KitLog pro

Powered By Kitlog Pro v2.0

Eds Web Site
Work Logs Found: 85
Category Work Time: 438 Hours
 Date
Hours
Work Log Summary

Details

 11-11-2019
4.00
new canopy
Details
     

 08-17-2018
4.00
prime wings
       

 08-17-2018
1.00
prime wings
       

 04-01-2018
0.00
cooling baffles
       

 03-25-2018
0.00
install seat belts
     

 03-16-2018
0.00
fab cooling baffles
       

 02-10-2018
0.00
finishing counterweight
       

 02-03-2018
1.00
add control stops
       

 11-18-2017
0.00
wingtip replacement
       

 10-31-2017
4.00
break up canopy to ship for replacement
       

 10-13-2017
4.00
Strip and refinish cowling, wingtips, wheel pants
       

 09-02-2015
4.00
trailering prep
       

 06-18-2015
0.00
wing mods
       

 06-16-2015
0.00
wing mods
Details
       

 06-13-2015
0.00
wing mods
Details
       

 06-09-2015
0.00
wing mod
Details
       

 06-07-2015
25.00
wing mods
Details
       

 06-06-2015
12.00
wing mod - drill rivets
       

 05-28-2015
0.00
wing mod
       

 05-28-2015
25.00
Install wing modifications "A" wing
       

 05-28-2015
9.50
Install "A" Wing Mod - Right Wing
Details
       

 05-24-2015
0.00
test run the engine
       

 05-22-2015
4.00
gascolator and coil install
       

 05-14-2015
12.00
newly painted
       

 05-02-2015
4.00
newly painted
       

 04-30-2015
12.00
Prime fusalage and tail
Details
       

 03-30-2015
12.00
stripping and priming again
       

 11-27-2014
0.00
wheel pants
     

 11-26-2014
10.00
wheel pants
       

 11-21-2014
4.00
Firewall fab
       

 11-17-2014
15.00
make a new firewall
Details
       

 11-09-2014
12.00
Mofdifications necessary to lower the wings
Details
       

 11-09-2014
1.00
add trailering attathment
     

 11-08-2014
2.00
Firewall template
       

 11-04-2014
4.00
firewall template
       

 11-03-2014
4.00
Fab new firewall
       

 10-19-2014
10.00
Towing attachment
       

 10-16-2014
4.00
tow bar fab
       

 06-29-2014
0.00
Fab and install instrument panel
       

 06-21-2014
8.00
fab switch panel
       

 05-04-2014
4.00
Install canopy skirts
       

 05-03-2014
5.00
fab new canopy skirts
       

 04-24-2014
4.00
Canopy installation with new hinges
Details
       

 04-20-2014
4.00
Install trailering attachment tube
Details
       

 04-20-2014
12.00
install supports for heel brakes
Details
       

 04-20-2014
10.00
Fab new canopy hinges
Details
       

 04-19-2014
2.00
install tailspring nut
Details
     

 04-19-2014
12.00
Install canopy hinges
       

 04-06-2014
4.00
fab and install hinges
       

 04-05-2014
12.00
Fab new hinges for empannage
Details
       

 04-05-2014
10.00
Fab elevator hinges
Details
       

 04-05-2014
10.00
fab and install elevator hinges
Details
       

 03-29-2014
6.00
Rudder hinge installation and alignment
Details
       

 03-23-2014
4.00
ream and install taper pin
Details
       

 03-23-2014
4.00
prepare and ream holes for taper pins
Details
       

 03-20-2014
2.00
pitot tube installation
Details
     

 03-20-2014
2.00
Aileron linkage installation
Details
       

 03-16-2014
10.00
install aieleron linkage
Details
       

 02-22-2014
4.00
install attach bushings for carrythrough
Details
       

 02-17-2014
4.00
move wing fold to lower position
Details
       

 02-09-2014
1.00
Installation in fusalage
Details
       

 02-07-2014
1.00
Install carrythrough
Details
       

 02-02-2014
10.00
Test fit in airplane
Details
       

 01-26-2014
4.00
Fabrication of carrythrough
       

 01-25-2014
10.00
Fab carrythrough for lower wing config
Details
       

 01-20-2014
1.00
Fabricate new torque tubes
Details
       

 01-18-2014
2.00
Carrythrough test fit
Details
       

 01-11-2014
1.00
Fabricate wing spar carry through
Details
       

 01-05-2014
0.00
Move to low wing cvonfiguration
Details
       

 10-26-2013
4.00
Reassemble in origianl configuration
Details
       

 09-08-2013
4.00
Fuel shutoff detail
Details
       

 09-02-2013
12.00
Priming fusalage
Details
       

 07-21-2013
12.00
Stripping
Details
       

 05-26-2013
0.00
New shop
Details
     

 04-21-2013
4.00
Fusalage condition Inspection
Details
     

 04-14-2013
1.00
POSA Carb
Details
     

 04-09-2013
4.00
Engine after reinstallation
Details
       

 03-17-2013
4.00
Engine reassembly
Details
       

 02-23-2013
8.00
Test fit case
Details
       

 02-23-2013
8.00
Engine disassembly
Details
       

 02-23-2013
6.00
Crank inspection
Details
       

 02-18-2013
4.00
Engine removal
Details
       

 02-13-2013
1.00
Engine Condition Inspection - initial
Details
       

 02-09-2013
0.00
Trailer aircraft home
Details
     

 02-09-2013
0.00
Project Acquired
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.