Powered By Kitlog Pro v2.0
N444MG
WAIEX-B
All
Work Logs Found:
40
Category Work Time:
215 Hours
Date
Hours
Work Log Summary
Details
02-02-2020
2.00
Rivet Ruddervator
Details
01-19-2020
4.00
Polished Ruddervator
Details
01-18-2020
1.00
Ruddervator Polish Jig
Details
11-27-2019
1.00
LH RUDDER VATOR HINGE, FITTING
Details
11-27-2019
1.00
LH Drive Plate rivet to Inner Rib
Details
11-23-2019
1.00
RH RUDDERVATOR HINGE
Details
11-23-2019
1.00
LH HINGE FIT, ATTACH
Details
11-21-2019
1.50
RH RUDDERVATER ASSY CONT
Details
11-19-2019
3.00
RH RUDDERVATOR ASSY - 2ND ATTEMPT
Details
11-08-2019
2.00
Sorting Out New Packaages
Details
11-04-2019
3.00
Fuse and Wings Arrive !!!
Details
11-02-2019
4.00
Polish LH Elevator Assy
Details
10-13-2019
2.00
Updrilling of LH Elevator and Ribs
Details
10-12-2019
1.00
Hinge Drilling
Details
10-08-2019
4.00
LH Elevator Drilling
Details
10-06-2019
1.00
Cut Piano Hinges
Details
10-05-2019
2.00
Hinge Drilling
Details
10-02-2019
1.00
Up Drilled Elevator Ribs RH
Details
09-29-2019
7.00
Attachment of Ribs to Right Ruddervator - Part 1
Details
09-28-2019
2.00
Trial Fitting of Right Ruddervator to Stab
Details
09-22-2019
2.00
Cut Inside Ruddervator Skip
Details
09-18-2019
1.00
Bend Drive Plates
Details
09-17-2019
3.00
Test Polish of Drive Plates
Details
09-15-2019
5.00
Drive Plate, Root Rib Assy
Details
09-02-2019
2.00
LH Stab Hinge Fitting and Drilling
Details
08-25-2019
2.00
RH Stab Hinge Fitting and Drilling
Details
08-24-2019
2.00
Cut for Length LH & RH Stab Tips
Details
08-23-2019
1.00
First Boo Boo! (LH Stab Rib Crack)
Details
08-19-2019
1.00
Dimpled Rivets on RH & LH Stab
Details
08-18-2019
6.00
LH STAB ASSEMBLY
Details
08-12-2019
0.50
Riveted LH Fwd Spar to Spar Channel
Details
08-11-2019
2.00
Riveting RH Stab
Details
08-10-2019
4.00
Updrilling Skin, First Rivets
Details
08-06-2019
2.00
Right Ruddervator Constuction
Details
08-04-2019
0.50
First Trial Assy
Details
07-31-2019
1.50
Drilling of WIX-T1107R with WIX-T11-02R
Details
07-27-2019
1.00
The BIG BEND
Details
07-21-2019
3.00
Tail Substructure Detail
Details
07-20-2019
130.00
Tooling Complete (for now)
Details
07-06-2019
1.00
Receipt of Tail Parts
Details
SITE NAVIGATION
Contact Builder
WAIEX-B Home
Category
# Logs
# Hours
All
40
215
Avionics
1
2
Empennage
35
74
Engine
1
4
Fuselage
1
3
None
1
2
Tools
1
130
Copyright © 2001-2024 Matronics. All Rights Reserved.