Powered By Kitlog Pro v2.0
JEAN-PHILIPPE'S WEB SITE
s21
All
Work Logs Found:
209
Category Work Time:
928 Hours
Date
Hours
Work Log Summary
Details
06-10-2021
5.00
run up engine
Details
06-09-2021
5.00
put interior in place and recheck engine for runup
06-07-2021
4.00
fix my problem with transponder and synthetique vi
06-04-2021
3.00
fix my selinoid starter work fine
06-03-2021
5.00
after pre oiling engine raidy for first runup
Details
06-02-2021
4.00
double check wirering waiting for new transponder
05-24-2021
5.00
try to find a problem with lightspeed
Details
05-21-2021
2.00
find the problem my transponder not compatible wit
05-20-2021
4.00
try to fix my conection of transponder
Details
05-19-2021
2.00
continue setup dynon
05-18-2021
4.00
instal wings cuff and work on skyview system
05-17-2021
5.00
mount prop
Details
05-14-2021
6.00
bleed break lineand finish seat belt
05-13-2021
6.00
grease weel and torque instal bracket forjack on w
Details
05-12-2021
4.00
start looking for everithing and check torque
Details
05-11-2021
4.00
start reconnecting the harness fix dimer problem
05-10-2021
6.00
fix radio probleme
Details
05-07-2021
2.00
look for radio problem
05-06-2021
4.00
route flap cable and pito tube and connect both
05-05-2021
4.00
instal flap seal gap
05-03-2021
4.00
rivet skylight on rib
04-30-2021
1.00
instal seal gap botom wings and door
04-30-2021
3.00
instal pito and wings tip
04-30-2021
3.00
conect position light strobe and landing light
04-29-2021
6.00
finish painting small part and hookup fuel line
Details
04-26-2021
5.00
start riging the wing instal seal gap on flap
Details
04-24-2021
6.50
finish instaling winshield and skylight
04-22-2021
3.00
instal lens cover on landing light
04-22-2021
5.00
adjust skylight rib to instal windshield
04-21-2021
4.00
instal landing light and wings tip
Details
04-20-2021
4.00
i put flap and aileron on wings
04-19-2021
6.00
attach wing to fuselage
04-16-2021
7.00
finish painting cowling and wing tip
04-13-2021
5.00
sand cowling and few part for painting
03-30-2021
3.00
start loading skyvew
03-29-2021
4.00
change power plug on vertical power
Details
03-27-2021
4.00
put power and check panel
03-26-2021
5.00
start over with vertical power find the problem
03-25-2021
4.00
diging for problem with vertical power
03-23-2021
4.00
work try to connect vertical power
03-19-2021
4.00
closing the tail
03-16-2021
4.00
instal cover for rudder cale and cover for landing
03-11-2021
4.00
clearing wirering
03-10-2021
3.00
put horizotal stab fairing
03-09-2021
3.00
continu wirering
03-08-2021
4.00
cannect ignition swich and reduce the harness
03-05-2021
4.00
adjust bafeling rubber
03-04-2021
4.00
conect master relay and starter relay
03-03-2021
4.00
still wirering
03-02-2021
6.00
work on rubber bafeling and wirering
03-01-2021
5.00
instal ignition coil
02-27-2021
6.00
contnue wirering probe on engine
02-26-2021
6.00
connect probe to engine for ems
02-25-2021
5.00
continuing wirering
02-23-2021
5.00
finish cowling and start clearing wirering
02-22-2021
5.00
work oncowling and wirering
02-20-2021
7.00
wirering the aft dash
02-19-2021
4.00
work on wirering
02-19-2021
3.00
finish adjusting the cowling
02-18-2021
6.00
work on adjusting cowling
02-17-2021
5.00
work on cowling and wirering
Details
02-16-2021
7.00
instal static and pito line
02-15-2021
5.00
relocated emsand start wirering
Details
02-13-2021
5.00
instal back up battery and network
Details
02-12-2021
6.00
work on spiner and cowling
02-11-2021
7.00
cut spiner and start to fit cowling
Details
02-10-2021
4.00
instal the prop for fiting
02-09-2021
6.00
instal exaust
02-08-2021
5.00
instal governor and air box
02-06-2021
5.00
instal censsor and alternator
02-05-2021
8.00
finish baffeling and intal faring on vertical stab
02-04-2021
5.50
continue working on baffle
02-03-2021
4.00
start assembling the air box and baffle
02-02-2021
5.00
mount engine on plane
02-01-2021
3.00
put the eyesball on firewall
Details
01-29-2021
4.00
instalgas colator
01-28-2021
4.00
instal air box
01-27-2021
4.00
instal oil cooler
01-26-2021
4.00
starte working on firewall
Details
01-25-2021
2.00
transfer engine and tool box to 702
01-23-2021
1.00
moove fuselage to north las vegas airport
01-22-2021
3.00
working on finish kit
01-21-2021
3.00
instaling finish kit in fuselage
01-19-2021
3.00
work on wirering panel
01-18-2021
5.00
working on side panel
01-17-2021
5.00
work on side panel
01-16-2021
3.00
wirering panel
01-15-2021
4.00
wirering panel
01-14-2021
4.00
wirering panel
01-13-2021
4.50
wirering panel
12-02-2020
2.00
continu to work on wirering
12-02-2020
2.00
close aft fuselage
12-01-2020
3.00
wireing sv-com
11-30-2020
3.00
stat wireing ap
11-25-2020
5.00
painting all small part
11-21-2020
5.00
wire grip stick and trim
11-20-2020
4.00
work on flap cover and central console
Details
11-19-2020
3.50
working on wireing trim and lighting lugage compar
11-18-2020
5.00
finish connecting ruder cable and push pull tube a
11-17-2020
4.00
adjust pvc cover and attach elevator stick and rud
11-16-2020
1.00
work on aileron cable
11-16-2020
4.00
ATTACH ELEVATOR TO HORIZONTAL STAB
11-15-2020
5.00
balance the elevator
11-13-2020
5.00
attach the ruder and buffing control instal instru
11-12-2020
3.00
finish attach vertical fin and buffing the control
11-11-2020
6.00
finish buffing horizontal stab and instal it on fu
11-10-2020
3.00
working on closing cockpit and buffing horizontal
11-09-2020
4.00
instal remote radio and transpondor
11-08-2020
6.00
finish the door and instal it
11-07-2020
8.00
finish left door and work on right door
11-06-2020
2.00
start working on left door
11-06-2020
4.00
finish buffing the fuselage
11-05-2020
5.00
buffing fuselage and clean small part for painting
Details
11-04-2020
3.00
put nutplate on back of fuselage and start buffing
11-04-2020
0.50
i receved my engine check it nice crating
11-03-2020
4.00
prep fiting the wings to fuselage
11-03-2020
2.00
desining the panel in computer to send for laser c
11-02-2020
4.00
preparing for attach the wings
10-31-2020
7.00
finish painting the wings
10-30-2020
5.00
continue painting and instal bally camera and part
10-29-2020
5.00
put clearcoat on horizotal stab and paint ruder
10-28-2020
3.00
instal mounting rack for vertical power and instal
10-28-2020
3.00
continue painting aileron and horizontal stab
10-27-2020
5.00
remove and clean ruder and aileron ready to be rep
Details
10-23-2020
5.00
paint aileron flap and ruder
10-22-2020
3.00
paint clear coat on left wing
Details
10-22-2020
3.00
instal break line on fire wall and parking brake
10-21-2020
3.00
sand left wing to remove default on clear coat
10-21-2020
2.00
instal break fluid reservoir and parking brake
Details
10-20-2020
2.00
put battery box
10-19-2020
5.00
painting of the left wings and vertical stabilyzer
10-16-2020
6.00
finish clear coate on fuselage
Details
10-15-2020
10.00
paint the fuselage need clear coat
10-14-2020
5.00
prep fuselage and apply primer
10-13-2020
5.00
put primer on wings
10-12-2020
5.00
start primer aileron plus vertical and horizontal
10-09-2020
4.50
prep fuselage for painting
10-08-2020
4.00
prep wings for paintig
10-07-2020
4.50
start prep part for painting
Details
10-06-2020
4.50
fabricate rotisserie for paint job
10-05-2020
4.00
finish attach wing tip and prep paint booth
10-04-2020
4.00
instal roll and pitch servo
10-02-2020
4.00
glue the wing tip and seal tank cap and rivetind t
10-01-2020
4.00
prep gas tank left wing
09-30-2020
4.00
finish adjusting wins tip and prep lift strud
09-29-2020
5.00
finishing bottom skin on left wing
09-28-2020
4.00
put pitot line and start bottom skin on left wing
09-26-2020
6.00
riveting top skin left wing
09-26-2020
3.50
instal roll servo suport and prep pitch servo plat
Details
09-25-2020
4.50
finish wing tip and start puting the top skin 0n l
09-22-2020
5.00
glue wing tip and finish rivet skin at fuel tank a
09-20-2020
5.00
trim and prep wing tip
09-19-2020
5.00
work on fuel tank
09-17-2020
5.00
finish riveting the bottom skin
09-16-2020
4.00
finish rivet top skin and seal gap put retainer ri
09-15-2020
5.00
rivet top right skin wing exept trailing edge
09-06-2020
6.00
assembling and finish aileron
09-05-2020
6.00
asembling and finish flap
09-03-2020
5.00
finish assembling let wing before skin
08-31-2020
3.00
start prep assembling left wing
08-31-2020
3.00
finish wire on right wing
08-30-2020
6.00
instal landing light finish wings for skin
08-29-2020
5.50
assembling aileron and flap belcrank
08-28-2020
3.50
assembling the right wing
08-26-2020
2.50
assembling wings
Details
08-25-2020
4.00
open crate of wing organize and inventory
08-24-2020
4.50
assembling flap handle and put fabric on skin luga
08-23-2020
7.00
finish header tank and close lugage compartment
08-22-2020
7.00
fuel pump
Details
08-21-2020
2.50
riveting boot cawl
08-18-2020
4.50
instal aileron control cable
Details
08-17-2020
5.00
adjust forward closing bagage compartment
Details
08-16-2020
7.00
continu closing section 4
Details
08-15-2020
6.00
start closing sction 4
08-14-2020
4.00
finish adjusting bootcall
Details
08-12-2020
5.00
cleco and adjust side skin
08-08-2020
4.00
spray bed liner paint
Details
08-07-2020
4.50
working on firewall
08-06-2020
5.00
prep firewall
Details
08-05-2020
5.00
riveting window
Details
08-04-2020
2.00
assembling weel on landing gear
08-02-2020
5.00
finish the stick assembling
Details
08-01-2020
5.00
finish assembling sit and prep for control stick a
08-01-2020
3.00
assembling sit
07-31-2020
5.00
start assembling sit
07-30-2020
6.00
shim and rivet again
Details
07-29-2020
6.00
rivet right side forward top skin closout
07-28-2020
5.50
top skin right side fuselage
Details
07-26-2020
4.00
side skin on cage and top skin forward
07-26-2020
3.00
ruder pedal
07-25-2020
9.00
pass cable and poulie
Details
07-24-2020
5.00
fuselage top skin
07-23-2020
2.00
rivet bottom longeron and side skin
07-23-2020
3.00
attach cone to cage
07-22-2020
5.00
bulk head on boton skin
Details
07-21-2020
5.00
assembling bottom fuselage
07-20-2020
4.50
assembling bulk head
07-19-2020
6.00
finish tip elevator and molding tip horizontal sta
07-18-2020
8.00
finish trim tab and inge and riveting the elevator
07-17-2020
5.00
work on trim tab
07-16-2020
5.00
finish assembling horizontal stabilizer
Details
07-15-2020
5.00
horizontal assembly
Details
07-13-2020
3.00
vertical stabilizer tip vertical done
07-13-2020
1.50
preparation and enventory for assembling horizonta
07-12-2020
6.50
vertical fin assembly less plastic mold cover
07-12-2020
2.50
finish rudder assembly
07-11-2020
3.00
start assembling rudder
07-11-2020
7.00
iventory and organize
06-28-2020
8.00
assembly table
SITE NAVIGATION
Contact Builder
s21 Home
Category
# Logs
# Hours
All
209
928
Avionics
38
154
Empennage
12
54
Engine
27
127
Fuselage
72
314
Miscellaneous
1
4
paint
21
107
Prop
1
5
Tools
1
4
Wings
32
141
work shop prep
4
18
Copyright © 2001-2024 Matronics. All Rights Reserved.