Powered By Kitlog Pro v2.0
Brians Web Site
RV-8
All
Work Logs Found:
173
Category Work Time:
573 Hours
Date
Hours
Work Log Summary
Details
12-14-2020
0.10
Airplane stored for winter
08-17-2020
2.00
Canopy Trimming
08-13-2020
2.00
Canopy Slider Jig
08-13-2020
5.00
Canopy Big Cut
08-09-2020
3.00
Canopy trimming
08-06-2020
3.00
Canopy Slid Block
08-05-2020
2.00
Canopy Frame Rear Bow
08-04-2020
8.00
Canopy rails, slide block & anchor block
08-01-2020
1.00
Tank attach bracket 1/4" slot and nut plate
08-01-2020
2.00
Installed Aft Flooring with LP4-3 pop rivets
08-01-2020
2.00
Aileron Stops
07-31-2020
6.00
Wing root fairing hardware installation
07-30-2020
4.00
Fuel Tank Cover Sealing/Installation
07-19-2020
8.00
Installing canopy slide cap and fabricating side r
07-10-2020
0.50
VHF Coms antenna Installation
07-10-2020
0.50
ADS-B In/Out Antenna Installation
07-10-2020
4.00
ADS-B In antenna Installation
07-09-2020
2.00
Interior Flooring Installation
07-08-2020
6.00
Installed screws, washers and nuts in gear tower s
07-07-2020
2.00
Installed Flap Fairings
07-06-2020
1.00
Completed aileron trim control installation
07-06-2020
1.00
Aft Throttle Quandrant
07-05-2020
0.50
Fuel Tank Line Fittings
07-03-2020
3.00
Installed fuel tank brackets and working on wing r
07-02-2020
2.00
Rigging Ailerons with Differential Aileron Jig
Details
07-02-2020
2.00
Alodine Flap Pushrods
07-01-2020
3.00
Flap Fairing
06-30-2020
3.00
FWD Wing Root Fairings
06-29-2020
4.00
Install Aft Wing Root Fairings
06-28-2020
6.00
Rigged/Trim Flaps
06-27-2020
2.00
Tank Brackets
06-27-2020
2.00
Fuel Vent Lines
06-26-2020
2.00
Set Wing Incidence/Sweep
06-26-2020
3.00
Set Wing Incidence/Sweep
Details
06-26-2020
1.00
Drill Aft Spar
06-25-2020
0.50
Testing fuel level senders
06-25-2020
2.00
Installing Wings
Details
06-25-2020
6.00
Fuel line pickup tubes and fuel level senders inst
06-23-2020
16.00
Rear Seat Throttle Installation
06-18-2020
2.50
Installed NACA Vent in wing for passenger vent
06-17-2020
2.00
Tank attach bracket fabrication
06-17-2020
5.00
Heater knob and bowden cable installation
06-16-2020
4.00
Anodized Instrument Sub-Panel and installed vent a
Details
06-15-2020
4.00
Top Aft Skin Installation (Turtle Deck)
Details
06-15-2020
2.00
Install Dynon Temperature Probe
06-14-2020
3.00
Install ADAHRS and secure tubing/wires
06-11-2020
5.00
Cut out instrument sub-panel. Anodized sub-panel.
Details
06-10-2020
4.00
Baggage Door Lock
06-09-2020
10.00
OP-6 Manual Aileron Trim System
06-08-2020
5.00
Tie-down holders
06-07-2020
8.00
Fabricating baggage door
06-06-2020
3.00
Installed 2 AWG Starting Wire & 8 AWG Master Switc
05-30-2020
3.00
Throttle Quantrant Installation
05-30-2020
2.00
Heater Box installed on Firewall
05-27-2020
3.00
2AWG Aft Battery Inst. Master and Starter Solenoid
Details
05-26-2020
2.00
Installed wiring from elevator autopilot servo to
05-26-2020
1.00
Installed upgraded brake reservior plumbing
05-24-2020
2.00
Ran wire to tail light
05-24-2020
0.50
Elevator Trim Wiring
Details
05-24-2020
4.00
Elevator Trim Rigging
05-23-2020
4.00
Elevator Trim Wiring
05-22-2020
3.00
Elevator Pitch Trim Servo Wiring
Details
05-22-2020
3.00
ADHRS Mount
05-21-2020
4.00
Dynon Static Ports Installation
Details
05-20-2020
4.00
Fueslage NACA Vent Installation
05-19-2020
3.00
Roll bar installed
05-19-2020
6.00
Forward upper skin match-drilled
05-08-2020
6.00
Installed fuel pump and plumbing to righ and left
05-07-2020
2.00
Forming edge of top aft skin & debur/dimpling
05-07-2020
4.00
Dimple and rivet top aft bulkheads
05-06-2020
1.00
Fuselage Conduit
Details
05-06-2020
2.00
Fuel valve fittings installed. Aft battery tray.
05-05-2020
2.00
Debur and paint bulkhead assemblies
05-03-2020
4.00
Final-drill Aft fuselage bulkheads and Aft top ski
05-02-2020
4.00
Installed fuel vent lines
05-01-2020
2.00
Install fuel pump
04-30-2020
4.00
Dynon Pitch Installation Guide RV8 Pitch
04-25-2020
4.00
Recieved new elevator F-840 Pushrod
04-24-2020
7.00
Installed rudder cables. Begin assembling rudder p
04-23-2020
3.00
Installed Flap Motor. Begin
04-23-2020
4.00
Elevator Stop Adjustment
Details
04-22-2020
6.00
Install Rudder
Details
04-19-2020
8.00
Elevator Control System
04-18-2020
4.00
Painted interior of fuselage & interior panels
04-17-2020
4.00
Painted interior of fuselage & interior panels
04-16-2020
3.00
Elevator pushrod
04-16-2020
2.00
Drilling Elevator Horns
04-15-2020
4.00
Vertical Stabilizer Installation
04-14-2020
0.50
Vertical Stabilizer Installation
04-14-2020
1.00
Vertical Stabilizer Installation
04-14-2020
2.00
Vertical Stabilizer Installation
04-14-2020
2.00
Interior panels prepping for painting
04-13-2020
0.50
Horizontal Stabilizer Installation
04-13-2020
4.00
Horizontal Stabilizer Installation
04-11-2020
6.00
Foot well recess and throttle quandrant cable anch
04-09-2020
3.00
Alodine stiffeners and rivet to seat floors
04-08-2020
6.00
Seat Floors & Flap Bearing Blocks
04-05-2020
4.00
Pilots seat back
04-04-2020
5.00
Fitting landing gear
04-03-2020
3.00
Fitting landing gear
04-02-2020
3.00
Drilling Gear Leg Brackets
03-28-2020
8.00
Left & Right Flap Installation
03-24-2020
8.00
Installing Left & Right Lower Wing Panels
Details
03-19-2020
2.00
Left Aileron rigging
03-16-2020
5.00
OP-46: Stall Warning System
03-14-2020
3.00
Installed Nav/Pos & Landing/Taxi Light wiring
Details
03-14-2020
3.00
Dynon Pitot Mast Installation
03-13-2020
4.00
Install Dynon Roll Servo Wiring
Details
03-08-2020
4.00
Dynon Roll Servo Installation
03-06-2020
4.00
Installed Flap brace and Aileron Gap Fairing
03-05-2020
4.00
Installed 3/4" electrical conduit in both wings.
01-12-2020
4.00
Deburr, dimpling lower wing skins, aileron gap fai
Details
01-12-2020
3.00
Deburr and dimple lower skins & access panels. Ins
Details
01-11-2020
3.00
Up-drill lower wing skins. Up-drill aileron gap fa
Details
01-11-2020
0.01
Quickbuild Flaps
01-11-2020
0.01
Quickbuild Ailerons
01-11-2020
0.50
Install right aileron brackets
Details
01-11-2020
0.50
Install left aileron brackets
Details
01-10-2020
1.00
Serevice Bulletin 16-03-28 Inboard aileron hinge b
Details
01-10-2020
1.00
Installed Right Aileron Torque Tubes/Bellcranks
Details
01-10-2020
1.00
Installed Left Aileron Torque Tubes/Bellcranks
Details
01-10-2020
1.00
Installed aileron hinges
01-05-2020
3.00
Install aileron hinges
01-04-2020
3.50
Serevice Bulletin 16-03-28 Inboard aileron hinge b
Details
01-03-2020
3.50
Sort hardware. Prime & assemble aileron pushrods.
01-01-2020
2.00
Place right wing on bench begin working on aileron
12-29-2019
5.00
Fuselage Cradle
11-17-2019
2.00
Rigging Elevators to Horz Stabilizer
11-17-2019
1.00
Rigging Elevators to Horz Stabilizer
11-16-2019
2.50
Elevator (Left) Trim tab servo
11-16-2019
3.00
Elevator (Left) Rolling leading edge
11-15-2019
3.00
Elevator (Right) Rolling the leading edge
11-14-2019
4.00
Elevator (Left) Fitting trim tab
11-14-2019
4.00
Elevator (Left) Fitting trim tab
11-13-2019
3.00
Elevator (Left) Rivet under-structure
11-13-2019
2.00
Elevator (Left) Pitch Trim bend & rivet spar reinf
11-13-2019
2.00
Elevator (Left) Bend tabs on trim tab
11-12-2019
1.00
Elevator (Left) Up-drill & prime
11-12-2019
3.00
Elevator (Left) Pitch Trim
11-11-2019
2.00
Elevator (Left)
11-10-2019
1.00
Elevator (Right) Rivet spare & reinf plates
11-10-2019
1.50
Elevator (Right) Prime and rivet spar
11-10-2019
0.10
Elevator (Right) Completed closing skin
11-10-2019
5.00
Elevator (Right) Closing skin & installed horn
11-09-2019
1.00
Elevator (Right) Up drill skin to understructure
11-09-2019
3.00
Elevator (Right) Bend T/E & inst counter weight
11-09-2019
1.00
Elevator (Left) Dimple, prime and back-rivet stiff
11-08-2019
3.00
Elevator (Right) Dimple, prime and back-rivet stif
10-09-2019
1.00
Quickbuild Arrives
10-09-2019
1.00
Quickbuild Arrives
10-09-2019
1.00
Quickbuild Arrives
09-22-2019
7.00
Horizontal Stab, closed skin (completed)
09-22-2019
3.50
Elevator (Right) Dimple and back-rivet stiffeners
09-19-2019
4.00
Horizontal Stab Prime parts & begin riveting under
09-19-2019
5.00
Horizontal Stab Install understructure with rear s
09-17-2019
5.00
Horizontal Stab assembling forward spare and ribs
09-16-2019
1.00
Horizontal Stab bend spar reinforcment plate to 6
09-15-2019
3.00
Horizontal stabilizer assemble rear spar and up-dr
09-13-2019
1.00
Rudder
09-13-2019
4.00
Rudder
09-13-2019
4.00
Rudder
09-13-2019
2.00
Rudder
09-12-2019
12.00
Rudder
09-11-2019
10.00
Rudder
09-10-2019
6.00
Vertical Stabilizer
09-10-2019
2.00
Vertical Stabilizer
09-08-2019
4.00
Vertical Stabilizer
09-08-2019
2.00
Vertical Stabilizer
09-08-2019
1.00
Vertical Stabilizer
09-08-2019
3.00
Vertical Stabilizer
09-07-2019
4.00
Empennage Arrived - Inventory
09-02-2019
8.00
Building Wing Cradle
07-24-2019
8.00
EAA Work Benches
SITE NAVIGATION
RV-8 Home
Category
# Logs
# Hours
All
173
573
Avionics
1
4
Empennage
64
192
Engine
1
3
Fuselage
57
224
Miscellaneous
1
0
None
7
28
Wings
42
122
Copyright © 2001-2024 Matronics. All Rights Reserved.