MIKE'S WEB SITE
Work Logs Found: 137
Category Work Time: 390 Hours
 Date
Hours
Work Log Summary

Details

 05-29-2021
2.00
Attached fuel line brackets
Details
     

 05-29-2021
4.00
Attached Brake lines, secured fuel lines
Details
       

 05-28-2021
1.00
Enlarged holes to run AS brake lines
Details
       

 05-24-2021
2.00
Rudder pedal re-install
Details
       

 05-18-2021
2.00
Brake pedal and Master cylinder assy continued
Details
       

 05-18-2021
3.00
Brake Pedal and Master Cylinder Assy
Details
       

 05-13-2021
3.00
Paint Interior
Details

 05-12-2021
4.00
Built paint booth for interior painting
Details
       

 04-29-2021
5.00
Completed Baggage Area, Sprayed Brake Pedals
Details
       

 04-28-2021
2.00
Seat hinges and baggage splice
Details
       

 04-27-2021
5.00
Installed baggage floors
Details
       

 04-21-2021
2.00
Brake pedals and pull rivet
Details
       

 01-11-2021
1.00
More pictures of shipment
       

 01-11-2021
1.00
Finished Up Tail Fairings
Details
       

 01-11-2021
2.00
Arrival of Finish, QB Fuselage and QB Wings
Details
       

 10-25-2020
0.50
EAA Technical Advisor Inspection
Details

 10-07-2020
1.00
Trimmed cured glass and mixed flox to fill recesse
Details
       

 10-06-2020
2.00
Mixed up epoxy and laid fiberglass in fairings
Details
     

 10-05-2020
2.00
Attached elevator fairings and sized HS fairing ti
Details
       

 10-02-2020
2.00
Prepped HS fairings.
Details
     

 10-01-2020
3.00
Rudder top fairing
Details
       

 09-30-2020
2.00
Rudder bottom fairing nutplates
Details
       

 09-28-2020
3.00
Began Chpt 12...Installing fairings
Details

 09-27-2020
3.00
Attached tail pieces to aft fuselage
Details
       

 09-26-2020
1.00
Drilled elevator horns
Details
       

 09-22-2020
4.00
Finished Ch 10
Details
       

 09-22-2020
2.00
Assembled HS with elevators
Details
       

 09-22-2020
0.50

Details
     

 09-21-2020
2.00
Riveted Top Side skins
Details

 09-19-2020
1.00
Riveted left side top side skin to aft fuselage
Details
     

 09-18-2020
1.00
Dimpled right side top skin and primed left and ri
Details

 09-17-2020
4.00
Top side skin prep, match drilled VS
Details
       

 09-17-2020
1.00
Riveted pieces to the top skin
Details
     

 09-17-2020
1.00
Ran static port lines
Details
     

 09-17-2020
2.00
Finished aft deck and replaced some bad rivets in
Details
       

 09-14-2020
1.00
Static ports installed
Details
       

 09-14-2020
3.00
Aft deck and top skin dimples
Details
       

 09-10-2020
3.00
Ran cables and wires. Prepped, dimpled and primed
Details
     

 09-09-2020
2.00
Rudder cables
Details
       

 09-08-2020
4.00
Finished side skins and nut plates
Details
       

 09-07-2020
3.00
Riveted left side skin
Details
       

 09-03-2020
6.50
Riveted aft bottom skin and right side skin
Details
       

 09-01-2020
1.00
Finished bottom rivets and enlarged holes
Details
       

 08-31-2020
1.00
Riveted bottom skin
Details
       

 08-30-2020
1.50
Riveting bottom skin
Details
       

 08-25-2020
7.50
Prep work on skins
Details
       

 08-24-2020
2.50
Countersunk F1418B Longerons
Details
       

 08-19-2020
1.00
Dimpling side skins
Details
     

 08-18-2020
1.00
Deburred F1473L skin
Details

 08-17-2020
3.00


 08-16-2020
1.00
More riveting and vinyl removal
Details
       

 08-14-2020
4.50
Bulkhead assembly and battery angles
Details
       

 08-11-2020
5.00
Aft bottom skin, bulkheads and battery angles
Details
       

 08-10-2020
2.00
Finished elevators
Details

 08-10-2020
1.00
Edged, deburred bulkheads
Details
       

 08-01-2020
8.00
Deburred, edged, riveted aft bulkheads
Details
       

 07-31-2020
3.00
Primed, riveted, cut rudder stops
Details
       

 07-30-2020
2.00
Edged, primed
Details

 07-29-2020
4.00
Match and final drilled bulkhead and tie down to
Details
       

 07-28-2020
3.00
Fabricated rudder stops and support bar
Details
       

 07-27-2020
3.00
Fabricated stiffners, doublers
Details

 07-25-2020
2.00
Began work on Aft Fuselage and almost complete ele
Details
     

 07-24-2020
3.00
Fabricated counterweights
Details
     

 07-23-2020
2.00
Rolled leading edge of right elevator
Details
     

 07-22-2020
3.00
Rolled leading edge, molex connector issue
Details
       

 07-21-2020
4.00
Riveted trailing edge of both elevators
Details
       

 07-20-2020
1.00
Completed trim tab
Details

 07-18-2020
1.00
Installed foam ribs
Details

 07-17-2020
4.00
Riveted Rib Tips and taped trailing edge
Details
       

 07-16-2020
4.00
Patience is a virtue?!
Details
       

 07-15-2020
5.00
Riveted rear spar and front spar to skins, and rib
Details
       

 07-13-2020
5.00
Riveted ribs and trim access panels in place
Details
       

 07-12-2020
1.00
Back riveting ribs to left elevator
Details
     

 07-11-2020
1.00
Riveted left elevator rear spar
Details
       

 07-10-2020
3.00
Assembled trim tab. Assembled rear spar to ribs
Details
       

 07-09-2020
3.00
Counterbalance skins and horns riveted
Details
     

 07-08-2020
4.00
Prepped skins for foam ribs, assembled tip ribs
Details
       

 07-07-2020
7.00
Trim tab work. Primed all parts
Details
       

 07-06-2020
4.00
Countersinking and dimpling
Details
       

 07-03-2020
3.00
Dimpled skins
Details
       

 07-02-2020
4.00
Disassembly, deburring and dimpling
Details
     

 07-01-2020
2.00
Fitted gusset's and tip rib assy
Details
       

 07-01-2020
1.50
Fabricated trailing edge wedge
Details
       

 07-01-2020
1.00
Close out tabs drilled and elevator horns
Details
       

 06-30-2020
1.00
Trim tab hinge note
Details
       

 06-30-2020
2.00
Trim tab hinge fabrication
Details
       

 06-29-2020
3.00
Elevator skin and spar prep
Details
       

 06-25-2020
4.00
More edging, deburring and foam cutting
Details
       

 06-24-2020
2.00
Trim tab work
Details
       

 06-24-2020
2.00
Left skins prep
Details
       

 06-23-2020
2.00
Prepped inboard and outboard tip ribs
Details
       

 06-20-2020
4.00
Began Elevator Construction
Details
       

 06-11-2020
2.00
Rear spar assembly
Details
       

 06-11-2020
2.00
Horizontal Stab Complete
Details
       

 06-10-2020
7.00
Riveting continued on the skins
Details
       

 06-09-2020
5.00
It's been a Riveting day!
Details
       

 06-08-2020
2.00
Riveting front spar assembly
Details
       

 06-08-2020
3.00
Riveted nose ribs and front spar
Details
       

 06-06-2020
1.00
Nose rib riveting
Details
     

 06-05-2020
1.00
Assembled In-spar assembly
Details
     

 06-05-2020
2.00
Assembled Front Spar Assembly
Details
       

 06-03-2020
2.00
Trailing Edge Rivets and Leading edge bend
Details
       

 06-03-2020
4.00
Bending the leading edge
Details
       

 06-02-2020
1.00
Installed Top Rib
Details
       

 06-01-2020
2.00
Counter Balance and Remaining Rudder Skin Riveting
Details
       

 05-30-2020
3.00
Riveted Bottom Rudder Assy
Details
       

 05-29-2020
4.00
Riveted Rudder Spar
Details
       

 05-29-2020
1.00
Installed rudder spar on to rudder skin
Details
       

 05-28-2020
5.50
Vertical Stabilizer Complete
Details
       

 05-28-2020
0.00
Vertical Stabilizer
       

 05-27-2020
3.00
VS riveting
Details
       

 05-26-2020
1.00
Vertical Stab riveting
Details
       

 05-26-2020
7.00
Front spar riveting. Rib prep
Details
       

 05-23-2020
1.00
Riveting rear spar
Details
       

 05-22-2020
2.00
Numatx Squeezer set up
Details
     

 05-21-2020
5.00
Prep work for HS parts
Details

 05-20-2020
7.00
Dimpled HS skins
Details
       

 05-14-2020
5.00
More drilling, made cradles, adjusted ribs
Details

 05-13-2020
1.00
Countersinking Front Spar Doubler
Details
     

 05-12-2020
6.00
Front Spar Prep
Details
       

 05-11-2020
4.00
Began constructing Horizontal Stablizer
Details
       

 05-06-2020
4.00
Attached left and right skins together
Details
       

 05-05-2020
3.00
Attached shear clips. Set one side of TE to skin.
Details
       

 05-04-2020
4.00
Back riveting stiffners
Details
       

 05-02-2020
4.00
Trailing edge countersinking
Details
     

 04-29-2020
2.00
Shot Primer
Details
       

 04-28-2020
4.00
Drilled trailing edge
Details
       

 04-27-2020
4.00
Clecoed skins together for final drilling
Details
       

 04-20-2020
5.00
Rudder prep
Details
       

 04-17-2020
2.00
Boxed and shipped Numatx Squeezer
Details

 04-15-2020
3.00
Deburred and primed
Details
       

 04-14-2020
4.00
Clecoed skin, final drilled, primed
Details
     

 04-13-2020
5.00
VS prep
Details
     

 04-13-2020
3.00
The build begins
Details
       

 04-09-2020
2.00
Cleaveland Tool RV14 kit
Details
       

 04-04-2020
4.00
Inventory
Details
       

 03-29-2020
4.00
Constructed 2 EAA tables
     