Date
|
Hours
|
Work Log Summary

|
Details

|
02-03-2019
|
1.00
|
weight and balance
|
Details
|
 |
|
02-03-2019
|
0.50
|
Installed placards
|
Details
|
 |
|
02-03-2019
|
1.00
|
Installed optional oil cooler air scoop
|
Details
|
  |
|
02-03-2019
|
1.50
|
check work of last two days
|
Details
|
  |
|
02-02-2019
|
0.50
|
Used TLR software
|
Details
|
  |
|
02-02-2019
|
2.50
|
Installed tube handles
|
Details
|
 |
|
02-02-2019
|
2.00
|
Installed rotor
|
Details
|
 |
|
02-02-2019
|
3.50
|
Installed left and right side covers
|
Details
|
|
|
02-02-2019
|
1.50
|
Installed front and rear windscreen
|
Details
|
 |
|
02-01-2019
|
1.00
|
trial fit left side body
|
Details
|
  |
|
02-01-2019
|
1.50
|
set rotor head
|
Details
|
  |
|
02-01-2019
|
3.00
|
punch list
|
Details
|
  |
|
02-01-2019
|
2.00
|
kick plate and sunshield
|
Details
|
  |
|
02-01-2019
|
1.00
|
final connections of rudder cables
|
Details
|
  |
|
02-01-2019
|
3.00
|
balance carbs
|
Details
|
  |
|
01-31-2019
|
2.00
|
Finished wiring
|
Details
|
  |
|
01-24-2019
|
3.50
|
Wired up radio and iFly GPS
|
Details
|
  |
|
01-23-2019
|
1.50
|
Velcro seats and install seat straps
|
Details
|
|
|
01-23-2019
|
1.00
|
Installed wheel spats
|
Details
|
 |
|
01-23-2019
|
1.00
|
Installed propeller and set pitch
|
Details
|
 |
|
01-23-2019
|
0.50
|
Installed keel fin
|
Details
|
 |
|
01-23-2019
|
2.00
|
Coolant, oil, run to check all gauges
|
Details
|
 |
|
01-23-2019
|
1.50
|
Continued with wiring
|
Details
|
  |
|
01-23-2019
|
2.50
|
Bled brake system, adjusted rod
|
Details
|
  |
|
01-22-2019
|
3.50
|
Installed front nose body
|
Details
|
  |
|
01-22-2019
|
3.50
|
Connected instrument panel
|
Details
|
 |
|
01-22-2019
|
2.50
|
Completed tail and rudder assembly
|
Details
|
 |
|
01-22-2019
|
0.50
|
Attached strobes and made up wiring
|
Details
|
  |
|
01-21-2019
|
2.00
|
Installed front seat cushions with heater
|
Details
|
  |
|
01-21-2019
|
2.00
|
Completed rear throttle console
|
Details
|
 |
|
01-21-2019
|
3.00
|
Completed front control console
|
Details
|
 |
|
01-21-2019
|
3.00
|
Attached and adjusted throttle and choke
|
Details
|
  |
|
01-21-2019
|
2.00
|
Assembled rear seat cushion with heater
|
Details
|
  |
|
01-21-2019
|
1.50
|
Added carb bowl clips
|
Details
|
  |
|
01-19-2019
|
1.50
|
Installed head lights and GPS
|
Details
|
  |
|
01-19-2019
|
1.00
|
installed baggage parts
|
Details
|
|
|
01-19-2019
|
6.50
|
Completed engine assembly
|
Details
|
|
|
01-18-2019
|
3.00
|
Prepped front cover for install
|
Details
|
  |
|
01-18-2019
|
0.50
|
Installed prerotator shafts
|
Details
|
 |
|
01-18-2019
|
1.00
|
Installed fuel filters and fuel lines
|
Details
|
  |
|
01-18-2019
|
1.00
|
Final assembly of pushrods
|
Details
|
  |
|
01-18-2019
|
2.50
|
Completed fuel tank section
|
Details
|
|
|
01-18-2019
|
1.50
|
Completed baggage door
|
Details
|
  |
|
01-17-2019
|
1.00
|
R and R prerotator system
|
Details
|
  |
|
01-17-2019
|
0.50
|
mounted rear throttle
|
Details
|
  |
|
01-17-2019
|
3.00
|
Installed fuel tanks and some fuel lines
|
Details
|
  |
|
01-17-2019
|
1.00
|
finished harness straps and zip ties
|
Details
|
  |
|
01-17-2019
|
2.50
|
Completed throttle and choke cables
|
Details
|
  |
|
01-17-2019
|
3.50
|
Completed seats and seat belts
|
Details
|
 |
|
01-13-2019
|
0.50
|
Test fit fuel tanks
|
Details
|
 |
|
01-13-2019
|
2.50
|
Mounted engine to frame
|
Details
|
|
|
01-13-2019
|
1.50
|
Finished fuse wiring
|
Details
|
 |
|
01-13-2019
|
2.00
|
Completed engine wiring prep
|
Details
|
  |
|
01-13-2019
|
0.50
|
Assembeld prerotator parts
|
Details
|
  |
|
01-12-2019
|
5.50
|
Started engine prep
|
Details
|
  |
|
01-12-2019
|
0.50
|
Mounted seats to frame
|
Details
|
  |
|
01-12-2019
|
1.00
|
Mounted fuel pumps and wired them
|
Details
|
  |
|
01-12-2019
|
2.00
|
Installed battery and fuse system
|
Details
|
  |
|
01-12-2019
|
0.50
|
Final torque pneumatic trim cylinders
|
Details
|
  |
|
01-12-2019
|
0.50
|
Final torque of controls
|
Details
|
  |
|
01-12-2019
|
1.50
|
Completed pneumatic clutch system
|
Details
|
  |
|
01-11-2019
|
0.50
|
Set rudder cables at rudder bellcrank
|
Details
|
  |
|
01-11-2019
|
4.50
|
Installed seat brackets
|
Details
|
 |
|
01-11-2019
|
1.50
|
Installed rotor head
|
Details
|
 |
|
01-11-2019
|
3.50
|
Installed harnesses
|
Details
|
|
|
01-11-2019
|
1.00
|
Completed mast top
|
Details
|
  |
|
01-10-2019
|
0.50
|
Nosewheel alignment
|
Details
|
  |
|
01-10-2019
|
2.50
|
Mounted pedals
|
Details
|
|
|
01-10-2019
|
3.00
|
Installed rudder system
|
Details
|
  |
|
01-10-2019
|
3.00
|
Control shafts and sticks
|
Details
|
 |
|
01-10-2019
|
2.00
|
Aligned mast top
|
Details
|
 |
|
01-09-2019
|
4.00
|
Unload shipment and inventory all parts
|
Details
|
 |
|
01-09-2019
|
1.00
|
Installed wheels, calipers, brake rotors
|
Details
|
 |
|
01-09-2019
|
1.50
|
Install main landing gear
|
Details
|
|
|
01-09-2019
|
0.50
|
Completed nose wheel assembly
|
Details
|
 |
|
01-09-2019
|
1.50
|
Completed frame prep
|
Details
|
 |