Powered By Kitlog Pro v2.0
Skip's Web Site
Hatz CB1/Classic
All
Work Logs Found:
199
Category Work Time:
6602 Hours
Date
Hours
Work Log Summary
Details
03-27-2022
0.00
Review
Details
03-27-2022
0.00
Review
Details
03-27-2022
0.00
Review
Details
03-27-2022
0.00
Review
Details
03-27-2022
0.00
Review
Details
03-27-2022
0.00
Review
Details
03-27-2022
0.00
Review
Details
03-18-2022
0.50
Review
Details
02-05-2022
1.00
Lettering"no step"
Details
02-04-2022
1.00
CAT House
Details
02-02-2022
1.00
Cleaning up Misc. items
Details
01-24-2022
2.00
"Hatz Off To You" - Nose Art
Details
07-28-2021
6.00
TBI Carb sticking
Details
07-12-2021
1.00
Prop Allignment
Details
06-25-2021
1.00
Took it Outside for progress pictures
Details
06-25-2021
1.00
Took it outside for Progress Pictures
Details
06-06-2021
2.00
Trim tab Installation
Details
06-06-2021
4.00
Tail Braces and Trrim Tab
Details
06-06-2021
0.50
Finishing the wing walks
Details
05-23-2021
1.00
Placing the Center Section
Details
05-23-2021
2.00
Place the Center Section
Details
04-12-2021
1.00
Name Plate for tail section
Details
04-07-2021
6.00
Working up the Instrument Panels
Details
03-10-2021
6.00
Putting the engine assories back together
Details
03-06-2021
4.00
Nose Art
Details
03-05-2021
3.00
Checing out seat leather colors
Details
02-26-2021
5.00
Finishing the instrument panels
Details
02-23-2021
5.00
Bringing the painted parts back
Details
02-22-2021
3.00
Tail Wheel change
Details
02-22-2021
8.00
Sanding for final results
Details
02-07-2021
6.00
Painting the parts
Details
02-03-2021
4.00
Sent everything to Paint Shop
Details
01-18-2021
6.00
More on scallops and stripes
Details
01-16-2021
8.00
Checking the scallaps
Details
08-31-2020
3.00
Fitting the headcomb
Details
08-15-2020
30.00
Finishing the Fuselage
Details
08-06-2020
1.00
Reviewed KitLog Pro 2.0 and updated
Details
03-23-2020
138.00
Prep for Painting
Details
09-22-2019
10.00
Instrument Panels
Details
09-21-2019
15.00
Update the Instrument panels
Details
09-16-2019
10.00
Covering the fuselage
Details
09-14-2019
10.00
Covering the fuselage
Details
09-06-2019
15.00
Covering the fuselage
Details
08-24-2019
10.00
Starting to cover the Fuselage
Details
07-05-2019
15.00
Cover the bottom of the Fuselage
Details
06-09-2019
60.00
Cowling Metal work
Details
06-09-2019
60.00
Cover the gear
Details
05-02-2019
4.00
Instruments
Details
03-25-2019
36.00
Aligning horizontal stablizer
Details
03-24-2019
36.00
Cleaning up the fuselage & tail feathers
Details
02-16-2019
40.00
Cowlings
Details
12-31-2018
6.00
Aluminum cockpit cowling
Details
09-23-2018
7.00
Covering Wing 3 & 4
Details
09-18-2018
7.00
Wing Covering
Details
09-14-2018
14.00
Still Working on Covering
Details
09-12-2018
49.00
1st Wing
Details
09-03-2018
28.00
Wing Covering/Stitching
Details
08-20-2018
7.00
Bottom left Wing
Details
07-14-2018
21.00
Cover & Stitch
Details
07-04-2018
7.00
Wing 2 covering
Details
07-01-2018
7.00
Wing 1 covering
Details
06-24-2018
91.00
Tapeing and doilies
Details
06-24-2018
91.00
Rib Stiching
Details
06-13-2018
7.00
Tape and Poly Brush
Details
05-29-2018
91.00
More pictures of the Poly Brush coating
Details
05-16-2018
10.00
Still shrinking
Details
05-16-2018
91.00
Still covering process (shrinking the Fabric)
Details
05-06-2018
91.00
Covering the wings
Details
05-05-2018
10.00
More on covering the wings
Details
05-05-2018
91.00
Covering wings
Details
03-25-2018
91.00
Wing Clean up
Details
03-18-2018
60.00
Review and catch up logging
02-17-2018
1200.00
Mar 17/Feb 18 lost time
Details
01-28-2018
65.00
Review and inventory of fuselage
Details
08-30-2017
130.00
Catch up work on total Hatz
Details
07-23-2017
80.00
Wireing the side panel
Details
05-03-2017
24.00
Covering Tail Feathers
Details
04-23-2017
10.00
Radio Stack
Details
04-14-2017
4.00
Side panel
Details
03-08-2017
2.00
Photo OP!
Details
02-15-2017
24.00
Covering the tail Feathers
Details
01-28-2017
70.00
Wireing and engine
Details
12-31-2016
120.00
Fuselage and Engine
Details
11-19-2016
60.00
Working to get engine connected
Details
11-19-2016
60.00
Fuselage prep and inventory
Details
10-27-2016
210.00
Fuselage and Tail
Details
10-27-2016
210.00
Connections to the engine
Details
07-30-2016
2.00
Review
Details
07-22-2016
36.00
Side and Reg Instrument Panel
Details
07-20-2016
2.00
W & B
Details
07-20-2016
8.00
Prelim Weight & Balance
Details
07-20-2016
2.00
More W & B
Details
07-20-2016
2.00
Configured for W & B
Details
06-08-2016
6.00
Instrument panel comparison
Details
06-08-2016
3.00
Instrument panel comparison
Details
06-06-2016
6.00
Putting it together
Details
06-01-2016
10.00
Fuselage sand blasted and painted
Details
05-16-2016
15.00
Flying wires andcontrol cables + positioning
Details
05-09-2016
5.00
Ribs for the gear legs
Details
05-09-2016
5.00
curved members for Horizontal and verticle tail se
Details
04-12-2016
15.00
Throttle quadrant
Details
04-12-2016
180.00
Side and bottom stringers.
Details
04-12-2016
20.00
Redoing the Stringers
Details
04-12-2016
15.00
More on the side stringers
Details
04-12-2016
180.00
Carb heat box
Details
04-12-2016
25.00
Bottom Stringers
Details
01-15-2016
20.00
Replace the bottom stringers
Details
12-17-2015
4.00
Paint shop
Details
12-16-2015
4.00
Paint shop
Details
12-14-2015
15.00
Getting fuselage ready to paint
Details
10-24-2015
32.00
Front panels
Details
09-26-2015
20.00
Continuing to get fuselage ready for paint
Details
08-29-2015
100.00
Continue to do the little things on the wings and
Details
07-04-2015
100.00
Catch up hours
Details
05-10-2015
360.00
Catch-up hours from March 2015 to April 2015
Details
05-07-2015
3.00
Firewall template
Details
04-23-2015
8.00
Different items we are doing
Details
03-23-2015
10.00
Measuring and adjusting the horizontal surfaces
Details
02-26-2015
3.00
Door for the right side
Details
02-18-2015
3.00
More engine pictures
Details
02-18-2015
38.10
Mfg. of the Engine Mount
02-18-2015
1.00
Mfg. of Engine Mount
02-18-2015
1.00
Installation of Engine mount
02-14-2015
8.00
Revising the Turtle Deck
Details
02-07-2015
8.00
Still working on Turtle Deck
Details
01-31-2015
8.00
Working on the Turtle Deck
Details
01-28-2015
6.00
Learning mode
Details
01-28-2015
6.00
Learning about ribstiching
Details
12-20-2014
3.00
Started to weld engine mount
Details
12-20-2014
3.00
Making the engine mount
Details
12-20-2014
3.00
Engine mount construction
Details
12-13-2014
3.00
Position of the engine
Details
10-15-2014
1.00
Engine mount
Details
10-13-2014
2.00
More leading edge
Details
10-13-2014
2.00
Left top wing
Details
10-13-2014
40.00
Geting the left top wing ready
Details
10-13-2014
2.00
Gear Drawings we used
Details
10-13-2014
15.00
Gear coming together
Details
09-20-2014
6.00
Making the formers for stringers
Details
09-13-2014
2.00
Engine again
Details
09-06-2014
2.00
Review and preserve engine
Details
08-30-2014
2.00
Move Engine upright
Details
08-16-2014
4.00
We received the R3600 9 cly Radial
Details
08-02-2014
12.00
Making a rotating wing jig
Details
07-05-2014
12.00
Control Cables
Details
07-04-2014
6.00
Aileron cable connections
Details
06-28-2014
182.00
Finishing the Ailerons
Details
05-02-2014
3.00
More Ailerons
Details
04-12-2014
6.00
More Ailerons
Details
04-02-2014
6.00
More work on Ailerons
Details
03-29-2014
2.00
Sold our Landing Gear
Details
03-08-2014
6.00
More cabane pictures
Details
02-15-2014
6.00
Gordy's work
Details
02-02-2014
6.00
Painting and more rivet practice
Details
02-01-2014
5.00
Riveting
Details
01-24-2014
13.00
Finishing the Cabane struts
Details
01-24-2014
5.00
Final Cabanes
Details
01-24-2014
2.00
Cabanes complete
Details
01-18-2014
10.00
Old cabanes used for measurments
Details
01-04-2014
5.00
Cabane
Details
10-19-2013
10.00
Painting and finishing the Ailerons
Details
04-26-2013
2.00
Review of Gear
Details
04-26-2013
2.00
Gear
Details
12-31-2012
384.00
Various areas
Details
08-26-2012
25.00
Continue on Ailerons
Details
08-12-2012
40.00
Making the Ailerons
Details
08-12-2012
40.00
Making Ailerons
Details
08-12-2012
40.00
Center Section
Details
05-30-2012
10.00
Center Section in process views
Details
05-12-2012
12.00
Continue with Ailerons
Details
05-06-2012
208.00
Hours Worked Sundays
Details
05-05-2012
312.00
Hours worked Saturdays
Details
03-10-2012
8.00
Ailerons
Details
08-06-2011
8.00
More Center Section Pictures
Details
05-05-2011
8.00
Bow and more Center section
Details
04-16-2011
3.00
Wing/CC layout
Details
04-02-2011
8.00
New Wing Walk
Details
03-19-2011
8.00
Wing Walk
Details
03-05-2011
5.00
Center Section tank and bottom
Details
03-05-2011
6.00
Center Section Ribs and tank molding
Details
02-26-2011
6.00
Center section ribs
Details
02-12-2011
3.00
Problem with leading edge
Details
02-06-2011
1.00
Panel
Details
02-05-2011
1.00
Wheels and axels
Details
02-05-2011
1.00
Panels as received
Details
02-05-2011
1.00
Panel
Details
02-05-2011
1.00
Gear pictures as we received the project
Details
01-15-2011
6.00
Inboard braces
Details
01-08-2011
6.00
Wing position lights
Details
12-11-2010
5.00
Repare rib/ new position lights/chase for wiring
Details
12-05-2010
3.00
Center Section
Details
11-28-2010
6.00
inspection and trueing of wings
Details
11-27-2010
5.00
Working the wings, squareing up the aileron bay
Details
11-27-2010
3.00
Measure and adjust wing ribs
Details
11-27-2010
3.00
Inventory and update wings
Details
11-20-2010
5.00
Hatz Project delivered
Details
11-20-2010
1.00
Hatz 3 view Drawing
Details
11-20-2010
1.00
3rd in project unload
11-20-2010
5.00
2nd series of delivery
Details
SITE NAVIGATION
Contact Builder
Hatz CB1/Classic Home
Category
# Logs
# Hours
All
199
6602
Ailerons
12
343
Avionics
2
25
Cabanes and Interpla
6
42
Center Section
10
91
Cockpit
10
251
Empennage
4
305
Engine
12
95
Engine Mount
4
43
Firewall forward
3
253
Fuselage
32
1052
Gear
8
90
Hatz Project
13
480
Horizontal and verti
5
62
Misc.
1
1
Miscellaneous
9
1833
None
1
120
Painting
2
14
Panel and cockpit
7
92
Prop
1
1
Rib Stitching
2
12
Turtle Deck, Tail Fe
7
442
Various for review
7
Wings
41
955
Copyright © 2001-2024 Matronics. All Rights Reserved.