KitLog pro

Powered By Kitlog Pro v2.0

Ronalds Web Site
Work Logs Found: 176
Category Work Time: 603 Hours
 Date
Hours
Work Log Summary

Details

 12-14-2019
4.00
Constructed Aileron Trim Module
Details
       

 12-07-2019
7.00
Dimpled bottom skins
Details
       

 12-02-2019
3.00
Mounted GMU22
Details
       

 12-01-2019
2.00
Roll Servo
Details
     

 11-26-2019
3.00
Gretz Pitot Tube Mast
Details
       

 11-18-2019
2.00
Wired Fly LED's
Details
       

 11-18-2019
1.00
Tie wrapped electrical wires
Details
       

 11-14-2019
2.00
Wired Aero LEDs
Details

 11-14-2019
2.00
Mounted Left Aileron
Details

 11-13-2019
5.00
Assembed Left Aileron
Details
       

 11-12-2019
6.00
Assembled all Aileron Linkages
Details
       

 11-11-2019
4.00
Prepped and Primed Aileron Linkage

 11-09-2019
1.00
Hung the Right Aileron
Details
       

 11-08-2019
8.00
Final Rivet of Right Trailing Edge
Details
       

 11-06-2019
6.00
Assembled Right Aileron
Details
       

 11-05-2019
2.00
Primed all the aileron parts
Details

 11-05-2019
6.00
Last Final Assembly
Details

 11-03-2019
4.00
Final Drill Leading Edge
Details
     

 11-02-2019
6.00
Prepped all Aileron Parts
Details
     

 11-01-2019
2.00
Riveted Trailing Edge of Right Flap
Details
       

 11-01-2019
4.00
Prepped all Alieron parts
Details
     

 10-30-2019
0.50
Clecoed Trailing Edge of Right Flap
Details
     

 10-29-2019
5.00
Riveted Flap Skins
Details
       

 10-28-2019
3.00
Riveted Right Top Flap
Details
       

 10-27-2019
2.00
Riveted flap nose pieces
Details
     

 10-27-2019
4.00
Riveted Aileron and Flap Gap Fairings
Details
       

 10-26-2019
2.00
Primered Flap Parts
Details
       

 10-24-2019
3.00
Dimpled Skins and Ribs

 10-18-2019
4.00
Match drill trailing edge
Details

 10-17-2019
4.00
Preassembly of Flaps
Details
       

 10-16-2019
4.00
Deburred all Flap parts
     

 10-13-2019
3.00
Wired Nav and Landing Lights
Details
       

 10-13-2019
1.50
Mounted Left Fuel Tank
Details

 10-12-2019
2.00
Mounted Right Tank
Details
       

 10-07-2019
1.00
Pressure Check of Right Tank
Details
       

 10-07-2019
4.00
Installed Left Tank Baffle
Details

 10-05-2019
4.00
Installed Right Tank Baffle and Z Brackets
Details
       

 10-02-2019
1.00
Left Tank Fuel Sender and fittings
Details
       

 10-01-2019
0.25
Installed vent line to AN Fitting

 09-30-2019
2.00
Riveted J Stiffener in Left Tank

 09-30-2019
3.00
Installed root rib, fuel vent and tank bracket
Details

 09-27-2019
5.00
Installed left tank 5th, 6th and outboard ribs

 09-25-2019
3.00
Riveted 3rd and 4th tank rib

 09-24-2019
3.00
Riveted first two inboard ribs on left tank.

 09-24-2019
1.00
Leak Test Right Tank
Details
       

 09-23-2019
1.00
Riveted Right Wing Nutplates
Details

 09-22-2019
1.50
Fuel Sender Install
Details
       

 09-21-2019
0.50
Installation of Vent Line
Details
       

 09-21-2019
3.00
Fuel Tank Bracket and End Rib
Details
       

 08-31-2019
3.00
Final Outboard Ribs Riveted
Details
       

 08-19-2019
3.00
Riveted and Prosealed two more ribs right tank

 08-17-2019
3.00
Wet Rivet Ribs RightTank
Details
       

 08-11-2019
2.00
Clecoed Fuel Tank Ribs
Details
       

 08-10-2019
4.00
Left Fuel Tank
Details
       

 08-04-2019
4.00
Fuel Tank Stiffeners and Cap
Details
       

 08-03-2019
4.00
Prosealed Inboard fuel fittins
Details
       

 07-28-2019
4.00
Fuel Tank Brackets
Details
     

 07-27-2019
8.00
Dimpled Fuel Tanks
Details
       

 07-19-2019
5.00
J Stringers and Baffle
Details
       

 07-17-2019
6.00
Ribs and Brackets
Details
       

 07-14-2019
4.00
Flute Tank Ribs
Details

 07-13-2019
4.00
Wing light install
Details
       

 07-05-2019
7.00
Riveted Leading edges to spars
Details
       

 07-03-2019
7.00
Riveted the outboard leading edges
Details
       

 07-02-2019
7.00
Riveted the remaining outboard leading edge
Details

 07-01-2019
4.00
Assembled the Wing Lights
Details
       

 07-01-2019
4.00
Assembled all the parts in the cradle for the left
Details
       

 06-30-2019
6.00
Alodined the outboard ribs

 06-16-2019
6.00
Left Outboard Leading Edge
Details
       

 06-02-2019
2.00
Outer Nose Ribs
Details

 06-01-2019
8.00
Left Top Wing Skins
Details
       

 05-25-2019
4.00
Rivet Outboard Top Wing Skin
       

 05-23-2019
2.00
Rivet inboard top wing skin
     

 05-18-2019
3.00
Wing Skins
Details
       

 05-17-2019
6.00
Top Wing Skins Dimple
Details

 05-16-2019
5.00
Top Wing Walk
Details
       

 05-06-2019
8.00
Riveting the Rear Spars
Details
       

 05-05-2019
2.00
Inboard Aileron hinge
Details
       

 05-04-2019
3.00
Primed the wing rear spars
Details
       

 05-02-2019
4.00
Rear Wing Spar
Details
       

 04-28-2019
8.00
Match drill rear spars on wings
Details
       

 04-27-2019
6.00
Aileron Hinges
Details
       

 02-27-2019
1.00
Rolled Leading edge
Details

 02-24-2019
3.00
Rivet elevator replacement
Details

 02-21-2019
3.00
Riveting together
Details

 02-20-2019
3.00
Primed the new elevator parts
Details

 02-17-2019
8.00
Rebuild of Right Elevator
Details

 02-10-2019
2.00
Rudder top fairing
Details
       

 02-09-2019
4.00
Bottom Rudder Fairing
Details
       

 02-03-2019
1.00
Mounting the HS
Details
       

 02-03-2019
1.00
Mounting of Vertical Stabilizer
Details
       

 02-03-2019
1.00
Horizontal Stab mounted
Details
       

 02-02-2019
2.00
Rivet Top Skin
Details
       

 02-02-2019
1.00
Right Side Rivet
     

 01-24-2019
4.00
Side Skins
Details
       

 01-23-2019
1.00
VS stabilizer drilling
Details
     

 01-23-2019
4.00
Rear Deck
Details
     

 01-22-2019
2.00
Static air installation
Details
       

 01-21-2019
4.00
Rivet the aft fuselage sides
Details
       

 01-20-2019
8.00
Sides riveting
Details
       

 01-19-2019
6.00
Skid plate tail cone
Details
       

 01-17-2019
6.00
Tail Cone Sides
Details
       

 01-13-2019
3.00
Bottom Skin and Bulkhead Assembly
Details
       

 01-13-2019
2.00
Bellcrank to Bulkheads
Details
     

 01-13-2019
1.00
Battery Angles
Details
       

 01-13-2019
2.00
1412, 1411 and 1410 Bulkhead
Details
       

 01-12-2019
4.00
Primered all empennage parts
Details
     

 01-12-2019
0.50
Electric Trim
Details
       

 01-11-2019
6.00
Prep parts for primer
       

 01-04-2019
2.00
Dubur and separate parts

 01-02-2019
3.00
Separate, debur and prep tail cone parts
Details
     

 01-02-2019
3.00
Separate and debur tail cone parts
     

 01-01-2019
1.50
Vertical Stablilizer Bulk head
Details
       

 01-01-2019
3.00
Prepping tail cone parts
Details

 01-01-2019
2.00
Fabrication of rudder stops
Details

 12-30-2018
1.00
Trim Servo Wiring
Details
       

 12-29-2018
1.00
Trim Tab
Details
       

 12-29-2018
3.00
Elevator rolled edge
Details
       

 12-28-2018
3.00
Trailing Edge Rivets
Details
       

 12-26-2018
1.50
Foam ribs
Details
       

 12-25-2018
2.00
Trim Tab
Details
       

 12-23-2018
10.00
Assembly of the skins
Details
       

 12-21-2018
7.00
Elevator Ribs
Details
       

 12-20-2018
5.00
Elevator Skeleton Assembly
Details
       

 12-15-2018
3.00
Elevator Priming
Details
       

 12-13-2018
1.50
Counter Weights
Details
     

 12-12-2018
2.00
Countersink Trailing Edge Wedge
Details
     

 12-11-2018
3.00
Roughed skins for foam ribs
     

 12-11-2018
2.00
Prep Trim Tab
Details
     

 12-08-2018
7.00
Dimpling and Deburring
Details
       

 12-06-2018
2.00
Debur and Scotchbrite parts
Details

 12-04-2018
3.00
Trim Elevator trailing edge
Details
       

 12-02-2018
1.00
Foam Ribs
Details
     

 12-02-2018
7.00
Assembly of the ribs to the skins
Details
       

 12-01-2018
3.00
Elevator Ribs
Details
       

 11-28-2018
3.00
Riveting Skins
Details
       

 11-27-2018
5.00
Skins to HS Stabilizer
Details
       

 11-27-2018
1.00
Cleco rear spar
Details
     

 11-25-2018
1.00
Stringer Web Assembly
Details
     

 11-25-2018
2.00
Riveting Inspars
Details
       

 11-25-2018
0.50
Inboard hinge bracket
Details
       

 11-25-2018
1.00
HS Spar Doubler
Details
       

 11-25-2018
3.00
Cleco HS skins to skeleton
Details
       

 11-23-2018
1.00
Trailing edge
Details
     

 11-23-2018
1.00
Tip rib
Details
       

 11-23-2018
1.00
Rudder Weight
Details
       

 11-23-2018
3.00
Rolling the leading edge
Details
       

 11-22-2018
3.00
Zippered up the rudder skins
Details
       

 11-22-2018
1.00
Trailing edge tape
Details
     

 11-22-2018
2.00
Front spar riveted on
Details
       

 11-21-2018
1.00
VS Stab hinges
Details
       

 11-21-2018
2.00
Rudder Stiffeners
Details
       

 11-21-2018
2.00
Rudder skeleton
Details
       

 11-21-2018
2.00
Finished VS Stabilizer
Details
       

 11-20-2018
1.00
Rivet VS rear spar
Details
       

 11-20-2018
1.00
Rivet Front Spar
Details
       

 11-20-2018
3.00
Primer empennage parts
Details
       

 11-20-2018
1.00
Assembly of the VS skeleton
Details
       

 11-18-2018
3.00
Dimpled and countersink of spars
Details
       

 11-17-2018
9.00
Cleco Vertical Stab together
Details
       

 11-15-2018
2.00
Rib Dimpling
Details
     

 11-15-2018
6.00
Modified Inboard Ribs
Details
     

 11-15-2018
2.00
HS Skins dimpling
Details
       

 11-12-2018
8.00
HS rib deburring and straightening
Details
       

 11-11-2018
8.00
Forward spar and caps
Details
       

 11-10-2018
5.00
Deburred Rear Spar
Details

 11-09-2018
4.00
Trailing Edge
Details
     

 11-08-2018
3.00
Dimpled Rudder Skeleton
Details
     

 11-07-2018
6.00
Removing clecos to rudder
Details
       

 11-06-2018
5.00
Cleco the skins
Details
       

 11-05-2018
5.00
Rudder Skeleton
Details
     

 11-05-2018
6.00
Parts separation and deburr
Details
       

 11-01-2018
5.00
Fitting Vert Stab Ribs
Details
       

 10-31-2018
3.00
VS-702 doubler
Details
       

 10-31-2018
6.00
Inventory
Details
       

 10-30-2018
2.00
Unpacking and Inventory
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.