
|
Details
|
|
|
10-07-2020
|
1.75
|
Mark & Tape Canopy's Aft & Forward Fairing Lines
|
|
|
|
10-04-2020
|
0.50
|
Fabricate Canopy 7/8" Aft Limit Tape Gauge
|
|
|
|
10-03-2020
|
0.75
|
Fabricate Canopy Sanding Block
|
|
|
|
09-26-2020
|
3.50
|
Enlarge #40 Pilot Holes in Canopy to #27
|
|
|
|
09-25-2020
|
4.25
|
Drill/Match Drill #40 Pilot Holes in Canopy
|
|
|
|
09-24-2020
|
1.25
|
Weights Added & Final Check of Canopy. Drill Next
|
|
|
|
09-22-2020
|
1.50
|
Final Grinding, Sanding, Fitting of Canopy
|
|
|
|
09-21-2020
|
1.25
|
Continue Chamfering Canopy Front Edge - Close
|
|
|
|
09-19-2020
|
1.00
|
Continue Chamfering Canopy Front Edge
|
|
|
|
09-16-2020
|
1.25
|
Continue Chamfering Canopy Front Edge
|
|
|
|
09-14-2020
|
1.50
|
Chamfered Canopy Front Edge @ Point Oscar
|
|
|
|
09-13-2020
|
0.25
|
Fabricate 0.40 Feeler Gauge
|
|
|
|
09-12-2020
|
2.50
|
Sit Canopy in Frame. See Notes to Right
|
Details
|
|
|
09-10-2020
|
1.50
|
Prep Frame for Canopy's Initial Fit. Add Template
|
|
|
|
09-10-2020
|
1.00
|
Final Sanding of Widow's Leading Edge
|
|
|
|
09-09-2020
|
2.00
|
Begin Final Sanding of Widow's Leading Edge
|
|
|
|
09-08-2020
|
1.75
|
Trim & Fit sides of Window to Clear Skin Supports
|
|
|
|
09-06-2020
|
1.50
|
Continue Countersinking Window - Leading Edge
|
|
|
|
09-05-2020
|
2.50
|
Complete Installation of Canopy Locking Mechanism
|
|
|
|
09-04-2020
|
3.50
|
Begin Installation of Canopy Locking Mechanism
|
|
|
|
09-03-2020
|
1.00
|
Tap Rollbar for #6 Screws
|
|
|
|
09-03-2020
|
2.00
|
Continue Countersinking Window for #6 Screws
|
|
|
|
09-02-2020
|
2.00
|
Sanding Window Eges & Started Countersinking
|
|
|
|
09-01-2020
|
0.75
|
Final Rivet Side Skins to Fuselage
|
|
|
|
09-01-2020
|
1.00
|
Begin Trimming Front Edge of Window
|
|
|
|
08-31-2020
|
1.25
|
Window - Final Drill #27 & Relieve Inside Holes
|
|
|
|
08-31-2020
|
1.75
|
Rivet F-01474A-L&R to Fuselage
|
|
|
|
08-31-2020
|
1.50
|
Final Drill #27 & Dimple Fuselage for Window
|
|
|
|
08-30-2020
|
1.50
|
Remove, Trim & Install Canopy Frame onto Aircraft
|
|
|
|
08-28-2020
|
0.50
|
Trial Fit Canopy Frame onto Aircraft
|
|
|
|
08-26-2020
|
3.00
|
Complete Drilling Sequence of Window Installation
|
|
|
|
08-24-2020
|
2.00
|
Prep Flooring Panels for Primer & Fininsh Paint
|
|
|
|
08-24-2020
|
1.50
|
Begin Drilling Sequence of Window Installation
|
|
|
|
08-22-2020
|
1.75
|
Mark Edging, Remove Film. Enlarge Roll Bar Holes
|
|
|
|
08-20-2020
|
2.25
|
Cut Notches in Rear Window - Buff, Polish, Fit
|
|
|
|
08-19-2020
|
1.50
|
Finish Deburring & Polishing Flooring Panels
|
|
|
|
08-19-2020
|
1.50
|
Final Fit Window for Notching
|
|
|
|
08-18-2020
|
1.50
|
Continue Deburring & Polishing Flooring Panels
|
|
|
|
08-17-2020
|
1.50
|
Prep Window for Installation
|
|
|
|
08-15-2020
|
0.50
|
Reinstall Barake & Rudder Pedel System
|
|
|
|
08-13-2020
|
1.00
|
Wash Down & Prep Interior for Final Coat
|
|
|
|
08-13-2020
|
1.00
|
Remove Masking & Clean
|
|
|
|
08-13-2020
|
1.75
|
AppliedFinal Coat to Fuselage.
|
|
|
|
08-12-2020
|
1.50
|
Begin Deburring & Polishing Floor Components
|
|
|
|
08-11-2020
|
1.75
|
2nd Coat of Paint Applied to Fwd Fuselage Interior
|
|
|
|
08-10-2020
|
2.00
|
2nd Coat of Paint Applied to Aft Fuselage Interior
|
|
|
|
08-08-2020
|
2.75
|
1st Coat of Paint Applied to Fuselage Interior
|
|
|
|
08-05-2020
|
0.50
|
1st Coat of Etching Primer Applied to Baggage Area
|
|
|
|
08-02-2020
|
0.00
|
Painting Weather Delay, Storms w/High Humidity
|
|
|
|
08-01-2020
|
1.50
|
Clean & Rinse Interior to Prep for Painting - Cove
|
|
|
|
07-31-2020
|
3.00
|
Finish Taping off Interior & Exterior for Painting
|
|
|
|
07-29-2020
|
3.50
|
Taping & Blocking Off Firewall Interior for Painti
|
|
|
|
07-28-2020
|
0.50
|
Install Two Missed Rivets in Baggage Floor
|
|
|
|
07-28-2020
|
3.25
|
ContinueTaping Off Interior for Prime & Paint
|
|
|
|
07-27-2020
|
0.75
|
Continue Taping Fuselage Interior/Exterior
|
|
|
|
07-25-2020
|
2.50
|
Finish Sanding Interior for Painting. Started Tapi
|
|
|
|
07-24-2020
|
0.50
|
Continue Sanding of Cockpit Floors
|
|
|
|
07-24-2020
|
1.00
|
Apply 2nd Finish Coat to EZ Out Glovebox
|
|
|
|
07-23-2020
|
1.00
|
Paint 1st Finish Coat to EZ Out Glovebox
|
|
|
|
07-22-2020
|
1.50
|
Sanding, Prep, Prime, etc. - See Notes to Right
|
Details
|
|
|
07-22-2020
|
0.75
|
Begin Sanding of Cockpit Floors
|
|
|
|
07-22-2020
|
1.50
|
Begin Assy. of EZ Out Glove Box
|
|
|
|
07-21-2020
|
0.75
|
Prep & Prime Flap Motor Cover
|
|
|
|
07-21-2020
|
1.00
|
Continue Prepping Cockpit Interior for Painting
|
|
|
|
07-20-2020
|
1.50
|
Began Prepping/Sanding Cockpit for Painting
|
|
|
|
07-19-2020
|
1.50
|
Assemble & Rivet Flap Motor Housing Cover
|
|
|
|
07-17-2020
|
1.75
|
Remove HS & VS Tail Fethers. Reposition Fuselage
|
|
|
|
07-17-2020
|
0.75
|
Add Epoxy Filler (final coat) to HS Stabilizer Tip
|
|
|
|
07-16-2020
|
1.00
|
Sand & Shape Empennage Fairing
|
|
|
|
07-15-2020
|
1.50
|
Remove Empennage Fairing & Rough Sand
|
|
|
|
07-14-2020
|
3.00
|
Prep & Epoxy Empennage Fairing w/Filler
|
|
|
|
07-12-2020
|
1.50
|
Install K1000-6 Nutplates in VS & HS for F-01496
|
|
|
|
07-11-2020
|
3.50
|
Fairing Works - See Notes to Right
|
Details
|
|
|
07-09-2020
|
1.75
|
Final Fitting of F-01496 & Drilling #40 Attach Hol
|
|
|
|
07-08-2020
|
1.75
|
Sand F-01496 Empennage toward scrib line.
|
|
|
|
07-07-2020
|
0.75
|
Continue Sanding & Fitting F-01496 Emp. Fairing
|
|
|
|
07-06-2020
|
1.25
|
Begin Sanding & Fitting F-01496 Emp. Fairing
|
|
|
|
07-02-2020
|
2.50
|
Remove Brake Pedel Assy. for Interior Painting
|
|
|
|
07-01-2020
|
1.00
|
Continue Prepping Cockpit Interior for Painting
|
|
|
|
06-30-2020
|
0.75
|
Rough Trim Empennage Fairing, F-01496
|
|
|
|
06-29-2020
|
1.00
|
Marking of Empennage Fairing & Hole Patterns
|
|
|
|
06-28-2020
|
2.50
|
Final Sanding of Fairings - See Notes to Right
|
Details
|
|
|
06-25-2020
|
0.80
|
More Sanding of Rudder & Elevator Fairings
|
|
|
|
06-24-2020
|
1.00
|
Sanding of Rudder & Elevator Fairings
|
|
|
|
06-23-2020
|
2.50
|
Continue Sanding & Filling Rudder & Elevators
|
|
|
|
06-22-2020
|
1.00
|
Sand & Fill Rudder & Elevators
|
|
|
|
06-20-2020
|
1.25
|
Lightly Sand & Fill Rudder & Elevators
|
|
|
|
06-19-2020
|
1.50
|
Fairing Works Continue - See Note to Right
|
Details
|
|
|
06-17-2020
|
1.25
|
Rough Bend, Left F-14111 Empennage Gap Cover
|
|
|
|
06-17-2020
|
1.00
|
More Fill Workings on Rudder & Left Elevator
|
|
|
|
06-15-2020
|
2.00
|
More Fill Workings on Rudder & Left Elevator
|
|
|
|
06-14-2020
|
2.50
|
More Fill Workings - See Notes to Right
|
Details
|
|
|
06-12-2020
|
10.50
|
Filler Workings. See Note to Right
|
Details
|
|
|
06-05-2020
|
2.00
|
Remove Tail Feathers - See Notes to Right
|
Details
|
|
|
06-04-2020
|
1.50
|
Add Dynalight Filler to L&R Evelators Ends
|
|
|
|
06-03-2020
|
0.50
|
Right Elevator Front Face Bondo Application
|
|
|
|
06-02-2020
|
0.50
|
Left Elevator Front Face Bondo Application
|
|
|
|
05-29-2020
|
1.25
|
Deburr & Polish Flap Motor Cover Box
|
|
|
|
05-29-2020
|
2.00
|
Attached Tail Feathers for Fairing Clearance Check
|
|
|
|
05-28-2020
|
1.50
|
Apply Another Layer of Bondo to Sub-Assemblies
|
|
|
|
05-20-2020
|
1.00
|
Install & Adjust Rod End Bearings
|
|
|
|
05-18-2020
|
3.00
|
Continue Empennage Fairing Work
|
|
|
|
05-12-2020
|
0.75
|
Began Testing of Dynalight Filler on VS Tip
|
|
|
|
05-07-2020
|
1.25
|
Began Sanding & Preping VS Top Fairing for Filler
|
|
|
|
05-06-2020
|
1.00
|
Added Reinforcement Cloth to Interior of VS Tip.
|
Details
|
|
|
05-04-2020
|
1.00
|
Fairing Works: See Remarks to Right...
|
Details
|
|
|
05-03-2020
|
1.50
|
Cut, Trim, Drill & Sand VS Fairing. Rough Cut Fill
|
|
|
|
05-02-2020
|
1.50
|
Interior Cloth Applied to Tips. Laid VS Tip Filler
|
|
|
|
05-01-2020
|
1.25
|
Set 1st Epoxy Layer for Tips Inserts
|
|
|
|
04-30-2020
|
1.25
|
Began Triming HS Tip Inserts
|
|
|
|
04-28-2020
|
1.50
|
Fiberglass Work on Left Elevator Tip Insert
|
Details
|
|
|
04-23-2020
|
2.00
|
Add 3 More Layers to Left Tip Insert. Right Done.
|
Details
|
|
|
03-29-2020
|
3.50
|
Elevator Attach - See Notes to Right
|
Details
|
|
|
03-25-2020
|
1.00
|
Elevator Alignment - See Notes to Right
|
Details
|
|
|
03-21-2020
|
0.75
|
Install VS-01402 Brackets
|
|
|
|
03-20-2020
|
2.50
|
Install L&R Elevator Tips & Rod End Bearings, x4ea
|
|
|
|
03-19-2020
|
1.00
|
Epoxy #4 Washers to Elevator Fairings
|
Details
|
|
|
03-18-2020
|
1.00
|
Match Drill & Countersink Left Elevator Fairing
|
|
|
|
03-13-2020
|
1.00
|
Match Drill & Dimple for Right Elevator Fairing
|
|
|
|
03-11-2020
|
3.00
|
Began Right Elevator Fairing - See Notes to Right
|
Details
|
|
|
03-10-2020
|
1.25
|
Completed Rudder Fairings
|
Details
|
|
|
03-09-2020
|
2.25
|
Fairings Continue - See Notes to Right
|
Details
|
|
|
03-08-2020
|
3.00
|
Fairings Continue - See Notes to Right
|
Details
|
|
|
03-07-2020
|
4.25
|
Continue Fairing Work - See Notes to Right
|
Details
|
|
|
03-06-2020
|
1.25
|
Clean Up & Match Drill #40 Bottom Rudder Fairing
|
|
|
|
03-05-2020
|
2.75
|
Continue Working Rudder Fairings
|
|
|
|
03-04-2020
|
2.00
|
Continue Working Rudder Fairings
|
|
|
|
03-03-2020
|
3.25
|
Began Sect. 12 Rudder Bottom Fairing Work
|
|
|
|
03-02-2020
|
1.00
|
Prime & Rivet VA-195C to Left Wing Bottom
|
Details
|
|
|
03-01-2020
|
2.50
|
Deburring, Priming & Riveting - See Notes to Right
|
Details
|
|
|
02-29-2020
|
3.00
|
Deburr, Polish & Dimple - See Notes to Right
|
Details
|
|
|
02-27-2020
|
4.80
|
Main Gear Work - See Notes to Right
|
Details
|
|
|
02-26-2020
|
3.75
|
Deburr, Polish & Prime 4ea. U-00002 Brackets
|
Details
|
|
|
02-25-2020
|
2.00
|
Begin QB Wing Assembly - See Notes to Right
|
Details
|
|
|
02-24-2020
|
1.00
|
Safety Wired Brake Assemblies. Connect Hoses
|
|
|
|
02-23-2020
|
2.50
|
Installed Main Tires & Brake Assemblies
|
Details
|
|
|
02-22-2020
|
2.00
|
Repositioned Fuselage & Attached U-0009 Axles
|
|
|
|
02-21-2020
|
2.50
|
Installlation of Nose Gear Yoke & Tire Assembly
|
|
|
|
02-19-2020
|
5.50
|
Gear Works - See Notes to Right
|
Details
|
|
|
02-18-2020
|
5.00
|
Finished Right & Left Main Gear Installations
|
|
|
|
02-17-2020
|
2.50
|
Torque Engine Mount Bolts. Install Main Gear (R)
|
|
|
|
02-17-2020
|
2.25
|
Began Right Main Gear Installation
|
|
|
|
02-16-2020
|
2.25
|
Raise Fuselage -See Notes to Right
|
Details
|
|
|
02-15-2020
|
3.50
|
Install U-01404 L&R w/Alum. Bushings
|
Details
|
|
|
02-14-2020
|
1.50
|
Torque Hub Bolts, Pack Bearing & Infliate to 35psi
|
|
|
|
02-13-2020
|
1.00
|
Continue Tube to Tire Assy for Nose Wheel
|
|
|
|
02-12-2020
|
0.75
|
Prime U-01405 L&R and U-01404 L&R
|
|
|
|
02-12-2020
|
2.00
|
Fabricated L&R Gear Attachment Angles, U-01405
|
|
|
|
02-12-2020
|
0.50
|
Began Tube to Tire Assembly
|
|
|
|
02-11-2020
|
1.25
|
Start of Section 40. Installed Engine Mount
|
|
|
|
02-10-2020
|
3.75
|
Finish Riveting Canopy Frame. See Notes to Right
|
Details
|
|
|
02-09-2020
|
2.00
|
Final Riveting of Canopy Frame - See Notes
|
Details
|
|
|
02-09-2020
|
1.00
|
Began Riveting Rails to Forward Canopy Assembly
|
|
|
|
02-08-2020
|
3.50
|
Riviting of Forward Canopy Frame
|
|
|
|
02-07-2020
|
4.50
|
Riveting of Forward Canopy - See Notes to Right
|
Details
|
|
|
02-06-2020
|
3.00
|
Dimpling, Deburring, etc. - See Notes to Right
|
Details
|
|
|
02-05-2020
|
3.25
|
Machine Countersinking - See Notes to Right
|
Details
|
|
|
02-04-2020
|
4.75
|
Dimple C-01419 L&R. Begin Countersinking Rails
|
|
|
|
02-03-2020
|
2.00
|
Canopy Handles - See Notes to Right
|
Details
|
|
|
02-02-2020
|
3.25
|
Canopy Works Continue - See Notes to Right
|
Details
|
|
|
02-01-2020
|
3.00
|
Canopy Rails, etc. - See Notes to Right
|
Details
|
|
|
01-31-2020
|
1.75
|
Rivet, Match Drill, etc. - See Notes to Right
|
Details
|
|
|
01-30-2020
|
2.00
|
Stress Relief & M/C - See Notes to Right
|
Details
|
|
|
01-28-2020
|
2.25
|
Rivet C-01409 L&R to C-01427 L&R
|
|
|
|
01-27-2020
|
2.25
|
M/C, Prime & Fabricate - See Notes to Right...
|
Details
|
|
|
01-25-2020
|
1.50
|
Flute C-01409 L&R, Match Drill to C-01427 L&R
|
|
|
|
01-25-2020
|
1.50
|
Countersink C-01409 L&R, - 19 ea. per Rail
|
|
|
|
01-24-2020
|
1.25
|
Countersink C-01427 L&R, Prep C-01409 for fluting
|
|
|
|
01-22-2020
|
1.25
|
Deburr & Polish Continues - See Right
|
Details
|
|
|
01-21-2020
|
2.25
|
Match & Final Drilling - See Right
|
Details
|
|
|
01-17-2020
|
1.50
|
Continue Assembly of Canopy Frame - See Right
|
Details
|
|
|
01-16-2020
|
1.50
|
Machine Countersink C-01408 L&R Rail Base
|
|
|
|
01-16-2020
|
2.25
|
Began Riveting of Canopy Frame - See Right
|
Details
|
|
|
01-15-2020
|
1.50
|
Finish Alignment of Canopy Skin Ribs
|
|
|
|
01-15-2020
|
0.50
|
Canopy Ribs, etc.
|
|
|
|
01-13-2020
|
1.00
|
Flute & Fit -01402 & C-01403 to Canopy Top Skin
|
|
|
|
01-13-2020
|
1.00
|
Fit C-01402 & C-01403 to Canopy Top Skin
|
Details
|
|
|
01-12-2020
|
1.75
|
Separate, Deburr & Polish C-01409 L&R
|
Details
|
|
|
01-11-2020
|
2.50
|
Deburring, Polish, & Dimple - See Notes to Right
|
Details
|
|
|
01-11-2020
|
0.50
|
Complete Canopy Top Skin Dimpling
|
|
|
|
01-10-2020
|
3.00
|
Debur & Polish, See Note to Right
|
Details
|
|
|
01-09-2020
|
1.50
|
Moving Forward Deburring Canopy Components
|
Details
|
|
|
01-08-2020
|
1.50
|
Continue Deburring & Polishing Canopy Components
|
Details
|
|
|
01-07-2020
|
1.50
|
Debur & Polish C-01406L
|
|
|
|
01-06-2020
|
1.50
|
Debur & Polish C-01406R
|
|
|
|
01-03-2020
|
1.50
|
Riveting & Separating Parts - See Right for Detail
|
Details
|
|
|
01-01-2020
|
2.75
|
More Canopy Frame Works - See Right for Details
|
Details
|
|
|
12-31-2019
|
1.00
|
Debur & Polish Canopy Latch Assemblies
|
Details
|
|
|
12-26-2019
|
3.00
|
Begin Assembly of Canopy Frame - See Right
|
Details
|
|
|
12-22-2019
|
0.50
|
Re-Position Seatback Braces
|
|
|
|
12-17-2019
|
1.25
|
Fabricate Seat Hinge Pins & Install
|
|
|
|
12-17-2019
|
2.25
|
Complete Riveting of Seat Back Assemblies
|
|
|
|
12-16-2019
|
1.50
|
Prime & Rivet Hinges to F-01437 Seat Braces
|
|
|
|
12-16-2019
|
2.00
|
Match Drill #12 Seat Angles, Deburr & Reassemble
|
|
|
|
12-16-2019
|
0.75
|
Begin Final Riviting of Seat Back Assemblies
|
|
|
|
12-15-2019
|
4.00
|
Continue Seat Works - See Notes to Right.
|
Details
|
|
|
12-14-2019
|
3.50
|
Continue w/ Seat Back Workings
|
Details
|
|
|
12-13-2019
|
2.00
|
Sect.37 C/W - Rivet F-14125 L&R to Fuselage
|
|
|
|
12-13-2019
|
2.50
|
Seat Back Assemblies Prep
|
|
|
|
12-12-2019
|
0.50
|
Final Riveting of Rollover Bar Assembly
|
|
|
|
12-12-2019
|
0.75
|
Begin Side Stiffeners Attachment
|
|
|
|
12-11-2019
|
3.50
|
Continue Attachment of Rollover Bar to Fuselage
|
|
|
|
12-10-2019
|
2.50
|
Begin Attachment of Rollover Bar to Fuselage
|
|
|
|
12-09-2019
|
2.25
|
Rollover Structure Assy. - See Notes to Right.
|
Details
|
|
|
12-05-2019
|
1.00
|
Match Drill Rollover Bar's Forward Mount Holes
|
|
|
|
12-02-2019
|
4.00
|
Final Assy. & Riviting of Rollover Bar
|
|
|
|
12-01-2019
|
1.00
|
Prime Inside of Rollover Bars. Prep for Riveting
|
|
|
|
12-01-2019
|
3.00
|
Countersink Fwd Bar, Outer Strap & Window Shims
|
|
|
|
11-29-2019
|
2.00
|
Match Drill Rollover Assy., Aft Side
|
|
|
|
11-29-2019
|
1.25
|
Deburr Rollover Assy.
|
|
|
|
11-28-2019
|
0.50
|
Separate & Debur & Polish C-01433, 4ea
|
|
|
|
11-27-2019
|
0.75
|
Separate & Debur& Polish C-01432, 4ea
|
|
|
|
11-27-2019
|
1.50
|
Match Drill Rollover Assy., Forward Side, Outboard
|
|
|
|
11-26-2019
|
1.75
|
Match Drill Rollover Assy., Aft Side, Outboard
|
|
|
|
11-25-2019
|
0.75
|
Prep Forward Rollover Structure for Riveting
|
|
|
|
11-25-2019
|
2.50
|
Assemble Rollover Structure for Match Drilling
|
|
|
|
11-22-2019
|
0.75
|
Remove Powdercoating & Attach CS Bases
|
|
|
|
11-22-2019
|
1.75
|
Match Drill Control Stick Holes to CS Bases
|
|
|
|
11-22-2019
|
2.00
|
Install Pushrobs & Bellcrank Mounting Plate
|
|
|
|
11-21-2019
|
1.25
|
Paint Wiring Channel & Power Module Assembles
|
|
|
|
11-21-2019
|
1.25
|
File, Fit & Install CS-00011 Idler Arm
|
|
|
|
11-20-2019
|
2.50
|
Prep & Complete Bellcrank Mounting Plate
|
|
|
|
11-20-2019
|
3.00
|
Complete Push Rod Assemblies & Prime
|
|
|
|
11-19-2019
|
3.50
|
Prep & Complete Bellcrank Assembly
|
|
|
|
11-19-2019
|
1.50
|
Assembly of Pushrod CS-3
|
|
|
|
11-18-2019
|
1.50
|
Begin Aileron & Elevator Systems
|
Details
|
|
|
11-18-2019
|
2.50
|
Assembly of Pushrods CS-1 & CS-2
|
|
|
|
11-16-2019
|
0.75
|
Prime Wiring Channel & Power Module Assembles
|
|
|
|
11-16-2019
|
0.75
|
Install Nutplates to Wiring Channel Assembly
|
|
|
|
11-16-2019
|
2.50
|
Debur, Polish & Dimple Wiring Channel Assy.
|
|
|
|
11-16-2019
|
2.50
|
Debur, Dimple & Assemble Power Module Assembly
|
|
|
|
11-15-2019
|
1.00
|
Tighten & Torque Flap Control Assembly Bolts
|
|
|
|
11-15-2019
|
0.75
|
Safety Wire & Torque Seal Flap Control Assy.
|
|
|
|
11-15-2019
|
2.50
|
Install Flap Control Motor Assy.
|
|
|
|
11-14-2019
|
0.75
|
Install Flap Crank to Flap Torque Arms
|
|
|
|
11-14-2019
|
1.00
|
Align & Drill Right Flap Control Arm Assembly
|
|
|
|
11-13-2019
|
1.50
|
Align & Drill Left Flap Control Arm Assembly
|
|
|
|
11-12-2019
|
3.50
|
Install Rudder Cables Through Wing Spar & Tunnel
|
Details
|
|
|
11-11-2019
|
1.50
|
Tighten & Tie Wrap Brake lines
|
Details
|
|
|
11-01-2019
|
1.50
|
Begin Assembly of Flap Control System
|
|
|
|
10-31-2019
|
1.00
|
Finish Deburring Roll-Over Structure
|
|
|
|
10-30-2019
|
3.00
|
Continue Deburring Roll-Over Structure
|
|
|
|
10-29-2019
|
1.50
|
Completed Install of Aircraft Speciality Lines
|
|
|
|
10-29-2019
|
1.00
|
Began Torguing Fuel Line AN Fittings
|
|
|
|
10-28-2019
|
2.00
|
Routing Modification of Aircraft Speciality Lines
|
|
|
|
10-26-2019
|
0.50
|
Prime & Paint (2nd coat) Air Vent Components
|
|
|
|
10-23-2019
|
1.25
|
Prime & Paint (1st coat) Air Vent Components
|
|
|
|
10-22-2019
|
1.75
|
Prep Vent Assemblies for Painting
|
|
|
|
10-22-2019
|
1.50
|
Install Brake Pedals to Cockpit
|
|
|
|
10-21-2019
|
2.00
|
Taping for Interior Painting
|
Details
|
|
|
10-20-2019
|
2.50
|
Completed Pedal & Cylinder Attachment Assembly
|
|
|
|
10-19-2019
|
1.50
|
Begin Pedal Attachment to Brake Assembly
|
|
|
|
10-17-2019
|
2.50
|
Begin Deburring Roll-Over Structure
|
|
|
|
10-16-2019
|
1.50
|
Complete Brake & Rudder Pedal Riveting
|
Details
|
|
|
10-11-2019
|
0.75
|
Finished Riveting Baggage Area Side Skins Panels
|
|
|
|
10-10-2019
|
1.75
|
Deburr Baggage Area Side Skins
|
|
|
|
10-10-2019
|
1.50
|
Complete the Installation of Flap Motor Channel
|
|
|
|
10-10-2019
|
2.00
|
Begin Installation of Left Baggage Area Side Skins
|
|
|
|
10-09-2019
|
2.00
|
Begin Installation of Flap Motor Channel
|
|
|
|
10-08-2019
|
3.75
|
Rivet Baggage Floor Panel Nutplates
|
|
|
|
10-07-2019
|
5.00
|
Prep & Blind Rivet Left Baggage Floor Panel
|
|
|
|
10-06-2019
|
6.50
|
Prep & Blind Rivet Right Baggage Floor Panel
|
|
|
|
10-05-2019
|
2.00
|
Complete the Mating of the Fuselage Sections
|
|
|
|
10-03-2019
|
2.00
|
Modify Brake Assembly Mounting Blocks
|
|
|
|
10-02-2019
|
3.00
|
Continue With the Mating of the Fuselage Sections
|
|
|
|
09-30-2019
|
0.75
|
Installed Brake Fluid Reservoir
|
|
|
|
09-26-2019
|
3.25
|
Completed Prep of Right Rudder Pedal Assembly
|
Details
|
|
|
09-25-2019
|
2.25
|
Prepping & Deburring Right Brake Pedal
|
|
|
|
09-24-2019
|
2.50
|
Continue Riveting Fuselage Sections Together
|
Details
|
|
|
09-24-2019
|
1.50
|
Continue Prepping & Deburring Left Brake Pedal
|
|
|
|
09-24-2019
|
1.50
|
Completed Prep of Left Rudder Pedal Assembly
|
|
|
|
09-23-2019
|
2.00
|
Prep & Deburr Brake Pedals
|
|
|
|
09-22-2019
|
1.50
|
Prep & Rivet Flap Motor Channel
|
|
|
|
09-21-2019
|
1.50
|
Prep & Countersink Baggage Floor Splice
|
|
|
|
09-19-2019
|
2.00
|
Continue Riveting Fuselage Sections Together
|
Details
|
|
|
09-18-2019
|
3.00
|
Riveting of Forward & Aft Fuselages
|
|
|
|
09-17-2019
|
2.50
|
Dimple Baggage Floor Panels, Install Nutplates
|
|
|
|
09-16-2019
|
1.75
|
Debur Baggage Floor Panels. Mark for Dimpling
|
|
|
|
09-15-2019
|
2.50
|
Fabricate Seatback Hinges
|
|
|
|
09-13-2019
|
2.50
|
Fabricate Flap Bushings
|
|
|
|
09-12-2019
|
1.50
|
Complete Left & Right Air Vent Assembly
|
|
|
|
09-11-2019
|
0.75
|
Cut & Trim Right Vent Assembly
|
|
|
|
09-10-2019
|
1.75
|
Cut & Trim Left Vent Assembly
|
|
|
|
09-09-2019
|
1.75
|
Prep SV-10 Fresh Air Vents
|
|
|
|
09-08-2019
|
4.00
|
Install Fuel Lines
|
|
|
|
09-07-2019
|
1.75
|
Install Fuel Pump & Filter Assembly
|
|
|
|
09-06-2019
|
2.00
|
Install Fuel Line Holding Tabs in Fuselage
|
|
|
|
09-03-2019
|
2.50
|
Begin Riveting to Aft to Forward Fuselages
|
Details
|
|
|
09-02-2019
|
1.75
|
Final Riveting of Lug Assemblies to Fuselage
|
|
|
|
09-01-2019
|
1.75
|
Build Fuselage Flooring
|
|
|
|
08-31-2019
|
4.00
|
Build & Install Fuselage Supports
|
|
|
|
08-29-2019
|
1.75
|
Assembly of Shoulder Harness Lugs
|
|
|
|
08-28-2019
|
1.00
|
Straighten Forward Bulkheads for Assembly
|
|
|
|
08-28-2019
|
4.00
|
Married & Clecoed Forward & Aft Fuselage
|
|
|
|
08-28-2019
|
2.00
|
Install Forward Bulkhead Assembly
|
|
|
|
08-26-2019
|
3.50
|
Begin Assembly of Forward Bulkhead, Deburr & Dimpl
|
|
|
|
08-25-2019
|
1.75
|
Install U-01402 Lower Gear Braces
|
|
|
|
08-24-2019
|
0.50
|
Install Brass Elbows to U-01402 Lower Gear Braces
|
|
|
|
08-20-2019
|
1.25
|
Enlarge Holes in Floor, Begin Gear Leg Cutouts
|
|
|
|
08-16-2019
|
1.50
|
Review plans for QB completion of required steps
|
|
|
|
08-15-2019
|
2.00
|
Rolled & Rivited Right Elevators Leading Edge.
|
Details
|
|
|
08-12-2019
|
2.00
|
Phase Inspection #1 - N418BV RV14A
|
Details
|
|
|
08-12-2019
|
1.25
|
Attach Rightt Elevator Counter Balance Weights
|
|
|
|
08-11-2019
|
1.50
|
Final Closing of Right Elevator
|
|
|
|
08-09-2019
|
2.50
|
Close Right Elevator's Trailing Edge. Set to Cure
|
|
|
|
08-08-2019
|
2.50
|
Rivet Shear Clip, Gusset, & Top Skin to Rear Spar
|
|
|
|
08-08-2019
|
2.00
|
Continue Close-Up,Right Elevato to Trailing Edge
|
|
|
|
08-07-2019
|
2.00
|
Rivet Top Skin to Rear Spar. Attach Front Spar
|
|
|
|
08-07-2019
|
2.75
|
Rivet Bottom Skin to Rear Spar & Ribs to Skins
|
|
|
|
08-06-2019
|
1.50
|
Buffed Up Rib &Trailing Edges of Skins for Bonding
|
|
|
|
08-05-2019
|
4.00
|
Dimple Right Skins & Spar. Mark Foam Ribs Loocatio
|
|
|
|
08-04-2019
|
1.00
|
Began Re-Constructin of Right Elevator
|
|
|
|
08-02-2019
|
1.50
|
Complete Left Elevator
|
|
|
|
07-28-2019
|
1.50
|
Attach Left Elevator Counter Balance Weights
|
|
|
|
07-27-2019
|
2.50
|
Roll Left Elevator's Leading Edge
|
|
|
|
07-25-2019
|
1.50
|
Final Riveting of Left Elevator's Trailing Edge
|
|
|
|
07-24-2019
|
1.00
|
Assembly of Elevator Trim Servo Mount
|
|
|
|
07-23-2019
|
2.00
|
Continue Close-out of Left Elevator
|
Details
|
|
|
07-23-2019
|
1.50
|
Completed Riveting, Added Sealant to Ribs, Curing
|
|
|
|
07-22-2019
|
1.75
|
Riveting - Left Elevator Close-Up
|
Details
|
|
|
07-22-2019
|
2.50
|
Rivet Front Spar, Cleco Assembly for Riveting
|
|
|
|
07-19-2019
|
0.50
|
Continue Prep Left Elevator for Final Assembly
|
Details
|
|
|
07-17-2019
|
2.50
|
Rivet Ribs & AttachTrim Tab Servo Mount
|
|
|
|
07-16-2019
|
1.50
|
Dimple Top Left Skin, Rivet Aft Spar
|
|
|
|
07-13-2019
|
1.00
|
Final Assembly of Elevator Trim Tab
|
|
|
|
07-12-2019
|
1.50
|
RivetTrim Horn & Bottom Flange to Skin
|
|
|
|
07-11-2019
|
2.50
|
Cut Foam Ribs, Scuff, Clean & Dimple Trim Tab
|
|
|
|
07-08-2019
|
0.50
|
Finish Counterinking of Trim Wedge
|
|
|
|
07-05-2019
|
1.00
|
Counterinking of Trim Wedge
|
|
|
|
07-04-2019
|
1.00
|
Complete Match Drill & Setup for Assembly
|
|
|
|
07-03-2019
|
1.50
|
Match Drill Trim Tab Hinge
|
|
|
|
07-03-2019
|
2.50
|
Deburr Forward Spars, Assemble for Hinge Prep
|
|
|
|
07-02-2019
|
2.50
|
Rivet Top Center Skin Assembly to Fuselage
|
|
|
|
07-02-2019
|
0.50
|
Complete Fuselage
|
|
|
|
07-01-2019
|
1.50
|
Shape & Bend Left Elevator Closeout Tabs
|
|
|
|
07-01-2019
|
2.00
|
Began Re-Construction of Left Elevator
|
|
|
|
06-26-2019
|
2.00
|
Rivet Left Top Skin to Fuselage
|
|
|
|
06-25-2019
|
0.50
|
Cleco Top Plate to Fuselage
|
|
|
|
06-24-2019
|
3.00
|
Build Fuselage Platform
|
|
|
|
06-18-2019
|
2.00
|
Rivet Top Right Skin to Fuselage
|
|
|
|
06-15-2019
|
1.50
|
Secure Wiring Harness, Remove 2 Nutplate Rivets
|
|
|
|
06-14-2019
|
2.50
|
Modify Yoke to Enable Aft Fuselage Riveting
|
|
|
|
06-14-2019
|
1.25
|
Install Remaining Aft Fuselage Rivets
|
|
|
|
06-13-2019
|
1.00
|
Fit Skins
|
|
|
|
06-13-2019
|
1.50
|
Deburr, File & Smooth Edges to Left Top Skin
|
|
|
|
06-13-2019
|
1.25
|
Break Edges & Dimple Left Top Skin
|
|
|
|
06-12-2019
|
2.00
|
Break Edges & Dimple Right Top Skin
|
|
|
|
06-11-2019
|
1.50
|
Deburr, File & Smooth Edges to Right Top Skin
|
|
|
|
06-10-2019
|
3.00
|
Deburr, Break & Assemble Center Top Plate Skin
|
|
|
|
06-08-2019
|
1.50
|
Completed Top Plate Installation
|
|
|
|
06-05-2019
|
2.00
|
Riveting Top Plate to Fuselage
|
Details
|
|
|
06-03-2019
|
1.50
|
Installed Comm & ELT cablels
|
|
|
|
06-01-2019
|
1.50
|
Completed Installation of Static System
|
|
|
|
05-31-2019
|
0.75
|
Begin Installation of Static System
|
|
|
|
05-29-2019
|
1.50
|
Install Rudder Cable & Guides
|
|
|
|
05-28-2019
|
1.50
|
Attach F-01473A Stiffeners & Right Rudder Stop
|
|
|
|
05-27-2019
|
2.00
|
Finished Riveting Tail Cone Side Skins to Skeleton
|
|
|
|
05-24-2019
|
0.50
|
Continue Riveting Tail Cone Side Skins to Skeleton
|
|
|
|
05-23-2019
|
3.50
|
Continue Riveting Tail Cone Side Skins to Skeleton
|
|
|
|
05-22-2019
|
3.50
|
Continue Riveting Tail Cone Side Skins to Skeleton
|
|
|
|
05-21-2019
|
1.50
|
Continue Riveting Tail Cone Side Skins to Skeleton
|
|
|
|
05-20-2019
|
4.00
|
Continue Riveting Tail Cone Side Skins to Skeleton
|
|
|
|
05-16-2019
|
1.25
|
Continue Riveting Tail Cone Assembly
|
|
|
|
05-15-2019
|
2.00
|
Continue Riveting Tail Cone Assembly
|
|
|
|
05-14-2019
|
4.00
|
Continue Riveting Tail Cone Assembly
|
|
|
|
05-13-2019
|
1.50
|
Clecoed Tail Cone & Began Riveting
|
|
|
|
05-11-2019
|
2.50
|
Cleco on Left & Right Side Skins
|
|
|
|
05-10-2019
|
2.00
|
Countersink Longerons for #6 Screws
|
Details
|
|
|
05-08-2019
|
0.00
|
Hold on construction - awaiting tooling & parts
|
Details
|
|
|
05-05-2019
|
5.00
|
Rivet Bulkheads & Lower Aft Fuselage Skin
|
|
|
|
05-04-2019
|
2.50
|
Install Wiring Harness in Fuselage Skeleton
|
|
|
|
05-03-2019
|
2.50
|
Complete Dimpling of Side Skins
|
|
|
|
05-03-2019
|
1.00
|
Beginning Assembly of Tailcone Skeleton
|
|
|
|
05-02-2019
|
1.50
|
Complete Countersinking Longerons
|
|
|
|
05-01-2019
|
2.25
|
Begin Countersinking Longerons
|
|
|
|
04-30-2019
|
2.00
|
Complete Riveting of Bottom Skin. Prep Side Skins
|
|
|
|
04-30-2019
|
1.50
|
Begin Dimpling of Side Skins
|
Details
|
|
|
04-29-2019
|
4.50
|
Rivet Bottom Skin to Skeleton
|
|
|
|
04-28-2019
|
4.50
|
Dimple F-01478 Skin. Celco on Bulkheads & Stiffene
|
Details
|
|
|
04-27-2019
|
2.50
|
Complete Battery Angle & Bulkhead Assembly, F-0140
|
|
|
|
04-26-2019
|
1.50
|
Countersink Battery Angles, Prime. Attach Nutplate
|
|
|
|
04-26-2019
|
1.00
|
Assembly& Rivet F-01407 & F-01408 Bulkheads
|
|
|
|
04-25-2019
|
2.50
|
Deburring of F-01407 & F-01408 Bulkheads
|
|
|
|
04-25-2019
|
2.30
|
Complete Assembly of F-01410 Bulkhead
|
|
|
|
04-24-2019
|
1.50
|
Completed Assembly of F-01411 Bulkhead
|
|
|
|
04-24-2019
|
2.00
|
Begin Assembly of F-01410 Bulkhead, Deburring
|
|
|
|
04-23-2019
|
1.00
|
Begin Assembly of F-01411 Bulkhead
|
|
|
|
04-22-2019
|
1.00
|
Prep F-01412 Bulkhead for Assembly
|
|
|
|
04-22-2019
|
1.50
|
Finish F-01412 Bulkhead
|
|
|
|
04-21-2019
|
6.50
|
Fabricate Rudder Stop & HS Attachment Bar
|
|
|
|
04-21-2019
|
2.50
|
Deburring, Sanding & Buffing
|
|
|
|
04-20-2019
|
4.50
|
Begin Assembly of Tail Cone, Deburring, etc.
|
|
|
|
04-19-2019
|
1.50
|
Preassembly of Skins to Skeleton; Left & Right
|
|
|
|
04-19-2019
|
2.50
|
Completed Riveting of Skins to Rear Spars
|
Details
|
|
|
04-17-2019
|
2.00
|
Continuing Riveting Skins & Spars
|
|
|
|
04-16-2019
|
1.50
|
Riveting Skins & Spars
|
|
|
|
04-15-2019
|
1.40
|
Rivet Trim Tab Hinge to Rear Spar
|
|
|
|
04-14-2019
|
4.50
|
Evelvator Skeleton Assembly, x2
|
|
|
|
04-14-2019
|
4.00
|
Continue with Evelvator Skeleton Assembly, x2
|
|
|
|
04-12-2019
|
2.50
|
Complete Trim Tab Assembly
|
|
|
|
04-10-2019
|
2.00
|
Scuff Skins & Spars, Dimple, Deburring
|
|
|
|
04-09-2019
|
0.75
|
Prep Left Skins for Scuffing
|
|
|
|
04-07-2019
|
0.50
|
Trim Trim Tab Foam Support Wedges
|
|
|
|
04-06-2019
|
3.00
|
Scuff & Pre-Assemble, Rivet Trim Tab
|
|
|
|
04-05-2019
|
1.25
|
Dimple & Prep Trim Tab Skins for Bonding of Ribs
|
|
|
|
04-03-2019
|
1.00
|
Begin Assembly of Elevator Trim Tab
|
|
|
|
04-02-2019
|
3.00
|
Prep & Assemble; Nut Plates, Trim Pushrod & Horn
|
|
|
|
04-01-2019
|
1.75
|
Machine Countersink Trailing Edge Wedges
|
|
|
|
03-31-2019
|
3.75
|
Disassemble Leftt Evelator, Deburr & Dimple
|
|
|
|
03-30-2019
|
4.50
|
Disassemble Right Evelator, Deburr & Dimple
|
|
|
|
03-29-2019
|
2.00
|
Continue with Evelator Skeleton Assemblies
|
|
|
|
03-29-2019
|
2.00
|
Attachment of Control Horns & Tip Rib Assemblies
|
|
|
|
03-28-2019
|
1.50
|
Align & Matc Drill Evelator Hinges
|
|
|
|
03-27-2019
|
1.50
|
Continue Assembly oof Skeleton
|
|
|
|
03-26-2019
|
2.50
|
Assembly of Skeltons
|
|
|
|
03-25-2019
|
1.75
|
Cut out foam blocks, bend skin tabs, prep spars
|
|
|
|
03-24-2019
|
1.00
|
Prep Foam Blocks, etc.
|
|
|
|
03-22-2019
|
1.50
|
Trim out support ribs. Deburring.
|
|
|
|
03-21-2019
|
2.00
|
Completed HS Skins Riveting & Assembly
|
|
|
|
03-20-2019
|
2.50
|
Continue Riveting HS Skins to Skeleton
|
|
|
|
03-19-2019
|
2.50
|
Continue Riveting HS Skins to Skeleton
|
|
|
|
03-18-2019
|
3.00
|
Begin Riveting HS Skins to Skeleton
|
|
|
|
03-17-2019
|
5.00
|
Complete Spar Assemblies & Insert into Skins
|
|
|
|
03-16-2019
|
1.75
|
Rivit Central Spar/Stiffener Assy. Prime Tip Rib
|
Details
|
|
|
03-16-2019
|
1.50
|
Modify & celco in place 905 ribs to left & right s
|
|
|
|
03-16-2019
|
1.00
|
Complete Riveting of Ribs to Froward Spar
|
|
|
|
03-15-2019
|
1.50
|
Countersinking Bottom of HS Spars & Stiffeners
|
|
|
|
03-14-2019
|
1.75
|
Countersinking Top of HS Spars & Stiffeners
|
Details
|
|
|
03-13-2019
|
0.00
|
Combating the Flu - No Construction from 3/8--3/13
|
|
|
|
03-07-2019
|
0.50
|
Finished Skin Dimpling - Leading Edge Holes
|
|
|
|
03-07-2019
|
3.50
|
Begin Skin Dimpling
|
|
|
|
03-05-2019
|
2.00
|
Rib Deburring & Fluting
|
|
|
|
03-04-2019
|
2.50
|
Front Spar Prep & Riveting
|
|
|
|
03-03-2019
|
1.50
|
Match Drill Reinforcement Angles & Plate to Spar
|
|
|
|
03-01-2019
|
1.50
|
Add Front Spar Reinforcement Angle
|
|
|
|
02-28-2019
|
1.50
|
Continue Shaping & Deburring HS Parts
|
|
|
|
02-27-2019
|
3.00
|
Shaping & Deburring HS Parts
|
|
|
|
02-26-2019
|
1.50
|
Rivet Spar Doubler & Attach Elevator Brackets
|
|
|
|
02-24-2019
|
1.50
|
Continue Deburring. Primed HS Doubler
|
|
|
|
02-23-2019
|
2.50
|
Began Assembly - Deburring
|
|
|
|
02-22-2019
|
2.00
|
Completed Rudder Assembly
|
|
|
|
02-21-2019
|
1.00
|
Continue Rolling Leading Edge - Center Section
|
|
|
|
02-20-2019
|
0.75
|
Continue Rolling Leading Edge
|
|
|
|
02-19-2019
|
1.75
|
Complete Rudder Riveting
|
|
|
|
02-19-2019
|
0.75
|
Began Rolling Leading Edge
|
|
|
|
02-18-2019
|
2.00
|
Install Rudder Horn & Rivet Skins
|
|
|
|
02-18-2019
|
0.50
|
Assemble & Rivet Counter Weight Attachment
|
|
|
|
02-17-2019
|
1.50
|
Install Spar Assembly
|
|
|
|
02-17-2019
|
3.50
|
Finish Trailing Edge
|
|
|
|
02-16-2019
|
3.50
|
Fabricate HS cradles, 4ea.
|
|
|
|
02-16-2019
|
1.25
|
Attach Skins & Trailing Edge
|
|
|
|
02-15-2019
|
1.50
|
Attach 3M VHB tape to wedge. Prep roll templates
|
|
|
|
02-14-2019
|
1.00
|
Prep Wedge for Adhesion to Right Skin
|
Details
|
|
|
02-13-2019
|
1.25
|
Complete Wedge Countersinking
|
|
|
|
02-12-2019
|
1.25
|
Additional Countersinking of Rudder Wedge
|
|
|
|
02-10-2019
|
2.00
|
Rivet Stiffeners to Right Skin
|
|
|
|
02-10-2019
|
1.00
|
Coutersink Trailing Edge Wedge
|
|
|
|
02-09-2019
|
0.50
|
Re-Prime Rudder Ribs - Touch-Up.
|
|
|
|
02-09-2019
|
3.00
|
Dimple Rudder Skins
|
|
|
|
02-08-2019
|
1.50
|
Finish Tabletop Modification. Sand top smooth.
|
|
|
|
02-07-2019
|
1.00
|
Modify Tabletop for Aluminum Angle
|
|
|
|
02-06-2019
|
3.00
|
Match Drill Skins to Skeleton
|
|
|
|
02-05-2019
|
2.50
|
Setting Rudder Skins
|
|
|
|
02-04-2019
|
2.00
|
Continued Assembly of Rudder Skeleton
|
|
|
|
02-04-2019
|
2.00
|
Began Riveting of Main Spar
|
|
|
|
02-03-2019
|
1.25
|
Complete Stiffener Assemblies
|
|
|
|
02-02-2019
|
5.00
|
Modify, Trim & Buff Stiffener Assy.
|
|
|
|
01-31-2019
|
2.50
|
Begin Rudder Assembly
|
|
|
|
01-30-2019
|
0.75
|
Rivet VS Skeleton
|
|
|
|
01-30-2019
|
2.25
|
Completed Assembly of Vertical Stabilizer
|
|
|
|
01-29-2019
|
2.25
|
Rivet Skin to VS skeleton
|
|
|
|
01-28-2019
|
2.25
|
Rivet Rear Spar Assy.
|
|
|
|
01-27-2019
|
1.50
|
Prime VS Ribs & Spar Reinforcement
|
|
|
|
01-25-2019
|
1.50
|
Dimple Ribs
|
|
|
|
01-24-2019
|
4.00
|
Build Paint Booth
|
|
|
|
01-21-2019
|
1.50
|
Prep Vertical Stabilizer (VS) Reinforcement
|
|
|
|
01-19-2019
|
3.75
|
Begin Assembly of Vertical Stabilizer
|
|
|
|
01-18-2019
|
7.00
|
Inventory of Empennage & Tailcone Kit
|
|
|