Date
|
Hours
|
Work Log Summary
|
Details
|
06-13-2021
|
50.00
|
VP-X and PPS Install
|
Details
|
|
|
11-11-2020
|
8.00
|
Verify component power wiring
|
Details
|
|
|
06-07-2020
|
2.00
|
Install Suntail Light
|
Details
|
|
|
05-31-2020
|
6.00
|
Installed Nav/Strobe lights
|
Details
|
|
|
05-23-2020
|
12.00
|
Stick Grip Wiring
|
Details
|
|
|
05-07-2020
|
6.00
|
Install Control Stick Grips (Mechanical)
|
Details
|
|
|
02-02-2020
|
3.00
|
Finish Spinner Fore/Aft Mounts
|
|
|
|
01-26-2020
|
6.00
|
Spinner alignment and match drilling
|
|
|
|
01-25-2020
|
12.00
|
Engine Wiring
|
Details
|
|
|
01-24-2020
|
1.00
|
Air Filter Bypass Door Install
|
Details
|
|
|
12-31-2019
|
2.00
|
Wire Starter and Alternators
|
|
|
|
12-07-2019
|
8.00
|
Install Vetterman Exhaust Pipes
|
|
|
|
10-12-2019
|
2.00
|
Install Engine Oil Cooler
|
|
|
|
09-01-2019
|
12.50
|
Horizontal Induction Install
|
Details
|
|
|
07-21-2019
|
8.00
|
Inlet Ducts and Oil Filler Door
|
Details
|
|
|
07-13-2019
|
6.00
|
Lower Cowl Nosegear Brace
|
Details
|
|
|
07-04-2019
|
4.00
|
Fit and drill side hinges
|
Details
|
|
|
06-30-2019
|
7.00
|
Lower Cowl drilling
|
Details
|
|
|
06-22-2019
|
3.50
|
Lower Cowl Fitting
|
Details
|
|
|
06-22-2019
|
2.00
|
Fitting the upper cowl
|
Details
|
|
|
06-20-2019
|
2.00
|
Spinner opening prep
|
Details
|
|
|
06-16-2019
|
4.00
|
Firewall side hinge installation
|
Details
|
|
|
06-15-2019
|
1.00
|
Cut oil filler access door into upper cowl
|
|
|
|
06-08-2019
|
4.00
|
Propeller surrogate
|
Details
|
|
|
05-23-2019
|
15.00
|
Rework Engine Control Cable brackets
|
Details
|
|
|
05-18-2019
|
8.00
|
Install fuel system components and alternator
|
Details
|
|
|
05-05-2019
|
2.00
|
Install Oil lines
|
Details
|
|
|
05-04-2019
|
8.00
|
P-Mag Wiring
|
Details
|
|
|
04-27-2019
|
8.00
|
Mounted Engine to Airframe
|
Details
|
|
|
04-21-2019
|
5.00
|
Throttle Body Installation
|
Details
|
|
|
04-19-2019
|
5.00
|
Throttle and Mixture Brackets onto Engine Sump
|
Details
|
|
|
04-06-2019
|
2.00
|
Oil line fittings
|
Details
|
|
|
03-24-2019
|
1.00
|
Install Back Up Alternator
|
Details
|
|
|
03-03-2019
|
8.00
|
Prop Governor Installation
|
Details
|
|
|
02-16-2019
|
6.00
|
Engine Dessicant System
|
Details
|
|
|
02-10-2019
|
8.00
|
Uncrate engine
|
|
|
|
01-21-2019
|
3.00
|
Engine Controls installation
|
Details
|
|
|
01-06-2019
|
50.00
|
Lighted Switches Wiring
|
Details
|
|
|
11-25-2018
|
12.00
|
Intercom wiring
|
Details
|
|
|
11-18-2018
|
12.00
|
Finished wiring SkyView Display harnesses
|
Details
|
|
|
11-12-2018
|
5.00
|
Wiring of Skyview Display Harnesses
|
Details
|
|
|
10-28-2018
|
3.00
|
Riveted Firewall Recess
|
Details
|
|
|
10-27-2018
|
4.00
|
Install sound dampener on cockpit side of firewall
|
Details
|
|
|
10-20-2018
|
3.00
|
COMM Antenna installation
|
Details
|
|
|
10-08-2018
|
15.00
|
Instrument Panel Layout
|
Details
|
|
|
05-28-2018
|
20.00
|
More Wiring
|
Details
|
|
|
04-30-2018
|
3.00
|
Fuel Line and Wiring Harness routing
|
Details
|
|
|
03-31-2018
|
8.00
|
Electrical Harness Fabrication
|
Details
|
|
|
03-24-2018
|
8.00
|
Remove Right Fuel Tank
|
Details
|
|
|
03-22-2018
|
2.00
|
Fabricated RF cables
|
Details
|
|
|
03-10-2018
|
3.00
|
Elevator AP Servo Bracket Installation
|
|
|
|
02-11-2018
|
10.00
|
Battery Box Fabrication
|
Details
|
|
|
02-03-2018
|
6.00
|
Flap Position Sensor and wiring
|
Details
|
|
|
01-27-2018
|
1.00
|
Repaired damaged baggage compartment stringer
|
Details
|
|
|
01-06-2018
|
6.00
|
Wiring harness for Aileron Trim
|
Details
|
|
|
12-31-2017
|
3.00
|
Wing tie-down storage mounts
|
Details
|
|
|
12-29-2017
|
8.00
|
Functional layout
|
Details
|
|
|
12-26-2017
|
7.00
|
Wired Pitot Probe
|
Details
|
|
|
11-26-2017
|
12.00
|
Drilled holes in the firewall
|
Details
|
|
|
11-24-2017
|
6.00
|
Fabricated mounting ribs for VP-X & EMS
|
Details
|
|
|
10-09-2017
|
6.00
|
Located Firewall Penetrations
|
Details
|
|
|
09-04-2017
|
3.00
|
Put in brake fluid
|
Details
|
|
|
08-27-2017
|
12.00
|
Final prep and priming of Landing gear fairings &
|
Details
|
|
|
08-20-2017
|
8.00
|
Prep and prime ldg gear fairings
|
Details
|
|
|
08-19-2017
|
1.00
|
Custom fit fairing to nose gear leg
|
Details
|
|
|
08-18-2017
|
6.00
|
Finish Nosegear wheel fairing and align gear leg f
|
|
|
|
08-16-2017
|
2.00
|
Finish Nosewheel front fairing
|
Details
|
|
|
08-15-2017
|
1.00
|
Nose wheel front fairing fitting
|
Details
|
|
|
08-14-2017
|
2.00
|
Nose Gear Fairing Fitting
|
Details
|
|
|
08-13-2017
|
4.00
|
Nosewheel Breakout Force and Fairing prep
|
Details
|
|
|
08-04-2017
|
4.00
|
Nosewheel Installation
|
Details
|
|
|
06-12-2017
|
2.50
|
Installed Intersection Fairings
|
Details
|
|
|
06-10-2017
|
4.00
|
Wheel Fairing nutplates and riveting
|
Details
|
|
|
06-04-2017
|
9.00
|
Main Wheel Fairings
|
Details
|
|
|
05-21-2017
|
4.00
|
Main Gear Fairing "Fingers" and Wheel Pants
|
Details
|
|
|
05-20-2017
|
2.00
|
Finish making Main Gear Leg Fairings
|
Details
|
|
|
01-16-2017
|
2.00
|
Finished brakes
|
|
|
|
01-13-2017
|
3.00
|
Countersunk gear fairings; put airplane on the Mai
|
|
|
|
01-10-2017
|
2.00
|
Drilled the gear fairing hinge
|
|
|
|
01-08-2017
|
2.00
|
Trimmed the hinge material and laid out the rivet
|
|
|
|
01-03-2017
|
3.00
|
Prepared main gear fairings for trimming
|
Details
|
|
|
01-01-2017
|
3.00
|
Repacked Main Wheel bearings
|
Details
|
|
|
11-26-2016
|
2.00
|
Rivet aft upper skin to bulkheads and longerons
|
Details
|
|
|
07-31-2016
|
10.00
|
Canopy bow fiberglass molding
|
Details
|
|
|
07-03-2016
|
6.00
|
Fuel pickup safety service bulletin
|
Details
|
|
|
06-26-2016
|
20.00
|
Complete Right Wing Tip
|
Details
|
|
|
05-09-2016
|
3.00
|
Completed Right Wing Tip attach points
|
Details
|
|
|
04-25-2016
|
1.00
|
Installed tip rib
|
Details
|
|
|
04-24-2016
|
2.00
|
Match-drilled right wing tip to wing
|
Details
|
|
|
04-23-2016
|
6.00
|
Right wing light kit complete
|
Details
|
|
|
04-20-2016
|
3.00
|
Right Wing Light Cut out
|
Details
|
|
|
04-16-2016
|
3.00
|
finish cleanup of left wing
|
Details
|
|
|
04-05-2016
|
2.00
|
Install foam rib in left wingtip
|
Details
|
|
|
03-20-2016
|
8.00
|
Left Wing tip fairing; SB06-2-23
|
Details
|
|
|
03-06-2016
|
5.00
|
Left wingtip epoxy and tip lens install
|
Details
|
|
|
03-02-2016
|
2.00
|
Finished installing nutplates on left tip
|
|
|
|
02-28-2016
|
6.00
|
Match-drill left wing tip
|
Details
|
|
|
02-13-2016
|
4.00
|
Completed Left Wing Landing Light Kit
|
|
|
|
12-27-2015
|
4.00
|
Hung Rudder and Elevators
|
Details
|
|
|
12-23-2015
|
4.00
|
Primed Elevators and Rudder
|
Details
|
|
|
12-21-2015
|
1.00
|
Painting Prep
|
Details
|
|
|
12-20-2015
|
2.00
|
Final Sanding of Rudder and Elevators
|
Details
|
|
|
12-19-2015
|
4.00
|
Epoxy Top Coat
|
Details
|
|
|
12-18-2015
|
4.00
|
Sanding and Filling!
|
Details
|
|
|
12-17-2015
|
2.00
|
Applied Filler to Elevators and Rudder
|
Details
|
|
|
12-16-2015
|
2.00
|
Rudder, Elevator Sanding
|
Details
|
|
|
12-10-2015
|
1.00
|
HS Tip sanding
|
Details
|
|
|
12-09-2015
|
1.00
|
Sanding the HS Tips
|
Details
|
|
|
11-01-2008
|
5.00
|
Riveted foreward subpanel assembly
|
Details
|
|
|
03-16-2008
|
4.00
|
Wheel Fairing bracket nutplates
|
Details
|
|
|
03-15-2008
|
4.00
|
Main Landing Gear Assembly
|
Details
|
|
|
03-09-2008
|
1.00
|
Installed Engine mount
|
Details
|
|
|
03-08-2008
|
4.00
|
Assembled nosewheel and tire
|
Details
|
|
|
03-07-2008
|
3.00
|
Assembled Main Wheels and Tires
|
|
|
|
03-02-2008
|
3.00
|
Drilled 6 engine mount attach points
|
|
|
|
12-30-2007
|
8.00
|
Fuel & Brake line close out
|
Details
|
|
|
12-26-2007
|
7.00
|
Fuel & Brake Line installation
|
Details
|
|
|
12-23-2007
|
4.00
|
Fuel & brake supply line fab
|
Details
|
|
|
12-22-2007
|
3.00
|
Fabricated Fuel Pump Lines
|
Details
|
|
|
12-15-2007
|
5.00
|
Fuel Pump Cover Assembly
|
Details
|
|
|
12-13-2007
|
2.00
|
Fuel Pump Cover
|
Details
|
|
|
12-12-2007
|
1.50
|
Fuel Pump Cover work
|
Details
|
|
|
12-02-2007
|
6.00
|
Fin. Ail. Trim, Began Fuel Pump
|
Details
|
|
|
12-01-2007
|
2.50
|
Aileron Trim
|
Details
|
|
|
11-27-2007
|
3.00
|
Aileron Trim
|
Details
|
|
|
11-24-2007
|
3.00
|
Aileron Trim Work
|
Details
|
|
|
11-12-2007
|
8.00
|
Aileron Trim, ele. pushrod, static sys
|
Details
|
|
|
11-10-2007
|
2.00
|
Miscellaneous Riveting
|
Details
|
|
|
11-07-2007
|
1.00
|
Tail section access plates
|
Details
|
|
|
11-05-2007
|
1.50
|
Prepared Static Line Ports
|
Details
|
|
|
10-17-2007
|
3.00
|
Finished painting cabin parts
|
Details
|
|
|
10-15-2007
|
10.00
|
Riveted seatbacks; painted cabin
|
Details
|
|
|
10-15-2007
|
5.00
|
Cabin area priming
|
Details
|
|
|
10-13-2007
|
12.00
|
Prep Fuselage for priming
|
Details
|
|
|
10-08-2007
|
7.00
|
Finished instrument panel mounting
|
Details
|
|
|
10-06-2007
|
5.00
|
Forward Top skin
|
Details
|
|
|
10-04-2007
|
1.50
|
Subpanel Work
|
Details
|
|
|
09-29-2007
|
10.50
|
F768 Subpanel assembly
|
Details
|
|
|
09-25-2007
|
2.50
|
Finished 703B angle
|
Details
|
|
|
09-19-2007
|
1.50
|
Forward Cabin work
|
Details
|
|
|
09-18-2007
|
2.00
|
Foreward cabin work
|
Details
|
|
|
09-08-2007
|
12.00
|
Fixed Problem with Cabin Frame
|
Details
|
|
|
09-03-2007
|
6.00
|
Finished Emp Fitting; worked Cabin Frame
|
Details
|
|
|
09-02-2007
|
4.50
|
Empennage Fitting
|
Details
|
|
|
09-01-2007
|
8.00
|
Empennage Fitting
|
Details
|
|
|
08-31-2007
|
3.50
|
Drill Elevator Horns; unpack Finish Kit
|
Details
|
|
|
08-25-2007
|
6.00
|
Aft-End Upper Fuselage prep work
|
Details
|
|
|
08-24-2007
|
6.00
|
Made F790 elevator pushrod
|
Details
|
|
|
08-23-2007
|
9.00
|
Cabin Frame Construction Completed
|
Details
|
|
|
08-22-2007
|
6.00
|
Cabin Frame Construction
|
Details
|
|
|
08-21-2007
|
4.00
|
Cabin Frame Construction
|
Details
|
|
|
08-19-2007
|
4.00
|
Cabin Frame Construction
|
Details
|
|
|
08-18-2007
|
3.00
|
Wing Removal
|
Details
|
|
|
08-14-2007
|
1.50
|
Misc Wing-mate cleanup tasks
|
Details
|
|
|
08-11-2007
|
6.00
|
Fuel line installation
|
Details
|
|
|
08-09-2007
|
9.00
|
Fuel Line installation
|
Details
|
|
|
08-07-2007
|
4.00
|
Finished rigging ailerons and flaps
|
Details
|
|
|
08-05-2007
|
3.00
|
Cut holes in fuselage for flap pushrods
|
|
|
|
07-29-2007
|
3.50
|
Rigged ailerons
|
Details
|
|
|
07-28-2007
|
4.00
|
Fuel Tank Attach Bracket
|
Details
|
|
|
07-27-2007
|
1.50
|
Drilled Rear Spar Attach point
|
Details
|
|
|
07-24-2007
|
2.50
|
Measured Wing Sweep and Incidence
|
Details
|
|
|
07-21-2007
|
4.00
|
Wings Mated!
|
Details
|
|
|
07-19-2007
|
2.00
|
Finished prep for wing mate
|
Details
|
|
|
07-17-2007
|
2.00
|
Wing Mate Prep Work
|
Details
|
|
|
07-16-2007
|
1.00
|
Wing Mate Prep Work
|
Details
|
|
|
07-08-2007
|
10.00
|
Install Ldg Gear Mounts
|
Details
|
|
|
07-05-2007
|
1.00
|
Fit Ldg Gear Legs to Mounts
|
Details
|
|
|
07-04-2007
|
4.00
|
Completed Electric Flap Install
|
Details
|
|
|
07-02-2007
|
2.00
|
Electric Flaps
|
Details
|
|
|
07-01-2007
|
2.50
|
Electric Flaps
|
Details
|
|
|
06-30-2007
|
2.50
|
Electric Flaps
|
Details
|
|
|
06-28-2007
|
5.00
|
Completed Forward Covers
|
Details
|
|
|
06-27-2007
|
1.00
|
Began Forward Cabin Covers
|
Details
|
|
|
06-26-2007
|
2.00
|
Finished drilling seatbacks
|
Details
|
|
|
06-25-2007
|
2.50
|
Seat Back Assembly
|
Details
|
|
|
06-24-2007
|
7.00
|
Fabricated Seat Back pieces
|
Details
|
|
|
06-23-2007
|
7.00
|
Floors and Control Rod Tunnel
|
Details
|
|
|
06-21-2007
|
4.00
|
Finished Aft Seat Skins, F715 nutplates
|
Details
|
|
|
06-19-2007
|
2.00
|
Seat Hinge Work
|
Details
|
|
|
06-18-2007
|
3.00
|
Fwd Baggage covers and seat hinges
|
Details
|
|
|
06-16-2007
|
3.50
|
Baggage bulkhead and tunnel cover
|
Details
|
|
|
06-14-2007
|
2.00
|
F706 nutplates
|
Details
|
|
|
06-13-2007
|
2.00
|
F706 Nutplates
|
Details
|
|
|
06-12-2007
|
2.00
|
Baggage Bulkhead Fabrication
|
Details
|
|
|
06-11-2007
|
2.00
|
Baggage floor complete; started bulkhead
|
Details
|
|
|
06-10-2007
|
4.00
|
Baggage area installation
|
Details
|
|
|
06-06-2007
|
3.00
|
Attached steps to fuselage
|
Details
|
|
|
06-05-2007
|
2.00
|
Fit and drill F774 Forward Top Skin
|
Details
|
|
|
06-04-2007
|
1.50
|
Clecoed and drilled F775 Aft Top Skin
|
|
|
|
05-30-2007
|
4.00
|
Finished riveting, started Aft Top Skin
|
Details
|
|
|
05-29-2007
|
2.50
|
Riveted gussets, canopy deck pieces
|
|
|
|
05-28-2007
|
2.50
|
Primed miscellaneous parts
|
Details
|
|
|
05-27-2007
|
9.00
|
Side Rails & Canopy Decks, & Misc
|
Details
|
|
|
05-26-2007
|
9.00
|
F714 Aft Deck & miscellaneous
|
Details
|
|
|
05-25-2007
|
4.00
|
Bellcrank Support
|
Details
|
|
|
05-24-2007
|
6.00
|
Built False Spar Jig
|
Details
|
|
|
05-19-2007
|
2.00
|
Flipped the Canoe!
|
Details
|
|
|
05-12-2007
|
4.00
|
Foreward bottom skin riveting
|
Details
|
|
|
05-05-2007
|
4.50
|
Foreward Fuselage Riveting
|
Details
|
|
|
05-01-2007
|
2.00
|
Foreward Fuselage Riveting
|
Details
|
|
|
04-29-2007
|
6.00
|
Fuselage rivet squeezing
|
Details
|
|
|
04-21-2007
|
2.00
|
Fwd Fuselage Riveting
|
Details
|
|
|
04-20-2007
|
2.50
|
Fuselage Reassembly
|
Details
|
|
|
04-17-2007
|
1.50
|
Aft-Mid Fuselage prep for reassembly
|
Details
|
|
|
04-16-2007
|
2.00
|
Mid-Fuselage Riveting
|
Details
|
|
|
04-15-2007
|
4.00
|
Fuselage skin priming
|
Details
|
|
|
04-14-2007
|
6.50
|
Fuselage parts cleaning and priming
|
Details
|
|
|
04-13-2007
|
2.00
|
Aft/Mid Fuselage dimpling
|
Details
|
|
|
04-11-2007
|
3.00
|
Longeron and aft fuselage prep
|
Details
|
|
|
04-09-2007
|
1.00
|
Longeron Prep
|
Details
|
|
|
04-08-2007
|
4.00
|
Fuselage prep for priming
|
Details
|
|
|
03-25-2007
|
4.00
|
Foreward fuselage prep - side skins
|
Details
|
|
|
03-23-2007
|
2.00
|
Foreward fuselage prep, 7101-L replace
|
Details
|
|
|
03-19-2007
|
1.50
|
Foreward fuselage prep
|
Details
|
|
|
03-18-2007
|
6.00
|
More prep work
|
Details
|
|
|
03-12-2007
|
2.00
|
F772 Bottom Skin Prep
|
Details
|
|
|
03-10-2007
|
6.00
|
WD-657 Step and Fuselage Disassembly
|
Details
|
|
|
03-09-2007
|
6.00
|
WD-657 External Step
|
Details
|
|
|
01-15-2007
|
2.50
|
Framed Baggage Area
|
Details
|
|
|
01-07-2007
|
4.50
|
Floor stiffener install
|
Details
|
|
|
01-04-2007
|
2.50
|
F6118 Rudder pedal brace
|
Details
|
|
|
01-03-2007
|
3.50
|
Drilled mounting holes for rudder assy's
|
Details
|
|
|
01-01-2007
|
7.00
|
Brake/rudder pedal assembly
|
Details
|
|
|
12-30-2006
|
3.50
|
Assembled brake pedals
|
Details
|
|
|
12-29-2006
|
5.00
|
Fab & Install F796B angles
|
|
|
|
12-28-2006
|
1.00
|
Fab'd all 4 F796C&D Spacers
|
|
|
|
12-27-2006
|
2.50
|
Forward bulkhead fitting
|
Details
|
|
|
12-26-2006
|
7.00
|
Lower Longeron and F-684 Gusset install
|
Details
|
|
|
12-23-2006
|
4.50
|
Installed Aux Longerons & Fwd Stiffners
|
Details
|
|
|
12-20-2006
|
1.50
|
Aux Longerons work
|
Details
|
|
|
12-16-2006
|
2.00
|
Cut holes for landing gear
|
Details
|
|
|
12-14-2006
|
1.50
|
Drilled F770 side skins to firewall
|
Details
|
|
|
12-11-2006
|
1.50
|
Firewall mounting
|
Details
|
|
|
11-25-2006
|
5.00
|
Joining Rear and Center Fuselage Assy.
|
Details
|
|
|
11-24-2006
|
2.00
|
Joining Rear and Center Fuselage Assy.
|
Details
|
|
|
11-23-2006
|
4.00
|
Center Fuselage Joining
|
Details
|
|
|
11-22-2006
|
3.00
|
Center Fuselage Joining
|
Details
|
|
|
11-20-2006
|
1.00
|
Joining Rear and Center Fuselage Assy.
|
Details
|
|
|
11-19-2006
|
2.00
|
Center Fuselage Assembly
|
Details
|
|
|
11-18-2006
|
1.50
|
Finished riveting aft fuselage
|
Details
|
|
|
11-15-2006
|
2.00
|
Mid-Fuselage Assembly
|
Details
|
|
|
11-11-2006
|
3.00
|
Mid-Fuselage riveting
|
Details
|
|
|
11-10-2006
|
9.00
|
Mid Fuselage Riveting
|
Details
|
|
|
11-09-2006
|
7.00
|
Mid Fuselage Prime
|
Details
|
|
|
11-08-2006
|
1.50
|
Finished Dimpling Mid fuselage
|
Details
|
|
|
11-04-2006
|
8.00
|
Mid Fuselage Prep
|
Details
|
|
|
11-03-2006
|
2.00
|
F704 Fit and drill
|
Details
|
|
|
10-09-2006
|
4.00
|
F716 work
|
Details
|
|
|
10-08-2006
|
1.50
|
F716 work
|
Details
|
|
|
10-07-2006
|
3.00
|
Fab'd misc. parts
|
Details
|
|
|
10-02-2006
|
1.50
|
Began Riveting Aft Bottom Skin
|
Details
|
|
|
10-01-2006
|
3.00
|
Aft fuselage reassembly & riveting
|
Details
|
|
|
09-30-2006
|
10.00
|
Finish Aft Fuselage Prep
|
Details
|
|
|
09-27-2006
|
2.00
|
Aft Fuselage Prep for Riveting
|
Details
|
|
|
09-25-2006
|
2.00
|
Aft Fuselage Prep for riveting
|
Details
|
|
|
09-24-2006
|
1.00
|
Aft Fuselage Disassembly for prep
|
|
|
|
09-23-2006
|
7.00
|
Aft fuselage assembly (continued)
|
Details
|
|
|
09-22-2006
|
4.50
|
Aft fuselage assembly (cont)
|
Details
|
|
|
09-20-2006
|
1.00
|
Began Aft Fuselage Assembly
|
Details
|
|
|
09-17-2006
|
5.00
|
Finished longerons and J-chanl stringers
|
Details
|
|
|
09-16-2006
|
12.00
|
Longeron Bending
|
Details
|
|
|
09-10-2006
|
2.00
|
Longeron prep
|
Details
|
|
|
09-04-2006
|
4.00
|
Aft Fuselage Bulkhead Assembly
|
Details
|
|
|
09-03-2006
|
2.00
|
Primed Aft bulkhead pieces
|
Details
|
|
|
09-02-2006
|
8.00
|
F711&F712 Fabrication
|
Details
|
|
|
08-29-2006
|
4.00
|
F706 Fabrication
|
Details
|
|
|
08-27-2006
|
6.00
|
Bulkhead prep & 706 Bulkhead Fabrication
|
Details
|
|
|
08-19-2006
|
4.50
|
Assembled F705 Bulkhead
|
Details
|
|
|
08-18-2006
|
2.00
|
Primed F705 Bulkhead Parts
|
Details
|
|
|
08-17-2006
|
2.50
|
Prepped F705 Bulkhead parts for priming
|
|
|
|
03-30-2006
|
1.50
|
F705 Bulkhead work
|
Details
|
|
|
03-26-2006
|
2.00
|
F705 Bulkhead Work
|
Details
|
|
|
03-21-2006
|
6.00
|
F705 Bulkhead work
|
Details
|
|
|
03-19-2006
|
3.50
|
F704 Bulkhead Work
|
Details
|
|
|
03-18-2006
|
3.00
|
Rivet F704 Bulkhead
|
Details
|
|
|
03-11-2006
|
7.00
|
F704 Bulkhead work
|
Details
|
|
|
03-05-2006
|
6.50
|
F704 Bulkhead work
|
Details
|
|
|
03-04-2006
|
2.00
|
704 Bulkhead Work
|
Details
|
|
|
02-28-2006
|
1.50
|
F704 Bulkhead drilling
|
Details
|
|
|
11-12-2005
|
2.50
|
Finish wing riveting, etc
|
Details
|
|
|
11-07-2005
|
2.00
|
Finished Riveting Wing Skins
|
Details
|
|
|
11-03-2005
|
2.50
|
Wing Skin Riveting
|
Details
|
|
|
10-23-2005
|
2.00
|
Finished firewall riveting.
|
|
|
|
10-17-2005
|
2.00
|
Skin Work
|
Details
|
|
|
10-15-2005
|
4.00
|
Wing skin riveting and firewall riveting
|
Details
|
|
|
10-14-2005
|
1.50
|
Firewall work
|
Details
|
|
|
10-10-2005
|
3.00
|
Firewall work
|
Details
|
|
|
10-08-2005
|
3.00
|
Firewall work
|
Details
|
|
|
10-06-2005
|
2.50
|
Rivet on Left Bottom Inboard Skin
|
Details
|
|
|
10-01-2005
|
2.50
|
Firewall Assembly
|
Details
|
|
|
09-30-2005
|
1.50
|
Begin Firewall assembly
|
Details
|
|
|
09-26-2005
|
2.00
|
Completed Fuselage Inventory
|
|
|
|
09-25-2005
|
2.50
|
Began Inventory of Fuselage Kit
|
|
|
|
09-21-2005
|
0.50
|
Finished Dimpling Left Bottom Wing Skins
|
|
|
|
09-20-2005
|
8.00
|
Left Wing Bottom skin prep
|
Details
|
|
|
09-19-2005
|
5.00
|
Mount Left Aileron, flap hinge work
|
Details
|
|
|
09-17-2005
|
6.00
|
Finish Prep of Bottom Right Wing Skins
|
Details
|
|
|
09-15-2005
|
1.50
|
Prepping Right Bottom Wing Skins
|
Details
|
|
|
09-13-2005
|
2.50
|
Prepped Right Bottom Wing Skins
|
Details
|
|
|
09-12-2005
|
4.00
|
Various Right Wing Tasks
|
Details
|
|
|
09-05-2005
|
5.00
|
Leak Testing and Right Aileron Mounting
|
Details
|
|
|
09-04-2005
|
4.00
|
Leak Test Fuel Tanks
|
Details
|
|
|
09-02-2005
|
3.00
|
Finish right wing aileron attach. , etc
|
Details
|
|
|
09-01-2005
|
2.00
|
Prime inside of aileron pushrods
|
Details
|
|
|
08-28-2005
|
3.00
|
Aileron/Flap Attach Work (Both Wings)
|
Details
|
|
|
08-27-2005
|
3.50
|
Aileron/Flap Attachment Work (Left Wing)
|
Details
|
|
|
08-26-2005
|
1.00
|
Deburring and Aileron Bracket Riveting
|
Details
|
|
|
08-21-2005
|
1.50
|
Prepared Aileron Brackets
|
Details
|
|
|
08-20-2005
|
8.50
|
Completed Flaps
|
Details
|
|
|
08-19-2005
|
3.50
|
Flap work
|
Details
|
|
|
08-18-2005
|
1.50
|
Dimpled Flap parts
|
Details
|
|
|
08-17-2005
|
2.00
|
Flap Drilling and Deburring
|
Details
|
|
|
08-16-2005
|
1.00
|
Primed Stiffener plates
|
Details
|
|
|
08-15-2005
|
3.00
|
Flap stiffener fab
|
Details
|
|
|
08-14-2005
|
5.50
|
Flap assembly and match drilling
|
Details
|
|
|
08-13-2005
|
6.00
|
Completed Ailerons
|
Details
|
|
|
08-12-2005
|
5.00
|
Aileron Riveting
|
Details
|
|
|
08-08-2005
|
3.00
|
Finished sealing left tank....maybe
|
Details
|
|
|
08-07-2005
|
3.00
|
Finished Sealing Right Tank!
|
Details
|
|
|
08-06-2005
|
4.00
|
Fuel Tank Prep for final sealing
|
Details
|
|
|
08-04-2005
|
2.00
|
Aileron Prep
|
Details
|
|
|
08-03-2005
|
1.00
|
Debur ailerons
|
Details
|
|
|
08-02-2005
|
2.00
|
Match Drilled Ailerons
|
Details
|
|
|
08-01-2005
|
2.50
|
Tank & Aileron Work
|
Details
|
|
|
07-31-2005
|
5.00
|
Sealed Inner/Outer Ribs
|
Details
|
|
|
07-30-2005
|
1.00
|
Fuel Tank Component Work
|
Details
|
|
|
07-29-2005
|
1.50
|
Fuel Tank Work
|
Details
|
|
|
07-28-2005
|
2.00
|
Fuel Tank Sealing (Pt3)
|
Details
|
|
|
07-27-2005
|
4.00
|
Fuel Tank Sealing, Pt 2
|
Details
|
|
|
07-25-2005
|
2.50
|
Aileron Work
|
Details
|
|
|
07-24-2005
|
4.00
|
Aileron Stiffeners Installed
|
Details
|
|
|
07-23-2005
|
2.00
|
Aileron Stiffener prep
|
Details
|
|
|
07-21-2005
|
4.00
|
Sealing Fuel Tanks, Part 1
|
Details
|
|
|
07-20-2005
|
3.00
|
Fuel Tank Prep & Cleaning
|
Details
|
|
|
07-18-2005
|
2.00
|
Fuel Tank Prep
|
Details
|
|
|
07-17-2005
|
2.00
|
Fuel Tank Sealing Prep
|
Details
|
|
|
07-16-2005
|
4.00
|
Fuel Tank Prep
|
Details
|
|
|
07-15-2005
|
3.00
|
Right Fuel Tank Prep
|
Details
|
|
|
07-12-2005
|
2.00
|
Riveted Right Wing Top Skins
|
Details
|
|
|
07-10-2005
|
1.50
|
Rt Tank Fuel Level Sensor Work
|
Details
|
|
|
07-09-2005
|
4.50
|
Rt Tank Inboard Rib Prep
|
Details
|
|
|
07-08-2005
|
1.00
|
Rt Tank Rib Stiffeners
|
Details
|
|
|
07-07-2005
|
2.00
|
Right Fuel Tank and Wing Work
|
Details
|
|
|
07-06-2005
|
1.50
|
Finish Rt Wing prep for riveting
|
Details
|
|
|
07-05-2005
|
2.00
|
Dimple Right Wing
|
Details
|
|
|
07-04-2005
|
3.50
|
Right Wing Deburr/Dimple
|
Details
|
|
|
07-03-2005
|
8.00
|
Right Leading Edge Finish, Spar Work
|
Details
|
|
|
07-02-2005
|
5.50
|
Prep Right Leading Edge for Riveting
|
Details
|
|
|
06-30-2005
|
4.00
|
Right Fuel Tank Prep
|
Details
|
|
|
06-28-2005
|
2.50
|
Prepare Rt Fuel Tank Z-brackets
|
Details
|
|
|
06-27-2005
|
2.50
|
Right Wing and Fuel Tank Work
|
Details
|
|
|
06-26-2005
|
4.50
|
Right Wing / Leading Edge Work
|
Details
|
|
|
06-25-2005
|
4.50
|
Rivet L Top W Skins, Put R Wing on Stand
|
Details
|
|
|
06-24-2005
|
0.50
|
Deburr Wing Skin
|
Details
|
|
|
06-23-2005
|
1.50
|
Prepare Pitot Mast
|
Details
|
|
|
06-22-2005
|
3.50
|
Rivet Left Leading Edge
|
Details
|
|
|
06-20-2005
|
3.50
|
Left Wing Top Skin Prep and Mount
|
Details
|
|
|
06-19-2005
|
4.00
|
Left Wing Upper Skins prep
|
Details
|
|
|
06-18-2005
|
1.00
|
Prep rear spar to skin holes
|
Details
|
|
|
06-16-2005
|
2.00
|
Left Wing Skeleton Deburr/Dimple
|
Details
|
|
|
06-15-2005
|
2.00
|
CS Front spar for skin dimples
|
Details
|
|
|
06-14-2005
|
2.50
|
Left Leading Edge Finished, etc
|
Details
|
|
|
06-13-2005
|
2.00
|
Left Leading Edge Riveting
|
Details
|
|
|
06-12-2005
|
4.00
|
Left Leading Edge Prep for Riveting
|
Details
|
|
|
06-10-2005
|
4.00
|
Left Fuel Tank Prep
|
Details
|
|
|
06-09-2005
|
2.00
|
Deburr left wing upper skins
|
Details
|
|
|
06-08-2005
|
1.50
|
Cut T711 stiffeners
|
Details
|
|
|
06-06-2005
|
3.50
|
Left Fuel Tank Prep continued
|
Details
|
|
|
06-05-2005
|
2.50
|
Fuel Tank skin prep
|
Details
|
|
|
06-04-2005
|
6.00
|
Left Fuel Tank Fitting
|
Details
|
|
|
06-03-2005
|
5.50
|
Left fuel tank attach Z-brackets
|
Details
|
|
|
05-30-2005
|
3.00
|
Leading Edge Assy (left wing, pt 2)
|
Details
|
|
|
05-27-2005
|
4.00
|
Leading Edge Assembly (left wing)
|
Details
|
|
|
05-25-2005
|
2.00
|
Finish Match Drilling Left Wing Skins
|
Details
|
|
|
05-24-2005
|
2.50
|
Match Drilled Left Wing Top Skins
|
Details
|
|
|
04-17-2005
|
4.00
|
Primed Ribs
|
Details
|
|
|
04-16-2005
|
4.00
|
Prepped Ribs for priming
|
Details
|
|
|
04-06-2005
|
2.00
|
Corrected Left Spar Manufacturing Flaw
|
Details
|
|
|
04-05-2005
|
1.00
|
Deburred Wing Ribs
|
Details
|
|
|
04-04-2005
|
1.00
|
Debur Ribs
|
Details
|
|
|
04-03-2005
|
2.50
|
Conduit Holes
|
Details
|
|
|
03-30-2005
|
3.00
|
Drilled Wing Skeletons
|
Details
|
|
|
03-28-2005
|
1.00
|
Clecoed Right Wing Skeleton
|
Details
|
|
|
03-14-2005
|
3.00
|
Complete Front/Rear Spar assembly
|
Details
|
|
|
03-12-2005
|
10.00
|
Rear Spar Assembly/Priming
|
Details
|
|
|
03-11-2005
|
1.00
|
Rear Spar Assembly
|
Details
|
|
|
03-10-2005
|
3.00
|
Prep rear spar pieces
|
Details
|
|
|
03-06-2005
|
2.50
|
Assembled Wing Tiedowns
|
Details
|
|
|
03-05-2005
|
4.00
|
Fabricated Wing TieDowns
|
Details
|
|
|
03-02-2005
|
1.00
|
More spar nutplates
|
Details
|
|
|
03-02-2005
|
2.50
|
Front Spar Prep
|
Details
|
|
|
02-28-2005
|
1.50
|
CS tank attach screw holes
|
Details
|
|
|
02-27-2005
|
5.00
|
Tank skin platenuts
|
Details
|
|
|
02-26-2005
|
5.00
|
Built Wing Cradle
|
Details
|
|
|
02-22-2005
|
2.00
|
Inventory Completed
|
Details
|
|
|
02-19-2005
|
2.50
|
Inventory Continued
|
Details
|
|
|
02-18-2005
|
1.50
|
Began Inventory
|
Details
|
|
|
02-05-2005
|
4.00
|
Finished Elevators
|
Details
|
|
|
01-29-2005
|
6.00
|
Elevator Finishing
|
Details
|
|
|
01-22-2005
|
7.00
|
Completed Trim Tab (1 exception!)
|
Details
|
|
|
01-20-2005
|
2.00
|
Trim Tab Prep
|
Details
|
|
|
01-19-2005
|
1.50
|
Trim tab prep
|
Details
|
|
|
01-18-2005
|
2.50
|
Rivet L Elevator skin
|
Details
|
|
|
01-17-2005
|
5.00
|
L. Elevator prep and riveting
|
Details
|
|
|
01-16-2005
|
8.00
|
Close elevator at trim tab cutout
|
Details
|
|
|
01-15-2005
|
1.00
|
Prep Elevator Trim parts
|
Details
|
|
|
01-02-2005
|
3.50
|
Right Elevator riveting
|
Details
|
|
|
01-01-2005
|
3.00
|
Elevator priming and riveting
|
Details
|
|
|
12-25-2004
|
2.00
|
Left elevator prep
|
Details
|
|
|
12-24-2004
|
1.50
|
Left Elevator prep
|
Details
|
|
|
12-23-2004
|
1.00
|
Dimple Right Elevator
|
Details
|
|
|
12-22-2004
|
3.00
|
Right Elevator assembly prep
|
Details
|
|
|
12-20-2004
|
2.00
|
Elevator Skins drilled
|
Details
|
|
|
12-19-2004
|
1.50
|
Elevator Skeleton work
|
Details
|
|
|
12-16-2004
|
2.50
|
Elevator skeleton prep
|
Details
|
|
|
12-13-2004
|
2.00
|
Back Rivet Elevator Skins
|
Details
|
|
|
12-12-2004
|
2.00
|
Rudder Complete
|
Details
|
|
|
12-12-2004
|
1.50
|
Dimple Elevator Skins/Stiffeners
|
Details
|
|
|
12-11-2004
|
4.50
|
Rudder Riveting
|
Details
|
|
|
12-08-2004
|
1.50
|
Elevator Stiffeners
|
Details
|
|
|
12-07-2004
|
1.00
|
Elevator Stiffeners
|
Details
|
|
|
12-06-2004
|
2.00
|
Cut Elevator Stiffeners
|
Details
|
|
|
12-05-2004
|
4.50
|
Rudder Riveting
|
Details
|
|
|
12-05-2004
|
1.50
|
Rivet Rudder Skeleton
|
Details
|
|
|
12-04-2004
|
4.50
|
Rudder Riveting
|
Details
|
|
|
12-01-2004
|
2.00
|
Rudder Work
|
Details
|
|
|
11-29-2004
|
2.50
|
Rudder Prep
|
Details
|
|
|
11-27-2004
|
3.00
|
Rudder assembly and deburr
|
Details
|
|
|
11-26-2004
|
3.50
|
Assemble rudder skeleton
|
Details
|
|
|
11-25-2004
|
5.00
|
Finish rudder stiffener/skin work
|
Details
|
|
|
11-24-2004
|
3.00
|
Dimple Rudder Skins
|
Details
|
|
|
11-20-2004
|
1.50
|
Drill Rudder Stiffeners
|
Details
|
|
|
11-19-2004
|
1.00
|
Trimmed Rudder Stiffeners
|
|
|
|
11-17-2004
|
3.50
|
Completed VS
|
Details
|
|
|
11-16-2004
|
3.00
|
Rivet VS skeleton
|
Details
|
|
|
11-14-2004
|
2.00
|
Primed VS parts
|
Details
|
|
|
11-13-2004
|
5.00
|
VS prep work
|
Details
|
|
|
11-11-2004
|
3.50
|
dimple, CS VS parts
|
Details
|
|
|
11-09-2004
|
3.00
|
Drilled and Deburred VS parts
|
Details
|
|
|
11-08-2004
|
1.50
|
Drilled VS skeleton
|
Details
|
|
|
11-07-2004
|
2.00
|
Cleco'd rear VS, prepped ribs
|
|
|
|
11-06-2004
|
6.00
|
Finished HS
|
Details
|
|
|
11-05-2004
|
3.00
|
Finish riveting left HS
|
Details
|
|
|
11-04-2004
|
1.00
|
Rivet HS707 left to skin
|
Details
|
|
|
11-03-2004
|
1.00
|
Riveted the HS-707s (top)
|
Details
|
|
|
11-02-2004
|
2.00
|
HS riveting
|
Details
|
|
|
11-01-2004
|
2.00
|
Rivet HS Rear Spar
|
Details
|
|
|
10-31-2004
|
2.50
|
Primed HS parts
|
Details
|
|
|
10-30-2004
|
2.00
|
Cleaned/Etched HS parts
|
Details
|
|
|
10-30-2004
|
2.50
|
Built etching/painting jigs
|
Details
|
|
|
10-29-2004
|
2.50
|
Dimpled HS skins, edge finishing
|
Details
|
|
|
10-28-2004
|
2.50
|
HS Dimpling
|
Details
|
|
|
10-26-2004
|
2.50
|
Deburr HS parts
|
Details
|
|
|
10-24-2004
|
3.50
|
Drilled HS, Right Side
|
Details
|
|
|
10-23-2004
|
5.00
|
Drill HS, Left side
|
Details
|
|
|
10-22-2004
|
2.50
|
Finish HS ribs prep
|
Details
|
|
|
10-20-2004
|
1.00
|
Trim HS404 Flanges
|
Details
|
|
|
10-19-2004
|
5.50
|
Front Spar Assembly
|
Details
|
|
|
10-18-2004
|
1.50
|
Asmble HS-411; Fin HS R Spar Prep
|
Details
|
|
|
10-17-2004
|
2.50
|
Match drilled HS rear spar
|
Details
|
|
|
10-16-2004
|
4.00
|
Prep HS Rear Spar Stiffeners
|
|
|
|
10-15-2004
|
3.00
|
Inventory Empannage Kit
|
|
|