KitLog pro

Powered By Kitlog Pro v2.0

Tim's MTO Gyro Build
Work Logs Found: 76
Category Work Time: 144 Hours
 Date
Hours
Work Log Summary

Details

 02-03-2019
1.00
weight and balance
Details
     

 02-03-2019
0.50
Installed placards
Details
     

 02-03-2019
1.00
Installed optional oil cooler air scoop
Details

 02-03-2019
1.50
check work of last two days
Details

 02-02-2019
0.50
Used TLR software
Details

 02-02-2019
2.50
Installed tube handles
Details
     

 02-02-2019
2.00
Installed rotor
Details
     

 02-02-2019
3.50
Installed left and right side covers
Details
       

 02-02-2019
1.50
Installed front and rear windscreen
Details
     

 02-01-2019
1.00
trial fit left side body
Details

 02-01-2019
1.50
set rotor head
Details

 02-01-2019
3.00
punch list
Details

 02-01-2019
2.00
kick plate and sunshield
Details

 02-01-2019
1.00
final connections of rudder cables
Details

 02-01-2019
3.00
balance carbs
Details

 01-31-2019
2.00
Finished wiring
Details

 01-24-2019
3.50
Wired up radio and iFly GPS
Details

 01-23-2019
1.50
Velcro seats and install seat straps
Details
       

 01-23-2019
1.00
Installed wheel spats
Details
     

 01-23-2019
1.00
Installed propeller and set pitch
Details
     

 01-23-2019
0.50
Installed keel fin
Details
     

 01-23-2019
2.00
Coolant, oil, run to check all gauges
Details
     

 01-23-2019
1.50
Continued with wiring
Details

 01-23-2019
2.50
Bled brake system, adjusted rod
Details

 01-22-2019
3.50
Installed front nose body
Details

 01-22-2019
3.50
Connected instrument panel
Details
     

 01-22-2019
2.50
Completed tail and rudder assembly
Details
     

 01-22-2019
0.50
Attached strobes and made up wiring
Details

 01-21-2019
2.00
Installed front seat cushions with heater
Details

 01-21-2019
2.00
Completed rear throttle console
Details
     

 01-21-2019
3.00
Completed front control console
Details
     

 01-21-2019
3.00
Attached and adjusted throttle and choke
Details

 01-21-2019
2.00
Assembled rear seat cushion with heater
Details

 01-21-2019
1.50
Added carb bowl clips
Details

 01-19-2019
1.50
Installed head lights and GPS
Details

 01-19-2019
1.00
installed baggage parts
Details
       

 01-19-2019
6.50
Completed engine assembly
Details
       

 01-18-2019
3.00
Prepped front cover for install
Details

 01-18-2019
0.50
Installed prerotator shafts
Details
     

 01-18-2019
1.00
Installed fuel filters and fuel lines
Details

 01-18-2019
1.00
Final assembly of pushrods
Details

 01-18-2019
2.50
Completed fuel tank section
Details
       

 01-18-2019
1.50
Completed baggage door
Details

 01-17-2019
1.00
R and R prerotator system
Details

 01-17-2019
0.50
mounted rear throttle
Details

 01-17-2019
3.00
Installed fuel tanks and some fuel lines
Details

 01-17-2019
1.00
finished harness straps and zip ties
Details

 01-17-2019
2.50
Completed throttle and choke cables
Details

 01-17-2019
3.50
Completed seats and seat belts
Details
     

 01-13-2019
0.50
Test fit fuel tanks
Details
     

 01-13-2019
2.50
Mounted engine to frame
Details
       

 01-13-2019
1.50
Finished fuse wiring
Details
     

 01-13-2019
2.00
Completed engine wiring prep
Details

 01-13-2019
0.50
Assembeld prerotator parts
Details

 01-12-2019
5.50
Started engine prep
Details

 01-12-2019
0.50
Mounted seats to frame
Details

 01-12-2019
1.00
Mounted fuel pumps and wired them
Details

 01-12-2019
2.00
Installed battery and fuse system
Details

 01-12-2019
0.50
Final torque pneumatic trim cylinders
Details

 01-12-2019
0.50
Final torque of controls
Details

 01-12-2019
1.50
Completed pneumatic clutch system
Details

 01-11-2019
0.50
Set rudder cables at rudder bellcrank
Details

 01-11-2019
4.50
Installed seat brackets
Details
     

 01-11-2019
1.50
Installed rotor head
Details
     

 01-11-2019
3.50
Installed harnesses
Details
       

 01-11-2019
1.00
Completed mast top
Details

 01-10-2019
0.50
Nosewheel alignment
Details

 01-10-2019
2.50
Mounted pedals
Details
       

 01-10-2019
3.00
Installed rudder system
Details

 01-10-2019
3.00
Control shafts and sticks
Details
     

 01-10-2019
2.00
Aligned mast top
Details
     

 01-09-2019
4.00
Unload shipment and inventory all parts
Details
     

 01-09-2019
1.00
Installed wheels, calipers, brake rotors
Details
     

 01-09-2019
1.50
Install main landing gear
Details
       

 01-09-2019
0.50
Completed nose wheel assembly
Details
     

 01-09-2019
1.50
Completed frame prep
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.