KitLog pro

Powered By Kitlog Pro v2.0

LAUREN'S WEB SITE
Work Logs Found: 104
Category Work Time: 1040 Hours
 Date
Hours
Work Log Summary

Details

 07-05-2021
4.00
weight and balance
Details
     

 07-02-2021
20.00
interior
       

 06-30-2021
10.00
cowl mods
       

 06-28-2021
10.00
flapperon final install
       

 06-26-2021
30.00
under cowl
       

 06-25-2021
80.00
wiring
       

 06-23-2021
7.00
battery tray install
       

 06-21-2021
10.00
sutton exhaust install
     

 06-20-2021
40.00
panel build
       

 06-18-2021
5.00
brake resevior and lines leak tested
     

 06-11-2021
10.00
fuel lines and flow test
       

 06-04-2021
10.00
intake recess
     

 04-30-2021
4.00
nose bowl paint
     

 04-30-2021
30.00
covering cowl in Oratex
       

 04-30-2021
4.00
brake clocking
     

 04-16-2021
10.00
exhaust mock up
       

 04-09-2021
80.00
building alluminum cowl
       

 04-02-2021
30.00
cowl template
       

 03-26-2021
30.00
starting the custom cowl
       

 03-19-2021
4.00
hanging engine for the first time
     

 03-12-2021
2.00
engine mount mock up
Details
     

 03-05-2021
20.00
brake line install and routing
Details
       

 02-26-2021
2.00
engine mock up
     

 02-26-2021
4.00
belly pod mock up
Details
       

 02-19-2021
10.00
Baggage door
Details
       

 02-12-2021
4.00
painting lift struts
Details
       

 02-12-2021
15.00
adding custom baggage door
Details
       

 02-05-2021
4.00
Gluing to lift strut
Details
     

 01-29-2021
7.00
Lift strut fairing covers
Details
       

 01-22-2021
1.00
Super Cub cowl mock up
Details
     

 01-22-2021
8.00
Freedom of movement test post covering
Details
       

 01-15-2021
4.00
painting door jams
Details
     

 01-08-2021
2.00
O-320-B2B
Details
       

 01-08-2021
5.00
left wing tip fences
Details
       

 01-08-2021
10.00
bubble door (pilot side)
Details
       

 01-01-2021
4.00
PVC lift struts
Details
       

 12-25-2020
12.00
PVC lift strut fairings
Details
       

 12-18-2020
12.00
Paint rib roots/fuel placards
Details
       

 12-11-2020
6.00
Sanding and painting of stall fences
Details
       

 12-04-2020
7.00
Covering tip in Oratex
Details
     

 11-27-2020
8.00
match drilling and mounting tips
Details
       

 11-20-2020
3.00
#1 rib close out pieces
Details
     

 11-13-2020
4.00
filling of wing tip edges
Details
     

 11-06-2020
6.00
wing tip mounting brackets
Details
     

 10-23-2020
7.00
Rib stitching left wing
Details
     

 10-16-2020
30.00
Left wing Top and Bottom blanker
Details
       

 10-15-2020
4.00
pitot tube and tubing mounting
Details
     

 10-09-2020
8.00
Rib stitching right wing
Details
       

 10-02-2020
12.00
right wing top blanket
Details
       

 09-25-2020
10.00
right wing bottom blanket
Details
       

 09-18-2020
6.00
rigging and fitting right wing Flapperon
Details
       

 09-11-2020
3.00
trim accuator and elevator rigging
Details
       

 09-04-2020
6.00
Rudder hung, tail springs installed
Details
       

 08-15-2020
2.00
rudder painted
Details
     

 08-09-2020
6.00
Paint
Details
       

 08-02-2020
6.00
Rudder
Details
       

 07-31-2020
3.00
razorback finish tape
Details
     

 07-26-2020
4.00
Vertical covering
Details
       

 07-24-2020
6.00
Finish tapes, reinstalling the gear
Details
       

 07-22-2020
7.00
third and final piece
Details
       

 07-20-2020
8.00
Handle side Fuselage
Details
       

 07-18-2020
6.00
finish tapes
Details
     

 07-16-2020
10.00
begin covering fuselage
Details
       

 07-13-2020
4.00
Oratex!
Details
       

 07-10-2020
8.00
empennage wiring/tubing
Details
       

 07-06-2020
6.00
STi wingtip/stall fence
Details
       

 07-04-2020
5.00
Flapperon reinforcement brackets
Details
       

 07-03-2020
4.00
baggage floor and sack install
Details
       

 06-30-2020
10.00
Laker edge final install
Details
       

 06-29-2020
3.00
filler neck drain
Details
     

 06-27-2020
8.00
Laker leading edge
Details
       

 06-21-2020
4.00
rib 1-3 trailing edge
Details
     

 06-19-2020
8.00
fuel tank false ribs and #2 rib
Details
       

 06-17-2020
12.00
bottom false ribs
Details
       

 06-06-2020
10.00
sloshing and install of fuel tanks
Details
       

 06-04-2020
20.00
varnish all wood ribs
Details
       

 06-01-2020
12.00
Push pull tubes
Details
       

 05-27-2020
6.00
Jury Struts
Details
       

 05-23-2020
8.00
Butt ribs
Details
       

 05-21-2020
10.00
Yamaha APEX engine
Details
       

 05-12-2020
5.00
transition ribs
Details
       

 05-09-2020
6.00
#1 rib installed
Details
       

 05-08-2020
12.00
attachment of lift strust brackets
Details
       

 05-05-2020
4.00
Verifying sweep, dihedral, and was in/out
Details
       

 05-03-2020
5.00
spar reenforcements
Details
       

 05-02-2020
5.00
Fuselage stringers
Details
       

 05-01-2020
4.00
tail feather tips
Details
       

 04-26-2020
8.00
door frames
Details
       

 04-23-2020
3.00
tail tips
Details
     

 04-21-2020
7.00
center console side panels
Details
       

 04-19-2020
11.00
Rudder cables, Master Cyl, Seat pan
Details
       

 04-19-2020
6.00
rudder cables
Details
       

 04-18-2020
2.00
seat pan trimming
Details
     

 04-17-2020
6.00
Shock Monster gear and T3 tail mounted
Details
       

 04-16-2020
12.00
adjustable rudder pedals, and adjusters
Details
       

 04-15-2020
9.00
Varnish/floorboards/rudder pedal assembly part 1
Details
       

 04-15-2020
2.00
Flap handle/center console
Details
       

 04-14-2020
13.00
final install of rear bulkhead/controls
Details
       

 04-13-2020
12.00
speedster tail/ rear bulkhead inspection area
Details
       

 04-12-2020
8.00
trim accuator/ horizontal / rudder rib instal
Details
       

 04-11-2020
9.00
horizontal bushings and bearings/pre fit to Fusela
Details
       

 04-10-2020
11.00
horizontal and elevator
Details
       

 04-09-2020
10.00
unboxing and inventory
Details
       

 04-08-2020
0.10
Kitfox S7 STi arrives










Copyright © 2001-2024 Matronics. All Rights Reserved.