KitLog pro

Powered By Kitlog Pro v2.0

Ricks Web Site
Work Logs Found: 294
Category Work Time: 986 Hours
 Date
Hours
Work Log Summary

Details

 12-05-2010
5.50
Covers and nutplates

 11-27-2010
3.00
Covers and nutplates

 11-26-2010
2.00
covers and nutplates

 11-06-2010
5.00
Riveting cover nutplates

 10-25-2010
2.00
10101 mods for open tail

 10-23-2010
5.00
10101 mods for open tail

 03-28-2010
3.00
Continue 10101 modifications

 03-27-2010
7.00
10101 covers
Details

 03-21-2010
4.00
tailpost cover
Details

 03-20-2010
5.50
10102 LH and 10119
Details

 03-13-2010
6.50
10102 and LH transition piece

 03-06-2010
2.00
10102 covers

 01-30-2010
6.50
10119 and 10102 covers
Details

 01-27-2010
1.00
Continue w 10119 covers

 01-25-2010
2.00
Vert fin leading edge
Details

 01-25-2010
1.50
tail cover 10119
Details

 01-23-2010
2.50
Vert fin strip
Details

 06-28-2009
9.00
Vertical stabiizer strip
Details
     

 06-22-2009
2.00
Stringers and fin
Details

 04-20-2009
2.00
plastic slides and stringers
Details

 08-17-2008
4.00
Sliding frames
     

 07-28-2008
3.00
Sliding frames

 07-27-2008
4.00
Side panels and sliding frames
Details

 07-26-2008
5.50
fitting vertical fin

 07-19-2008
2.00
10100 standoffs and covers
Details
     

 07-11-2008
5.50
Stringers and tail standoff brackets
Details
       

 07-05-2008
5.00
Upper former
Details

 04-12-2008
8.00
Stringers and top former
Details

 03-17-2008
6.50
Greenhouse tubing
Details

 03-01-2008
2.00
Trim cable and stringers
Details

 03-01-2008
2.50
Door channel,brake lines,trim cable
Details

 02-27-2008
2.50
Fitting RH door channel

 02-23-2008
4.00
Fuel drain mounts
Details

 02-20-2008
1.00
Fuel drain mounts
Details

 02-19-2008
2.00
deburr various panels

 02-18-2008
6.00
Fuel drain blocks and mounts
Details

 10-13-2007
7.50
Door channels
Details

 06-09-2007
2.00
Door channel and stringer tabs
Details
     

 05-25-2007
2.00
Start installing fuselage side stringers

 05-25-2007
3.00
Brake lines and boot cowl
Details

 05-20-2007
2.00
Float install layout
Details

 05-19-2007
5.00
Door channel
Details

 05-07-2007
2.00
Fuselage stringers

 04-25-2007
3.00
Fuselage stringers

 04-23-2007
2.00
Fuselage stringers

 04-19-2007
4.00
Fabricate brake links

 04-11-2007
3.00
brake link length and top stringers
Details

 04-06-2007
3.00
Fuselage top stringers

 04-04-2007
3.00
Fuselage top stringers

 04-02-2007
2.50
Fuselage top stringers
Details

 04-01-2007
2.00
Install alternator and primer lines
Details
       

 03-31-2007
5.00
Alternator housing adapter plate
Details
       

 03-30-2007
2.50
Shoulder harness mounts
Details

 03-07-2007
3.00
Install brackets Brake cylinder mts ???

 03-06-2007
3.00
Alternator adapter plate

 03-05-2007
1.00
Alternator housing adapter plate
Details

 03-04-2007
3.00
Brake mounts

 03-03-2007
9.00
Alternator drive adapter
Details
       

 03-02-2007
3.00
Brake mounts and rudder cable cover
Details

 03-02-2007
1.50
Brake mounts

 02-28-2007
3.75
Brake mounts
Details

 02-12-2007
3.50
Floor inspection panels
Details

 02-09-2007
3.50
Front door channels
Details

 02-07-2007
3.25
Door sills and floor inspection covers
Details

 02-05-2007
3.00
Rudder tubes and installing center floorboard

 02-02-2007
2.50
rudder tubes and rudder springs
Details
     

 01-31-2007
1.75
Work on misalignment of rudder tubes

 01-29-2007
3.00
Fairlead sleeve, floorboad, rudder torque tube
Details

 01-27-2007
7.00
B&C alternator adapter shaft
Details
       

 01-26-2007
2.00
LH rudder cable

 01-10-2007
4.50
cables and cable guards

 12-11-2006
2.00
Cable guards
Details

 12-08-2006
2.00
Cables in belly

 12-06-2006
4.50
cable routing in belly

 12-04-2006
1.00
Cable guides
Details

 12-01-2006
3.00
Nutplates

 11-27-2006
3.00
nutplates and top bulkheads
Details
       

 11-22-2006
3.00
Bulkhead nutplates

 11-20-2006
3.50
stringer bulkheads
Details

 09-13-2005
4.00
float corrosion repairs

 09-12-2005
5.00
Float corrosion repairs

 09-11-2005
3.00
Float corrosion repairs

 09-08-2005
5.00
Float corrosion repairs

 08-31-2005
3.00
Float corrosion repairs

 08-30-2005
4.00
Float corrosion repairs

 08-30-2005
1.00
Assemble trim adjuster

 08-29-2005
4.00
Finish fuel primer block and make trim handle

 08-28-2005
2.00
Start fabricating primer block????

 08-15-2005
8.00
Take down float mock up
Details
     

 08-10-2005
17.50
Continue float mockup
       

 08-09-2005
16.00
Mock up float installation
Details
       

 08-07-2005
3.00
Rewelding fuselage leaks

 08-05-2005
8.00
Rewelding fuselage leaks

 08-04-2005
6.00
Tubing updates and leaks at fuselage welds
Details

 08-03-2005
4.00
Tail updates

 08-02-2005
2.00
Tail updates

 07-25-2005
5.00
Tail updates

 07-24-2005
2.00
Tail updates

 07-23-2005
3.00
Start updates to fuselage tail area
Details
       

 07-23-2005
3.00
Finish lift strut doublers
     

 07-22-2005
1.00
Work on lift strut fittings

 07-20-2005
2.00
Work on lift strut fittings
Details

 07-20-2005
4.00
Fuel block brackets
Details

 07-19-2005
1.50
Modify lift strut fittings
Details

 07-19-2005
1.00
finish flap and trim mounts
     

 07-18-2005
2.00
Seat latch pin
Details

 07-18-2005
5.50
modify flap and trim mounts
Details
       

 07-07-2005
3.00
Continue float repairs
Details

 06-26-2005
5.00
continue with float repairs
       

 06-25-2005
4.00
Start repairs to LH float
Details
       

 06-25-2005
1.00
Finish repairs to nosebowl vanes

 06-12-2005
1.50
Repairs to Bumblebee nosebowl rivets and vanes

 06-01-2005
2.00
Finish tube oiling

 06-01-2005
2.00
Continue tube oiling

 05-31-2005
5.00
Continue tube oiling

 05-30-2005
2.00
Dimple instrument panel arch, start tube oil
Details

 05-30-2005
2.50
Chasing threads and drill tabs
Details

 05-28-2005
7.00
Continue welding then chase threads
Details

 05-27-2005
6.00
Continue with welding mounts

 05-26-2005
3.00
Welding various mounts on airframe

 05-25-2005
3.00
Trim floorboard and install interior anchors
Details

 05-25-2005
2.00
Remove cowling and floors

 05-18-2005
3.00
Finish front door bottom skins

 05-17-2005
5.00
Front doors-includes fitting transucent skins on b

 05-04-2005
4.00
Front doors

 05-02-2005
1.50
Pilot side front door

 05-01-2005
5.00
Pilot side front door
Details

 04-30-2005
3.00
Front door latch mounting
Details
     

 04-29-2005
2.50
Interior Panels

 04-28-2005
1.00
Measure Continental Generator drive
Details
     

 04-28-2005
2.00
Interior Panels

 04-28-2005
4.00
Finish LH cargo door & Rivnuts on control surfaces

 04-27-2005
6.00
LH cargo door & rivet nutplates on control surface

 04-26-2005
6.00
Interior plate and finish dead bolt
Details

 04-25-2005
2.00
Dead bolt in cargo door
Details

 04-24-2005
4.00
Cargo door skin
     

 04-23-2005
2.00
Mod. RH cargo door hinges
Details

 04-18-2005
6.00
Interior panels

 04-17-2005
5.00
Interior Panels

 04-16-2005
6.00
Interior panels

 04-14-2005
5.00
Interior panels

 03-23-2005
3.00
Interior panels

 03-22-2005
3.50
Interior panels
     

 03-21-2005
7.00
Interior panels

 03-20-2005
3.00
Kydex interior panels
       

 03-20-2005
3.00
Cowl braces/remove cowl/inst. floor
Details

 03-19-2005
4.00
Work w/PT on ceiling

 03-19-2005
2.00
Ceiling panel - Kydex
     

 03-17-2005
4.50
Finish tail feather updates/bag. panels

 03-16-2005
3.50
Weld on updates to the tailfeathers
Details
       

 03-15-2005
4.00
Rear baggage panels
Details
     

 03-14-2005
6.50
Finish bushings start baggage panels
Details

 03-13-2005
4.00
Firewall bushings various items
Details

 03-12-2005
5.00
Spade mounts strut doublers
Details

 03-11-2005
2.75
Fit tunnel/fab. elevator spade mount
Details

 03-10-2005
5.00
Cowl tunnel final fitting
     

 03-08-2005
8.00
Cowl tunnels

 03-07-2005
5.00
Finish lip rework, con't w/tunnel

 03-06-2005
2.00
Rework of firewall lip

 02-27-2005
1.00
Start rework of firewall lip

 02-25-2005
4.00
Cowl Tunnel remove firewall
Details

 02-24-2005
2.50
Cowl tunnels
Details
       

 02-23-2005
4.50
Finish cowl panel and assemble
     

 02-21-2005
2.00
Fab. cowl insert

 02-20-2005
3.00
Fab. cowl panels

 02-19-2005
5.50
Fab. insert and assemble cowl panel

 02-17-2005
2.00
Finish bending tool

 02-17-2005
6.00
Fab. boot cowl panels

 02-16-2005
3.00
Fab. bending brake for tapered bend
Details
     

 02-15-2005
1.50
Fab. cowl panels
     

 02-10-2005
5.00
Fab. cowl panel and cowl insert
Details
       

 02-10-2005
2.00
Build MDF form for side scoop
Details

 02-05-2005
1.00
Fab. boot cowl side panel

 02-04-2005
4.00
Begin layout &fab. boot cowl side panels

 02-03-2005
6.00
Fabricating inst. panel and boot cowl

 01-24-2005
2.00
finish removing and measuring fittings

 01-23-2005
2.50
Removing and measurring engine fittings
Details

 01-22-2005
3.00
Continue fabing inst. panel

 01-21-2005
2.00
Remove engine & exhaust to move fuselage
Details

 09-12-2004
2.00
Fab & weld hor. stab. cover tabs
Details

 09-11-2004
5.00
Weld on tabs for boot cowl

 08-31-2004
1.50
Panel

 08-30-2004
1.50
Panel

 08-28-2004
1.25
Panel

 08-27-2004
1.00
Panel - fabricating from sheet alum.
Details

 08-26-2004
1.00
fitting top cowl

 08-25-2004
1.00
Fitting top cowl

 08-24-2004
0.50
fitting top cowl

 08-22-2004
3.00
layout and cutting out top cowl

 08-22-2004
2.00
finish cowl rails

 08-08-2004
6.00
cowling rails and layout on cowl panels

 08-07-2004
9.00
modify panel angle and start cowl rails

 07-26-2004
1.50
r & r engine to install firewall

 07-25-2004
2.00
firewall lip fab and install

 07-24-2004
3.25
fab and install firewall lip

 07-19-2004
0.50
fab & install firewall lip

 07-18-2004
5.50
fab. & install firewall lip
Details
     

 07-17-2004
5.00
fab. firewall lip

 07-04-2004
2.50
fab. firewall lip

 07-03-2004
1.25
cut out firewall

 06-19-2004
1.00
cut out firewall
Details

 06-09-2004
1.00
revise .dxf of firewall pattern & print
Details

 05-31-2004
2.00
install engine on fuselage
Details
       

 05-30-2004
2.50
install engine mount on engine
     

 05-29-2004
1.00
mill down engine mounting blocks
Details

 05-23-2004
1.00
prepare engine for mount installation

 04-24-2004
5.00
install door supports
       

 04-11-2004
5.50
installation of belly stirngers

 04-10-2004
5.50
fab door supports & belly stringers

 04-04-2004
3.50
fab belly stringers/design door support
Details

 04-03-2004
2.50
skylight center support/belly stringers
     

 03-27-2004
6.00
fab, install wing root skylight supports
     

 03-06-2004
4.00
fab wing root skylight supports

 02-28-2004
2.00
front skylight tab install & weld

 02-22-2004
3.50
front skylight tab installation

 02-21-2004
1.00
measure for interior panels

 02-15-2004
2.00
fab front skylight tabs

 02-14-2004
0.50
fab front skylight tabs

 01-31-2004
3.00
fab and fit rear skylight supports
     

 01-31-2004
2.00
design and fab. front skylight tabs

 01-18-2004
1.00
fabricating rear skylight support panels

 01-17-2004
5.00
make and weld rear skylight tabs
Details

 01-10-2004
6.00
weld wing root tabs and windshield tabs
Details

 01-10-2004
0.50
test fit. rear skylight support
Details

 12-13-2003
3.00
Weld in panel former/chase thds on mount
Details

 12-06-2003
0.75
Finish welding float wire fittings

 12-06-2003
5.50
Fabricate panel mount/former
Details
     

 11-30-2003
1.75
Shoulder harness mounts and float wire f
Details

 11-29-2003
4.50
Ceiling tabs and shoulder harness mounts

 11-09-2003
5.00
Welding various mounts and tabs
Details
     

 11-08-2003
5.00
Welding seat belt and sh. harness mts
Details

 11-08-2003
1.00
Designing and fab shoulder harness mts

 11-02-2003
1.25
welding tie down nuts

 11-01-2003
5.50
Build fixture for rotating fuselage

 09-10-2003
1.50
Weld seat mounts together

 09-07-2003
3.50
Design and machine seat belt mounts

 09-06-2003
7.50
Floorboards/Cargo and seat belt anchors

 09-06-2003
1.50
Floorboards & locating seat belt anchors

 09-04-2003
1.00
Floorboards/Small tie down anchors
Details

 09-03-2003
2.50
Floorboards
Details
       

 09-03-2003
1.50
Floorboards
Details
     

 09-02-2003
1.00
Floorboards

 09-01-2003
4.50
Floorboards
Details

 09-01-2003
6.50
Cargo anchors & floorboards

 08-31-2003
5.50
Complete various welding/Start tie downs
Details

 08-27-2003
1.00
Fit stiffener to rear window frame

 08-25-2003
0.50
Weld doublers to 8222 fittings

 08-24-2003
4.75
Weld tabs
Details

 08-23-2003
4.50
Make Inst. panel template & weld tabs

 08-17-2003
2.50
Start making floorboards - baggage comp.

 08-17-2003
1.50
Make cargo tie down anchors

 08-17-2003
4.00
Floorboards
Details

 08-16-2003
1.00
p/n 8222 float fittings
Details

 08-14-2003
1.00
Weld tabs for interior panels

 08-13-2003
1.00
Weld tabs for interior panels

 08-12-2003
2.00
Weld tabs for interior panels

 08-10-2003
1.50
Weld tabs for interior panels

 08-07-2003
1.00
Weld tabs for interior panels

 08-06-2003
1.00
Weld tabs for interior panels

 08-04-2003
1.25
Weld tabs for interior panels

 08-03-2003
1.50
Weld tabs for interior panels
     

 07-01-2001
1.50
Finish 2nd brake disc modifications

 03-19-2001
2.00
Finish 2nd axle shaft

 03-18-2001
2.50
Con't fab 2nd axle

 03-17-2001
6.75
Start 2nd axle shaft

 03-12-2001
1.50
Revise axle installation drawing

 03-12-2001
2.50
Finish 1st axle shaft

 03-11-2001
5.00
Finish 2nd brake spacer/mod. 2nd hub
Details

 03-10-2001
6.50
Finish new caliper brackets
Details

 02-18-2001
6.00
Fab. new caliper brackets
     

 02-17-2001
6.50
Rework completed caliper brackets
Details

 02-12-2001
1.00
Layout revision to caliper brackets

 02-11-2001
4.50
Caliper brackets con't

 02-10-2001
1.50
Bending and mach. caliper brackets

 02-04-2001
2.00
Finish 2nd hub spacer
     

 02-03-2001
3.50
Start 2nd. hub spacer.

 12-18-2000
4.00
Con't work on axle

 12-17-2000
7.00
Finish spacer/disc hub mods/axle
Details
       

 12-16-2000
7.00
Continue turning brake spacer

 12-15-2000
1.00
fab. brake spacer

 12-10-2000
3.75
fab. axle & caliper bracket/start spacer

 12-05-2000
1.00
Revise brake bracket bend line

 12-03-2000
3.00
Generate axle and caliper bracket g code

 12-02-2000
2.00
Start fab. axle and caliper brackets

 12-02-2000
2.50
Brake spacer and axle design

 11-29-2000
2.00
Axle bracket design con't

 11-26-2000
2.00
Axle design con't

 11-23-2000
1.00
Caliper Bracket Design

 11-20-2000
1.00
Spacer Design
     

 11-19-2000
1.00
Axle design con't

 11-17-2000
3.00
Concept Sketch for axle design
Details

 11-16-2000
2.00
Axle Bracket Design
Details

 11-14-2000
2.00
Start Brake Spacer Design
Details

 11-11-2000
2.00
Measure and Sketch Tie Down Brakes
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.