Work Log Summary
|
Details
|
03-13-2019
|
8.00
|
Weight and balance
|
Details
|
|
|
03-11-2019
|
10.00
|
Intalled windshield
|
Details
|
|
|
03-09-2019
|
4.00
|
Fuel flow test
|
Details
|
|
|
03-08-2019
|
6.00
|
Cowl installaltion
|
Details
|
|
|
03-07-2019
|
6.00
|
Working on cowl , seats and final trim connector
|
Details
|
|
|
03-07-2019
|
5.00
|
Installed label ,work on final cockpit installatio
|
Details
|
|
|
03-06-2019
|
6.00
|
Installed seat belt , preparing cockpit cover
|
Details
|
|
|
03-05-2019
|
8.00
|
Installed panel and clean up the wire
|
Details
|
|
|
03-04-2019
|
4.00
|
Pick up and and installed seats
|
Details
|
|
|
02-28-2019
|
2.00
|
Reserched the plate requirements
|
Details
|
|
|
02-28-2019
|
5.00
|
Exchanged connector
|
Details
|
|
|
02-27-2019
|
6.00
|
More avionics work
|
Details
|
|
|
02-26-2019
|
5.00
|
Wings final details
|
Details
|
|
|
02-25-2019
|
5.00
|
Connecting right wingn avigation lights
|
Details
|
|
|
02-22-2019
|
6.00
|
Ffinishing wing strut
|
Details
|
|
|
02-21-2019
|
5.00
|
Installing pitot tube
|
Details
|
|
|
02-20-2019
|
6.00
|
Fuselage floor and more
|
Details
|
|
|
02-19-2019
|
6.00
|
Cleaning the wires
|
Details
|
|
|
02-18-2019
|
6.00
|
More work on avionics
|
Details
|
|
|
02-17-2019
|
4.00
|
Installing Jury Strut
|
Details
|
|
|
02-15-2019
|
6.00
|
Inserted wing pins and safe springs
|
Details
|
|
|
02-14-2019
|
6.00
|
Installed secondary spar and strut on left wing
|
Details
|
|
|
02-13-2019
|
8.00
|
Installed strut and secondary spar right wing
|
Details
|
|
|
02-12-2019
|
8.00
|
First wing installation
|
Details
|
|
|
02-11-2019
|
8.00
|
finishing the wing tip and landing lights installa
|
Details
|
|
|
02-08-2019
|
3.00
|
Inserted rivnuts on wing tips
|
Details
|
|
|
02-08-2019
|
3.00
|
Avionics work
|
Details
|
|
|
02-07-2019
|
5.00
|
More work on wiring avionics
|
Details
|
|
|
02-06-2019
|
6.00
|
Finishing the wing tips
|
Details
|
|
|
02-06-2019
|
3.00
|
Carbon fiber cocpit
|
Details
|
|
|
02-05-2019
|
4.00
|
Avionics programming
|
Details
|
|
|
02-04-2019
|
5.00
|
Still working on avionics connetions
|
Details
|
|
|
02-03-2019
|
3.00
|
Installing part pt the windshiedl frame
|
Details
|
|
|
02-02-2019
|
3.00
|
Engine started
|
Details
|
|
|
02-01-2019
|
8.00
|
filled up engine oil fo rthe first time
|
Details
|
|
|
01-31-2019
|
4.00
|
More work on avionics and engine sensor
|
Details
|
|
|
01-31-2019
|
3.00
|
Installing fuel lines and valve
|
Details
|
|
|
01-30-2019
|
2.00
|
Wing tips ligts installed
|
Details
|
|
|
01-30-2019
|
6.00
|
Rotax magneto pins
|
Details
|
|
|
01-29-2019
|
6.00
|
Connecting more wire
|
Details
|
|
|
01-28-2019
|
6.00
|
Engine wiring
|
Details
|
|
|
01-28-2019
|
2.00
|
Breaks line installed
|
Details
|
|
|
01-27-2019
|
4.00
|
Throttle cables installed
|
Details
|
|
|
01-26-2019
|
5.00
|
Installed Choke cable
|
Details
|
|
|
01-25-2019
|
5.00
|
ADS-B in installed
|
Details
|
|
|
01-24-2019
|
6.00
|
More work on avionics
|
Details
|
|
|
01-23-2019
|
8.00
|
Fuel valve ,muffler installation ,
|
Details
|
|
|
01-22-2019
|
5.00
|
Intalling EGT ,CHT wires
|
Details
|
|
|
01-21-2019
|
4.00
|
More wires , more pins
|
Details
|
|
|
01-20-2019
|
4.00
|
Regulator and started solenoid and more pipe work
|
Details
|
|
|
01-19-2019
|
5.00
|
More engine oil lines ,and accessories
|
Details
|
|
|
01-18-2019
|
6.00
|
Engine water and oil lines installation
|
Details
|
|
|
01-17-2019
|
8.00
|
Engine installation
|
Details
|
|
|
01-16-2019
|
6.00
|
engine mount installed and firewall parts
|
Details
|
|
|
01-15-2019
|
3.00
|
Installing landing gear
|
Details
|
|
|
01-15-2019
|
3.00
|
Clearing customs and pick up the engine
|
Details
|
|
|
01-14-2019
|
6.00
|
Connecting Trasponder & Radio antenna
|
Details
|
|
|
01-13-2019
|
4.00
|
finishing door ,riveting glass
|
Details
|
|
|
01-12-2019
|
5.00
|
More on cockpit work wiring master and radio
|
Details
|
|
|
01-11-2019
|
3.00
|
Still rivecting fuselage panels
|
Details
|
|
|
01-10-2019
|
6.00
|
Installing and connecting Flaps switch
|
Details
|
|
|
01-09-2019
|
6.00
|
Installing and connecting trim swicth
|
Details
|
|
|
01-07-2019
|
6.00
|
Preparing wiring under the seats
|
Details
|
|
|
01-06-2019
|
6.00
|
More riveting
|
Details
|
|
|
01-05-2019
|
6.00
|
Riveting th efuselage
|
Details
|
|
|
01-04-2019
|
8.00
|
Installed stabilizer cap ,lights and cables
|
Details
|
|
|
01-03-2019
|
3.00
|
Stabilizer tip drilled and primed
|
Details
|
|
|
01-03-2019
|
2.00
|
Painted fuselage former
|
Details
|
|
|
01-03-2019
|
3.00
|
Installed stick swicthes
|
Details
|
|
|
01-02-2019
|
8.00
|
almost finished the autopilot ,battery and soleno
|
Details
|
|
|
01-01-2019
|
6.00
|
vertical stabilizer installed
|
Details
|
|
|
12-31-2018
|
6.00
|
still working on vertical stabilizer
|
Details
|
|
|
12-29-2018
|
8.00
|
worrkig on autopilot tray and antennas
|
Details
|
|
|
12-28-2018
|
12.00
|
Vertical stabilizer installed
|
Details
|
|
|
12-22-2018
|
6.00
|
Finishing tail wing
|
Details
|
|
|
12-21-2018
|
8.00
|
Tail wing stabilizer section finished and install
|
Details
|
|
|
12-21-2018
|
2.00
|
Fuselage bottom installed
|
Details
|
|
|
12-19-2018
|
4.00
|
Working on elevator
|
Details
|
|
|
12-19-2018
|
5.00
|
More wiring
|
Details
|
|
|
12-18-2018
|
7.00
|
working on step 15 tail wing
|
Details
|
|
|
12-18-2018
|
6.00
|
Avionics work
|
Details
|
|
|
12-17-2018
|
6.00
|
Installing the autopilot servos
|
Details
|
|
|
12-15-2018
|
5.00
|
Cockpit work
|
Details
|
|
|
12-13-2018
|
8.00
|
More work on wiring and cockpit layout
|
Details
|
|
|
12-12-2018
|
4.00
|
working on tank cover
|
Details
|
|
|
12-12-2018
|
2.00
|
Installed battery holder and more small items on
|
Details
|
|
|
12-12-2018
|
2.00
|
ELT based installed
|
Details
|
|
|
12-11-2018
|
6.00
|
Working on avionics
|
Details
|
|
|
12-10-2018
|
6.00
|
Step 19 landing gear
|
Details
|
|
|
12-08-2018
|
6.00
|
Panting primer on door and and left panel
|
Details
|
|
|
12-07-2018
|
14.00
|
finishing the door
|
Details
|
|
|
12-06-2018
|
6.00
|
Moving the fuselage painted panels
|
Details
|
|
|
12-05-2018
|
6.00
|
Painting the fuselage panels
|
Details
|
|
|
12-04-2018
|
8.00
|
Painting interior panels
|
Details
|
|
|
12-03-2018
|
5.00
|
Washing and preparing panels for primer
|
Details
|
|
|
12-01-2018
|
5.00
|
Step 21 , preparing the door
|
Details
|
|
|
11-28-2018
|
12.00
|
step 8,9
|
Details
|
|
|
11-26-2018
|
15.00
|
step 8 ,9 and 12
|
Details
|
|
|
11-25-2018
|
15.00
|
step 8 and 9
|
Details
|
|
|
11-21-2018
|
8.00
|
step 8 and 9
|
Details
|
|
|
11-20-2018
|
8.00
|
step 8 and 9
|
Details
|
|
|
11-19-2018
|
8.00
|
step 8 and 9 assembly
|
Details
|
|
|
11-17-2018
|
8.00
|
Step 8 and 9 continue
|
Details
|
|
|
11-16-2018
|
12.00
|
Step 9 fuselage assembly
|
Details
|
|
|
11-15-2018
|
8.00
|
Fuselage assembly
|
Details
|
|
|
11-14-2018
|
11.00
|
Steo 8 10/16 reassembly and riveted fuselage
|
Details
|
|
|
11-13-2018
|
10.00
|
Disassembly deburr and paint fuselage
|
Details
|
|
|
11-12-2018
|
10.00
|
Step 8 ,9 of 16
|
Details
|
|
|
11-12-2018
|
10.00
|
Right wing assembly
|
Details
|
|
|
11-11-2018
|
10.00
|
Right and left wing Complete
|
Details
|
|
|
11-09-2018
|
12.00
|
Finishd left wing ,started right wing
|
Details
|
|
|
11-08-2018
|
14.00
|
finishing left wing ,closing skin
|
Details
|
|
|
11-07-2018
|
15.00
|
still working on step 29 on left wing
|
Details
|
|
|
11-06-2018
|
10.00
|
Step 29
|
Details
|
|
|
11-05-2018
|
8.00
|
Step 29
|
Details
|
|
|
11-03-2018
|
6.00
|
still working on step 29
|
Details
|
|
|
11-02-2018
|
8.00
|
step 29
|
Details
|
|
|
11-01-2018
|
8.00
|
Step 28 complete started step 29
|
Details
|
|
|
10-31-2018
|
8.00
|
flaps done one ailern done
|
Details
|
|
|
10-30-2018
|
8.00
|
still working on flasps and ailerons
|
Details
|
|
|
10-29-2018
|
8.00
|
flap assebly e preparation de burr and primed
|
Details
|
|
|
10-28-2018
|
2.00
|
step 26 and 27 flaps and ailerons control
|
Details
|
|
|
10-27-2018
|
4.00
|
Step 24 and 25 Flaps and ailerons parts
|
Details
|
|
|
10-26-2018
|
6.00
|
Preparing formers step 8
|
Details
|
|
|
10-25-2018
|
4.00
|
Preparing and reserching parts for step 8
|
Details
|
|
|
10-25-2018
|
6.00
|
finishing step 6 and 7
|
Details
|
|
|
10-24-2018
|
5.00
|
Step 4 installing rudder pedals
|
Details
|
|
|
10-24-2018
|
2.00
|
Preparing step 6 and 7 parts
|
Details
|
|
|
10-22-2018
|
6.00
|
Step 3 bottom sheetiing fuselage
|
Details
|
|
|
10-19-2018
|
10.00
|
Step 1 to 3 groppo manual
|
Details
|
|
|
10-18-2018
|
3.00
|
Open box and parts inventory
|
Details
|
|
|
10-18-2018
|
3.00
|
Loading and unloading
|
Details
|
|
|
10-12-2018
|
2.00
|
Preparing shop & tools
|
Details
|
|
|
09-17-2018
|
1.00
|
Shipping
|
Details
|
|