08-14-2018
4.00
completed nav/strob fairings
Details
08-12-2018
1.00
trimmed left nav/strob fairing
Details
08-10-2018
2.00
completed wingtip
Details
08-09-2018
1.00
continued left wingtip
Details
08-08-2018
3.00
left wing top skins
Details
08-07-2018
3.00
started left wing lighting
Details
08-07-2018
1.00
fit wingtip fiberglass
Details
08-06-2018
1.50
Trim tip lighting fiberglass
Details
08-06-2018
3.00
completed right wingtip
Details
08-05-2018
2.00
wingtip construction begins
Details
08-05-2018
3.00
upper wing skins
Details
08-05-2018
3.00
fit landing light
Details
08-05-2018
3.00
continued wing skin install
Details
08-04-2018
0.50
Recieved and inventoried lighting kit
Details
08-04-2018
1.00
landing light cutout
Details
08-04-2018
1.00
fitting landing light lense
Details
02-24-2018
3.00
Completed SB 18-02-02
Details
02-22-2018
3.00
Began install of SB 18-02-02
Details
01-22-2018
3.00
Completed left flaperon construction
Details
01-18-2018
4.00
continued construction of right flaperon
Details
01-14-2018
1.00
Began right flaperon skeleton construction
Details
01-13-2018
3.00
continued flaperon assembly
Details
01-13-2018
2.00
assembled flaperon skeleton
Details
01-12-2018
4.00
preped flaperon nose ribs
Details
01-11-2018
2.00
installed middle right wing skin
Details
01-11-2018
3.00
Flipped over wing and riveted leading edge
Details
01-09-2018
2.00
installed out right wing skin
Details
01-09-2018
4.00
Installed inner wing skin on right wing
Details
01-08-2018
2.00
Riveted leading edge of left wing and installed hi
Details
01-08-2018
3.00
Installed lower middle skin
Details
01-08-2018
1.00
inspection cover
Details
01-07-2018
3.00
installed bottom outer wing skin
Details
01-06-2018
2.00
installed wiring and wing root connectors
Details
01-06-2018
5.00
bottom wing skin installation
Details
01-06-2018
2.00
assembled stall warning
Details
01-05-2018
4.00
completed skeleton of right wing
Details
01-05-2018
3.00
Added nose ribs and stub spar to left wing
Details
01-05-2018
2.00
added main ribs to right spar
Details
01-04-2018
2.00
rib attach
Details
01-04-2018
6.00
preped right main ribs
Details
01-04-2018
2.00
match drill ribs for hinge brackets and doublers
Details
01-04-2018
1.00
installed rear spar
Details
01-03-2018
8.00
Begain prep of main wing ribs
Details
01-02-2018
4.00
completed prep of Right nose ribs
Details
01-02-2018
2.00
added nutplates and doublers
Details
01-01-2018
3.00
right nose rib prep
Details
01-01-2018
3.00
continued rib prep
Details
01-01-2018
5.00
began preping wing ribs
Details
12-31-2017
4.00
prepaired rear spars
Details
12-31-2017
2.00
completed rear spars
Details
12-31-2017
3.00
assmbled hinge brackets
Details
12-30-2017
3.00
prepred stub spar and hinge brackets
Details
12-30-2017
3.00
attached attach angles
Details
12-30-2017
1.00
assmbled stub spar
Details
12-29-2017
3.00
Inventoried Wing kit
Details
12-29-2017
3.00
begain prep of wing spar
Details
12-01-2017
1.00
riveted VS and rudder tip
Details
12-01-2017
3.00
Fit Stab fairings
Details
09-03-2017
4.00
installed Stabilator
Details
09-03-2017
3.00
completed pushrod assembly
Details
09-02-2017
3.00
riveted remaining tailcone holes
Details
09-02-2017
1.00
Installed Vertical Stab and rudder
Details
09-01-2017
2.00
fitted fiberglass rudder and VS fairing
Details
08-31-2017
2.00
completed forward vs rib
Details
08-30-2017
1.00
installed upper skin to tail cone
Details
08-29-2017
3.00
riveted side skins to tail cone
Details
08-28-2017
6.00
installed static ports upper skins
Details
08-26-2017
3.00
begin tailcone construction
Details
08-26-2017
4.00
added lower left and right skins to tail cone
Details
08-26-2017
2.00
added last former and sides to tailcone
Details
08-21-2017
1.00
test fit aft bulkhead
Details
08-21-2017
3.00
seperated and deburred parts
Details
08-21-2017
6.00
completed F-1211D assembly
Details
08-20-2017
4.00
Frabicated tail skid bracket
Details
08-20-2017
4.00
completed stabilator
Details
08-19-2017
1.00
Technical advisor visit
Details
08-19-2017
8.00
skin stabilator
Details
08-18-2017
6.00
Prepare tail cone skins
Details
08-18-2017
6.00
prepare fuselage Frames
Details
08-12-2017
3.00
anti servo tab hinge prep and deburring
Details
08-11-2017
4.00
completed rib installation
Details
08-11-2017
4.00
Begain stabilator rib installation
Details
08-10-2017
3.00
continued Spar box construction
Details
08-09-2017
2.00
Continued Spar construction
Details
08-09-2017
2.00
continued Spar Box construction
Details
08-08-2017
3.00
continued spar box assembly
Details
08-08-2017
3.00
Completed Anti Servo Tab construction
Details
08-08-2017
3.00
Began Stabilator Spar box construction
Details
08-07-2017
3.00
Completed rudder construction
Details
08-07-2017
3.00
Begain Anti Servo Tab construction
Details
08-06-2017
2.00
Prepaired VS skins
Details
08-06-2017
3.00
Installed Vertical Stab skin
Details
08-06-2017
2.00
Begain Rudder construction
Details
08-05-2017
5.00
Began Vertical Stabalizer Skeleton
Details
08-04-2017
5.00
Vertical Stabalizer construction
Details
08-04-2017
3.00
Continued VS spar construction
Details
08-03-2017
3.00
Inventory Empennage kit
Details
SITE NAVIGATION
Contact Builder
RV-12is Home
Category
# Logs
# Hours
All
97
285
Empennage
35
115
Fuselage
8
24
Wings
54
146
Copyright © 2001-2024 Matronics. All Rights Reserved.