GARY'S WEB SITE
Work Logs Found: 333
Category Work Time: 813 Hours
 Date
Hours
Work Log Summary

Details

 03-06-2022
4.50
tail cone skin stiffening clips
Details

 11-14-2021
1.00
n numbers
Details
     

 11-01-2021
2.50
panel installed
     

 10-31-2021
1.00
first engine run
Details

 10-25-2021
2.00
cables checked

 10-24-2021
30.00
multiple trials
       

 10-23-2021
2.00
attach wings
Details

 10-17-2021
1.50
seats installed
     

 10-07-2021
1.00
stabilator trim adjustment
     

 10-04-2021
2.00
placards

 09-04-2021
8.00
engine controls

 09-04-2021
2.50
cooling system

 08-24-2021
10.00
tail cone
       

 08-14-2021
6.00
plexiglass aftt window
     

 07-31-2021
3.50
exhaust system

 07-25-2021
1.50
egt probes

 07-24-2021
3.00
prop spinner

 07-10-2021
2.50
blade angles
     

 06-26-2021
3.00
prop spinner
     

 06-19-2021
2.00
pitot tube

 05-29-2021
1.00
safety wire engine plugs

 05-01-2021
2.00
naca cowl

 04-11-2021
2.00
voltage regulator

 03-28-2021
3.00
engine hoses

 03-13-2021
3.00
sb-00023 engine mount standoff
     

 03-13-2021
1.00
radiator door

 02-21-2021
0.50
manifold pressure

 02-20-2021
2.00
starter cables

 02-17-2021
2.00
engine hoses

 01-30-2021
3.00
engine mount
       

 11-27-2020
3.00
battery/regulator
     

 11-22-2020
0.50
wiring

 11-22-2020
1.25
relays

 11-22-2020
0.50
manifold pressure connector

 11-20-2020
1.00
inventory engine parts

 11-20-2020
1.00
harness

 11-20-2020
0.75
fuel pressure sensor

 11-08-2020
6.00
stabilator tips option
     

 10-10-2020
3.00
wing and flaperon installation
       

 09-17-2020
8.00
canopy fiberglass
     

 08-29-2020
0.50
baggage cover

 08-29-2020
1.00
adahrs install

 08-23-2020
1.50
uat antenna

 08-22-2020
2.00
com/.transponder antenna

 08-20-2020
1.50
uat install

 08-20-2020
0.50
switch module

 08-20-2020
0.50
ignition harness

 08-20-2020
2.00
com garmin

 08-20-2020
0.50
antenna doublers

 08-20-2020
1.00
adsb

 08-15-2020
1.00
gps install

 08-15-2020
3.00
dynon skyview

 08-11-2020
2.00


 07-29-2020
2.00


 07-23-2020
1.50
canopy frame

 07-01-2020
2.50
canopy skirts

 03-10-2020
1.00
fuselage pins

 02-28-2020
2.00
canopy

 02-14-2020
1.50
nose gear service bulletin replacement
Details

 11-22-2019
2.00
install fuel tank

 10-18-2019
3.00
fuel tank vent

 10-13-2019
4.00
fuel tank

 09-29-2019
4.00
wheels/brakes/tires35-08

 09-29-2019
1.00
nose wheel

 09-02-2019
1.00
engine mount standoff

 08-31-2019
4.00
misc covers

 08-30-2019
1.00
lap belts

 08-25-2019
4.00
rudder cables

 08-25-2019
1.00


 08-18-2019
2.50
rudder cable routing

 08-17-2019
2.50
flaperon torque tube

 08-13-2019
2.00
flap knob

 08-11-2019
2.00
install bellcranks

 08-03-2019
2.00
finish wiring

 07-23-2019
4.00
control pushrods

 07-21-2019
2.00
flaperon tourque arms

 05-30-2019
2.50
flap handel

 05-29-2019
1.00
BRAKE RESERVOIR

 05-17-2019
3.00
FUSUELAGE COVER ASSY

 05-14-2019
2.00
CANOPY LATCH/WIRES

 05-06-2019
2.50
TAILCONE ROUTING HARNESS

 05-05-2019
1.50
PITCH SERVO WIRING

 04-28-2019
2.00
CONNECTORS FUSUELAGE

 04-19-2019
1.50
HEADSET JACKS

 04-03-2019
2.00
power outlet

 03-31-2019
2.00
options wiring harness

 03-30-2019
1.50
oat

 03-29-2019
2.00
control ptt wiring

 03-24-2019
1.00
wiring harness

 03-22-2019
2.00
wiring harness

 03-21-2019
1.50
wiring harness

 03-20-2019
3.00


 03-17-2019
1.50
wiring

 03-15-2019
2.00
route antenna cables

 03-10-2019
2.00
bellcrank assembly

 03-03-2019
2.00
inventory finish kit

 02-18-2019
1.00
finishing kit arrival

 01-13-2019
1.00


 01-11-2019
3.00
tail cone attachement
       

 01-11-2019
1.00
sb 16-08-24

 01-05-2019
3.00
SERVOS INSTALLED

 01-01-2019
1.50
attach rudder
     

 12-28-2018
1.00
sb 13-04-05
Details

 12-28-2018
1.50
attach vertical stab
     

 12-18-2018
9.00
upper fusuelage
     

 12-11-2018
4.00
fuel system
     

 12-09-2018
5.00
rudder pedals and brake pedals
     

 12-01-2018
0.50
install seatbacks
     

 11-30-2018
6.00
seat backs

 11-27-2018
10.90
rollover strucrure/f-1207 bulkhead
     

 11-23-2018
13.00
side skins
     

 11-14-2018
0.50
stabilator bearing inspection

 11-13-2018
0.50
rollers relaced

 10-16-2018
3.00
wing/spar rivet wear
     

 10-12-2018
8.00
horizontal stabilator front spar
     

 10-06-2018
1.00
bearing brackett brace

 09-30-2018
1.00
day 1
     

 08-09-2014
0.00
Pack wings for transport
       

 06-07-2014
1.00
Install gasolator nutplate & bracket - end Virgini
       

 06-06-2014
1.00
Install flow-scan mount bracket
     

 06-06-2014
1.50
Construct gasolator bracket

 06-05-2014
2.00
Firewall shelf
       

 05-03-2014
1.00
Demo building at Manassas airshow
     

 04-19-2014
3.50
Lower firewall nutplates & cooler stiffener
       

 04-17-2014
3.50
Lower skins to tunnel assembly
       

 04-15-2014
0.75
Install engine mount brackets to tunner ribs
     

 04-12-2014
1.00
Install tunnel assembly nutplates

 04-10-2014
2.50
Prep for tunnel assembly nutplates

 04-09-2014
1.00
Install block studs. Mid fuselage complete
       

 04-07-2014
1.50
Install facet pump bracket

 04-03-2014
2.50
Install cockpit rear bulkhead & AP brackets
     

 03-31-2014
1.50
Install step floors
     

 03-27-2014
1.00
Attach nutplates to step floors

 03-26-2014
3.00
Install fwd bulkhead and step attach angles
       

 03-19-2014
2.00
Prep nutplate bracket & match drill step attach an
     

 03-18-2014
1.00
Prep step attach angles & nutplate bracket

 03-14-2014
2.00
Finish riveting fuselage bottom skin

 03-13-2014
1.50
Start riveting fuselage bottom
     

 03-12-2014
1.00
Cleco bottom stiffeners

 03-11-2014
2.00
Cockpit bottom skin: Install nutplates, cleco to f
       

 03-09-2014
1.50
Prepare bottom skin

 03-09-2014
2.00
Install bottom fuselage corner skins
       

 03-07-2014
3.00
Attach fwd bulkhead, insert snap bushings, prep co

 03-06-2014
3.00
Install control column & step ribs to fwd bulkhead
       

 03-05-2014
1.50
Nutplates to seat ramp floors

 03-04-2014
2.50
Install fwd bulkhead assembly and seat ramp floors
       

 03-02-2014
2.20
Fwd bulkhead nutplates and prep doublers

 03-01-2014
3.00
Doubler & control column assembly to fwd bulkhead

 02-28-2014
3.00
Fwd bulkhead assembly prep & stub spar recepticles

 02-25-2014
1.50
Install left and right bulkhead cap and roller

 02-25-2014
1.00
Counter sink control column mount assembly

 02-21-2014
3.00
Left seat floor assembly to bulkhead & prime parts
     

 02-20-2014
1.00
Finish rt seat floor assembly & rivet to bulkhead

 02-18-2014
1.50
Complete lft seat floor assembly, start rt seat fl

 02-17-2014
2.50
Left seat floor assembly
     

 02-04-2014
2.00
Re-build seat back hinges & match drill to seat fl

 02-03-2014
1.00
Rt seat crotch strap brackets install

 02-02-2014
1.00
Right seat rib assembly
     

 01-31-2014
2.00
A/P seat rib doubler prep

 01-29-2014
1.50
Prep bulkhd flange & spar receptical support

 01-23-2014
2.50
Seatback hinge & seat floor support construct
     

 01-10-2014
1.00
Prep crotch strap brackets

 01-08-2014
0.50
Flaperon mixer to Rt Seat Rib

 01-06-2014
1.00
Seat rib assemblies

 12-31-2013
3.50
Seat ribs preparation

 12-30-2013
3.50
Flaperon mixer arm & seatbelt rib attachments
     

 12-29-2013
2.50
Baggage brackets & flaperon mixer
       

 12-28-2013
1.50
Baggage nutplates & bearing brackets

 12-27-2013
3.50
Attach baggage bulkhead aft ribs

 12-26-2013
1.50
Baggage bulkhead parts prep

 12-26-2013
0.50
Attach bag bulkhead to ribs
     

 12-24-2013
1.00
Prep baggage ribs

 12-23-2013
2.50
Blind rivet in bag floor nutplate, prep bag floor
       

 12-22-2013
3.00
Baggage floor nutplates & start bulkhead assembly
Details
     

 12-14-2013
1.50
Buck in last 3 baggage floor rivets in each end
       

 10-07-2013
3.50
Rivet baggage floor ribs
     

 10-02-2013
1.00
Mitch assist in bag floor solid rivets in tight sp
       

 08-18-2013
2.00
Rivet bulkhead assembly
     

 08-11-2013
2.00
Prime bulkhead assembly
     

 07-07-2013
3.00
Countersink Ctr Section & prep Ctr Sect flanges
     

 07-05-2013
1.50
Finish match drill 73 holes in center section
     

 07-04-2013
3.50
Start match drill 73 holes in center section
       

 06-17-2013
2.00
Center section preparation

 06-16-2013
2.00
Counter sink & install nutplates on Center Section
     

 05-25-2013
1.00
Fuselage kit arrives
       

 03-30-2013
0.00
Wings stored
       

 02-24-2013
2.00
Finish flaperons -- wings complete
     

 02-23-2013
5.00
Flaperon inbrd & mid nose skins
     

 02-18-2013
1.00
Match drill inbrd leading edge skin to nose ribs
     

 02-17-2013
2.50
Attach flaperon outbrd nose skins
       

 02-03-2013
2.50
Rivet flaperon aft skins
     

 01-27-2013
2.50
Prep left aft flaperon skins
     

 01-26-2013
2.00
Attach flaperon internal structures
     

 01-21-2013
2.00
Rivet flaperon actuation and pivot brackets
       

 01-20-2013
3.00
Prime flaperon brackets
     

 01-19-2013
1.50
Match drill right pivot and actuation brackets
     

 01-13-2013
3.00
Finish rt counterbalance, rt inbrd noserib asmbly

 01-12-2013
2.50
Start right counterbalance drilling

 01-06-2013
2.00
Finish left counterbalance drill & debur flaperon

 12-31-2012
1.00
Drill left counterbalance holes

 12-30-2012
4.00
Left aileron brackets and drill 3 counterbalance h
Details
       

 12-29-2012
2.50
Left flaperon counterbalance

 12-26-2012
1.00
Drill 2nd hole in left counterbalance

 12-23-2012
1.00
First counterbalance hole drilled
     

 12-22-2012
1.50
Start left aileron counterbalance
     

 12-16-2012
3.00
Wing tip trailing edge
       

 12-16-2012
1.00
Attach wingtip lights to extension
     

 12-09-2012
2.50
Flox epoxy inside both wing tip light extensions
       

 11-25-2012
1.50
Prep all flaperon skins

 11-24-2012
0.50
Flute flaperon nose ribs

 11-22-2012
2.00
Drill, countersink & cutout tip light extensions

 11-18-2012
3.00
Rivet left wing tip closeout. Fit both wing tip l
       

 11-12-2012
1.50
Install stall indicator access hatch
       

 10-08-2012
3.00
Wing tip light molex connectors
       

 10-08-2012
3.00
Trim wing tip light brackets
     

 10-08-2012
1.00
Rivet right bottom wing tip
     

 10-07-2012
0.50
Make wing tip light grounding wires
     

 10-07-2012
3.50
Cut rt wing light cutout & install both tip bottom
       

 09-15-2012
3.20
Install left and right upper wing tips
       

 09-09-2012
2.00
Install left and right wing tip hand holds and tip

 09-07-2012
2.50
Dry fit left wing tip pieces

 09-03-2012
3.50
Finish riveting right wiing skins
     

 09-02-2012
3.50
Prep right wing top aft skins... started riveting
       

 09-01-2012
1.50
Rivet right top leading edge
       

 09-01-2012
2.00
Finish landing light install. Install landing ligh
       

 08-26-2012
4.00
Fabricate landing light lens and brackets
       

 08-19-2012
4.00
Rivet left top leading edge. Prep right wing top
       

 08-06-2012
5.00
Install flaperon hinges, cleco left top in & outer
       

 08-05-2012
4.00
Left top leading edge riveted, start landing light
       

 08-04-2012
1.50
Attach and rivet right center wing skin - right bo
       

 07-29-2012
5.00
Right lower outer skin and left mid lower skin com
       

 07-28-2012
1.00
Rivet left outer wing skin
     

 07-07-2012
1.50
Cleco left outer lower skin. Prep right lower oute
     

 07-05-2012
4.00
Install & rivet right lower inner wing skin.
     

 07-04-2012
3.50
Rivet left inner lower wing skin
       

 07-01-2012
1.00
Attach left lower inner wing skin
     

 06-24-2012
2.00
Install wing wires and elec connectors
       

 06-16-2012
1.50
Attach connector pins to wing wires and insert in

 06-03-2012
3.00
Install wing elec connector doublers and standoffs
       

 06-02-2012
2.00
Drill and tap flaperon brackets
     

 05-28-2012
4.00
Flaperon hardware fabricate
       

 05-27-2012
1.50
Start wing electrice update

 05-27-2012
2.50
Landng light rib prep - Learned about Molex pins
     

 05-06-2012
2.50
Construct landing light ribs
     

 05-05-2012
3.00
Disassemble temp wing shin, prep inbd bottom skin

 02-26-2012
1.50
Left wing light cut out
       

 02-20-2012
3.50
Temp install outwing and tips in prep for lighting
       

 02-12-2012
3.00
Landing light cut out
       

 01-25-2012
1.50
Prepare wing for landing light cutout
     

 01-22-2012
2.00
Fabricate and attach left and right wing terrminal
       

 01-21-2012
1.50
Install stall warning and verify allignment thru w
       

 01-16-2012
2.00
Remove and reinstall stall warning nutplate rivets
       

 01-15-2012
2.50
Start stall warning
       

 01-07-2012
2.50
Attach right wing forward ribs
       

 01-02-2012
2.50
Right wing rear ribs
     

 01-01-2012
2.50
Start right wing ribs
       

 12-26-2011
1.50
Complete left wing fwd rib attachments
     

 12-25-2011
1.50
Attach left wing fwd ribs
       

 11-23-2011
2.50
Left rear wing ribs and rear spar
       

 11-19-2011
3.50
Rig flaperon hinge & doubler, start attach left r
       

 11-13-2011
1.00
Wing rib doublers
     

 11-11-2011
2.50
Finish rib flut, trim ribs

 09-05-2011
3.00
Paint noserib trim cuts, nutplates on noseribs

 07-24-2011
4.00
Nose ribs: Flute and trim
       

 07-23-2011
2.00
Finish rear spar assemblies

 07-18-2011
1.00
Start rear spar assemblies

 07-17-2011
2.00
Hinge assemblies & tip attach angles

 07-10-2011
5.00
Stub spars and hinge bracket assemblies
       

 07-04-2011
2.50
Prep stub spars. Paint rudder hinges. R/R one sp

 06-27-2011
2.50
Finish spar assembly rivets

 06-26-2011
2.00
Start attaching angles to wing spars
     

 06-19-2011
3.00
Start wings. Tap tiedown holes
     

 06-18-2011
2.00
Finish pitch trim pushrod and servo assembly

 06-12-2011
2.50
Start push rod assembly

 06-12-2011
1.00
Crimp terminals on trim servo at Tim's house

 05-30-2011
2.50
Complete wing inventory
     

 05-29-2011
3.00
Inventory wing kit
     

 04-14-2011
3.50
Wing kit arrives
       

 03-13-2011
4.50
Partially build servo tray assembly

 02-27-2011
1.00
Store tailcone
       

 01-30-2011
1.00
Partially install verticle stab.
Details

 01-29-2011
1.00
Install top 3 rivets to aft tailcone rib assembly
Details
     

 01-27-2011
2.00
Prepare vert stab for installation. Found 3 missi
Details
     

 01-23-2011
6.00
Install tailcone top. Tailcone complete
     

 01-22-2011
4.00
Finish riveting tailcone side
       

 01-17-2011
3.50
Install upper tailcone skins. Start riveting side
     

 01-16-2011
2.00
Prepare upper tailcone skin

 01-16-2011
2.00
Install static tubing
       

 01-09-2011
1.50
Install tail wire & static ports
     

 01-02-2011
2.50
Re-work side skins, control cable string, trim wir

 12-28-2010
5.00
Construct tailcone bottom
       

 12-26-2010
4.00
Attach tailcone ribs to bottom
     

 11-27-2010
3.00
Fit aft frame to stabilator. Prep bottom skin

 11-21-2010
1.50
Complete aft tailcone frame - 105 rivets
       

 11-14-2010
1.50
Finish riveting aft tailcone frame assembly

 11-12-2010
1.00
Aft frame nut plates and corrision paint tiedown

 10-24-2010
1.00
Finish riveting doubler to aft frame

 10-23-2010
1.00
Start rivet doubler to aft frame

 10-17-2010
1.00
Continue rear tailcone rib assembly

 10-16-2010
1.00
Start rear rib assembly

 10-11-2010
4.40
All page 10-3 and #1 on Pg10-4
Details

 09-06-2010
2.00
Tap & fabricate tail skid bracket
     

 08-25-2010
1.00
Solid rivet frame 1210
     

 08-14-2010
1.50
Construct tailcone frames

 08-07-2010
1.00
Break edges and fluting

 08-01-2010
0.50
Start tailcone

 08-01-2010
3.50
Stabilator complete - connect control horns and co
     

 07-25-2010
4.50
Finish stabilator skin and aft hinge installed
     

 07-24-2010
4.00
Right stabaliator skin attached
       

 07-18-2010
4.50
Stabilator skeleton complete; drill stab hinge
       

 07-11-2010
4.00
Stabaliator skeleton ready for riveting
     

 07-10-2010
4.50
Install nut plates and counter-balance brackets
     

 07-04-2010
2.00
Spar box assembly & counterbalance arm

 07-03-2010
2.00
Replace bad rivets, finish inspar rib assembly
       

 06-05-2010
3.00
Completed AST, started inspar rib

 04-11-2010
0.50
Rivet AST bottom skin - with Mark Barnett
       

 02-28-2010
2.00
AST hinge drill and paing

 02-21-2010
2.50
R/R lft AST horn. Install L&R AST spar
     

 02-15-2010
2.50
Start stabilator. Steps 1 - 4 delayed to confirm

 02-14-2010
4.00
Left & right AST thru # 4
Details

 02-11-2010
0.50
Left AST

 02-10-2010
5.00
Finish rudder, start AST
       

 02-09-2010
4.00
Rudder spar work
     

 02-08-2010
3.00
Sort bolts & washser, finish vert stab, start rudd

 01-18-2010
3.00
Finish riveting vertical stabalizer
     

 01-17-2010
4.00
Prep vert stab and start riveting
     

 01-16-2010
2.00
Prep vert stab

 01-03-2010
6.50
V-Stab Skeleton complete - Jan 1,2,3 2010
       

 12-31-2009
3.00
Spar caps drill to rear spar web
     

 12-21-2009
2.50
Upper & lower hinge assembly
     

 11-11-2009
1.00
Fabricate rivet wedge jigs
     

 09-07-2009
3.00
Enventory tail kit
     

 09-01-2009
3.00
Unload tail kit
     