Date
|
Hours
|
Work Log Summary
|
Details
|
05-29-2021
|
2.00
|
Attached fuel line brackets
|
Details
|
|
|
05-29-2021
|
4.00
|
Attached Brake lines, secured fuel lines
|
Details
|
|
|
05-28-2021
|
1.00
|
Enlarged holes to run AS brake lines
|
Details
|
|
|
05-24-2021
|
2.00
|
Rudder pedal re-install
|
Details
|
|
|
05-18-2021
|
2.00
|
Brake pedal and Master cylinder assy continued
|
Details
|
|
|
05-18-2021
|
3.00
|
Brake Pedal and Master Cylinder Assy
|
Details
|
|
|
05-13-2021
|
3.00
|
Paint Interior
|
Details
|
|
|
05-12-2021
|
4.00
|
Built paint booth for interior painting
|
Details
|
|
|
04-29-2021
|
5.00
|
Completed Baggage Area, Sprayed Brake Pedals
|
Details
|
|
|
04-28-2021
|
2.00
|
Seat hinges and baggage splice
|
Details
|
|
|
04-27-2021
|
5.00
|
Installed baggage floors
|
Details
|
|
|
04-21-2021
|
2.00
|
Brake pedals and pull rivet
|
Details
|
|
|
01-11-2021
|
1.00
|
More pictures of shipment
|
|
|
|
01-11-2021
|
1.00
|
Finished Up Tail Fairings
|
Details
|
|
|
01-11-2021
|
2.00
|
Arrival of Finish, QB Fuselage and QB Wings
|
Details
|
|
|
10-25-2020
|
0.50
|
EAA Technical Advisor Inspection
|
Details
|
|
|
10-07-2020
|
1.00
|
Trimmed cured glass and mixed flox to fill recesse
|
Details
|
|
|
10-06-2020
|
2.00
|
Mixed up epoxy and laid fiberglass in fairings
|
Details
|
|
|
10-05-2020
|
2.00
|
Attached elevator fairings and sized HS fairing ti
|
Details
|
|
|
10-02-2020
|
2.00
|
Prepped HS fairings.
|
Details
|
|
|
10-01-2020
|
3.00
|
Rudder top fairing
|
Details
|
|
|
09-30-2020
|
2.00
|
Rudder bottom fairing nutplates
|
Details
|
|
|
09-28-2020
|
3.00
|
Began Chpt 12...Installing fairings
|
Details
|
|
|
09-27-2020
|
3.00
|
Attached tail pieces to aft fuselage
|
Details
|
|
|
09-26-2020
|
1.00
|
Drilled elevator horns
|
Details
|
|
|
09-22-2020
|
4.00
|
Finished Ch 10
|
Details
|
|
|
09-22-2020
|
2.00
|
Assembled HS with elevators
|
Details
|
|
|
09-22-2020
|
0.50
|
|
Details
|
|
|
09-21-2020
|
2.00
|
Riveted Top Side skins
|
Details
|
|
|
09-19-2020
|
1.00
|
Riveted left side top side skin to aft fuselage
|
Details
|
|
|
09-18-2020
|
1.00
|
Dimpled right side top skin and primed left and ri
|
Details
|
|
|
09-17-2020
|
4.00
|
Top side skin prep, match drilled VS
|
Details
|
|
|
09-17-2020
|
1.00
|
Riveted pieces to the top skin
|
Details
|
|
|
09-17-2020
|
1.00
|
Ran static port lines
|
Details
|
|
|
09-17-2020
|
2.00
|
Finished aft deck and replaced some bad rivets in
|
Details
|
|
|
09-14-2020
|
1.00
|
Static ports installed
|
Details
|
|
|
09-14-2020
|
3.00
|
Aft deck and top skin dimples
|
Details
|
|
|
09-10-2020
|
3.00
|
Ran cables and wires. Prepped, dimpled and primed
|
Details
|
|
|
09-09-2020
|
2.00
|
Rudder cables
|
Details
|
|
|
09-08-2020
|
4.00
|
Finished side skins and nut plates
|
Details
|
|
|
09-07-2020
|
3.00
|
Riveted left side skin
|
Details
|
|
|
09-03-2020
|
6.50
|
Riveted aft bottom skin and right side skin
|
Details
|
|
|
09-01-2020
|
1.00
|
Finished bottom rivets and enlarged holes
|
Details
|
|
|
08-31-2020
|
1.00
|
Riveted bottom skin
|
Details
|
|
|
08-30-2020
|
1.50
|
Riveting bottom skin
|
Details
|
|
|
08-25-2020
|
7.50
|
Prep work on skins
|
Details
|
|
|
08-24-2020
|
2.50
|
Countersunk F1418B Longerons
|
Details
|
|
|
08-19-2020
|
1.00
|
Dimpling side skins
|
Details
|
|
|
08-18-2020
|
1.00
|
Deburred F1473L skin
|
Details
|
|
|
08-17-2020
|
3.00
|
|
|
|
|
08-16-2020
|
1.00
|
More riveting and vinyl removal
|
Details
|
|
|
08-14-2020
|
4.50
|
Bulkhead assembly and battery angles
|
Details
|
|
|
08-11-2020
|
5.00
|
Aft bottom skin, bulkheads and battery angles
|
Details
|
|
|
08-10-2020
|
2.00
|
Finished elevators
|
Details
|
|
|
08-10-2020
|
1.00
|
Edged, deburred bulkheads
|
Details
|
|
|
08-01-2020
|
8.00
|
Deburred, edged, riveted aft bulkheads
|
Details
|
|
|
07-31-2020
|
3.00
|
Primed, riveted, cut rudder stops
|
Details
|
|
|
07-30-2020
|
2.00
|
Edged, primed
|
Details
|
|
|
07-29-2020
|
4.00
|
Match and final drilled bulkhead and tie down to
|
Details
|
|
|
07-28-2020
|
3.00
|
Fabricated rudder stops and support bar
|
Details
|
|
|
07-27-2020
|
3.00
|
Fabricated stiffners, doublers
|
Details
|
|
|
07-25-2020
|
2.00
|
Began work on Aft Fuselage and almost complete ele
|
Details
|
|
|
07-24-2020
|
3.00
|
Fabricated counterweights
|
Details
|
|
|
07-23-2020
|
2.00
|
Rolled leading edge of right elevator
|
Details
|
|
|
07-22-2020
|
3.00
|
Rolled leading edge, molex connector issue
|
Details
|
|
|
07-21-2020
|
4.00
|
Riveted trailing edge of both elevators
|
Details
|
|
|
07-20-2020
|
1.00
|
Completed trim tab
|
Details
|
|
|
07-18-2020
|
1.00
|
Installed foam ribs
|
Details
|
|
|
07-17-2020
|
4.00
|
Riveted Rib Tips and taped trailing edge
|
Details
|
|
|
07-16-2020
|
4.00
|
Patience is a virtue?!
|
Details
|
|
|
07-15-2020
|
5.00
|
Riveted rear spar and front spar to skins, and rib
|
Details
|
|
|
07-13-2020
|
5.00
|
Riveted ribs and trim access panels in place
|
Details
|
|
|
07-12-2020
|
1.00
|
Back riveting ribs to left elevator
|
Details
|
|
|
07-11-2020
|
1.00
|
Riveted left elevator rear spar
|
Details
|
|
|
07-10-2020
|
3.00
|
Assembled trim tab. Assembled rear spar to ribs
|
Details
|
|
|
07-09-2020
|
3.00
|
Counterbalance skins and horns riveted
|
Details
|
|
|
07-08-2020
|
4.00
|
Prepped skins for foam ribs, assembled tip ribs
|
Details
|
|
|
07-07-2020
|
7.00
|
Trim tab work. Primed all parts
|
Details
|
|
|
07-06-2020
|
4.00
|
Countersinking and dimpling
|
Details
|
|
|
07-03-2020
|
3.00
|
Dimpled skins
|
Details
|
|
|
07-02-2020
|
4.00
|
Disassembly, deburring and dimpling
|
Details
|
|
|
07-01-2020
|
2.00
|
Fitted gusset's and tip rib assy
|
Details
|
|
|
07-01-2020
|
1.50
|
Fabricated trailing edge wedge
|
Details
|
|
|
07-01-2020
|
1.00
|
Close out tabs drilled and elevator horns
|
Details
|
|
|
06-30-2020
|
1.00
|
Trim tab hinge note
|
Details
|
|
|
06-30-2020
|
2.00
|
Trim tab hinge fabrication
|
Details
|
|
|
06-29-2020
|
3.00
|
Elevator skin and spar prep
|
Details
|
|
|
06-25-2020
|
4.00
|
More edging, deburring and foam cutting
|
Details
|
|
|
06-24-2020
|
2.00
|
Trim tab work
|
Details
|
|
|
06-24-2020
|
2.00
|
Left skins prep
|
Details
|
|
|
06-23-2020
|
2.00
|
Prepped inboard and outboard tip ribs
|
Details
|
|
|
06-20-2020
|
4.00
|
Began Elevator Construction
|
Details
|
|
|
06-11-2020
|
2.00
|
Rear spar assembly
|
Details
|
|
|
06-11-2020
|
2.00
|
Horizontal Stab Complete
|
Details
|
|
|
06-10-2020
|
7.00
|
Riveting continued on the skins
|
Details
|
|
|
06-09-2020
|
5.00
|
It's been a Riveting day!
|
Details
|
|
|
06-08-2020
|
2.00
|
Riveting front spar assembly
|
Details
|
|
|
06-08-2020
|
3.00
|
Riveted nose ribs and front spar
|
Details
|
|
|
06-06-2020
|
1.00
|
Nose rib riveting
|
Details
|
|
|
06-05-2020
|
1.00
|
Assembled In-spar assembly
|
Details
|
|
|
06-05-2020
|
2.00
|
Assembled Front Spar Assembly
|
Details
|
|
|
06-03-2020
|
2.00
|
Trailing Edge Rivets and Leading edge bend
|
Details
|
|
|
06-03-2020
|
4.00
|
Bending the leading edge
|
Details
|
|
|
06-02-2020
|
1.00
|
Installed Top Rib
|
Details
|
|
|
06-01-2020
|
2.00
|
Counter Balance and Remaining Rudder Skin Riveting
|
Details
|
|
|
05-30-2020
|
3.00
|
Riveted Bottom Rudder Assy
|
Details
|
|
|
05-29-2020
|
4.00
|
Riveted Rudder Spar
|
Details
|
|
|
05-29-2020
|
1.00
|
Installed rudder spar on to rudder skin
|
Details
|
|
|
05-28-2020
|
5.50
|
Vertical Stabilizer Complete
|
Details
|
|
|
05-28-2020
|
0.00
|
Vertical Stabilizer
|
|
|
|
05-27-2020
|
3.00
|
VS riveting
|
Details
|
|
|
05-26-2020
|
1.00
|
Vertical Stab riveting
|
Details
|
|
|
05-26-2020
|
7.00
|
Front spar riveting. Rib prep
|
Details
|
|
|
05-23-2020
|
1.00
|
Riveting rear spar
|
Details
|
|
|
05-22-2020
|
2.00
|
Numatx Squeezer set up
|
Details
|
|
|
05-21-2020
|
5.00
|
Prep work for HS parts
|
Details
|
|
|
05-20-2020
|
7.00
|
Dimpled HS skins
|
Details
|
|
|
05-14-2020
|
5.00
|
More drilling, made cradles, adjusted ribs
|
Details
|
|
|
05-13-2020
|
1.00
|
Countersinking Front Spar Doubler
|
Details
|
|
|
05-12-2020
|
6.00
|
Front Spar Prep
|
Details
|
|
|
05-11-2020
|
4.00
|
Began constructing Horizontal Stablizer
|
Details
|
|
|
05-06-2020
|
4.00
|
Attached left and right skins together
|
Details
|
|
|
05-05-2020
|
3.00
|
Attached shear clips. Set one side of TE to skin.
|
Details
|
|
|
05-04-2020
|
4.00
|
Back riveting stiffners
|
Details
|
|
|
05-02-2020
|
4.00
|
Trailing edge countersinking
|
Details
|
|
|
04-29-2020
|
2.00
|
Shot Primer
|
Details
|
|
|
04-28-2020
|
4.00
|
Drilled trailing edge
|
Details
|
|
|
04-27-2020
|
4.00
|
Clecoed skins together for final drilling
|
Details
|
|
|
04-20-2020
|
5.00
|
Rudder prep
|
Details
|
|
|
04-17-2020
|
2.00
|
Boxed and shipped Numatx Squeezer
|
Details
|
|
|
04-15-2020
|
3.00
|
Deburred and primed
|
Details
|
|
|
04-14-2020
|
4.00
|
Clecoed skin, final drilled, primed
|
Details
|
|
|
04-13-2020
|
5.00
|
VS prep
|
Details
|
|
|
04-13-2020
|
3.00
|
The build begins
|
Details
|
|
|
04-09-2020
|
2.00
|
Cleaveland Tool RV14 kit
|
Details
|
|
|
04-04-2020
|
4.00
|
Inventory
|
Details
|
|
|
03-29-2020
|
4.00
|
Constructed 2 EAA tables
|
|
|