Date
|
Hours
|
Work Log Summary
|
Details
|
01-23-2021
|
0.60
|
First Flight!
|
Details
|
|
|
01-20-2021
|
1.00
|
Labels
|
Details
|
|
|
01-09-2021
|
1.50
|
Airworthiness inspection
|
Details
|
|
|
01-08-2021
|
2.00
|
Moved plane to heated hangar.
|
Details
|
|
|
01-06-2021
|
7.00
|
Inspection Prep
|
Details
|
|
|
01-03-2021
|
2.50
|
Reattach fuel tank
|
Details
|
|
|
01-02-2021
|
2.00
|
Fixed fuel tank leak.
|
Details
|
|
|
01-01-2021
|
2.00
|
Pulled left tank
|
Details
|
|
|
12-27-2020
|
2.00
|
Fuel leak
|
Details
|
|
|
12-26-2020
|
3.00
|
Wing root fairings
|
Details
|
|
|
12-24-2020
|
1.50
|
Wing root fairings
|
Details
|
|
|
12-20-2020
|
4.50
|
First start.
|
Details
|
|
|
12-19-2020
|
1.50
|
Engine oil
|
Details
|
|
|
12-16-2020
|
1.00
|
Fuel lines
|
Details
|
|
|
12-15-2020
|
1.00
|
Installed engraved gas caps.
|
Details
|
|
|
12-13-2020
|
2.00
|
Aileron adjust
|
Details
|
|
|
12-12-2020
|
3.50
|
New front spinner plate
|
Details
|
|
|
12-11-2020
|
2.00
|
Flaps
|
Details
|
|
|
12-05-2020
|
3.50
|
Tail fairing
|
Details
|
|
|
12-02-2020
|
4.00
|
Avionics calibration
|
Details
|
|
|
11-29-2020
|
3.00
|
Light Attach
|
Details
|
|
|
11-28-2020
|
4.00
|
Wing Attach
|
Details
|
|
|
11-27-2020
|
4.00
|
Prepare for wing attach.
|
Details
|
|
|
11-25-2020
|
5.00
|
Attach control surfaces.
|
Details
|
|
|
11-18-2020
|
0.00
|
Transition training
|
Details
|
|
|
11-14-2020
|
4.00
|
Moved wings to hangar.
|
Details
|
|
|
11-13-2020
|
3.00
|
Moving day!
|
Details
|
|
|
11-08-2020
|
4.00
|
Put on fiberglass parts
|
Details
|
|
|
11-07-2020
|
4.00
|
SB-00027
|
Details
|
|
|
11-04-2020
|
2.00
|
Primer
|
Details
|
|
|
11-01-2020
|
2.00
|
Programing avionics
|
Details
|
|
|
10-25-2020
|
5.00
|
Rear window.
|
Details
|
|
|
10-24-2020
|
6.00
|
Updated G3x software, put on cowl to check fit.
|
Details
|
|
|
10-23-2020
|
5.00
|
Put on canopy
|
Details
|
|
|
10-23-2020
|
4.00
|
Continued work on cowl.
|
Details
|
|
|
10-21-2020
|
4.00
|
Seat belts
|
Details
|
|
|
10-15-2020
|
3.00
|
Cowl work
|
Details
|
|
|
09-27-2020
|
3.00
|
Relocated remote radio
|
Details
|
|
|
09-27-2020
|
2.00
|
Empenage fairing.
|
Details
|
|
|
09-26-2020
|
2.00
|
Sanding wheel pants.
|
Details
|
|
|
09-26-2020
|
3.00
|
ELT
|
Details
|
|
|
09-25-2020
|
5.00
|
Added flox to wheel pants at junction fairings.
|
Details
|
|
|
09-21-2020
|
2.00
|
Sanded lower cowl to match baffles.
|
Details
|
|
|
09-20-2020
|
6.00
|
Started on junction fairings for the main gear.
|
Details
|
|
|
09-19-2020
|
6.00
|
Finished main gear fairings
|
Details
|
|
|
09-15-2020
|
1.50
|
Tech advisor inspection.
|
Details
|
|
|
09-12-2020
|
6.00
|
Main gear fairing
|
Details
|
|
|
09-11-2020
|
4.00
|
Nose gear fairing
|
Details
|
|
|
09-05-2020
|
6.00
|
Nose gear pants
|
Details
|
|
|
09-02-2020
|
4.00
|
Nose gear pants
|
Details
|
|
|
08-30-2020
|
5.00
|
Started nosewheel pants
|
Details
|
|
|
08-29-2020
|
6.00
|
Fitting main gear wheel pants.
|
Details
|
|
|
08-24-2020
|
2.00
|
Marked lower cowl
|
Details
|
|
|
08-23-2020
|
4.00
|
Heat SCAT tubing and EGT/CHT
|
Details
|
|
|
08-22-2020
|
4.00
|
Heat system
|
Details
|
|
|
08-21-2020
|
3.00
|
Heat muffs
|
Details
|
|
|
08-19-2020
|
5.00
|
Exhaust
|
Details
|
|
|
08-16-2020
|
5.00
|
Oil cooler
|
Details
|
|
|
08-15-2020
|
6.00
|
Baffles continued
|
Details
|
|
|
08-14-2020
|
5.00
|
More engine
|
Details
|
|
|
08-09-2020
|
5.00
|
Baffles, started engine cooler and snorkel
|
Details
|
|
|
08-08-2020
|
5.00
|
Baffles
|
Details
|
|
|
08-07-2020
|
2.00
|
Baffles
|
Details
|
|
|
08-02-2020
|
5.00
|
More cowling
|
Details
|
|
|
08-01-2020
|
5.00
|
Riveted cowl hinges
|
Details
|
|
|
07-26-2020
|
6.00
|
Lower cowl
|
Details
|
|
|
07-25-2020
|
8.00
|
Upper cowl
|
Details
|
|
|
07-22-2020
|
5.00
|
Cowling continued
|
Details
|
|
|
07-19-2020
|
3.00
|
Start Cowl
|
Details
|
|
|
07-18-2020
|
3.00
|
Gap fillers for spinner.
|
Details
|
|
|
07-12-2020
|
4.00
|
Spinner mounting
|
Details
|
|
|
07-11-2020
|
6.00
|
Safety wire
|
Details
|
|
|
07-10-2020
|
6.00
|
Propeller mounted.
|
Details
|
|
|
07-09-2020
|
2.00
|
Throttle and spinner start
|
Details
|
|
|
07-05-2020
|
5.00
|
Engine systems hookup
|
Details
|
|
|
07-04-2020
|
8.00
|
Continued engine systems hookup
|
Details
|
|
|
07-01-2020
|
3.00
|
More engine systems.
|
Details
|
|
|
06-28-2020
|
7.00
|
Engine systems
|
Details
|
|
|
06-27-2020
|
9.00
|
Engine mounted
|
Details
|
|
|
06-26-2020
|
8.00
|
Preheater, Electrical
|
Details
|
|
|
06-23-2020
|
1.50
|
Tech inspection.
|
Details
|
|
|
06-21-2020
|
7.00
|
More engine prep
|
Details
|
|
|
06-20-2020
|
8.00
|
Side panels
|
Details
|
|
|
06-16-2020
|
4.00
|
Heated seats
|
Details
|
|
|
06-14-2020
|
8.00
|
Wiring, brakes
|
Details
|
|
|
06-13-2020
|
8.00
|
Engine prep
|
Details
|
|
|
06-12-2020
|
3.00
|
Engine arrived!
|
Details
|
|
|
06-11-2020
|
4.00
|
Axle shims
|
Details
|
|
|
06-07-2020
|
6.00
|
Interior and more electrical problems
|
Details
|
|
|
06-06-2020
|
5.00
|
Interior
|
Details
|
|
|
05-25-2020
|
4.00
|
Electrical problems continued
|
Details
|
|
|
05-23-2020
|
8.00
|
Yaw damper, electrical problems
|
Details
|
|
|
05-22-2020
|
4.00
|
Put on the empenage, antennas, left step
|
Details
|
|
|
05-22-2020
|
6.00
|
On the gear
|
Details
|
|
|
05-21-2020
|
2.50
|
Right main landing gear
|
Details
|
|
|
05-18-2020
|
1.00
|
Canopy release
|
Details
|
|
|
05-17-2020
|
5.00
|
Engine controls
|
Details
|
|
|
05-16-2020
|
5.00
|
Avionics
|
Details
|
|
|
05-10-2020
|
7.00
|
Avionics install
|
Details
|
|
|
05-09-2020
|
10.00
|
Avionics install
|
Details
|
|
|
05-08-2020
|
10.00
|
Avionics install
|
Details
|
|
|
05-07-2020
|
5.00
|
Install Avionics
|
Details
|
|
|
05-06-2020
|
3.00
|
Shelf for GTX 45R
|
Details
|
|
|
05-06-2020
|
4.00
|
Avionics arrived!
|
Details
|
|
|
05-05-2020
|
3.00
|
Miscellaneous finishing kit
|
Details
|
|
|
05-03-2020
|
4.00
|
Engine mount
|
Details
|
|
|
05-02-2020
|
5.00
|
Canopy finished
|
Details
|
|
|
05-01-2020
|
2.00
|
Canopy fairing 9
|
Details
|
|
|
04-30-2020
|
2.00
|
Canopy fairing 8
|
Details
|
|
|
04-29-2020
|
3.00
|
Canopy fairing 7
|
Details
|
|
|
04-27-2020
|
2.00
|
Canopy fairing 6
|
Details
|
|
|
04-26-2020
|
2.00
|
Canopy fairing 5
|
Details
|
|
|
04-25-2020
|
3.00
|
Landing gear start.
|
Details
|
|
|
04-25-2020
|
2.00
|
Canopy fairing 4
|
Details
|
|
|
04-24-2020
|
3.00
|
Canopy fairing 3
|
Details
|
|
|
04-22-2020
|
1.00
|
Canopy fairing 2
|
Details
|
|
|
04-21-2020
|
4.00
|
Canopy fairing
|
Details
|
|
|
04-19-2020
|
4.00
|
Filler layer at bottom of canopy.
|
Details
|
|
|
04-18-2020
|
5.00
|
Rivet canopy side skins
|
Details
|
|
|
04-15-2020
|
2.00
|
Paint glareshield
|
Details
|
|
|
04-13-2020
|
2.00
|
Canopy countersinks
|
Details
|
|
|
04-11-2020
|
5.00
|
Canopy drilled
|
Details
|
|
|
04-11-2020
|
4.00
|
Began canopy attach process
|
Details
|
|
|
04-10-2020
|
4.00
|
Canopy frame painted.
|
Details
|
|
|
04-09-2020
|
1.00
|
Canopy frame fits!
|
Details
|
|
|
04-08-2020
|
12.00
|
Canopy frame completed
|
Details
|
|
|
04-07-2020
|
10.00
|
Canopy continued...
|
Details
|
|
|
04-06-2020
|
5.00
|
Started the canopy
|
Details
|
|
|
04-05-2020
|
3.00
|
Nutplates for empenage fairing
|
Details
|
|
|
04-04-2020
|
6.00
|
Fitting empenage fairing
|
Details
|
|
|
04-04-2020
|
6.00
|
Drilled the canopy
|
Details
|
|
|
03-28-2020
|
7.00
|
Rear window
|
Details
|
|
|
03-15-2020
|
4.00
|
Wing tip fairings
|
Details
|
|
|
03-14-2020
|
2.00
|
Glued in the vents and static ports.
|
Details
|
|
|
03-13-2020
|
5.00
|
Assembled the canopy latch.
|
Details
|
|
|
03-11-2020
|
3.00
|
Assembled the air vents.
|
Details
|
|
|
03-07-2020
|
3.00
|
Painted cockpit access covers.
|
Details
|
|
|
02-29-2020
|
6.00
|
Canopy rear frame assembly
|
Details
|
|
|
02-28-2020
|
6.00
|
Got canopy parts ready for assembly
|
Details
|
|
|
02-22-2020
|
7.00
|
Finish and Firewall foreward inventory.
|
Details
|
|
|
02-20-2020
|
3.00
|
Finish Kit arrived.
|
Details
|
|
|
02-07-2020
|
0.00
|
Paint design finalized
|
Details
|
|
|
02-04-2020
|
0.00
|
Panel design!
|
Details
|
|
|
02-03-2020
|
3.00
|
Antenna cable runs
|
Details
|
|
|
02-01-2020
|
1.00
|
Mounted VOR/ILS antenna
|
Details
|
|
|
01-30-2020
|
2.00
|
GPS antena mounting plate
|
Details
|
|
|
01-29-2020
|
4.00
|
GPS antenna mounting
|
Details
|
|
|
01-18-2020
|
6.00
|
Rudder pedals
|
Details
|
|
|
01-17-2020
|
3.00
|
Rudder pedals
|
Details
|
|
|
01-12-2020
|
4.00
|
Gap covers
|
Details
|
|
|
12-28-2019
|
6.00
|
Wingtips
|
Details
|
|
|
12-24-2019
|
8.00
|
Wingtips
|
Details
|
|
|
12-23-2019
|
3.00
|
Alignment of wing tips and aileron.
|
Details
|
|
|
12-22-2019
|
4.00
|
Wing tips
|
Details
|
|
|
12-21-2019
|
9.00
|
Installed the aileron trim motor and springs.
|
Details
|
|
|
12-14-2019
|
4.00
|
Pitot and AOA lines
|
Details
|
|
|
12-07-2019
|
7.00
|
More wiring
|
Details
|
|
|
12-01-2019
|
7.00
|
Fuselage wiring harness
|
Details
|
|
|
11-29-2019
|
8.00
|
Control sticks.
|
Details
|
|
|
11-24-2019
|
3.00
|
Flap motor
|
Details
|
|
|
11-23-2019
|
2.00
|
Second coat of paint for the interior
|
Details
|
|
|
11-23-2019
|
8.00
|
Riveted in the roll over assembly
|
Details
|
|
|
11-23-2019
|
2.00
|
Painted roll over assembly
|
Details
|
|
|
11-20-2019
|
6.00
|
Completed roll-over assembly
|
Details
|
|
|
11-16-2019
|
4.00
|
Painted the interior
|
Details
|
|
|
11-02-2019
|
5.00
|
Baggage floors
|
Details
|
|
|
11-01-2019
|
2.00
|
Flap bearing blocks
|
Details
|
|
|
10-30-2019
|
2.00
|
Fuel lines
|
Details
|
|
|
10-27-2019
|
3.50
|
Finished fusealge join.
|
Details
|
|
|
10-26-2019
|
4.25
|
Rivet fuselage joint
|
Details
|
|
|
10-25-2019
|
10.00
|
RIght wing skin
|
Details
|
|
|
10-25-2019
|
1.50
|
Fuselage join!
|
Details
|
|
|
10-25-2019
|
2.00
|
Aileron torque tubes
|
Details
|
|
|
10-20-2019
|
10.00
|
Left wing skin
|
Details
|
|
|
10-18-2019
|
3.00
|
Leak Test
|
Details
|
|
|
10-18-2019
|
6.00
|
Landing lights
|
Details
|
|
|
10-15-2019
|
2.00
|
Tech counsellor visit
|
Details
|
|
|
10-13-2019
|
6.00
|
Fuel senders and landing lights
|
Details
|
|
|
10-12-2019
|
5.00
|
Mounted Pitot AOA
|
Details
|
|
|
10-05-2019
|
5.00
|
Drill J-channel and cut out for pitot mast.
|
Details
|
|
|
09-29-2019
|
6.00
|
Removed fuel tanks
|
Details
|
|
|
09-28-2019
|
8.00
|
Continued installing systems
|
Details
|
|
|
09-27-2019
|
5.00
|
Started wing systems
|
Details
|
|
|
09-21-2019
|
9.00
|
Finished fiberglass work
|
Details
|
|
|
09-11-2019
|
16.00
|
Paint training
|
Details
|
|
|
09-04-2019
|
2.00
|
Started the HS fiberglass
|
Details
|
|
|
09-03-2019
|
3.00
|
Finished elevator tips
|
Details
|
|
|
09-02-2019
|
3.00
|
More Fiberglass
|
Details
|
|
|
08-30-2019
|
0.00
|
Control sticks
|
Details
|
|
|
08-25-2019
|
5.00
|
Prepared fuselage floors
|
Details
|
|
|
08-25-2019
|
3.00
|
Fiberglass work
|
Details
|
|
|
08-24-2019
|
8.00
|
Fuel system, Baggage bulkhead
|
Details
|
|
|
08-23-2019
|
4.00
|
Modifying QB fuse for tricyle gear
|
Details
|
|
|
08-21-2019
|
2.00
|
Various cuts and drills.
|
Details
|
|
|
08-19-2019
|
8.00
|
Checking quick build fuselage.
|
Details
|
|
|
08-17-2019
|
3.00
|
Aileron belcrank fabrication
|
Details
|
|
|
08-13-2019
|
3.00
|
Elevator pushrods
|
Details
|
|
|
08-08-2019
|
4.00
|
Autopilot servos
|
Details
|
|
|
08-04-2019
|
6.00
|
Flap/aileron gap seals
|
Details
|
|
|
08-03-2019
|
3.00
|
Various wing parts
|
Details
|
|
|
07-28-2019
|
8.00
|
Received and inventoried the quickbuild wing and f
|
Details
|
|
|
06-30-2019
|
3.00
|
Mounted control surfaces
|
Details
|
|
|
06-28-2019
|
2.00
|
Mounted HS and VS
|
Details
|
|
|
06-28-2019
|
2.00
|
Mounted elevator
|
Details
|
|
|
06-23-2019
|
4.00
|
Right top skin and center top skin
|
Details
|
|
|
06-21-2019
|
3.00
|
Left side top skin
|
Details
|
|
|
06-15-2019
|
4.00
|
Upper side skins
|
Details
|
|
|
06-14-2019
|
5.00
|
Rear deck
|
Details
|
|
|
06-09-2019
|
5.00
|
Wiring
|
Details
|
|
|
06-08-2019
|
7.00
|
Finished riveting tailcone side skins
|
Details
|
|
|
05-26-2019
|
6.00
|
Started riveting.
|
Details
|
|
|
05-25-2019
|
6.00
|
Tailcone assembly
|
Details
|
|
|
05-24-2019
|
4.00
|
Rivet underside, start dimple sides
|
Details
|
|
|
05-16-2019
|
1.00
|
Visit from EAA Tech Counselor
|
Details
|
|
|
05-12-2019
|
4.00
|
Started tailcone assembly
|
Details
|
|
|
05-11-2019
|
10.00
|
Started on tailcone.
|
Details
|
|
|
05-11-2019
|
1.00
|
Stand for empenage control surfaces.
|
Details
|
|
|
05-10-2019
|
2.00
|
Elevator Counterweights
|
Details
|
|
|
05-06-2019
|
1.00
|
Elevator leading edges
|
Details
|
|
|
05-04-2019
|
4.50
|
Finished trailing edge and trim servo mounting
|
Details
|
|
|
04-20-2019
|
4.00
|
Continue riveting
|
Details
|
|
|
04-14-2019
|
6.00
|
Continued assembly
|
Details
|
|
|
04-13-2019
|
7.00
|
Begin Assembly
|
Details
|
|
|
04-12-2019
|
6.00
|
Scuff, prime and start assembly
|
Details
|
|
|
03-31-2019
|
4.00
|
Dimple and countersink
|
Details
|
|
|
03-30-2019
|
3.00
|
Begin disassembly and dimple
|
Details
|
|
|
03-26-2019
|
1.50
|
Trailing edge
|
Details
|
|
|
03-23-2019
|
5.00
|
Started elevator
|
Details
|
|
|
03-22-2019
|
1.50
|
Rudder done
|
Details
|
|
|
03-17-2019
|
6.50
|
Finished
|
Details
|
|
|
03-16-2019
|
7.00
|
Riveting
|
Details
|
|
|
03-12-2019
|
3.00
|
Riveting
|
Details
|
|
|
03-09-2019
|
9.00
|
Deburr, prime
|
Details
|
|
|
03-08-2019
|
2.50
|
Rivet rear spar HS
|
|
|
|
03-08-2019
|
2.00
|
Rivet Front HS Spar
|
Details
|
|
|
03-07-2019
|
2.00
|
Final drill and prime HS spar parts
|
Details
|
|
|
03-06-2019
|
3.00
|
Started
|
Details
|
|
|
03-03-2019
|
6.00
|
Rudder done
|
Details
|
|
|
03-02-2019
|
8.50
|
Finished VS, more rudder
|
Details
|
|
|
03-01-2019
|
2.50
|
Dimpled and riveted
|
Details
|
|
|
02-24-2019
|
5.00
|
More work on rudder.
|
Details
|
|
|
02-23-2019
|
3.25
|
Rudder assemby
|
Details
|
|
|
02-23-2019
|
3.00
|
Began Rudder substructure
|
Details
|
|
|
02-22-2019
|
6.00
|
Primed and riveted substructure of VS
|
Details
|
|
|
02-22-2019
|
3.00
|
Finish VS substructure, Start rudder
|
|
|
|
02-21-2019
|
1.50
|
Assembly of VS substructure, First Rivets.
|
Details
|
|
|
02-19-2019
|
1.50
|
Debur parts for VS
|
Details
|
|
|
02-17-2019
|
4.00
|
Debur parts
|
Details
|
|
|
02-16-2019
|
5.00
|
Part Inventory
|
Details
|
|
|
02-08-2019
|
3.50
|
Build worktable
|
|
|