N983LK
Work Logs Found: 1335
Category Work Time: 4531 Hours
 Date
Hours
Work Log Summary

Details

 12-15-2023
0.00
Paint complete
Details
       

 11-29-2023
0.00
Paint shop visit
Details
       

 11-20-2023
0.00
Base coat applied
Details
       

 11-14-2023
0.00
Paint shop visit
Details
       

 10-23-2023
0.00
Drop off for paint
Details
     

 09-16-2023
0.00
Aft baggage tiedown rings
Details
       

 06-30-2023
4.00
Lower empennage fairing part 5
Details
       

 06-27-2023
4.00
Empennage lower fairing part 4
Details
       

 06-24-2023
6.00
Lower empennage fairing part 3
Details
       

 06-21-2023
2.00
Lower empenage fairing part 2
Details
       

 06-20-2023
4.00
Empenage lower fairing
Details
       

 05-28-2023
0.00
Aileron wedge
Details
       

 05-27-2023
0.00
Switch lock
Details
     

 04-14-2023
0.00
Modified forward baggage floor part 4
Details
       

 04-13-2023
0.00
Modified forward baggage floor part 3
Details

 03-26-2023
0.00
Modified forward baggage floor part 3
Details
     

 03-18-2023
0.00
Modified forward baggage floor part 2
Details
       

 02-26-2023
0.00
Modified forward baggage floor
Details
       

 08-24-2022
4.00
GPS Antenna Bracket Adapter
Details
     

 08-02-2022
8.00
More cockpit storage
Details
       

 07-17-2022
2.00
Fire extinguisher mount
Details
       

 07-13-2022
0.00
IFR Cert
Details
       

 07-09-2022
0.00
50 hour oil change
Details
       

 07-05-2022
0.00
Propeller dynamic balancing
Details
       

 07-03-2022
4.00
Canopy skirt aft edge gap
Details
       

 07-01-2022
0.00
Rear seat ipad mount
Details
       

 06-25-2022
0.00
Phase 1 complete
Details

 06-21-2022
0.00
Ultimate gust lock
Details
     

 06-16-2022
0.00
Travel cover and wheel chocks
Details
       

 05-30-2022
0.00
Photo session
Details
       

 05-28-2022
3.00
Stall warning vane removal
Details
       

 05-22-2022
0.00
Oil change
Details
       

 04-02-2022
0.00
Rudder wedge test flight
Details

 03-15-2022
0.50
Rudder wedge
Details
     

 03-11-2022
4.00
Reinstalled GPS ant bracket and fuel servo
Details
       

 03-10-2022
1.00
Painted GPS bracket antenna extension
Details

 03-06-2022
1.50
Fuel sampler
Details
       

 03-04-2022
5.00
Cockpit storage panel - LH side
Details
       

 02-27-2022
5.00
Cockpit storage panel - RH side
Details
       

 02-13-2022
4.00
Redesigned wing tip hing pin retainers
Details
       

 02-02-2022
3.50
Replacement fuel servo mixture lever
Details
       

 01-09-2022
3.50
Tape on oil cooler and wheel pants installation
Details
       

 01-02-2022
4.00
IFD-440 GPS antenna mount extensioin
Details
       

 12-29-2021
0.00
More misc tasks
Details
       

 12-28-2021
0.00
Misc tasks
Details

 12-22-2021
1.50
Finishing up wheel pant repair
Details

 12-21-2021
1.00
Wheel pant repair continued
Details
     

 12-20-2021
2.00
Wheel pant repair continued and fuel dip stick
Details
       

 12-18-2021
0.50
Wheel pant repair.
Details
     

 12-17-2021
1.00
My First Flight
Details
     

 12-09-2021
2.00
Misc fixes
Details
       

 12-08-2021
3.50
Completed Reiff heater installation
Details
       

 12-06-2021
2.00
Reiff heater continued
Details
       

 12-05-2021
5.00
Post flight checks
Details

 12-04-2021
0.00
First Flight!
Details
       

 12-03-2021
6.50
Fuel flow test and second engine run.
Details
       

 12-02-2021
5.00
Reiff heater continued
Details

 12-01-2021
2.50
Replacement throttle lever
Details
       

 11-21-2021
2.00
Misc
Details

 11-20-2021
5.00
First Engine Strart
Details
       

 11-18-2021
4.00
Reiff Heater part 1
Details
       

 11-17-2021
2.00
Replacement tailwheel bolt
Details
       

 11-13-2021
3.50
Fuel level calibration
Details
     

 11-12-2021
2.00
Airworthiness Inspection
Details
     

 11-11-2021
2.00
Prep for DAR part 2
Details

 11-10-2021
2.50
Prep for DAR
Details

 11-07-2021
4.00
Fueled RH tank
Details
       

 11-06-2021
4.00
Fueled LH tank
Details
       

 10-31-2021
2.50
Prep for fuel flow tests
Details
     

 10-30-2021
6.00
Weight and balance measurements
Details
       

 10-29-2021
4.00
Prep for weighing
Details
       

 10-26-2021
2.00
Upper intersection fairings continued
Details
       

 10-25-2021
3.00
Upper intersection fairings
Details
       

 10-24-2021
4.00
Refilled brake system
Details
       

 10-23-2021
5.00
R&R brake line fittings on langing gear legs
Details
       

 10-20-2021
2.00
Lower empenage fairings part 2
Details

 10-17-2021
5.00
Prep for landing gear removal
Details
       

 10-15-2021
6.00
Wing root fairings and upper intersection fairings
Details
       

 10-14-2021
25.00
More misc tasks
Details
       

 10-09-2021
4.00
Seats and harnesses
Details
       

 10-08-2021
2.50
Rear seat harness
Details
       

 10-05-2021
1.50
RH wing tip aft end re-bonding
Details
       

 10-04-2021
2.00
LH wing tip trailing edge re-bond
Details
       

 10-03-2021
4.00
Brake fluid and ELT test
Details
       

 10-02-2021
4.00
Various tasks
Details
       

 10-01-2021
5.00
Misc tasks again
Details
       

 09-29-2021
3.00
Rear baggage floor and Autopilot calibration
Details
       

 09-28-2021
3.00
Flap fairing rivets and gear tower covers
Details
       

 09-27-2021
2.50
Forward fuselage floor
Details
       

 09-26-2021
7.00
More misc tasks
Details
       

 09-17-2021
8.00
Misc tasks
Details
       

 09-16-2021
3.00
Roll servo wiring and fuel sensor wiring
Details
       

 09-15-2021
3.50
Pitot heat and stall warning wiring
Details
       

 09-13-2021
4.00
Misc final assembly tasks
Details
       

 09-11-2021
3.50
Wings on for good
Details
       

 09-10-2021
5.00
Wing root tasks
Details
       

 09-07-2021
4.00
Wing root nut plates
Details
       

 09-06-2021
2.50
Wings back off
Details
       

 09-05-2021
5.50
Wing tips and flap fairing work.
Details
       

 09-04-2021
5.00
Flap fairings and wing tip trimming
Details
       

 08-31-2021
3.00
Wing root fairings
Details
       

 08-30-2021
3.00
Flap alignment part 2
Details
       

 08-29-2021
6.00
Aileron and flap installation and adjustment
Details
       

 08-28-2021
7.00
Misc wing attachment tasks
Details
       

 08-25-2021
3.00
Wing alignment part 4
Details
       

 08-22-2021
3.00
Wing alignment part 3
Details
       

 08-21-2021
6.00
Wing alignment part 2
Details
       

 08-20-2021
4.00
Fuel tank attach brackets and wing alignment part
Details
       

 08-17-2021
2.00
Misc tasks
Details
       

 08-15-2021
6.50
Wings on!
Details
       

 08-14-2021
5.00
Prep for wing installation
Details
       

 08-11-2021
2.50
Hooked up tail nav/strobe
Details
       

 08-09-2021
2.50
Installed rudder
Details
       

 08-08-2021
4.00
Hooked up elevators
Details
       

 08-07-2021
6.00
Installed elevators. Wired up pitch trim servo
Details
       

 08-06-2021
4.00
Attached vertical stab
Details
       

 08-05-2021
1.00
Rudder fiberglass
Details

 08-04-2021
2.00
Rudder composite work continued
Details

 08-03-2021
2.00
Rudder composite work
Details

 07-31-2021
6.00
Final install of empenage on fuselage part 1
Details
       

 07-29-2021
1.50
VS tip work
Details

 07-28-2021
6.00
More empenage tip work
Details
       

 07-27-2021
2.50
Empenage tips
Details
       

 07-25-2021
4.50
More empenage work and misc
Details
     

 07-24-2021
6.00
Empennage fiberglass
Details
       

 07-21-2021
0.00
Fuselage Move
Details
       

 07-20-2021
3.60
Canopy clean up
Details
       

 07-18-2021
0.00
Hangar move
Details
       

 07-17-2021
2.00
Wheel fairings part 23
Details
       

 07-16-2021
3.00
Wheel fairings part 22
Details
       

 07-15-2021
4.00
Wheel fairings part 21
Details
       

 07-14-2021
4.00
Wheel fairings part 20
Details
       

 07-13-2021
4.00
Wheel fairings part 19
Details
       

 07-12-2021
4.00
Wheel fairings part 18
Details
       

 07-11-2021
2.00
Wheel fairings part 17
Details
       

 07-10-2021
3.00
Wheel fairings part 16
Details
       

 07-09-2021
3.00
Wheel fairings part 15
Details
       

 07-08-2021
2.00
Wheel fairings part 14
Details
       

 07-07-2021
2.00
Wheel fairings part 13
Details

 07-06-2021
3.00
Wheel fairings part 12
Details
       

 07-03-2021
6.00
Cowl part 43
Details
       

 07-02-2021
1.00
Cowl part 42
Details

 06-29-2021
1.00
Cowl Part 41
Details

 06-25-2021
4.00
Cowl part 40
Details
       

 06-23-2021
3.00
Cowl part 39
Details
     

 06-22-2021
4.00
Cowl part 38
Details
       

 06-20-2021
4.00
Cowl part 37
Details
       

 06-19-2021
4.00
Cowl part 36
Details
       

 06-18-2021
4.00
Miscellaneous work on cowl, baffles and engine.
Details
       

 06-17-2021
2.00
Cowl part 35
Details
       

 06-16-2021
4.00
Cowl part 34
Details
       

 06-15-2021
2.00
Cowl part 33
Details

 06-12-2021
3.00
Cowl part 32
Details
       

 06-08-2021
3.00
Cowl nose flange layups
Details
       

 06-07-2021
2.00
Lower intersection fairings part 3
Details
       

 06-06-2021
2.00
Lower intersection fairings part 2
Details

 06-05-2021
3.00
Lower intersection fairings part 1
Details
       

 06-04-2021
4.00
Baffles part 44
Details
       

 06-03-2021
3.00
Oil cooler
Details
       

 06-02-2021
2.00
Prop oil line part 2
Details
       

 05-31-2021
4.00
Baffles part 43
Details
       

 05-30-2021
6.00
Baffles part 42
Details
       

 05-29-2021
2.00
Cowl part 31
Details
       

 05-28-2021
2.00
Cowl part 30
Details
       

 05-26-2021
2.00
Cowl part 29
Details
     

 05-25-2021
1.00
Baffles part 41
Details
       

 05-23-2021
8.00
Baffles part 40
Details
       

 05-22-2021
9.00
Baffles part 39
Details
       

 05-19-2021
1.00
Baffles part 38
Details

 05-18-2021
5.00
LH engine temp probe wiring and baffles part 38
Details
       

 05-17-2021
3.00
RH engine temp probe wiring
Details
       

 05-15-2021
3.00
Baffles part 37
Details
       

 05-14-2021
4.00
Baffles part 36
Details
       

 05-13-2021
1.00
Baffles part 35
Details
       

 05-12-2021
2.00
Baffles part 34
Details
     

 05-10-2021
1.00
Baffles part 33
Details

 05-09-2021
6.00
Baffles part 32
Details
       

 05-08-2021
4.00
Baffles part 31
Details

 05-07-2021
3.00
Cowl part 28
Details
       

 05-06-2021
3.00
Cowl part 27
Details
       

 05-05-2021
2.00
Baffles part 30
Details
     

 05-04-2021
2.00
Baffles part 29
Details

 05-03-2021
1.50
Cowl part 26
Details

 05-02-2021
2.00
Baffles part 28
Details
       

 05-01-2021
3.00
Baffles part 27
Details
       

 04-30-2021
4.00
Cowl part 25
Details
       

 04-29-2021
1.50
Cowl part 24
Details
     

 04-28-2021
2.00
Cowl part 23
Details
       

 04-27-2021
2.00
Baffles part 26
Details

 04-26-2021
2.00
Baffles part 25
Details

 04-25-2021
2.00
Baffles part 24
Details

 04-24-2021
6.00
Baffles part 23
Details
       

 04-23-2021
4.00
Baffles part 22
Details
       

 04-22-2021
5.00
Cowl part 22
Details
       

 04-21-2021
2.70
Cowl part 21
Details

 04-20-2021
28.00
Baffles part 21
Details
       

 04-19-2021
1.50
Cowl part 20
Details
     

 04-18-2021
1.50
Baffles part 20
Details
       

 04-17-2021
4.80
Baffles part 19
Details
       

 04-16-2021
5.00
Baffles part 18
Details
       

 04-15-2021
3.00
Baffles Part 17
Details
       

 04-14-2021
3.20
Baffles part 16
Details
       

 04-13-2021
2.50
Baffles part 15
Details
       

 04-12-2021
3.00
Baffels part 14
Details
       

 04-11-2021
8.80
Baffles part 13
Details
       

 04-10-2021
6.00
Baffles part 12
Details
       

 04-09-2021
2.30
Baffles part 11
Details
       

 04-06-2021
2.50
Baffles Part 10
Details
       

 04-04-2021
4.00
Baffles part 9
Details
       

 04-03-2021
6.00
Prop oil line and Baffles part 8
Details
       

 04-02-2021
4.00
Cowl part 20
Details
     

 04-01-2021
2.00
Cowl part 19
Details

 03-31-2021
3.00
Cowl part 18
Details
       

 03-30-2021
3.00
Cowl part 17
Details
       

 03-29-2021
3.00
Cowl part 16
Details
       

 03-26-2021
3.00
Cowl Part 15
Details
       

 03-25-2021
2.00
Cowl part 14
Details

 03-24-2021
3.00
Cowl part 13
Details
     

 03-23-2021
4.00
Cowl part 12
Details
       

 03-21-2021
6.00
Cowl Part 11
Details
       

 03-20-2021
5.50
Cowl part 10
Details
       

 03-19-2021
7.00
Cowl Part 9
Details
       

 03-16-2021
1.00
Started snorkel fit up and cowl part 9
Details
       

 03-14-2021
1.50
Fuel Lines
Details

 03-13-2021
2.00
Fuel flow sensor wiring part 2
Details
       

 03-08-2021
1.00
Cowl part 8
Details

 03-07-2021
5.00
Cowl part 7
Details
       

 02-28-2021
2.00
Fuel flow sensor wiring and alternator field wire
Details
       

 02-23-2021
3.00
Prop part 3
Details
       

 02-22-2021
3.00
Cowl part 6
Details
       

 02-21-2021
6.00
Oil door hinge and cowl part 5
Details
       

 02-20-2021
6.00
Cowl part 4
Details
       

 02-19-2021
5.00
Cowl part 3
Details
       

 02-17-2021
2.00
Prop part 2
Details
       

 02-16-2021
2.50
Prop Part 1
Details
       

 02-13-2021
3.00
Cowl part 2
Details
       

 02-12-2021
4.00
Cowl part 1
Details
       

 02-11-2021
1.50
Baffles part 7
Details
       

 02-10-2021
2.50
Baffles part 6
Details
       

 02-09-2021
3.00
Sniffle valve
Details
       

 02-07-2021
3.00
Misc engine bottom tasks part 2
Details
       

 02-06-2021
4.00
Misc engine bottom tasks
Details
       

 02-01-2021
2.00
Misc work
Details

 01-28-2021
4.00
EGT and CHT probes plus Red Cube bracket
Details
       

 01-26-2021
3.00
Aternator wiring part 2
Details
       

 01-25-2021
2.00
Engine ground strap
Details
       

 01-22-2021
4.00
Exhaust part 4
Details
       

 01-21-2021
2.00
Red Cube part 1
Details
       

 01-20-2021
2.00
Exhaust Part 3
Details
       

 01-15-2021
2.00
Exhaust part 2
Details
       

 01-14-2021
2.50
Exhaust Part 1
Details
       

 01-13-2021
2.00
Baffles part 5
Details
       

 01-11-2021
3.00
Alternator
Details
       

 01-10-2021
4.00
Throttle cable bracket part 2
Details
       

 01-09-2021
3.00
Throttle cable bracket part 1
Details
       

 01-07-2021
4.00
Replacement mixture cable
Details
       

 01-06-2021
2.00
Starter cable part 2
Details
       

 01-05-2021
0.80
Starter part 1
Details
     

 01-04-2021
2.00
Baffles part 4
Details

 01-03-2021
6.00
Baffles part 3
Details
       

 01-02-2021
4.00
Oil cooler baffle reinforcement
Details
       

 12-31-2020
1.50
Engine hookups part 8
Details

 12-29-2020
6.00
Baffles part 2
Details
       

 12-28-2020
15.00
Baffles part 1
Details

 12-26-2020
0.50
Engine hookups part 7
Details

 12-24-2020
2.00
Engine hookups part 6
Details

 12-23-2020
4.00
Engine hookups part 5
Details
       

 12-22-2020
6.00
Engine hookups part 4
Details
       

 12-21-2020
4.00
Engine hookups part 3
Details
       

 12-20-2020
4.00
Engine hookups part 2
Details
       

 12-19-2020
2.00
Engine hookups
Details
       

 12-17-2020
2.50
Governor linkage continued
Details
       

 12-16-2020
4.00
Governor linkage adjustment
Details

 12-15-2020
4.00
Manifold pressure line
Details
       

 12-13-2020
4.00
Hung Engine
Details
       

 11-23-2020
1.50
Wheel fairings part 11
Details

 11-22-2020
2.00
Wheel fairings part 10
Details
       

 11-21-2020
2.00
Wheel fairings part 9
Details
       

 11-20-2020
1.50
Wheel fairings part 8
Details

 11-19-2020
1.00
Governor installation
Details
       

 11-18-2020
1.00
Wheel alignment adjustment again
Details

 11-15-2020
2.00
Wheel fairings part 7
Details

 11-14-2020
1.00
Wheel fairings part 6
Details

 11-13-2020
6.00
Wheel fairings part 5
Details
       

 11-12-2020
2.50
Wheel fairings part 4
Details

 11-11-2020
4.00
Wheel fairings part 3
Details
       

 11-09-2020
1.00
Wheel fairings part 2
Details

 11-08-2020
2.50
Wheel Fairings part 1
Details
       

 11-07-2020
3.00
More wheel alignment
Details
       

 11-06-2020
1.50
Wheel alignment correction
Details
       

 11-05-2020
1.00
Sealed top edge of firewall
Details

 11-04-2020
3.00
Engine Prep Part 3
Details
     

 11-01-2020
2.00
Engine prep part 2
Details
       

 10-31-2020
3.00
Engine prep part 1
Details
     

 10-30-2020
3.00
Fuselage Roll Out
Details
       

 10-29-2020
2.00
Wheels, brakes and tires
Details
       

 10-28-2020
2.00
Landing gear toe-in check
Details

 10-26-2020
4.00
Landing gear fit up
Details

 10-24-2020
2.50
Landing Gear Legs back on
Details
       

 10-23-2020
4.00
Windscreen unveiling
Details
       

 10-20-2020
2.00
Prep for landing gear installation
Details

 10-19-2020
1.00
Priming windscreen fairing
Details
       

 10-18-2020
3.00
Final sanding of the windscreen fairing
Details
       

 10-17-2020
2.00
Sanding the micro on the windscreen
Details
       

 10-16-2020
6.00
Windscreen final shaping
Details
       

 10-15-2020
2.00
Filling gaps under empennage fairing
Details
     

 10-14-2020
4.00
Empenage fairing continued
Details
       

 10-13-2020
4.00
Empenage fairing mod part 2
Details
       

 10-12-2020
6.00
Empennage fairing mod
Details
       

 10-10-2020
4.00
More windscreen fairing work
Details
       

 10-09-2020
1.00
Windscreen fairing part ??
Details

 10-08-2020
1.50
More windscreen fairing shaping
Details
     

 10-07-2020
1.00
Windscreen fairing shaping
Details

 09-21-2020
2.00
Laying up fiberglass patches on windscreen fairing
Details
       

 09-19-2020
0.00
Propellor arrives
Details
       

 09-18-2020
3.00
Windscreen trimming and sanding
Details

 09-17-2020
2.00
More canopy fiberglass work
Details

 09-16-2020
2.00
Fiberglass work on windscreen fairing and empenage
Details

 09-15-2020
4.00
Trimming and sanding the windscreen upper fairing
Details
       

 09-14-2020
3.00
Empennage tip work
Details
     

 09-13-2020
2.50
Opening canopy after windscreen fairing cure
Details
       

 09-12-2020
8.00
Windscreen/canopy fairing
Details
       

 09-11-2020
5.00
RH HS tip closeout
Details
       

 09-10-2020
4.00
LH HS closeout
Details

 09-09-2020
5.00
Empenage fairing and wing tip work
Details
       

 09-08-2020
2.00
SL-00014
Details
       

 09-06-2020
3.00
More canopy work
Details
     

 09-05-2020
2.00
More work on the forward end of the canopy
Details

 09-04-2020
8.00
Canopy final riveting and wheels/tires
Details
       

 09-02-2020
4.00
Fwd baggage door hinge support closeout angle
Details
       

 09-01-2020
3.00
Glareshield edge trim
Details
       

 08-31-2020
4.00
Reinstalled avionics and cut hole for drink holder
Details
       

 08-30-2020
4.00
Baggage door tweeking
Details
       

 08-29-2020
5.00
Baggage door complete
Details
       

 08-28-2020
4.00
Baggage door skin riveting
Details
       

 08-27-2020
5.00
Baggage door support
Details
       

 08-27-2020
3.00
Baggage door lock arm
Details
       

 08-26-2020
4.00
Skirt priming and some other stuff
Details
       

 08-25-2020
2.00
More skirt sanding
Details

 08-24-2020
3.00
More skirt sanding
Details

 08-23-2020
2.00
Canopy skirt flox sanding
Details

 08-21-2020
6.50
Riveting canopy
Details
       

 08-19-2020
2.00
Still more sanding of windscreen lower fairing
Details

 08-18-2020
1.50
More sanding of the windscreen lower fairing
Details

 08-17-2020
2.50
Windshield fairing lower fairing sanding
Details
     

 08-16-2020
3.00
Laying up wind screen forward bottom fairing
Details
       

 08-14-2020
0.00
Pilot's stick grip label
Details
       

 08-13-2020
2.00
Windscreen fillet part 2
Details

 08-12-2020
4.00
Windscreen fillet
Details
       

 08-11-2020
3.00
Prep for windscreen fairing layup
Details

 08-10-2020
1.00
Completed riveting forward top skin
Details
       

 08-09-2020
6.00
Wind screen fairing part 2
Details
       

 08-08-2020
6.00
Windscreen screws
Details
       

 08-07-2020
8.00
Baggage door
Details
       

 08-06-2020
4.00
More forward top skin work
Details
       

 08-05-2020
4.00
Riveting forward top skin
Details
       

 08-04-2020
3.50
Passenger warnings and landing gear bolts
Details
       

 08-03-2020
5.00
Misc tasks
Details
       

 08-02-2020
4.50
Replacement fuel lines
Details
       

 08-01-2020
4.00
Misc work
Details
       

 07-31-2020
5.00
Landing gear brackets etc
Details
       

 07-30-2020
6.00
Landing gear bolt retainer clips
Details
       

 07-29-2020
4.00
More work on canopy skirt
Details

 07-28-2020
3.00
Canopy skirt aft tunnel
Details
       

 07-27-2020
3.00
Canopy skirt and wing tips some more
Details
     

 07-26-2020
5.00
Canopy skirt aft section work etc
Details
       

 07-25-2020
4.50
Canopy skirt - shortening the aft edge
Details
       

 07-24-2020
5.00
Wing tip and canopy skirt work etc
Details
       

 07-22-2020
5.00
Throttle quadrant
Details
       

 07-21-2020
3.00
Engine linkages at throttle quadrant
Details
     

 07-20-2020
2.00
Wing tips continuuuuuuuuued
Details

 07-19-2020
3.00
Wing tip work and back to the canopy
Details

 07-18-2020
3.00
More wing tip and landing gear work
Details

 07-17-2020
2.00
Wing tips and landing gear
Details

 07-16-2020
1.50
Primered landing gear and misc rudder pedal work
Details

 07-15-2020
2.00
Landing gear legs - prep for primer
Details

 07-14-2020
2.50
Amps shunt to ANR fuse holder jumper wire
Details
       

 07-13-2020
5.00
Pressure sensor wiring hookup
Details
       

 07-12-2020
4.00
Alternate air cable and SV amps hookup
Details
       

 07-11-2020
3.00
Cabin heat cabin installation
Details
       

 07-10-2020
4.00
Cabin heat and alternate air bracket paint and lab
Details
       

 07-09-2020
4.00
Heater cable
Details

 07-08-2020
4.00
More cable bracket work
Details
       

 07-06-2020
2.00
Control cables
Details

 07-04-2020
2.20
Another firewall passthrough
Details
       

 07-03-2020
4.00
Wing tips and control cable FW passthroughs
Details
       

 07-01-2020
4.00
Wing tip lenses try number 3
Details
       

 06-29-2020
1.50
More wing tip work
Details

 06-28-2020
4.50
IFD-440 GPS antenna coax
Details
       

 06-26-2020
5.50
Engine mount
Details
       

 06-24-2020
4.00
GPS antenna bracket part 2
Details
       

 06-23-2020
6.50
Firewall equipment
Details
       

 06-22-2020
2.00
Wing tip sanding
Details

 06-21-2020
1.00
Firewall forward kit
Details
     

 06-19-2020
6.00
Bracket for ANL fuse and ammeter shunt
Details
       

 06-18-2020
4.00
Misc wiring tasks
Details
       

 06-17-2020
3.00
Starter contactor and Tach wiring
Details
       

 06-16-2020
2.50
Main power wire hook up to starter contactor
Details
       

 06-10-2020
6.00
Primary power wiring
Details
       

 06-07-2020
2.50
More firewall wiring
Details
       

 06-06-2020
5.50
Firewall groundblock wiring and moved wings
Details
       

 06-05-2020
8.00
Forward section wiring
Details
       

 06-04-2020
5.50
Wire routing for FWF wires to firewall
Details
       

 06-03-2020
3.00
Wingtips part 23 and some electrical work
Details

 06-02-2020
3.00
Wingtips part 22
Details

 06-01-2020
1.50
Wingtips part 21
Details

 05-31-2020
5.00
Wingtips part 20 and started the firewall forward
Details
       

 05-30-2020
1.50
Wing tips part 19
Details

 05-28-2020
5.00
Wingtips part 18
Details

 05-26-2020
0.00
Engine arrives
Details
       

 05-25-2020
3.00
Wingtips part 17 and canopy shims
Details

 05-24-2020
3.50
Wing tips part 16 and canopy work
Details
       

 05-23-2020
7.00
Wing tips part 15
Details
       

 05-22-2020
6.00
Wing tips part 14
Details
       

 05-20-2020
4.00
Wing tips part 13 and some canopy work
Details
       

 05-19-2020
3.70
Wing tips part 12 and back to the canopy
Details

 05-17-2020
5.00
Landing/Taxi Lights part 2
Details
       

 05-16-2020
6.00
Landing/Taxi Lights
Details
       

 05-15-2020
1.50
Wing Tips part 11
Details
       

 05-14-2020
1.00
Wing tips part 10
Details

 05-13-2020
2.30
Wing tips part 9
Details
       

 05-12-2020
1.00
Wing tips part 8
Details
       

 05-10-2020
5.00
Wing tips part 7 and canopy latch
Details
       

 05-09-2020
8.00
Wing tips part 6
Details
       

 05-08-2020
6.00
Wing tips part 5 and misc tasks
Details
       

 05-08-2020
0.00
Hangar!
Details
       

 05-07-2020
4.50
Roll Servo Part 4
Details
       

 05-06-2020
3.00
Roll servo part 3 and sanding wing tip micro
Details
       

 05-05-2020
4.00
Roll servo part 2 and filling wing tip gaps
Details
       

 05-04-2020
2.00
Roll servo part 1
Details
       

 05-04-2020
1.00
Filling wing tip gaps
Details
       

 05-03-2020
5.00
RH wing tip hinges and VOR antenna
Details
       

 05-02-2020
2.00
Riveting hinges on LH wing tip
Details
       

 05-01-2020
9.00
More wing tip work
Details
       

 04-30-2020
3.00
Wing tip lenses Part 4
Details
     

 04-28-2020
2.00
Wing tip lenses part 3
Details
       

 04-27-2020
2.00
Wing tip lenses part 2
Details
       

 04-26-2020
4.00
Wing tip lens
Details
       

 11-04-2019
2.00
Completed wiring for Skyview GPS antenna
Details
       

 10-28-2019
3.00
Sky view GPS wiring
Details

 10-20-2019
2.50
GPS antenna mounting and wire routing
Details
       

 10-19-2019
5.00
Indicator light wiring and some more canopy skirt
Details
     

 10-14-2019
8.00
Canopy rail mod and panel clearcoat
Details
       

 10-13-2019
4.00
Canopy Skirt Part 21
Details

 10-12-2019
6.00
Canopy skirt part 20
Details
       

 10-11-2019
4.00
Canopy skirt part 19
Details

 09-28-2019
4.00
Canopy forward edge reinforcement strip
Details
       

 09-21-2019
4.00
More canopy work
Details
       

 09-14-2019
8.00
Canopy latch
Details
       

 09-13-2019
4.00
Elevator counterweight closeouts
Details
       

 09-07-2019
6.00
Empennage tips part 8
Details
       

 09-06-2019
6.00
Empennage tips part 7
Details

 09-05-2019
1.00
Empennage tips part 6
Details

 09-04-2019
2.00
Empennage tips part 5
Details

 09-02-2019
2.00
Empennage tips part 4
Details

 08-31-2019
8.00
Empennage tips part 3
Details
       

 08-30-2019
7.00
Empennage tips part 2
Details
       

 08-29-2019
1.00
Canopy skirt part 18
Details

 08-28-2019
1.50
Canopy skirt part 17
Details
     

 08-25-2019
5.00
Empennage Tips part one
Details
       

 08-24-2019
6.00
Canopy skirt part 16 and Rudder fiberglass
Details
       

 08-21-2019
2.00
Canopy skirts part 15
Details
       

 08-20-2019
2.50
Canopy skirts part 14
Details
       

 08-18-2019
8.00
Canopy skirts part 13 and rudder bottom
Details
       

 08-17-2019
2.00
Canopy skirts part 12
Details
       

 08-16-2019
7.00
Canopy skirts part 11
Details
       

 08-14-2019
2.50
Canopy skirts part 10
Details
       

 08-13-2019
2.00
Canopy skirts part 9
Details
       

 08-11-2019
8.00
Canopy skirts part 8
Details
       

 08-10-2019
8.00
Canopy skirts part 7
Details
       

 08-04-2019
6.00
Canopy skirts part 6
Details

 08-03-2019
8.00
Canopy skirts part 5
Details
       

 08-02-2019
3.00
Canopy skirts part 4
Details

 08-01-2019
1.80
Canopy skirts part 3
Details
       

 07-31-2019
1.30
Canopy skirts part 2
Details
       

 07-28-2019
8.00
Started canopy skirts
Details
       

 07-27-2019
7.00
Canopy drilling and final trim
Details
       

 07-26-2019
5.00
Canopy trimming part 8
Details
       

 07-20-2019
6.00
Canopy Bubble Trimming Part 7 - The Big Cut - MEH
Details
       

 07-15-2019
2.00
Canopy Bubble Trimming Part 6
Details
       

 07-14-2019
4.00
Canopy Bubble Trimming Part 5
Details
       

 07-13-2019
6.00
Canopy bubble trimming part 4
Details
     

 07-10-2019
1.50
Canopy bubble trimming part 3
Details
       

 07-03-2019
3.00
Canopy bubble trimming part 2
Details
       

 06-30-2019
5.50
Canopy bubble trimming part 1
Details
       

 06-28-2019
3.50
More panel label work
Details
       

 06-22-2019
4.00
Trial canopy trimming
Details
       

 06-20-2019
2.00
Canopy rear stop
Details
       

 06-18-2019
0.00
Engine is done!
Details
       

 06-14-2019
4.00
More panel lables
Details
       

 06-13-2019
1.00
N Number panel lable
Details
     

 06-12-2019
2.50
Lower switch panel labels
Details
       

 06-10-2019
2.50
Panel labels and rear baggage floor paint
Details
       

 06-08-2019
3.50
Canopy frame part 6
Details
       

 06-07-2019
4.00
Canopy frame part 5
Details

 06-02-2019
2.50
Forward baggage floor paint and retainer clips for
Details
       

 05-29-2019
1.50
Canopy frame part 4
Details
     

 05-28-2019
2.00
Canopy frame part 3
Details
       

 05-27-2019
5.00
Canopy frame part 2
Details
       

 05-26-2019
5.00
Canopy frame part 1
Details
       

 05-25-2019
3.00
Canopy slide rail part 3
Details
       

 05-24-2019
5.00
Canopy slide rails part 2
Details
       

 05-22-2019
2.00
Canopy slide rail
Details

 05-17-2019
8.00
Finish Kit Arrives!
Details
       

 05-15-2019
2.50
Seat heat wire, harness clamps and floor paint
Details
       

 05-13-2019
1.00
Click studs for avionics bay wire harness support
Details
       

 05-12-2019
4.00
More interior painting and ram mount base installa
Details
       

 05-11-2019
6.00
Voltage regulator and interior painting
Details
       

 05-05-2019
3.50
Volatge regulator wiring
Details
     

 05-04-2019
1.50
Rear baggage compartment components
Details

 05-03-2019
3.00
Painted misc parts
Details
       

 05-01-2019
2.50
Misc work
Details
       

 04-28-2019
6.00
Finished battery and ELT access door mods
Details
       

 04-27-2019
4.50
ELT access door part 3
Details

 04-24-2019
3.00
ELT access door part 2
Details

 04-19-2019
1.50
ELT access hatch part 1
Details
       

 04-15-2019
2.50
Battery access door part 4
Details

 04-14-2019
2.50
Battery access door part 3
Details
       

 04-13-2019
6.00
Battery access door part 2
Details
       

 04-10-2019
2.50
Battery access door part 1
Details
       

 04-03-2019
0.00
Engine on order
Details
       

 03-24-2019
2.50
Painted cabin floors
Details

 03-23-2019
1.50
Painted the rear seat support
Details

 03-22-2019
1.50
Painted the bulkhead caps
Details

 03-20-2019
2.00
Lettering and clearcoat
Details

 03-17-2019
4.00
Started baggage door
Details
       

 03-16-2019
2.00
Upper forward skin substructure
Details

 03-15-2019
4.00
Forward upper fuselage skin
Details
       

 03-13-2019
2.50
Misc
Details

 03-10-2019
6.00
Cut out for avionics cooling fan
Details
       

 03-08-2019
8.00
CO Guardian
Details

 03-06-2019
2.00
Primed panel and deburred aft cabin covers
Details

 03-03-2019
8.00
Dimmer installation
Details
       

 02-24-2019
8.00
Cockpit lighting
Details
       

 02-23-2019
4.00
Finished console light brackets
Details
       

 02-22-2019
2.00
Painted misc parts and fabricated a light bracket
Details

 02-17-2019
5.00
Misc tasks
Details
     

 02-16-2019
5.00
Panel indicator lights
Details
       

 02-14-2019
2.00
Rear stick CPC - Stick side
Details
       

 02-13-2019
3.00
Rear stick CPC connector - Airplane side
Details
       

 02-12-2019
2.50
Bracket for rear stick CPC connector
Details

 02-10-2019
6.00
Rear seat stick
Details
       

 02-09-2019
6.00
Rear stick
Details
       

 02-02-2019
6.00
Painted roll bar and hooked up the avioincs foan
Details
       

 01-30-2019
2.50
Roll bar and avionics fan wiring
Details

 01-29-2019
2.50
Eyeball light mounting blocks
Details
       

 01-26-2019
6.00
Cabin heat and lighting
Details

 01-23-2019
4.50
Panel indicator lights
Details
       

 01-20-2019
5.00
CO Guardian troubleshooting
Details
       

 01-19-2019
9.00
Misc avionics work
Details
       

 01-16-2019
3.00
Skyview radio test and landing/taxi light test
Details
     

 01-13-2019
1.50
Skyview Configuration
Details
     

 01-12-2019
9.00
VP-X Pro first power up
Details
       

 01-05-2019
6.00
Avionics bay ground block
Details
       

 01-02-2019
2.50
Antenna diplexer
Details
       

 01-01-2019
5.00
Completed wiring IFD440
Details
       

 12-31-2018
4.00
Completed IFD440 connectors
Details
       

 12-30-2018
4.50
More IFD440 wiring
Details
       

 12-29-2018
4.00
IFD440 wiring continued
Details

 12-28-2018
2.00
SEATS!
Details
       

 12-15-2018
4.00
IFD440 Wiring
Details
       

 12-12-2018
1.50
More wire clamps and ground block
Details
       

 12-09-2018
2.50
Bench tested IFD-440
Details
       

 12-08-2018
3.20
SV-EMS wiring
Details
       

 12-05-2018
2.00
More VP-X wiring
Details
       

 12-02-2018
4.00
CO Guardian wiring
Details
       

 11-28-2018
2.00
Organized wiring
Details
       

 10-24-2018
2.00
VP-X switches
Details
     

 10-23-2018
1.50
Magneto P-leads
Details
     

 10-17-2018
2.80
More switch wiring
Details
       

 10-14-2018
2.50
Nutplate for switch wiring clamp
Details
     

 10-13-2018
5.00
VP-X Pro wiring
Details
       

 10-12-2018
2.50
Panel switchs
Details
       

 10-11-2018
2.00
VP-X pro J1 connector
Details
       

 10-09-2018
1.50
SV-AP-Panel D-sub backshell
Details
     

 10-07-2018
2.50
Completed SV-COM-425 wiring
Details
       

 10-06-2018
8.00
Finished audio panel wiring
Details
       

 10-01-2018
1.00
Roll trim servo wiring
Details

 09-29-2018
3.50
More audio panel wiring
Details

 09-27-2018
2.00
GMA2454 to IFD440 wires
Details
     

 09-26-2018
2.00
GMA245 to SV-425 wires
Details
     

 09-24-2018
1.00
Audio panel power up
Details
     

 09-23-2018
4.00
More audio panel wiring
Details
       

 09-22-2018
8.00
Audio panel wiring
Details
       

 09-12-2018
3.00
Audio panel hookups
Details

 09-09-2018
2.00
ARNIC-429 harness
Details

 09-08-2018
7.00
G5 wiring and other misc tasks
Details
       

 09-05-2018
3.00
SV-EMS wiring
Details

 09-03-2018
6.00
Stall warning board and Skyview backup battery
Details
       

 09-02-2018
6.00
Skyview display wiring part 2
Details

 09-01-2018
3.00
Skyview display wiring part 1
Details
       

 08-29-2018
3.00
More VP-X Pro wiring
Details

 08-26-2018
4.00
Mounting the ELT audio alerter
Details
       

 08-22-2018
2.50
Coax cables for IFD-440
Details
     

 08-19-2018
4.00
Finiished lower switch panel wiring and installed
Details
       

 08-18-2018
3.00
Sub-panel painting and switch panel wiring
Details
       

 08-17-2018
1.50
Sub-panel painting part 1
Details

 08-15-2018
2.00
MIsc
Details

 08-14-2018
1.50
Switch wires
Details

 08-12-2018
2.50
SV harness continued
Details

 08-11-2018
3.00
SV-ARINC429 shelf and network cables
Details
       

 08-08-2018
2.50
SV-ARINC429 mounting shelf
Details
       

 08-05-2018
6.00
IFD400 Mounting continued
Details
       

 08-04-2018
8.00
IFD400 Mounting
Details
       

 08-02-2018
1.50
Gear tower adel clamp supports continued
Details
       

 07-29-2018
2.50
Brackets for adel clamps
Details

 07-15-2018
3.00
Sub panel work
Details

 07-08-2018
6.00
Skyview network wiring and audio panel trial fit
Details
       

 07-07-2018
4.00
More wiring
Details

 07-06-2018
2.00
Nav/Strobe Wiring hookup
Details
       

 07-05-2018
7.00
Wiring
Details
       

 07-01-2018
6.00
Sub panel work
Details
       

 06-29-2018
1.50
Flap motor wires
Details

 06-27-2018
3.00
More wiring
Details
       

 06-24-2018
8.00
Avionics Shelves Part 5
Details
       

 06-23-2018
2.50
Avionis shelves part 4
Details

 06-20-2018
3.00
Avionics shelves part 3
Details
       

 06-17-2018
3.00
Avionics shelves part 2
Details
       

 06-16-2018
2.50
Avionics shelves
Details
       

 06-10-2018
7.00
LH gear tower wiring and VP-X pro mounting
Details
       

 06-09-2018
6.00
More RH gear tower wiring
Details
       

 06-06-2018
1.50
Pilots stick grip forward harness
Details
     

 06-05-2018
3.00
Pilots stick grip forward wire harness.
Details
       

 05-28-2018
3.00
Roll servo CPC connector
Details
       

 05-25-2018
7.00
VOR/LOC Coax, Comm 2 doubler riveting and click st
Details
       

 05-22-2018
2.50
LH Com 1 antenna doubler riveting
Details
       

 05-20-2018
3.00
AP disconnect wires and Com 2 coax
Details
     

 05-19-2018
5.00
Underfloor wiring and ventilation
Details
       

 05-10-2018
2.50
More underfloor wiring
Details

 05-09-2018
2.50
Under floor wiring continued
Details
       

 05-06-2018
4.00
More underfloor wiring
Details
       

 04-22-2018
4.00
Underfloor wiring RH side
Details
     

 04-21-2018
4.00
More mid cabin underfloor wiring
Details
     

 04-18-2018
2.00
Bracket for LH wing CPC
Details
       

 04-15-2018
2.00
LH com antenna doubler/stiffener
Details
     

 04-14-2018
4.00
LH antenna doubler and harness bracket
Details

 04-08-2018
4.00
Pitot-static line securing
Details
       

 04-07-2018
6.00
Misc wire and tubing routing tasks
Details
       

 04-05-2018
2.00
Pitot/static tube and wire guide
Details
     

 04-04-2018
1.50
Rerouted Pitot and AOA lines and wire harness in L
Details
       

 04-03-2018
2.50
Rear stick grip wire harness
Details
       

 03-28-2018
2.50
Finished pilots' stick wiring and New Panel!!
Details
       

 03-27-2018
2.00
Terminating stick grip wiring
Details
     

 03-25-2018
6.00
Stick grip wiring
Details
       

 03-24-2018
2.50
Panel cutting for ELT remote
Details
       

 03-23-2018
4.00
Front seat vents
Details
       

 03-18-2018
3.50
Wiring backup switches
Details
       

 03-12-2018
1.70
LH replacement brakeline
Details
       

 03-11-2018
4.00
Brakeline redo number three
Details
       

 03-10-2018
4.50
Wiring
Details
       

 03-07-2018
2.00
More wire routing
Details

 03-04-2018
4.00
More wiring
Details
     

 03-03-2018
3.00
Reprimed lower switch panel and installed power c
Details
       

 02-24-2018
6.00
Misc work
Details
       

 02-21-2018
2.00
Misc stuff
Details

 02-19-2018
7.00
Headset jack wiring continued
Details
       

 02-18-2018
2.50
Front headset jack holes
Details
     

 02-14-2018
2.50
Mounting headset jacks
Details
       

 02-11-2018
6.00
Headset jack wiring
Details
       

 02-10-2018
1.50
Headset jacks continued
Details

 02-03-2018
5.00
Replacement pilot's stick etc
Details
       

 01-31-2018
2.00
Headset jacks
Details

 01-28-2018
5.00
Pilot's USB charge port
Details
       

 01-27-2018
5.00
Seat mockup and lower switch console
Details
       

 01-24-2018
2.50
Front stick grip mounting
Details
     

 01-17-2018
2.00
More stick grip work
Details
       

 01-13-2018
4.00
Stick and stick grip
Details

 01-07-2018
4.00
Misc work
Details

 01-06-2018
6.00
Aileron trim
Details
       

 01-04-2018
2.00
Power cable routing
Details

 01-03-2018
1.50
Completed tailcone riveting
Details
       

 12-30-2017
4.00
Finished installing equipment in aft avionics bay
Details
       

 12-29-2017
7.00
Re-populating aft fuselage avionics bay
Details
       

 12-28-2017
7.00
Riveting aft upper tailcone skin
Details
       

 12-17-2017
3.50
Temporary aft fuselage floors
Details
       

 12-13-2017
3.00
Removable floor mod part 8
Details
       

 12-10-2017
7.00
Removable floor mod part 7
Details
       

 12-09-2017
7.00
Removable floor mod part 6
Details
       

 12-08-2017
3.00
Removable floor mod part 5
Details
       

 12-06-2017
3.00
Removable floor mod part 4
Details
       

 12-05-2017
2.50
Removable floor mod part 3
Details

 12-03-2017
6.00
Removable floor mod part 2
Details
       

 12-02-2017
8.00
Started removable floor mod
Details
       

 11-22-2017
3.00
Com antenna mounting holes
Details
       

 11-21-2017
5.50
Flap motor wire routing and comm antenna doublers
Details
       

 10-25-2017
1.00
Riveted power cable bracket to mid fuselage brace
Details
       

 10-18-2017
3.00
Main power cable support continued
Details

 10-15-2017
4.50
Main power cable support
Details

 10-07-2017
6.00
More main power cable routing
Details
       

 10-04-2017
2.50
Battery cables continued
Details
     

 09-29-2017
1.50
Battery cables
Details
       

 09-24-2017
3.00
Main battery ground lug
Details
       

 09-23-2017
4.50
More main power cable installation
Details
       

 09-21-2017
1.50
Main power cable
Details
       

 09-20-2017
2.50
Terminals for large gauge wire
Details
       

 09-19-2017
1.00
Throttle quadrant support disassembly
Details

 09-13-2017
2.00
ELT antenna cable
Details
       

 09-04-2017
3.50
Aft upper skin priming and E-Buss feed wire fab
Details
       

 09-03-2017
4.00
Flap sensor and motor connectors
Details
       

 09-02-2017
3.50
Nutplates for wire run support
Details

 08-29-2017
2.00
Master contactor and flap sensor wiring
Details

 08-23-2017
2.50
Master contactor mounting plate
Details
       

 08-20-2017
6.00
E-bus wire harness continued
Details
       

 08-19-2017
6.00
E-bus wiring
Details
       

 08-18-2017
6.00
ELT antenna bracket and E-Bus wiring
Details
       

 08-16-2017
2.50
One piece ELT antenna bracket
Details
       

 08-13-2017
8.00
Misc avionics tasks
Details
       

 08-12-2017
8.00
Completed E-bus fuse block holder and routed wires
Details
       

 08-09-2017
3.00
ELT wire harness
Details
       

 08-07-2017
2.50
Continued fabrication of E-bus fuse block for alte
Details
       

 08-02-2017
3.00
Alternate mount for E-Bus fuse holder
Details

 07-28-2017
6.00
E-bus fuse block mount
Details

 07-26-2017
3.00
Pitot-Static-AOA line routing
Details
       

 07-23-2017
4.00
Outside air temperature probe wires
Details
       

 07-22-2017
3.50
More aft avionics bay wire routing
Details
     

 07-20-2017
3.00
Securing Aft avionics bay wiring
Details
       

 07-19-2017
1.80
Adel Clamps
Details
       

 07-12-2017
3.00
Pitot-Static-AOA line routing
Details
       

 07-09-2017
4.00
Pitot-static lines
Details

 07-08-2017
8.00
Antenna cables and securing wires
Details
       

 07-04-2017
3.00
ADS-B antennas and aft fuselage wire routing redo
Details
       

 07-03-2017
4.50
Aft fuselage wiring Part 3
Details
       

 07-02-2017
4.00
Wire routing from aft fusealge
Details
       

 07-01-2017
4.00
Wire routing from aft fusealge
Details

 06-30-2017
1.00
Riveted antenna doublers and step cover
Details
       

 06-28-2017
2.50
OAT sensors and wiring
Details
       

 06-25-2017
3.00
Completed aft SV hub and ADS-B RX mount
Details
       

 06-24-2017
2.80
Aft SV hub and ADS-B mount part 5
Details
       

 06-21-2017
2.00
Skyview hub and ADS-B RX mount continued
Details

 06-19-2017
2.50
Aft SV hub and ADS-B RX mount
Details
     

 06-18-2017
3.00
Continued fabricating the mount aft equipment moun
Details

 06-17-2017
6.00
Started a mount for the aft skyview hub and ADS-B
Details
       

 06-14-2017
2.50
ADS-B antenna doubler and step cutout cover
Details
       

 06-13-2017
1.00
ADS-B antenna doubler
Details

 06-11-2017
5.00
Static line supports and transponder antenna
Details
       

 06-07-2017
3.00
Tailcone wiring rerouting
Details
       

 06-06-2017
2.00
Tailcone wire routing
Details
       

 05-31-2017
3.00
Tailcone wiring
Details
       

 05-30-2017
1.50
Autopilot wire harness connectors
Details
       

 05-29-2017
4.50
Misc tasks
Details
       

 05-25-2017
2.00
Completed ADAHRS shelf
Details
       

 05-24-2017
2.50
Flap actuator cover nutplates and ADAHRS shelf deb
Details
       

 05-21-2017
6.00
ADAHRS Shelf
Details
       

 05-20-2017
4.00
Static line and AP servo
Details
       

 05-17-2017
3.00
Static lines
Details
       

 05-10-2017
2.00
More flap actuator cover work
Details

 05-09-2017
3.00
Flap motor assembly cover
Details
       

 05-07-2017
6.00
Completed flap sensor bracket
Details
       

 05-07-2017
0.00
Additional pictures from 5/6/17
Details
       

 05-06-2017
7.50
Battery tray, static port and rudder exit cover in
Details
       

 04-30-2017
3.50
Completed battery/equipment tray
Details
       

 04-29-2017
6.00
More work on the battery/equipment tray
Details

 04-26-2017
3.00
Battery/equipment tray continued
Details

 04-23-2017
7.00
Static ports and battery tray
Details
       

 04-20-2017
2.00
Rudder cable exit fairings and flap position senso
Details
       

 04-19-2017
2.00
Rudder cable exit fairings
Details

 04-12-2017
2.00
Riveted 807 upper bulkhead and gussets to fuselage
Details
       

 04-01-2017
3.00
Forward skin attach ribs and aft upper bulkhead ri
Details
     

 03-26-2017
4.00
Forward top skin work
Details
       

 03-22-2017
2.50
Instrument subpanel riveting
Details
       

 03-21-2017
1.00
Deburred instrument panel mounting flange
Details

 03-19-2017
3.00
Instrument panel prep
Details
       

 03-18-2017
8.00
LG tower screws, fwd baggage riveting, and started
Details
       

 03-15-2017
2.00
Windscreen support
Details
       

 03-11-2017
7.00
More upper tailcone prep work.
Details
       

 03-08-2017
2.50
Upper aft skin drilling
Details

 03-05-2017
8.00
Upper aft fuselage skin
Details
       

 03-04-2017
2.00
Rudder stop riveting
Details

 03-03-2017
1.50
Installed rudder pedal assemblies
Details
       

 03-01-2017
2.50
Completed rudder peddal assembly
Details
       

 02-26-2017
8.00
Rudder pedal assembly
Details
       

 02-25-2017
8.00
Finished flap actuator and started the rudder peda
Details
       

 02-22-2017
3.50
Rudder cable
Details
       

 02-19-2017
4.50
Rudder stops
Details
       

 02-18-2017
4.00
Forward elevator control stop and rudder
Details
       

 02-17-2017
2.50
Trimmed aft elevator stop
Details
       

 02-16-2017
2.00
Elevator stops
Details

 02-15-2017
2.50
Elevator linkage adjustment
Details

 02-13-2017
2.80
More control work
Details
       

 02-12-2017
5.00
Control column adjustment
Details
       

 02-11-2017
6.00
Began mounting control rods in fuselage
Details
       

 02-10-2017
2.00
Rear stick dtilling
Details
       

 02-09-2017
2.00
Control rods continued
Details
     

 02-08-2017
2.50
Control rods
Details
       

 02-04-2017
5.00
Completed drilling elevator horns. Continued fabri
Details
       

 02-01-2017
3.00
Elevator bushings and horn drilling
Details
       

 01-29-2017
6.00
Completed installing VS and installed elevators
Details
       

 01-28-2017
6.00
Drilled mounting holes for vertical stabilizer
Details
       

 01-27-2017
2.50
Vertical stabillizer alignment part one
Details
       

 01-25-2017
3.00
HS attachment final drilling
Details
       

 01-23-2017
1.50
HS mounting part 2
Details
     

 01-21-2017
5.00
Landing gear covers and started mounting horizonta
Details
       

 01-18-2017
2.00
Finished riveting forward forward bottom skins
Details

 01-15-2017
2.00
Started riveting forward forward bottom skins
Details
       

 01-14-2017
6.00
Completed aft forward bottom skin
Details
       

 01-13-2017
2.00
Started riveting aft forward bottom skin
Details
       

 01-11-2017
2.50
Lower brake lines
Details
       

 01-08-2017
5.00
Forward bottom skins ready for riveting
Details
       

 01-07-2017
4.00
More forward bottom skin work
Details

 01-04-2017
2.50
Forward bottom skins
Details
       

 12-31-2016
7.00
Drilled mounting holes for landing gear.
Details
       

 12-30-2016
8.00
Landing gear leg alignment
Details
       

 12-29-2016
5.00
Started landing gear installation
Details
       

 12-26-2016
1.00
Elevator push rod
Details
       

 12-22-2016
4.00
Started tail flight control components
Details
       

 12-18-2016
2.50
Seat ramp and throttlle quadrant mount
Details
       

 12-17-2016
6.00
Seat ramp and throttle mount
Details
       

 12-16-2016
2.00
Misc cockpit floor tasks
Details
       

 12-13-2016
1.50
Switch console
Details

 12-11-2016
3.00
Front seat ramp
Details

 12-10-2016
5.50
Misc fuselage work
Details
       

 12-08-2016
1.00
Nutplates
Details

 12-07-2016
2.50
More floor panel riveting
Details
       

 12-06-2016
0.00
Grove Landing Gear Arrived
Details
       

 12-03-2016
4.50
Floor assembly riveting
Details
       

 11-30-2016
2.50
Primed RH aft floor
Details

 11-27-2016
3.00
More floor work
Details

 11-26-2016
6.00
Additional floor panel prep
Details

 11-25-2016
2.00
More floor panel prep
Details

 11-21-2016
2.50
Some more floor work
Details

 11-20-2016
6.00
More fuselage floor work
Details
       

 11-16-2016
2.50
Cabin floor and flap bearing block drilling
Details
     

 11-11-2016
8.00
Rear seat back and cockpit floor
Details
       

 11-09-2016
1.70
Riveting rear seat back
Details
     

 11-06-2016
6.00
More rear seat back prep work and installing front
Details
       

 11-05-2016
4.50
Fuselage rotator and rear seat back deburring
Details
       

 11-03-2016
1.00
Rear seat back
Details

 11-01-2016
1.50
Riveted front seat back
Details

 10-30-2016
4.00
Primed front seat back parts and painted seatback
Details

 10-29-2016
8.00
Front seat back and painting seat back support
Details
       

 10-28-2016
1.50
Seat back support plates
Details
     

 10-27-2016
2.00
RH fuselage rail riveting and started on battery t
Details
       

 10-26-2016
3.00
LH Fuselage rail
Details
     

 10-25-2016
2.50
Rotisserie,servo bracket and some priming
Details
     

 10-23-2016
3.00
Baggage rail bulkhead and rear seatbelt brackets
Details
       

 10-22-2016
8.00
Completed skin riveting
Details
       

 10-21-2016
1.50
Aft deck
Details
       

 10-20-2016
1.50
Finished riveting RH aft side skin
Details

 10-16-2016
2.00
Interior painting and continued riveting
Details

 10-15-2016
6.00
RH aft skin riveting
Details

 10-14-2016
2.50
Completed riveting LH aft side skin
Details
       

 10-13-2016
1.50
More LH forward side skin riveting
Details

 10-12-2016
3.00
LH aft side skin riveting
Details
       

 10-11-2016
1.00
Fuselage riveting continued
Details

 10-08-2016
4.00
More fuselage riveting
Details
       

 10-07-2016
6.50
Still more fuselage riveting
Details
       

 10-06-2016
1.50
More riveting
Details

 10-05-2016
2.50
More skin riveting
Details
       

 10-04-2016
2.00
Fuselage riveting
Details

 10-02-2016
4.00
Ready for skin riveting
Details
       

 10-01-2016
6.50
Tailcone assembly
Details
       

 09-30-2016
1.50
Fuselage NACA vent
Details
       

 09-29-2016
2.50
Prep for skin installation
Details

 09-28-2016
3.20
New Brake lines
Details
       

 09-25-2016
7.00
Parking brake valve brace
Details
       

 09-23-2016
1.50
Parking brake valve mounting
Details
       

 09-21-2016
3.00
Parking brake valve bracket
Details
     

 09-17-2016
3.50
Installed LH side skin and drilled forward end of
Details
       

 09-16-2016
12.00
Tail cone assembly & pitch servo bracket
Details
       

 09-14-2016
2.00
Misc tasks
Details

 09-11-2016
3.00
RH brake line
Details
       

 09-10-2016
7.00
Finish fuel lines and started brake lines
Details
       

 09-07-2016
3.00
RH fuel vent line
Details

 09-06-2016
2.00
LH fuel vent line
Details
       

 09-05-2016
4.00
More fuel lines
Details
       

 09-04-2016
3.50
Fuel tubing
Details
     

 09-03-2016
4.00
Fuel tubing
Details
       

 08-17-2016
3.00
Aux fuel pump etc
Details
       

 08-16-2016
2.50
Fuel fllter installation
Details
       

 08-14-2016
8.00
Continued fuselage construction
Details

 08-13-2016
8.00
Assembly
Details
       

 08-10-2016
4.00
Finished prepping for final assy
Details
       

 08-09-2016
1.50
Lower forward longeron riveting
Details

 08-07-2016
3.00
Aft bottom skin & started fuselage final assembly
Details
       

 08-06-2016
6.00
Upper longeron prep
Details
       

 08-03-2016
1.50
Interior paint on forward section and fwd baggage
Details
       

 07-31-2016
2.00
Fuselage bulkhead painting
Details
       

 07-30-2016
2.50
Prep for fuselage interior paint
Details
       

 07-29-2016
4.00
RH Aft side skin priming
Details

 07-27-2016
3.00
LH aft side skin prep and priming lower longerons
Details

 07-24-2016
7.00
Prep and painting side panels
Details

 07-24-2016
6.00
Forward side skin prep
Details
     

 07-16-2016
6.00
Misc prep tasks
Details
       

 07-10-2016
4.00
More fuselage prep
Details

 07-09-2016
4.00
Downdraft table improvements and painting interior
Details
       

 07-07-2016
1.50
Scuffed, cleaned and primed armrests for RH skin
Details

 07-06-2016
2.00
Painting arm rests and dimpling/priming bulkheads
Details

 06-29-2016
3.00
Dimpling
Details

 06-28-2016
2.00
Rear seat USB outlet location
Details
       

 06-25-2016
6.00
Finished deburring and started priming and dimplin
Details

 06-23-2016
3.00
Skin deburring
Details
     

 06-22-2016
3.00
Upper longeron countersinking and misc deburring
Details
       

 06-21-2016
1.50
Counterinking upper longerons

 06-17-2016
2.00
Fuselage deburring
Details

 06-08-2016
2.50
More countersinking
Details
       

 06-05-2016
4.00
Finished fuel valve bracket and started countersin
Details
       

 06-01-2016
2.50
Fuel valve bracket
Details

 05-30-2016
3.50
Countersinking and fuel valve bracket
Details
       

 05-28-2016
8.00
Tailwheel spring drilling
Details
       

 05-25-2016
2.00
Tailwheel spring bracket spring shim
Details
     

 05-21-2016
8.00
Fuselage rails, seatback support and tailwheel sup
Details
       

 05-19-2016
0.70
Aft deck
Details
     

 05-17-2016
2.00
More final drilling and fitting tailcone upper ski
Details

 05-16-2016
2.00
Final drilled aft side skins
Details

 05-15-2016
5.00
Match drilling and finishing up the drilling the u
Details
       

 05-14-2016
10.00
Longeron drilling
Details
       

 05-11-2016
2.00
Replacement F811 bulkhead parts
Details

 05-08-2016
2.50
Fuselage rails and bulkhead cap deburring
Details
       

 05-07-2016
5.00
Tail cone build up
Details
       

 05-06-2016
5.00
Tail cone skin prep
Details
       

 05-04-2016
2.30
Riveted rear seat belt bracket assys and deburred
Details
       

 05-02-2016
2.50
Rear seat lap belt bracktets, aft deck and lower l
Details
       

 05-01-2016
5.50
Tailcone bulkhead riveting and rear seat harness s
Details
       

 04-30-2016
6.00
More tailcone bulkhead prep
Details
       

 04-27-2016
2.00
More tailcone bulkhead prep
Details
       

 04-26-2016
2.00
Tailcone prep
Details
     

 04-23-2016
7.00
Forward skins and tailcone prep
Details
       

 04-20-2016
0.00
Saw Horses
Details

 04-17-2016
5.00
RH center section side skin assy and joining front
Details
       

 04-16-2016
4.50
Fuselage side skins
Details
       

 04-15-2016
2.00
More mid-section side skin assembly prep
Details
     

 04-13-2016
2.50
Mid fuselage sideskin structure prep
Details
     

 04-10-2016
7.00
Drilling lower longerons
Details
       

 04-09-2016
7.00
Bend the top (long) longerons - other prep work
Details
       

 04-03-2016
4.00
Started longeron prep
Details
       

 04-02-2016
7.00
Assembled seat rib assemby
Details
       

 03-30-2016
3.00
Finished prepping seat rib substructure

 03-28-2016
2.50
More prep and prime of seat rib assy parts

 03-27-2016
2.00
More prep and prime of seat rib assy parts

 03-26-2016
8.00
Fuselage center section continued
Details
       

 03-24-2016
1.50
More seat rib assy prep
Details
       

 03-23-2016
2.50
Inboard seat rib prep
Details
       

 03-22-2016
1.50
Seat support
Details
     

 03-20-2016
4.00
Assembled the center section
Details
       

 03-19-2016
1.00
Center section work
Details

 03-17-2016
2.50
Aft center section bulkhead assembly
Details
       

 03-16-2016
3.50
Riveting firewall to floor and started assembling
Details
       

 03-15-2016
1.30
Seat rib structure prep
Details

 03-14-2016
2.00
Priming center section parts and started rear seat
Details
     

 03-13-2016
4.00
Center section aft bulkhead prep
Details

 03-12-2016
8.00
Forward section and started center section
Details
       

 03-11-2016
8.00
More forward section work
Details
       

 03-10-2016
2.00
Priming avionics access door parts
Details

 03-09-2016
3.50
Drilled holes in avionics access door doubler.
Details
       

 03-08-2016
2.00
Avionics access door doubler
Details
     

 03-06-2016
6.00
Fwd baggage compartment avionics access panel
Details
       

 03-05-2016
4.00
Forward fuselage work
Details
     

 03-04-2016
1.70
Mid cabin braces
Details
       

 03-02-2016
1.50
Upper cabin braces
Details
     

 02-29-2016
2.50
Forward fuselage structure
Details

 02-28-2016
7.00
Finished landing gear boxes
Details
       

 02-27-2016
3.50
Landing gear box bolt weldments
Details
       

 02-24-2016
2.50
Began riveting the LG towers together
Details
       

 02-23-2016
1.00
LG Tower access cover nutplates
Details

 02-21-2016
4.00
Landing gear tower prep
Details
       

 02-20-2016
7.00
Landing gear tower mod
Details
       

 02-19-2016
7.00
Landing gear tower prep
Details
       

 02-17-2016
2.50
Riveting forward floor and cooling ramp
Details
       

 02-16-2016
1.00
Landing gear tower side angles
Details

 02-15-2016
2.50
Misc forward fuselage tasks
Details
       

 02-14-2016
8.00
Finished firewall and primed fwd floor parts
Details
       

 02-13-2016
5.00
More fwd floor prep and firewall riveting
Details
     

 02-11-2016
1.50
Forward fuselage floor
Details

 02-10-2016
2.50
Firewall angle priming and started forward fuselag
Details
       

 02-09-2016
1.50
Firewall angle counter sinking
Details

 02-08-2016
2.50
Firewall continued
Details
       

 02-07-2016
4.00
Firewall match drilling and deburring
Details
       

 02-01-2016
2.50
Firewall
Details

 01-27-2016
2.50
Firewall prep
Details

 01-23-2016
4.00
RH wing tip attach hinges and STARTED FUSELAGE!
Details
       

 01-21-2016
2.00
RH wing tip hinges
Details

 01-20-2016
3.00
RH wing tip hinges
Details

 01-19-2016
1.50
RH wing tip attach hinges
Details

 01-18-2016
4.00
RH wing tip attach hinges
Details
       

 01-17-2016
5.00
More wing tip work
Details
       

 01-14-2016
1.80
LH wing tip close out rib
Details
       

 01-13-2016
2.50
RH wing tip work
Details

 01-12-2016
1.40
LH Wing tip top inboard hinge half
Details
     

 01-10-2016
9.00
More LH Wing Tip work
Details
       

 01-07-2016
1.70
LH wing tip bottom hinge drilling
Details

 01-06-2016
3.00
LH wing tip bottom hinge prep
Details
       

 01-05-2016
1.50
Epoxied rivet holes in bottom flange of LH wing ti
Details

 01-04-2016
2.50
More wing tip work
Details

 01-03-2016
5.00
Continued LH wingtip fit up.
Details
       

 01-01-2016
3.00
Started wingtip fitup
Details
       

 12-31-2015
3.00
Attached RH flap to wing
Details
       

 12-30-2015
6.00
RH wing OB bottom skin riveting
Details
     

 12-29-2015
10.00
RH wing bottom IB skin
Details
       

 12-28-2015
2.50
NACA Vent installation
Details
       

 12-25-2015
1.50
Autopilot roll servo harness connection
Details
     

 12-23-2015
3.00
Finished riveting LH wing bottom skin
Details

 12-22-2015
7.00
LH wing outboard skin riveting
Details
       

 12-20-2015
2.00
Wing inspection hatch work
Details

 12-19-2015
7.00
Riveted LH inner bottom skin
Details
       

 12-14-2015
2.00
Prep for closing up the wing
Details
       

 12-13-2015
3.00
Finished mounting flaps and installed a wing skin
Details
       

 12-12-2015
4.00
Fitting flaps to wings
Details
       

 12-09-2015
2.50
Finished RH flap
Details
     

 12-08-2015
2.00
Inventoried fuselage kit hardware bags
Details

 12-06-2015
3.00
Finished riveting ribs to RH flap skin
Details

 12-05-2015
2.00
RH Flap riveting
Details

 12-05-2015
4.00
Fuselage parts storage
Details
       

 12-04-2015
2.00
RH flap skins
Details

 12-04-2015
5.00
Fuselage kit arrival and inventory
Details
       

 12-02-2015
2.50
RH flap deburring
Details

 12-01-2015
1.00
Deburring RH flap substructure
Details

 11-30-2015
2.50
Finished LH flap
Details
       

 11-29-2015
7.00
Riveting LH flap
Details
       

 11-28-2015
5.00
More flap work
Details
       

 11-27-2015
2.50
Priming RH flap parts
Details

 11-25-2015
4.00
More LH flap prep
Details
       

 11-22-2015
4.00
RH flap continued
Details

 11-21-2015
3.00
RH Flap
Details

 11-20-2015
2.00
More flap prep
Details

 11-19-2015
2.00
LH flap continued
Details

 11-18-2015
2.50
Contiuned on LH flap
Details
       

 11-17-2015
1.50
Started flaps
Details

 11-15-2015
3.00
RH wing aileron bell crank
Details

 11-14-2015
8.00
Completed pitot tube pumbing and wiring
Details
       

 11-13-2015
2.00
More pitot harness work
Details
       

 11-12-2015
1.50
Started building the pitot controller harness
Details

 11-11-2015
3.50
More pitot tube and wiring routing
Details
       

 11-10-2015
1.80
Pitot plumbing
Details

 11-07-2015
10.00
Pitot/AOA lines
Details
       

 11-05-2015
1.80
LH Aileron Hardware
Details
       

 11-04-2015
4.00
Aileron pushrods and LH bell crank
Details
       

 11-01-2015
4.00
More pushrod work
Details
       

 10-31-2015
4.00
Long aileron control rods
Details
       

 10-30-2015
4.00
Aileron push rods - short
Details
       

 10-29-2015
2.00
Pitot mast
Details
       

 10-29-2015
1.80
LH aileron hardware
Details

 10-28-2015
3.50
Pitot tube heat controller
Details
       

 10-27-2015
2.00
Finished RH aileron
Details
       

 10-25-2015
3.50
Riveting RH aileron
Details
       

 10-24-2015
7.00
Bottom wing skin prep and priming
Details
       

 10-23-2015
3.00
More wing skin prep
Details

 10-22-2015
7.00
RH bottom wing skins
Details

 10-21-2015
3.00
RH aileron prep and prime and RH bottom wing skin
Details

 10-17-2015
4.00
RH aileron prep
Details

 10-16-2015
1.00
FInished LH aileron
Details
       

 10-15-2015
2.00
Completted riveting LH aileron
Details

 10-14-2015
3.00
LH Aileron final assembly
Details
       

 10-13-2015
4.00
More aileron prep
Details
       

 10-11-2015
2.50
LH aileron prep
Details

 10-10-2015
6.00
More aileron prep
Details

 10-04-2015
3.50
Aileron build up
Details
       

 10-03-2015
6.00
Aileron skins
Details
       

 10-01-2015
3.00
Primed aileron stiffeners
Details

 09-30-2015
2.50
Aileron skin prep
Details
     

 09-29-2015
2.00
Aileron stiffeners continued
Details

 09-27-2015
3.00
Aileron stiffeners
Details
     

 09-26-2015
3.50
Flap brace riveting
Details
       

 09-25-2015
3.50
Riveted aileron gap fairings
Details

 09-24-2015
1.50
Dimpling and priming aileron gap fairings
Details
       

 09-23-2015
2.50
Aileron gap fairings and flap brace prep for prime
Details

 09-22-2015
2.00
Match drilled flap brace flanges to bottom skins
Details

 09-20-2015
4.00
Flap braces and aileron gap fairings
Details

 09-19-2015
7.00
Wing cart and aileron bracket installation
Details
       

 09-17-2015
1.00
Aileron stiffeners
Details

 09-16-2015
1.50
Fitting aileron brackets to wings
Details

 09-13-2015
3.50
Misc wing tasks
Details
       

 09-11-2015
6.00
RH top wing skin riveting
Details
       

 09-09-2015
6.00
Finished riveting LH top skins
Details
       

 09-08-2015
4.00
Started riveting wing skins and misc deburring
Details
       

 09-06-2015
4.00
Misc leading edge tasks
Details
       

 09-03-2015
1.00
Replacement aileron brackets
Details

 08-30-2015
3.00
Priming
Details

 08-29-2015
6.00
Leading edge sikin to spar rivets
Details
       

 08-28-2015
2.50
RH LE rib to spar rivets
Details
       

 08-27-2015
1.50
Fabricated another bucking bar guide
Details
     

 08-26-2015
2.50
More LE rib riveting
Details

 08-23-2015
3.00
Pitot Static Mast location layout
Details
     

 08-22-2015
3.00
Aileron bracket priming
Details

 08-21-2015
6.00
More LE riveting and preassembly of aileron bracke
Details
       

 08-20-2015
2.00
More LH LE to spar riveting
Details

 08-19-2015
2.00
Riveted second LH LE rib flange to the spar
Details
       

 08-18-2015
2.50
Started riveting LH LE to spar
Details
       

 08-16-2015
3.50
RH OB top skin dimpling and priming
Details

 08-14-2015
2.00
RH top wing skin prep
Details
     

 08-14-2015
6.00
OB LH LE Rib riveting and aileron bracket prep
Details

 08-13-2015
2.20
More RH wing skin prep
Details

 08-12-2015
2.50
RH wing skin and substructure prep
Details

 08-11-2015
1.50
More RH substructure prep for skins
Details

 08-10-2015
2.00
Deburring and dimpling RH wing substructure
Details

 08-08-2015
0.70
Primed LH top wing skins
Details

 08-07-2015
7.00
LH wing skin dimpling etc
Details
       

 08-06-2015
0.70
LH wing walk doubler prep
Details

 07-31-2015
0.00
LH leak check PASSED!
Details
     

 07-30-2015
1.00
More LH sub stucture deburring and dimpling
Details

 07-29-2015
1.50
More deburring and dimpling of LH wing structure

 07-28-2015
1.00
LH wing rib prep
Details

 07-25-2015
3.00
More RH spar prep
Details
       

 07-24-2015
4.00
LH tank leak check and RH spar prep
Details
       

 07-23-2015
2.50
RH Spar flange countersinking
Details

 07-21-2015
2.00
LH fuel tank end plate
Details

 07-19-2015
2.00
LH tank sending unit attachement
Details

 07-17-2015
2.50
LH tank final riveting and sealing
Details

 07-15-2015
4.50
LH fuel tank baffle installation
Details
       

 07-11-2015
1.50
More LH tank work
Details

 07-10-2015
3.00
LH fuel tank IB rib
Details

 07-08-2015
3.00
LH fuel tank OB rib
Details
       

 07-07-2015
1.50
LH tank fuel pickup
Details

 07-04-2015
2.00
Sealing LH tank inner rib shop heads
Details
       

 07-03-2015
7.00
LH tank riveting
Details
       

 07-02-2015
4.00
Sealing LH fuel tank
Details
       

 07-02-2015
0.00
More photos from 7/2
Details
       

 07-01-2015
2.00
LH wing skin prep
Details

 06-30-2015
1.50
RH wing skin prep work
Details

 06-28-2015
1.30
RH wing skin prep
Details

 06-26-2015
1.50
RH fuel tank leak check
Details
       

 06-25-2015
2.00
LH spar countersinking
Details

 06-23-2015
1.50
RH access cover
Details
     

 06-21-2015
4.00
RH tank
Details
     

 06-20-2015
1.50
Mounted RH sending unit
Details
       

 06-19-2015
2.50
RH tank finish work
Details

 06-18-2015
2.00
RH tank clean up
Details
       

 06-17-2015
5.00
RH tank baffel installation
Details
       

 06-16-2015
2.50
Main spar countersinking
Details

 06-14-2015
1.50
Spar Countersinking
Details
       

 06-13-2015
5.00
More fuel tank work
Details
       

 06-11-2015
1.50
Misc prosealing
Details
       

 06-10-2015
2.30
RH fuel sender float and fuel pickup
Details
       

 06-09-2015
1.50
Fuel tank access plates
Details
       

 06-06-2015
5.50
RH tank IB rib installation
Details
       

 06-05-2015
5.50
End rib work
Details
       

 06-04-2015
1.50
Prep for RH tank end rib proseal
Details

 06-02-2015
4.00
Prosealing rivet shop heads
Details

 06-01-2015
3.00
Prosealing shopheads
Details
       

 05-31-2015
7.00
Riveting RH ribs
Details
     

 05-30-2015
4.00
Prosealed 5 inner ribs to RH tank skin
Details
       

 05-28-2015
3.00
Replacing rivets on tank flanges
Details

 05-27-2015
4.50
Tank rib dimpling and cap flange riveting
Details

 05-25-2015
8.00
Fuel tankwork
Details
       

 05-22-2015
7.00
Fuel tank stiffener sealing and riveting
Details
       

 05-21-2015
3.00
Tank skin and stiffener dimpling
Details
       

 05-20-2015
2.00
Fuel vent clips and tank skin dimpling
Details
       

 05-18-2015
1.50
Tank prep
Details

 05-17-2015
2.50
Tank prep
Details

 05-14-2015
1.20
Deburring ribs
Details

 05-13-2015
3.00
Deburring wing skins
Details

 05-12-2015
2.00
Tank rib prep
Details
       

 05-10-2015
5.00
Fuel caps contiuned and fuel drains
Details
       

 05-08-2015
2.30
Inboard rib prep and fuel cap flange installation.
Details
       

 05-06-2015
1.50
Tank end rib prep
Details
       

 05-03-2015
2.00
Fuel tank end rib prep
Details

 05-01-2015
3.00
Modified T-405 tank brackets and cut holes in end
Details
       

 04-29-2015
3.20
T-405 tank rib attach angles.
Details

 04-26-2015
5.00
T-405 tank attach angles
Details
       

 04-24-2015
6.00
Fuel tank match drilling and countersinking
Details
       

 04-23-2015
3.00
Match drilling fuel tanks
Details

 04-22-2015
3.00
Tank stiffeners
Details

 04-21-2015
1.00
LH inboard top forward rib to spar rivets
Details

 04-18-2015
1.00
Finished riveting RH leading edge
Details

 04-17-2015
2.00
RH LE riveting
Details

 04-15-2015
3.00
Riveting RH leading edge
Details

 04-12-2015
2.00
LH landing light lens
Details
       

 04-11-2015
7.00
Landing light bays
Details
       

 04-10-2015
2.50
More work on LH LE landing light
Details

 04-09-2015
2.00
LH Landing light cut out
Details
       

 04-08-2015
3.00
LH LE landing light cut out
Details

 04-07-2015
1.50
RH wing LE priming and spar to rib rivets
Details

 04-05-2015
2.00
Misc RH wing items
Details

 04-04-2015
5.00
More RH LE prep
Details
       

 04-03-2015
10.00
RH Leading Edge prep
Details

 04-01-2015
3.50
RH LE Landing light lens
Details
       

 03-28-2015
4.00
RH LE langing light cut out
Details
       

 03-27-2015
2.00
RH Leading edge work
Details
       

 03-25-2015
3.00
RH fuel tank attachment
Details

 03-24-2015
1.20
Removed vinyl strips from LH fuel tank
Details

 03-23-2015
8.00
Stall horn switch bracket, RH wing tank zees, RH t
Details
       

 03-22-2015
0.00
More photos from 3/22/15
Details
       

 03-21-2015
8.00
Misc work on LH and RH wing
Details
       

 03-20-2015
2.30
RH tank zees
Details

 03-19-2015
2.00
Finished riveting LH leading edge
Details
       

 03-18-2015
3.00
Started riveting LH leading edge together
Details
       

 03-17-2015
1.50
More LH leading edge prep
Details

 03-16-2015
1.50
Dimpled LH LE
Details

 03-15-2015
7.00
LH LE prep
Details
       

 03-14-2015
9.00
LH wing leading edge Prep
Details
       

 03-12-2015
2.30
RH fuel tank rib prep
Details

 03-11-2015
3.00
RH wing LE inbrd rib
Details

 03-10-2015
2.00
Clecoed RH LE ribs to skin
Details

 03-08-2015
0.00
More photos from 4/8/15
       

 03-08-2015
6.00
LH fuel tank fit up
Details
       

 03-07-2015
6.00
LH fuel tanks
Details

 03-04-2015
3.00
LH Wing tank attach angles
Details
       

 03-03-2015
1.50
Wing rib prep
Details

 03-01-2015
2.50
Misc wing stuff
Details
       

 02-28-2015
0.00
More photos from 2/27/15
Details
       

 02-27-2015
4.00
LH leading edge prep
Details
       

 02-25-2015
1.00
More match drilling RH bottom skins
Details

 02-24-2015
1.50
RH wing skins
Details

 02-22-2015
5.00
RH wing skins
Details
       

 02-21-2015
2.00
Finished match drilling LH bottom wing skins and m
Details
       

 02-20-2015
2.00
Match drilling wing skins
Details
     

 02-19-2015
2.50
More LH skin prep
Details
     

 02-18-2015
4.00
LH Wing top skin
Details
     

 02-17-2015
1.50
Wing skins
Details

 02-15-2015
0.00
Built a wing stand/jig
Details
       

 02-11-2015
2.50
Finished riveting aft ribs to spars
Details
       

 02-10-2015
2.00
Finished riveting aft ribs to RH main spar

 02-09-2015
2.50
More riveting aft ribs to RH main spar

 02-08-2015
2.00
Riveting aft ribs to RH main spar

 02-06-2015
3.00
Finished LH wing skeleton
Details
       

 02-05-2015
0.00
More photos from last night
       

 02-05-2015
2.50
Continued riveting aft ribs to main spar
Details

 02-04-2015
3.50
Riveting ribs to main spar
Details
       

 02-01-2015
5.00
More aft rib priming

 01-31-2015
2.50
Aft rib priming

 01-29-2015
1.50
Rib priming and scuffing
Details

 01-28-2015
2.00
Wing rib priming
Details

 01-27-2015
2.50
Aft rib priming
Details
     

 01-26-2015
2.00
Rib deburring and priming
Details
     

 01-25-2015
4.00
Deburred rib flange holes and drilled holes for wi
Details
       

 01-24-2015
5.00
More wing rib prep and wing aft section fit up
Details
       

 01-22-2015
2.00
Assembled rear spars
Details
       

 01-21-2015
3.00
More rib prep
Details

 01-18-2015
2.00
More wing rib prep
Details

 01-17-2015
2.50
More rib prep
Details
       

 01-16-2015
1.50
Rib prep
Details

 01-12-2015
0.00
More photos of the down draft box
       

 01-11-2015
0.00
Built a drowdraft paint table
Details
       

 01-05-2015
2.50
Riveted tie down brackets
Details
       

 01-03-2015
1.00
Primed parts for tiedown brackets

 12-30-2014
2.00
More wing rear spar prep
Details

 12-29-2014
4.00
Wing rear spar prep
Details
       

 12-28-2014
6.00
Rear wing spar prep
Details

 12-26-2014
2.00
Tiedown brackets
Details

 12-24-2014
1.00
Tapped tiedown bracket for tie down bolts.
Details
       

 12-23-2014
3.50
Wing spar countersinking
Details

 12-22-2014
1.50
Spar countersinking
Details

 12-21-2014
7.00
Spar nutplates and countersinking
Details
       

 12-20-2014
5.00
Countersinking for tank attach screws
Details

 12-18-2014
2.00
RH spar prep
Details

 12-17-2014
2.00
RH wing spar prep
Details

 12-16-2014
3.00
LH spar countersinking
Details

 12-15-2014
2.00
Started wing
Details

 12-07-2014
2.00
Completed empenage - for now
Details
       

 12-06-2014
8.00
Drilled elevator center bearing bolt holes in elev
Details
       

 12-04-2014
2.50
Trimming HS
Details
       

 12-03-2014
3.00
Mounting elevators
Details
       

 12-02-2014
2.00
LH elevator - rolled leading edge
Details
       

 11-29-2014
5.00
Trim tab
Details
       

 11-26-2014
6.00
LH elevator assembly

 11-25-2014
0.00
Finished inventorying wing kit - nothing missing

 11-24-2014
0.00
Wing kit
Details
       

 11-22-2014
6.00
LH elevator
Details

 11-16-2014
1.00
Started riveting trim tab
Details

 11-12-2014
4.00
LH elevator and Horizontal Stab
Details
       

 11-11-2014
2.00
Elevator trim tab
Details

 11-10-2014
1.20
Assembled elevator trim motor bracket
Details
       

 11-09-2014
3.00
Elevator trim motor bracket
Details

 11-08-2014
3.00
Started to assemble LH elevator substructure
Details

 11-02-2014
4.00
Left elevator - bent tabs
Details
       

 11-01-2014
4.00
Rolled leading edge of RH elevator
Details

 10-30-2014
3.00
Riveted elevator
Details
       

 10-29-2014
1.50
Started to rivet RH elevator substructure
Details

 10-26-2014
6.00
Trim tab
Details
       

 10-22-2014
2.50
Left elevator
Details
       

 10-21-2014
1.00
Trim motor reinforcement plate
Details

 10-20-2014
3.00
Left elevator
Details

 10-19-2014
5.00
Left elevator
Details

 10-15-2014
3.50
Right elevator stiffeners, TE and match drilling
Details
       

 10-12-2014
1.00
Priming
Details

 10-11-2014
3.00
More elevator prep
Details

 10-10-2014
3.00
Elevator counter weights
Details

 10-09-2014
2.00
More elevator prep
Details

 10-08-2014
2.00
Dimpled elevetor skins and scuffed stiffeners

 10-07-2014
1.00
Elevator skin prep
Details

 10-05-2014
6.00
Elevator stiffeners
Details
       

 10-04-2014
5.00
Started Elevator
Details

 10-03-2014
2.00
Finished rudder
Details

 10-01-2014
2.00
Riveted rudder LE and build a tool to install rod
       

 09-30-2014
2.50
Rolled the rudder leading edges

 09-28-2014
2.00
Riveted rudder skin to sub-structure

 09-27-2014
1.50
Finished rudder sub-structure assemble
Details
       

 09-26-2014
2.00
Rudder buildup
Details
       

 09-18-2014
2.00
Rudder final assembly
Details
       

 09-13-2014
8.00
Rudder priming and finished VS
Details
       

 09-12-2014
2.00
Prep rudder sub-structure for primer
Details
       

 09-07-2014
2.50
Deburr and scuff rudder sub-structure

 09-06-2014
4.00
Rudder final fitup and drilling
Details
       

 09-03-2014
4.00
Rudder stiffeners
Details
       

 09-01-2014
1.50
Rudder and VS
Details
       

 09-01-2014
2.50
Rudder
Details

 08-31-2014
8.50
Rudder build up
Details
       

 08-30-2014
6.00
Rudder stiffeners
Details
       

 08-29-2014
1.50
Rudder work
Details

 08-27-2014
2.50
Started rudder
Details

 08-26-2014
1.50
Replaced some rivets on VS spar
Details

 08-23-2014
5.80
Riveted VS Skin to sub-structure
Details
       

 08-22-2014
4.50
Vertical Stabilizer Assembly
Details
       

 08-17-2014
5.00
More VS prep
Details
     

 08-16-2014
7.00
VS prep
Details
       

 08-15-2014
6.30
Final assy of RH HS
Details

 08-14-2014
2.00
Started attaching RH HS skin to HS substructure
Details
       

 08-13-2014
1.50
Disassembled VS and continued riveting RH HS
Details
       

 08-12-2014
2.80
Build up of VS
Details
       

 08-10-2014
3.00
Riveting HS and drilling deburring VS
Details

 08-09-2014
4.00
Rivet LH HS
Details
       

 08-09-2014
2.00
Final assembly of HS substucture
Details
       

 08-07-2014
3.00
Riveted front and rear spars
Details
       

 08-06-2014
2.75
HS LH Rear spar and VS Rear spar
Details
     

 08-05-2014
2.00
Drilled and deburred replacement LH HS spar

 08-03-2014
1.50
Started riveting front spar
Details
       

 07-30-2014
2.00
Primed LH HS skin and scuffed/dimpled RH HS skin
       

 07-29-2014
1.50
Deburred RH HS skin

 07-28-2014
2.00
Deburred and dimpled LH HS Skin

 07-27-2014
1.00
Primed HS spars

 07-26-2014
2.50
HS prep for assembly
Details
       

 07-24-2014
2.50
More deburring, scuffing and dimpling of the HS su

 07-23-2014
3.00
More deburring and scuffing

 07-20-2014
3.50
Deburring, scuffing and dimpling HS components

 07-19-2014
2.00
More scuffing and deburrring - Dimpling

 07-16-2014
1.50
Deburring and scuffing HS parts
Details

 07-15-2014
3.00
Finished drilling RH HS
Details

 07-14-2014
1.00
Drilled LH HS inboard rib
Details
       

 07-12-2014
2.50
LH Horizontal stab
Details

 07-11-2014
3.00
Completed fitup and drilling of RH HS
Details
       

 07-09-2014
2.50
Fit RH stab skin to substructure
Details
       

 07-08-2014
1.50
Fit LH stab skin to substructure
Details
       

 07-05-2014
2.00
Started bending and fluting rib flanges.
Details
       

 07-04-2014
5.00
HS forward spar assembly
Details
       

 07-04-2014
0.00
Filter and regulator for compressed air
Details
       

 07-03-2014
1.50
More work on HS Front spar angles
Details

 07-02-2014
1.00
Front Spar
Details

 06-29-2014
3.50
Empennage HS front and rear spars
Details
       

 06-28-2014
5.50
Continued emp HS rear spar and started on front sp
Details
       

 06-27-2014
0.00
Bought a new compressor
Details
     

 06-26-2014
2.00
Initial assembly of HS rear spar
Details
       

 06-25-2014
0.80
More work on HS spar reinforment bar
Details

 06-24-2014
1.00
More work on HS rear spar
Details

 06-23-2014
1.50
Started HS
Details

 06-23-2014
0.00
Finished practice kit
Details

 04-01-2014
0.00
Empenage kit arrives
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.