KitLog pro

Powered By Kitlog Pro v2.0

JEAN-PHILIPPE'S WEB SITE
Work Logs Found: 209
Category Work Time: 928 Hours
 Date
Hours
Work Log Summary

Details

 06-10-2021
5.00
run up engine
Details

 06-09-2021
5.00
put interior in place and recheck engine for runup

 06-07-2021
4.00
fix my problem with transponder and synthetique vi

 06-04-2021
3.00
fix my selinoid starter work fine

 06-03-2021
5.00
after pre oiling engine raidy for first runup
Details

 06-02-2021
4.00
double check wirering waiting for new transponder

 05-24-2021
5.00
try to find a problem with lightspeed
Details

 05-21-2021
2.00
find the problem my transponder not compatible wit

 05-20-2021
4.00
try to fix my conection of transponder
Details

 05-19-2021
2.00
continue setup dynon

 05-18-2021
4.00
instal wings cuff and work on skyview system

 05-17-2021
5.00
mount prop
Details

 05-14-2021
6.00
bleed break lineand finish seat belt
     

 05-13-2021
6.00
grease weel and torque instal bracket forjack on w
Details

 05-12-2021
4.00
start looking for everithing and check torque
Details

 05-11-2021
4.00
start reconnecting the harness fix dimer problem

 05-10-2021
6.00
fix radio probleme
Details

 05-07-2021
2.00
look for radio problem

 05-06-2021
4.00
route flap cable and pito tube and connect both

 05-05-2021
4.00
instal flap seal gap

 05-03-2021
4.00
rivet skylight on rib

 04-30-2021
1.00
instal seal gap botom wings and door
     

 04-30-2021
3.00
instal pito and wings tip
       

 04-30-2021
3.00
conect position light strobe and landing light
       

 04-29-2021
6.00
finish painting small part and hookup fuel line
Details

 04-26-2021
5.00
start riging the wing instal seal gap on flap
Details

 04-24-2021
6.50
finish instaling winshield and skylight
       

 04-22-2021
3.00
instal lens cover on landing light

 04-22-2021
5.00
adjust skylight rib to instal windshield

 04-21-2021
4.00
instal landing light and wings tip
Details

 04-20-2021
4.00
i put flap and aileron on wings
     

 04-19-2021
6.00
attach wing to fuselage
       

 04-16-2021
7.00
finish painting cowling and wing tip

 04-13-2021
5.00
sand cowling and few part for painting

 03-30-2021
3.00
start loading skyvew
       

 03-29-2021
4.00
change power plug on vertical power
Details

 03-27-2021
4.00
put power and check panel
       

 03-26-2021
5.00
start over with vertical power find the problem

 03-25-2021
4.00
diging for problem with vertical power

 03-23-2021
4.00
work try to connect vertical power

 03-19-2021
4.00
closing the tail
       

 03-16-2021
4.00
instal cover for rudder cale and cover for landing

 03-11-2021
4.00
clearing wirering

 03-10-2021
3.00
put horizotal stab fairing
       

 03-09-2021
3.00
continu wirering

 03-08-2021
4.00
cannect ignition swich and reduce the harness

 03-05-2021
4.00
adjust bafeling rubber
       

 03-04-2021
4.00
conect master relay and starter relay

 03-03-2021
4.00
still wirering

 03-02-2021
6.00
work on rubber bafeling and wirering

 03-01-2021
5.00
instal ignition coil
       

 02-27-2021
6.00
contnue wirering probe on engine
       

 02-26-2021
6.00
connect probe to engine for ems
       

 02-25-2021
5.00
continuing wirering
       

 02-23-2021
5.00
finish cowling and start clearing wirering
       

 02-22-2021
5.00
work oncowling and wirering

 02-20-2021
7.00
wirering the aft dash
       

 02-19-2021
4.00
work on wirering
       

 02-19-2021
3.00
finish adjusting the cowling
       

 02-18-2021
6.00
work on adjusting cowling
       

 02-17-2021
5.00
work on cowling and wirering
Details
       

 02-16-2021
7.00
instal static and pito line
       

 02-15-2021
5.00
relocated emsand start wirering
Details
       

 02-13-2021
5.00
instal back up battery and network
Details
       

 02-12-2021
6.00
work on spiner and cowling
       

 02-11-2021
7.00
cut spiner and start to fit cowling
Details
       

 02-10-2021
4.00
instal the prop for fiting
       

 02-09-2021
6.00
instal exaust
       

 02-08-2021
5.00
instal governor and air box
       

 02-06-2021
5.00
instal censsor and alternator
       

 02-05-2021
8.00
finish baffeling and intal faring on vertical stab
       

 02-04-2021
5.50
continue working on baffle
       

 02-03-2021
4.00
start assembling the air box and baffle
     

 02-02-2021
5.00
mount engine on plane
       

 02-01-2021
3.00
put the eyesball on firewall
Details
       

 01-29-2021
4.00
instalgas colator
     

 01-28-2021
4.00
instal air box
     

 01-27-2021
4.00
instal oil cooler
     

 01-26-2021
4.00
starte working on firewall
Details
     

 01-25-2021
2.00
transfer engine and tool box to 702

 01-23-2021
1.00
moove fuselage to north las vegas airport
       

 01-22-2021
3.00
working on finish kit
       

 01-21-2021
3.00
instaling finish kit in fuselage
       

 01-19-2021
3.00
work on wirering panel

 01-18-2021
5.00
working on side panel
       

 01-17-2021
5.00
work on side panel
       

 01-16-2021
3.00
wirering panel
       

 01-15-2021
4.00
wirering panel
       

 01-14-2021
4.00
wirering panel

 01-13-2021
4.50
wirering panel
       

 12-02-2020
2.00
continu to work on wirering

 12-02-2020
2.00
close aft fuselage

 12-01-2020
3.00
wireing sv-com

 11-30-2020
3.00
stat wireing ap
       

 11-25-2020
5.00
painting all small part
       

 11-21-2020
5.00
wire grip stick and trim

 11-20-2020
4.00
work on flap cover and central console
Details

 11-19-2020
3.50
working on wireing trim and lighting lugage compar

 11-18-2020
5.00
finish connecting ruder cable and push pull tube a
       

 11-17-2020
4.00
adjust pvc cover and attach elevator stick and rud

 11-16-2020
1.00
work on aileron cable
     

 11-16-2020
4.00
ATTACH ELEVATOR TO HORIZONTAL STAB
       

 11-15-2020
5.00
balance the elevator
     

 11-13-2020
5.00
attach the ruder and buffing control instal instru
       

 11-12-2020
3.00
finish attach vertical fin and buffing the control

 11-11-2020
6.00
finish buffing horizontal stab and instal it on fu
       

 11-10-2020
3.00
working on closing cockpit and buffing horizontal

 11-09-2020
4.00
instal remote radio and transpondor
       

 11-08-2020
6.00
finish the door and instal it
       

 11-07-2020
8.00
finish left door and work on right door

 11-06-2020
2.00
start working on left door
       

 11-06-2020
4.00
finish buffing the fuselage
     

 11-05-2020
5.00
buffing fuselage and clean small part for painting
Details

 11-04-2020
3.00
put nutplate on back of fuselage and start buffing

 11-04-2020
0.50
i receved my engine check it nice crating

 11-03-2020
4.00
prep fiting the wings to fuselage

 11-03-2020
2.00
desining the panel in computer to send for laser c

 11-02-2020
4.00
preparing for attach the wings

 10-31-2020
7.00
finish painting the wings

 10-30-2020
5.00
continue painting and instal bally camera and part
       

 10-29-2020
5.00
put clearcoat on horizotal stab and paint ruder
       

 10-28-2020
3.00
instal mounting rack for vertical power and instal
       

 10-28-2020
3.00
continue painting aileron and horizontal stab
       

 10-27-2020
5.00
remove and clean ruder and aileron ready to be rep
Details
       

 10-23-2020
5.00
paint aileron flap and ruder

 10-22-2020
3.00
paint clear coat on left wing
Details

 10-22-2020
3.00
instal break line on fire wall and parking brake

 10-21-2020
3.00
sand left wing to remove default on clear coat

 10-21-2020
2.00
instal break fluid reservoir and parking brake
Details
       

 10-20-2020
2.00
put battery box
     

 10-19-2020
5.00
painting of the left wings and vertical stabilyzer

 10-16-2020
6.00
finish clear coate on fuselage
Details
       

 10-15-2020
10.00
paint the fuselage need clear coat
       

 10-14-2020
5.00
prep fuselage and apply primer

 10-13-2020
5.00
put primer on wings
       

 10-12-2020
5.00
start primer aileron plus vertical and horizontal
       

 10-09-2020
4.50
prep fuselage for painting
       

 10-08-2020
4.00
prep wings for paintig
       

 10-07-2020
4.50
start prep part for painting
Details
       

 10-06-2020
4.50
fabricate rotisserie for paint job
     

 10-05-2020
4.00
finish attach wing tip and prep paint booth

 10-04-2020
4.00
instal roll and pitch servo
       

 10-02-2020
4.00
glue the wing tip and seal tank cap and rivetind t

 10-01-2020
4.00
prep gas tank left wing

 09-30-2020
4.00
finish adjusting wins tip and prep lift strud
       

 09-29-2020
5.00
finishing bottom skin on left wing
       

 09-28-2020
4.00
put pitot line and start bottom skin on left wing
       

 09-26-2020
6.00
riveting top skin left wing
       

 09-26-2020
3.50
instal roll servo suport and prep pitch servo plat
Details
       

 09-25-2020
4.50
finish wing tip and start puting the top skin 0n l
       

 09-22-2020
5.00
glue wing tip and finish rivet skin at fuel tank a
     

 09-20-2020
5.00
trim and prep wing tip
     

 09-19-2020
5.00
work on fuel tank
       

 09-17-2020
5.00
finish riveting the bottom skin
       

 09-16-2020
4.00
finish rivet top skin and seal gap put retainer ri
       

 09-15-2020
5.00
rivet top right skin wing exept trailing edge
       

 09-06-2020
6.00
assembling and finish aileron
       

 09-05-2020
6.00
asembling and finish flap
       

 09-03-2020
5.00
finish assembling let wing before skin

 08-31-2020
3.00
start prep assembling left wing

 08-31-2020
3.00
finish wire on right wing

 08-30-2020
6.00
instal landing light finish wings for skin
       

 08-29-2020
5.50
assembling aileron and flap belcrank
       

 08-28-2020
3.50
assembling the right wing

 08-26-2020
2.50
assembling wings
Details
       

 08-25-2020
4.00
open crate of wing organize and inventory

 08-24-2020
4.50
assembling flap handle and put fabric on skin luga
       

 08-23-2020
7.00
finish header tank and close lugage compartment
       

 08-22-2020
7.00
fuel pump
Details
       

 08-21-2020
2.50
riveting boot cawl

 08-18-2020
4.50
instal aileron control cable
Details
       

 08-17-2020
5.00
adjust forward closing bagage compartment
Details
       

 08-16-2020
7.00
continu closing section 4
Details
       

 08-15-2020
6.00
start closing sction 4

 08-14-2020
4.00
finish adjusting bootcall
Details
       

 08-12-2020
5.00
cleco and adjust side skin
       

 08-08-2020
4.00
spray bed liner paint
Details

 08-07-2020
4.50
working on firewall
       

 08-06-2020
5.00
prep firewall
Details
       

 08-05-2020
5.00
riveting window
Details
     

 08-04-2020
2.00
assembling weel on landing gear

 08-02-2020
5.00
finish the stick assembling
Details
       

 08-01-2020
5.00
finish assembling sit and prep for control stick a

 08-01-2020
3.00
assembling sit
       

 07-31-2020
5.00
start assembling sit

 07-30-2020
6.00
shim and rivet again
Details

 07-29-2020
6.00
rivet right side forward top skin closout
       

 07-28-2020
5.50
top skin right side fuselage
Details
       

 07-26-2020
4.00
side skin on cage and top skin forward
       

 07-26-2020
3.00
ruder pedal
       

 07-25-2020
9.00
pass cable and poulie
Details
       

 07-24-2020
5.00
fuselage top skin
       

 07-23-2020
2.00
rivet bottom longeron and side skin
       

 07-23-2020
3.00
attach cone to cage
       

 07-22-2020
5.00
bulk head on boton skin
Details
       

 07-21-2020
5.00
assembling bottom fuselage

 07-20-2020
4.50
assembling bulk head

 07-19-2020
6.00
finish tip elevator and molding tip horizontal sta
       

 07-18-2020
8.00
finish trim tab and inge and riveting the elevator
       

 07-17-2020
5.00
work on trim tab

 07-16-2020
5.00
finish assembling horizontal stabilizer
Details
       

 07-15-2020
5.00
horizontal assembly
Details
       

 07-13-2020
3.00
vertical stabilizer tip vertical done

 07-13-2020
1.50
preparation and enventory for assembling horizonta

 07-12-2020
6.50
vertical fin assembly less plastic mold cover
       

 07-12-2020
2.50
finish rudder assembly

 07-11-2020
3.00
start assembling rudder

 07-11-2020
7.00
iventory and organize

 06-28-2020
8.00
assembly table
     










Copyright © 2001-2024 Matronics. All Rights Reserved.