Date
|
Hours
|
Work Log Summary

|
Details

|
03-24-2025
|
10.00
|
Installed oil cooler, scat tubing, spark plug wire
|
Details
|
|
|
03-15-2025
|
4.00
|
Installed the propellor
|
Details
|
|
|
03-10-2025
|
6.00
|
More firewall forward wiring
|
Details
|
|
|
03-08-2025
|
12.00
|
Continued wiring of engine sensors and controls
|
Details
|
|
|
03-05-2025
|
6.00
|
Added thermocouple extension wire to probes
|
Details
|
|
|
03-01-2025
|
7.00
|
Added CHT/EGT probes and heat muffs
|
Details
|
|
|
02-28-2025
|
8.00
|
Added exhaust system to the engine
|
Details
|
|
|
02-06-2025
|
8.00
|
Added FlyLEDs and attached wingtips
|
Details
|
|
|
01-25-2025
|
7.00
|
Installed Flaps and Ailerons linkages
|
Details
|
|
|
01-04-2025
|
4.00
|
Finished fuel lines between wings and fuselage
|
Details
|
|
|
12-16-2024
|
3.00
|
Started fuel line connection between wings and fus
|
Details
|
|
|
12-06-2024
|
8.00
|
Made the wire/ pitot tube connections at wing root
|
Details
|
|
|
11-27-2024
|
6.00
|
Attached the wings to the fuselage
|
Details
|
|
|
11-26-2024
|
6.00
|
Finished up wiring connectors at the wing roots
|
Details
|
|
|
11-13-2024
|
5.00
|
Fianl assembly of Horizontal/Vertical Stabilizers
|
Details
|
|
|
11-11-2024
|
4.00
|
Started assembly of some of the painted parts
|
Details
|
|
|
11-07-2024
|
4.00
|
Painting - Lower Cowling and misc parts
|
Details
|
|
|
11-06-2024
|
4.00
|
Painting - Upper Cowling, Canopy
|
Details
|
|
|
11-05-2024
|
8.00
|
Painting - Priming cowling, canopy and other small
|
Details
|
|
|
11-01-2024
|
3.00
|
Painting- Fuselage and Wings after removing maskin
|
Details
|
|
|
10-31-2024
|
3.50
|
Painting - Fuselage,bottom side Green paint
|
Details
|
|
|
10-26-2024
|
10.00
|
Painting - Fuselage, Prep for Green lower side
|
Details
|
|
|
10-24-2024
|
8.00
|
Painting - Fuselage, Prep. for White top side
|
Details
|
|
|
10-19-2024
|
3.00
|
Painting - Fuselage priming
|
Details
|
|
|
10-18-2024
|
8.00
|
Painting - Fuselage prep
|
Details
|
|
|
10-11-2024
|
10.00
|
Painting continued
|
Details
|
|
|
10-03-2024
|
20.00
|
Painting Continued
|
Details
|
|
|
09-25-2024
|
40.00
|
Painting
|
Details
|
|
|
07-01-2024
|
45.00
|
First attempt at painting
|
Details
|
  |
|
06-21-2024
|
0.00
|
Completion of paint booth
|
Details
|
|
|
03-22-2024
|
8.50
|
Wing root fairings
|
Details
|
|
|
03-16-2024
|
25.00
|
Finished closeout of the bottom wing skins
|
Details
|
|
|
03-08-2024
|
4.00
|
Final prep. of pitot wiring and tubing before wing
|
Details
|
|
|
02-21-2024
|
5.00
|
Completed SB-00043
|
Details
|
|
|
02-17-2024
|
6.00
|
Moved fuselage to the hangar
|
Details
|
|
|
10-06-2023
|
8.00
|
Started running the electrical wires through the l
|
Details
|
|
|
09-09-2023
|
6.00
|
Installed the emergency canopy eject system
|
Details
|
|
|
09-07-2023
|
7.00
|
Completde buss manager installation and engine mon
|
Details
|
|
|
07-22-2023
|
12.50
|
Fitted the wingtips and installed the NAV antenna
|
Details
|
|
|
07-21-2023
|
11.00
|
Installed the control cables
|
Details
|
|
|
07-03-2023
|
4.00
|
Deburred and primed/painted several misc. parts.
|
Details
|
|
|
07-02-2023
|
5.00
|
Fitted the wingtip lenses
|
Details
|
|
|
06-25-2023
|
4.00
|
Deburred and primed miscelaneous floor panels
|
Details
|
|
|
06-24-2023
|
10.00
|
Finished assembly and mounting of FLYLED wingtip l
|
Details
|
|
|
06-16-2023
|
8.00
|
Prepared to move wings and hor stab to hangar spac
|
Details
|
|
|
05-10-2023
|
4.00
|
Cowling test fitting
|
Details
|
|
|
05-09-2023
|
7.50
|
Added rubber sealing strips to intakes on bottom c
|
Details
|
|
|
05-08-2023
|
6.00
|
Added rubber seal strips to the engine baffles
|
Details
|
|
|
05-04-2023
|
7.00
|
Installed air intake snorkle
|
Details
|
|
|
04-28-2023
|
7.00
|
Installed baffle assemblies to the engine
|
Details
|
|
|
04-20-2023
|
7.00
|
Continued assembling the engine baffles
|
Details
|
|
|
04-17-2023
|
2.00
|
Added RTV strips to rear baffle components
|
Details
|
|
|
04-15-2023
|
6.50
|
Started fabriaction of engine baffles
|
Details
|
|
|
04-06-2023
|
5.00
|
Added bottom cowl close-out piece
|
Details
|
|
|
04-01-2023
|
9.50
|
Fabricated the front wheel fairing
|
Details
|
|
|
03-17-2023
|
7.00
|
Added oil access door to top cowling
|
Details
|
|
|
03-09-2023
|
9.00
|
Continued cowling work
|
Details
|
|
|
02-24-2023
|
16.00
|
Continuation of fitting the cowling
|
Details
|
|
|
01-23-2023
|
20.00
|
Fitting the cowling
|
Details
|
|
|
01-02-2023
|
4.00
|
Installed alternator and spinner plate fixture
|
Details
|
|
|
12-20-2022
|
6.00
|
Prepared spinner
|
Details
|
|
|
12-10-2022
|
5.00
|
Installed engine
|
Details
|
|
|
12-09-2022
|
7.00
|
Unboxed engine and prepared for mounting
|
Details
|
|
|
12-01-2022
|
6.50
|
Added items to front of firewall
|
Details
|
|
|
11-03-2022
|
6.00
|
Assembled cooling flap assembly
|
Details
|
|
|
11-01-2022
|
6.00
|
Assembled and attached front landing gear
|
Details
|
|
|
10-14-2022
|
4.00
|
Attached engine mount and cleaned up some wiring.
|
Details
|
|
|
10-08-2022
|
6.00
|
Reinstalled instruments and 1st power test.
|
Details
|
|
|
10-03-2022
|
4.00
|
Started the FlyEFII Bus Manager Installation
|
Details
|
|
|
10-02-2022
|
2.50
|
Fabricated GPS antenna mount doubler
|
Details
|
|
|
10-01-2022
|
60.00
|
Nearly finished with wiring
|
Details
|
|
|
05-31-2022
|
1.00
|
test
|
|
  |
|
05-30-2022
|
12.00
|
Continued landing gear and wheel fairing fitting
|
Details
|
|
|
05-13-2022
|
10.00
|
Started gear and wheel fairing fitting
|
Details
|
|
|
05-05-2022
|
12.00
|
Main Landing gear installation
|
Details
|
|
|
04-02-2022
|
48.00
|
Avionics wiring harness
|
Details
|
|
|
02-07-2022
|
12.00
|
Designed and assembled center circuit breaker pane
|
Details
|
|
|
01-10-2022
|
10.00
|
Installing misc avionics components
|
Details
|
|
|
01-07-2022
|
6.00
|
Additional panel work
|
Details
|
|
|
01-03-2022
|
4.00
|
Preliminary seat design
|
Details
|
|
|
12-30-2021
|
9.00
|
Instrument Panel Work
|
Details
|
|
|
10-20-2021
|
3.00
|
Received engine from Lycoming
|
Details
|
|
|
10-18-2021
|
12.00
|
Started instrument panel design and fabrication
|
Details
|
|
|
10-16-2021
|
6.00
|
Prepared landing gear components
|
Details
|
|
|
09-27-2021
|
8.00
|
Seat frame assembly and start of top forward skin
|
Details
|
|
|
09-17-2021
|
3.00
|
Final fitting of canopy
|
Details
|
|
|
09-15-2021
|
14.00
|
Finished build up of fiberglass transition of cano
|
Details
|
|
|
08-30-2021
|
4.00
|
Added dyed fiberclass strips to the canopy skin jo
|
Details
|
|
|
08-28-2021
|
4.00
|
Added Epoxy/microballoon filler to canopy/fuse joi
|
Details
|
|
|
08-18-2021
|
9.00
|
Fitting the canopy to the frame
|
Details
|
|
|
08-15-2021
|
6.00
|
Built and mounted fuselage on a rotisserie
|
Details
|
|
|
08-13-2021
|
5.00
|
Assembling and test fitting canopy frame
|
Details
|
|
|
08-06-2021
|
5.00
|
Continued assembly of the canopy frame
|
Details
|
|
|
07-24-2021
|
6.00
|
Putting together the forward part of the canopy fr
|
Details
|
|
|
06-24-2021
|
5.00
|
Preparing parts for forward canopy frame
|
Details
|
|
|
06-21-2021
|
4.00
|
Added access panels for access to subpanel
|
Details
|
|
|
06-19-2021
|
4.00
|
Installed canopy latching mechanism
|
Details
|
|
|
06-18-2021
|
7.00
|
Rear window fitted
|
Details
|
|
|
06-17-2021
|
5.00
|
Added subpanel and main panel assemblies
|
Details
|
|
|
06-15-2021
|
6.00
|
Painted interior, Added pitch AP servo
|
Details
|
|
|
06-02-2021
|
7.00
|
Installed rudder/brake pedals and flap motor
|
Details
|
|
|
05-30-2021
|
9.00
|
Fuel lines in fuselage
|
Details
|
|
|
05-23-2021
|
5.00
|
More soundproofing
|
Details
|
|
|
05-19-2021
|
6.00
|
Added soundproofing and baggage area floor
|
Details
|
|
|
04-11-2021
|
5.00
|
Assembled the roll-over bar
|
Details
|
|
|
04-06-2021
|
7.00
|
Roll over bar prep.
|
Details
|
|
|
03-28-2021
|
5.00
|
Elevator push/pull rods and bellcrank
|
Details
|
|
|
03-26-2021
|
4.00
|
Forward fuselage parts
|
Details
|
|
|
03-16-2021
|
3.00
|
Assembled subpanel components
|
Details
|
|
|
03-08-2021
|
4.00
|
Preparing subpannel parts
|
Details
|
|
|
02-27-2021
|
5.00
|
Fitted firewall insulation and added master cylind
|
Details
|
|
|
02-23-2021
|
2.50
|
Assembled rudder pedals
|
Details
|
|
|
02-21-2021
|
9.00
|
Preparing inner deck and rudder pedal parts
|
Details
|
|
|
02-15-2021
|
6.00
|
Attached empanage to fuselage
|
Details
|
|
|
02-03-2021
|
4.00
|
Preparing to join fuselage to empanage
|
Details
|
|
|
01-23-2021
|
5.00
|
Installed seat back suport rail assembly
|
Details
|
|
|
01-03-2021
|
7.50
|
Riveted right side fuselage skin
|
Details
|
|
|
12-20-2020
|
7.00
|
Prepared the right side fuselage skin
|
Details
|
|
|
12-06-2020
|
8.00
|
Riveted left side fuselage skin
|
Details
|
|
|
11-28-2020
|
6.00
|
Continued preparing fuselage parts that attach to
|
Details
|
|
|
11-24-2020
|
5.00
|
Preparing left side fuselage skin and components
|
Details
|
|
|
11-19-2020
|
4.00
|
Preparing for side skin attach
|
Details
|
|
|
11-17-2020
|
4.00
|
Prepared upper and lower longerons
|
Details
|
|
|
11-08-2020
|
7.00
|
Connecting mid fuselage to firewall section
|
Details
|
|
|
10-23-2020
|
6.00
|
Joined 2 parts of lower fuselage
|
Details
|
|
|
10-11-2020
|
5.00
|
Finished firewall section of the plans...
|
Details
|
|
|
10-09-2020
|
3.00
|
Forward bottom fuselage
|
Details
|
|
|
10-05-2020
|
7.00
|
Firewall continued
|
Details
|
|
|
10-03-2020
|
4.00
|
Firewall continued
|
Details
|
|
|
10-01-2020
|
2.50
|
Firewall continued
|
Details
|
|
|
09-29-2020
|
3.00
|
Firewall continued
|
Details
|
|
|
09-27-2020
|
5.00
|
More firewall parts
|
Details
|
|
|
09-25-2020
|
3.50
|
Prepared parts for the firewall tunnel assembly
|
Details
|
|
|
09-24-2020
|
5.00
|
Firewall Parts prepped and assembed
|
Details
|
|
|
09-21-2020
|
3.50
|
Mid fuse bottom skin is on
|
Details
|
|
|
09-11-2020
|
1.50
|
Mid fuselage continued
|
Details
|
|
|
09-10-2020
|
1.50
|
Mid fuselage continued
|
Details
|
|
|
09-09-2020
|
5.00
|
Mid fuselage continued
|
Details
|
|
|
09-05-2020
|
3.00
|
Mid fuselage continued
|
Details
|
|
|
08-29-2020
|
3.50
|
Continued mid fuselage assembly
|
Details
|
|
|
08-26-2020
|
3.00
|
Continued mid fuselage assembly
|
Details
|
|
|
08-22-2020
|
4.50
|
Prepared parts for the deck of the main seating ar
|
Details
|
|
|
08-20-2020
|
4.00
|
Mid fuselage deck components
|
Details
|
|
|
08-15-2020
|
4.50
|
Forward Mid Fuselage Bulkheads continued
|
Details
|
|
|
08-09-2020
|
4.00
|
Forward Mid Fuselage Bulkheads
|
Details
|
|
|
08-01-2020
|
4.50
|
Started fuselage assembly
|
Details
|
|
|
07-30-2020
|
4.00
|
Prepped bottom skins and moved right wing for stor
|
Details
|
 |
|
07-20-2020
|
5.00
|
Finished right wing for now...
|
Details
|
|
|
07-11-2020
|
5.50
|
Added leading edge and fuel tank to right wing
|
Details
|
|
|
07-07-2020
|
3.50
|
Finishing up right wing oatboard leading edge
|
Details
|
|
|
06-30-2020
|
7.50
|
Assembled most of Right Outboard Leading edge
|
Details
|
|
|
06-21-2020
|
7.50
|
Riveted aft right wing skin
|
Details
|
|
|
06-13-2020
|
7.00
|
|
Details
|
|
|
06-07-2020
|
6.00
|
Started aft section of left wing
|
Details
|
|
|
06-02-2020
|
6.00
|
Stopping point for left wing
|
Details
|
|
|
05-27-2020
|
3.00
|
Aileron actuation parts
|
Details
|
|
|
05-25-2020
|
3.00
|
Prepapred aileron actuator rods
|
Details
|
|
|
05-19-2020
|
3.00
|
Installed Left wing gap fairings and started prep
|
Details
|
|
|
05-17-2020
|
3.00
|
Attached left outboard leading edge
|
Details
|
|
|
05-16-2020
|
4.00
|
Added landing light lens and hatch cover
|
Details
|
|
|
05-11-2020
|
5.00
|
Left, outboard leading edge assembly
|
Details
|
|
|
04-19-2020
|
5.00
|
Prepared left wing outboard leading edge parts
|
Details
|
|
|
04-12-2020
|
6.00
|
Riveted top left wing skin
|
Details
|
|
|
03-27-2020
|
8.50
|
Prepared top left wing skins for assembly
|
Details
|
|
|
03-09-2020
|
3.50
|
Finished attaching rear spar to left wing
|
Details
|
|
|
02-29-2020
|
7.50
|
Started on left rear wing spar
|
Details
|
|
|
02-21-2020
|
2.50
|
Assembled aft ribs to left wing spar
|
Details
|
|
|
02-20-2020
|
2.00
|
Assembling brackets and mount foor the left wing
|
Details
|
|
|
02-15-2020
|
9.50
|
Wing rib preparation
|
Details
|
|
|
02-08-2020
|
7.50
|
Leak tested both wing tanks
|
Details
|
|
|
02-01-2020
|
5.00
|
Completed assembly of right wing tank
|
Details
|
|
|
01-25-2020
|
6.00
|
Added tank baffle to right wing tank
|
Details
|
|
|
01-17-2020
|
8.50
|
Continued tank assembly
|
Details
|
|
|
01-05-2020
|
8.00
|
More tank sealing
|
Details
|
|
|
12-31-2019
|
7.00
|
Continued sealing wing tanks
|
Details
|
|
|
12-15-2019
|
6.00
|
Continued to assemble tanks with sealant
|
Details
|
|
|
12-08-2019
|
7.50
|
Started to seal and assemble tanks
|
Details
|
|
|
12-01-2019
|
8.50
|
Continued tank prep.
|
Details
|
|
|
11-29-2019
|
5.00
|
Tank parts prep. continued
|
Details
|
|
|
11-28-2019
|
4.00
|
Continued prep of tank components
|
Details
|
|
|
11-26-2019
|
3.00
|
Prep of tank components
|
Details
|
|
|
11-25-2019
|
6.00
|
Completed right aileron
|
Details
|
|
|
11-19-2019
|
2.00
|
Started assembly of right aileron
|
Details
|
|
|
11-18-2019
|
2.00
|
Completed left aileron assembly
|
Details
|
|
|
11-17-2019
|
6.00
|
Assembling left aileron
|
Details
|
|
|
11-16-2019
|
7.00
|
More aileron work...
|
Details
|
|
|
11-15-2019
|
3.00
|
Aileron parts prep. continued
|
Details
|
|
|
11-12-2019
|
3.00
|
Fitting aileron counterbalances
|
Details
|
|
|
11-09-2019
|
5.50
|
Preparring aileron parts
|
Details
|
|
|
11-08-2019
|
5.00
|
Complete right wing flap
|
Details
|
|
|
11-03-2019
|
6.50
|
Working on right Flap and starting to deburr Ailer
|
Details
|
|
|
11-01-2019
|
3.00
|
Finished assembly of left flap
|
Details
|
|
|
10-29-2019
|
2.00
|
Riveting bottom skin to left flap
|
Details
|
|
|
10-27-2019
|
3.00
|
Started assembly of left flap
|
Details
|
|
|
10-25-2019
|
3.00
|
Prepping left flap parts for assembly
|
Details
|
|
|
10-22-2019
|
3.00
|
Test assembly of the left flap
|
Details
|
|
|
10-20-2019
|
5.50
|
More deburring, priming of flap parts
|
Details
|
|
|
10-19-2019
|
7.00
|
Hours of deburring flap components
|
Details
|
|
|
10-16-2019
|
3.50
|
Added platenuts to wing spars
|
Details
|
|
|
10-13-2019
|
5.00
|
Completed drilling and countersinking left spar
|
Details
|
  |
|
10-12-2019
|
6.00
|
Final drilling and countersinking the right side m
|
Details
|
|
|
10-11-2019
|
3.00
|
Drilling J-channel using main spar as reference
|
Details
|
|
|
10-09-2019
|
4.00
|
Inventoring Wing Components
|
Details
|
|
|
10-06-2019
|
0.10
|
Picking up wing kit tomorrow
|
Details
|
  |
|
09-13-2019
|
4.00
|
Completing fiberglass HS fairings
|
Details
|
|
|
09-08-2019
|
4.00
|
Empannage fairings
|
Details
|
|
|
09-07-2019
|
6.00
|
Fiberglass fairings added to elevators
|
Details
|
|
|
09-04-2019
|
2.00
|
Attached horizontal stabilizer to tailcone
|
Details
|
|
|
09-03-2019
|
2.50
|
Elevator fitting to horizontal stabilizer
|
Details
|
|
|
09-02-2019
|
3.00
|
Rudder fairings
|
Details
|
|
|
08-30-2019
|
4.00
|
Completed tailcone riveting
|
Details
|
|
|
08-25-2019
|
8.00
|
Adding upper side skins to tailcone
|
Details
|
|
|
08-22-2019
|
1.00
|
Riveting rear deck
|
Details
|
|
|
08-21-2019
|
1.00
|
Rear deck plate
|
Details
|
 |
|
08-20-2019
|
1.50
|
Routing empennage wiring
|
Details
|
|
|
08-19-2019
|
1.50
|
Added rudder cables and guides, static system
|
Details
|
|
|
08-18-2019
|
4.00
|
Rivetting the rigth side tailcone skin
|
Details
|
|
|
08-17-2019
|
4.00
|
Rivitted left side skin to tailcone
|
Details
|
|
|
08-15-2019
|
1.50
|
Test fitting side skins
|
Details
|
|
|
08-13-2019
|
1.50
|
Contined work on tailcone skins
|
Details
|
|
|
08-12-2019
|
1.50
|
Prep of tailcone side skins
|
Details
|
|
|
08-11-2019
|
5.00
|
Assembling tailcone
|
Details
|
|
|
08-10-2019
|
4.00
|
Started tailcoine assembly
|
Details
|
|
|
08-09-2019
|
3.50
|
Deburring and Priming
|
Details
|
|
|
08-08-2019
|
2.00
|
Deburring tailcone parts
|
Details
|
 |
|
08-06-2019
|
1.50
|
Tailcone bulkhead
|
Details
|
 |
|
08-05-2019
|
2.00
|
Tailcone parts
|
Details
|
|
|
08-04-2019
|
6.00
|
Tailcone bulkhead assemblies and deburring
|
Details
|
|
|
08-02-2019
|
4.00
|
Elevator and tailcone work
|
Details
|
|
|
08-01-2019
|
2.00
|
Tailcone parts prep and deburring
|
Details
|
 |
|
07-30-2019
|
2.50
|
Elevator construction continued
|
Details
|
|
|
07-28-2019
|
5.00
|
Elevator construction
|
Details
|
|
|
07-27-2019
|
6.00
|
Riveting elevator components
|
Details
|
|
|
07-26-2019
|
3.00
|
Riveting Elevator parts
|
Details
|
|
|
07-25-2019
|
2.00
|
Riveting elevator parts
|
Details
|
|
|
07-24-2019
|
2.00
|
Preparation of elevator parts
|
Details
|
|
|
07-23-2019
|
2.00
|
Prepped and primed elevator trim parts
|
Details
|
 |
|
07-22-2019
|
2.00
|
Prepped and primed elevator parts
|
Details
|
|
|
07-21-2019
|
6.00
|
Test fitting elevator parts, dimpling skins and pa
|
Details
|
|
|
07-20-2019
|
6.00
|
Elevator parts prep and initial cleco assembly
|
Details
|
|
|
07-19-2019
|
3.00
|
Completed HS riveting
|
Details
|
|
|
07-16-2019
|
1.00
|
Elevator parts deburring and prep.
|
Details
|
 |
|
07-15-2019
|
1.50
|
Continued riveting HS, deburring Elevator parts
|
Details
|
  |
|
07-14-2019
|
6.00
|
Riveting horizontal stabilzer
|
Details
|
|
|
07-13-2019
|
5.00
|
Started to assemble the horizontal stabilizer
|
Details
|
|
|
07-12-2019
|
3.00
|
Primed inside HS skins and all other parts
|
Details
|
|
|
07-11-2019
|
2.50
|
Continued to deburr and dimple HS parts
|
Details
|
|
|
07-10-2019
|
2.00
|
Horizontal Stabilizer spar and skin prep
|
Details
|
|
|
07-09-2019
|
2.20
|
Preparing horizontal stabilizer ribs for priming
|
Details
|
|
|
07-08-2019
|
1.50
|
Riveted front spar of horizontal stabilizer
|
Details
|
|
|
07-07-2019
|
7.00
|
Horizontal Stabilizer parts prep.
|
Details
|
|
|
07-05-2019
|
7.00
|
Horizontal Stabilizer work
|
Details
|
|
|
07-04-2019
|
7.00
|
Completed rudder assembly
|
Details
|
|
|
07-03-2019
|
3.00
|
Completed Vertical Satbilizer
|
Details
|
|
|
07-02-2019
|
2.00
|
Riveted vertical stabilizer parts
|
Details
|
|
|
07-01-2019
|
1.30
|
Dimpled Vertical Stabilizer parts
|
Details
|
  |
|
06-30-2019
|
7.00
|
Started vertical stabilize construction
|
Details
|
|
|
06-29-2019
|
8.00
|
Rudder Construction continued
|
Details
|
|
|
06-22-2019
|
5.00
|
Rudder priming and start of assembly
|
Details
|
|
|
06-21-2019
|
2.00
|
More prep and deburring
|
|
 |
|
06-20-2019
|
2.50
|
Start of Rudder
|
Details
|
 |
|
06-18-2019
|
3.50
|
Unpacking and inventory
|
Details
|
|
|
06-16-2019
|
0.00
|
Empanage kit will arrive tomorrow
|
Details
|
 |