Powered By Kitlog Pro v2.0
Terry's Sportcopter Vortex
Vortex
All
Work Logs Found:
85
Category Work Time:
201 Hours
Date
Hours
Work Log Summary
Details
08-01-2021
1.50
Transponder antenna and mounting plate
Details
07-25-2021
4.50
Wiring for Air Trim
Details
07-18-2021
6.00
Radio Control wiring
Details
07-04-2021
3.00
Wiring Corrections and Instrument POWER!
Details
06-19-2021
8.00
Wiring for EMS and SP's
Details
06-18-2021
8.00
Wiring for Attitude and Heading Indication System
Details
06-17-2021
2.50
Rudder Part Assembly
Details
06-16-2021
1.50
Tail Parts assembly Plus Misc.
Details
06-15-2021
8.00
Instrument Panel wiring
Details
05-31-2021
2.00
Wiring of Instrument Panel
Details
05-29-2021
2.00
Extender Tank fittings
Details
05-23-2021
3.00
Pneumatics, Electricial and Avionics
Details
04-24-2021
1.00
Mounting of Radio Antenna
Details
04-18-2021
1.50
Air Trim Cylinder and Aux Fuel Pump Mounting
Details
03-05-2021
8.00
Antenna Mounts and Heading Sensor Mount Spacers
Details
02-02-2021
2.00
Mounting of GPS Antenna
Details
01-18-2021
1.50
Mounting of Pull Start Handle Bracket
Details
07-11-2020
1.00
Cleaning up of Fabricated Parts
Details
06-13-2020
8.00
Design of GPS Antenna & RDAC Mount
Details
05-25-2020
4.00
Final fitting os Shelf and Transponder
Details
05-24-2020
8.00
Fabricating Xponder Shelf
Details
05-23-2020
4.00
Change to MGL SP6-7 Location and Radio Plug
Details
05-17-2020
0.50
Visual alignement of parts
Details
05-17-2020
2.00
Shelf of MGL Avionics in Pod
Details
05-09-2020
1.25
Rotor Head Brake Handle
Details
05-03-2020
1.25
Mounting Trim Valves and Battery
Details
05-02-2020
1.75
Fuel Pressure Sender Wiring Extension
Details
02-15-2020
1.50
Mounting Fuel pump and pressure sender
Details
02-08-2020
1.00
Pitot Tube Finishing
Details
01-26-2020
2.50
Mounting Landing Lights
Details
01-25-2020
1.00
Fuel pump plate and Pitot tube primer
Details
12-29-2019
3.00
Fuel Pump Mount Continued
Details
12-29-2019
1.50
Fabricating Fuel Pump Mount
Details
12-08-2019
4.00
Pitot Tube Fabrication
Details
10-27-2019
1.50
Mounting RDAC Box to Gyro
Details
10-26-2019
1.00
Mounting Trim Pump
Details
09-22-2019
0.75
Prepping RDAC Box
Details
09-01-2019
2.00
Addition of Panel Gauges to Pod
Details
08-18-2019
1.00
Panel Switches and Labels added
Details
08-18-2019
2.50
Panel Labeling
Details
08-04-2019
1.50
Test Fitting of RDAC Box
Details
07-27-2019
1.75
Control Rods and Bell Cranks
Details
07-27-2019
1.00
Control Rods and Bell Cranks
Details
07-21-2019
2.00
Mast Support Tubes
Details
07-20-2019
3.50
Mounting the Upper Mast to Lower Mast
Details
07-13-2019
0.75
Pre-rotator Assembly to Engine
Details
07-06-2019
1.00
Pre-Rotator Parts
Details
07-06-2019
1.00
Mounting Engine to Gyro
Details
04-28-2019
0.75
Assembling Firrings to Fuel Pressure Sender
Details
03-30-2019
2.50
Brake Line installation
Details
03-24-2019
2.00
Toe Operated Brakes
Details
03-17-2019
1.00
Seat and Fuel Tank
Details
03-17-2019
2.50
Footrest, Rudder Pedals
Details
03-16-2019
4.50
Seat and Fuel Tank
Details
03-16-2019
1.00
Fuel Tank and Seat Mounting
Details
02-24-2019
1.00
Nose Wheel Spring Assembly
Details
02-24-2019
1.00
Joy Stick Controls
Details
02-18-2019
2.00
Main Gear Wheel Alignment
Details
12-30-2018
2.00
Assembly of Main Gear to Airframe
Details
12-30-2018
1.50
Assembly of Left Side Main Gear, and nose wheel
Details
09-15-2018
0.75
Attaching motor mount to lower mast
Details
09-15-2018
3.00
Assembling Engine Support tubes to Keel
Details
09-01-2018
4.00
Assembling airframe - Various components
Details
08-18-2018
1.00
Trailing Arms and all completed parts for Main Gea
Details
08-18-2018
1.00
Suspension parts
Details
08-18-2018
1.00
Main Gear and brakes
Details
08-04-2018
1.50
Forward Airframe
Details
07-21-2018
2.00
Airframe Assembly
Details
05-19-2018
1.00
Throttle and Pre-rotator Quadrant
Details
05-19-2018
1.00
More Quadrant work
Details
04-28-2018
1.50
Rudder Cable Pulleys
Details
04-14-2018
3.00
Tail Wheel and Keel wiring
Details
04-07-2018
2.00
Controls Assembly
Details
08-26-2017
0.50
Upper Control Tube
Details
08-26-2017
0.50
Roto-Control
Details
07-04-2017
6.00
Assembly of Rotorhead and Upper Mast
Details
04-23-2017
1.00
Lower Mount
Details
04-23-2017
5.00
Assembly of Upper & Lower Engine Mount Parts
Details
04-08-2017
1.00
Tail Stabilizer Tube
Details
04-08-2017
2.50
Shocks for Gyro Suspension
Details
04-02-2017
2.00
Nose Wheel Assembly
Details
04-01-2017
3.50
Nose Bearing Assembly
Details
03-25-2017
1.00
Crush Plug Installation
Details
03-18-2017
2.00
Mast Assembly
Details
03-12-2017
0.01
Who Am I?
Details
SITE NAVIGATION
Contact Builder
Vortex Home
Category
# Logs
# Hours
All
85
201
Airframe
8
30
Avionics
9
24
Builder
1
0
Controls
3
6
Electrical/Pneumatic
10
43
Empennage
2
4
Engine
9
12
Engine Mount
4
10
Forward Airframe
1
1
Keel & Frame
1
2
Keel Assembly
1
3
Lighting
1
2
Main Gear
6
10
Mast Assembly
2
4
Miscellaneous
7
12
Nose Wheel
3
6
Roto-Control
5
6
Rotorhead Assembly
3
11
Seat & Fuel Tank
4
8
Suspension
2
4
Tail Assembly
1
1
Throttle Quadrant
2
2
Copyright © 2001-2025 Matronics. All Rights Reserved.