KitLog pro

Powered By Kitlog Pro v2.0

Ron Web Site
Work Logs Found: 429
Category Work Time: 1380 Hours
 Date
Hours
Work Log Summary

Details

 01-24-2024
6.80
Seat Belts, Elevator Trim Rigging, Autopilot Servo
Details
       

 01-23-2024
0.00
Rear Stick
     

 01-23-2024
7.80
Interior, Transponder and Static Test, Rear Stick
Details
       

 01-21-2024
8.10
Pitot tube, roll servo, wing tips
Details
       

 01-19-2024
5.00
ELT Antenna and Removing Vinyl
Details
     

 01-18-2024
8.00
First Engine Run and Fuel Tank Calibration
Details

 11-20-2023
8.00
Avionics Power up and checkout
Details
       

 11-01-2023
6.00
Wiring
Details
       

 06-16-2023
5.60
Main Wheels and Panel
Details
     

 06-15-2023
5.90
Landing Gear and Tailwheel
Details
       

 06-14-2023
2.00
Landing Gear

 06-12-2023
5.70
Antennas and other miscellaneous items
       

 06-11-2023
2.00
Antenna Plates
Details
       

 05-03-2023
1.40
Tail Light
Details
     

 03-19-2023
0.80
FlyLEDs
Details
     

 03-17-2023
3.30
FlyLEDs
Details
     

 03-15-2023
1.80
Manifold Pressure
Details
       

 03-13-2023
1.10
Wiring

 03-12-2023
8.10
Wiring
Details
     

 03-11-2023
3.90
Wiring
Details
       

 03-10-2023
1.00
Wiring

 03-09-2023
0.70
Wiring

 03-04-2023
1.00
Battery Box
Details
     

 03-03-2023
2.90
Firewall, Battery box and wiring

 03-02-2023
5.10
Wiring

 02-28-2023
3.30
Firewall
Details
     

 02-27-2023
7.50
Firewall

 02-26-2023
5.10
Firewall
Details
       

 02-25-2023
4.70
Firewall
Details
       

 02-23-2023
2.40
Firewall
Details
       

 02-20-2023
6.30
ADS-B Access Panel and Antennas
Details
       

 02-19-2023
2.70
ADS-B Antenna Access Panel
Details
     

 02-18-2023
2.10
Antenna
Details

 02-15-2023
5.60
Magnetometer and VOR/ILS antenna
Details
     

 02-14-2023
3.60
Magnetometer
Details
     

 02-13-2023
0.60
Stick Grip

 02-12-2023
2.60
Stick Grip
Details
     

 02-11-2023
1.30
Wiring

 02-10-2023
1.90
Wiring

 02-06-2023
5.50
Wiring
Details
       

 01-30-2023
1.40
Wiring

 01-29-2023
4.90
Wiring

 01-24-2023
3.10
Wiring

 01-23-2023
2.70
Wiring
Details
       

 01-23-2023
0.00
Wiring
       

 01-18-2023
2.50
Wiring

 01-17-2023
4.50
Wiring

 01-16-2023
1.90
Wiring

 01-15-2023
3.70
FlyLEDs
Details
       

 01-14-2023
5.50
FlyLEDs Kit
Details
       

 01-13-2023
3.40
Wiring

 01-12-2023
5.20
Wiring

 01-11-2023
2.30
Wiring

 01-10-2023
2.00
Avionics/Wiring

 12-26-2022
5.20
Avionics Wiring
Details

 12-19-2022
1.30
Avionics Wiring

 10-12-2022
1.70
Avionics Wiring

 03-25-2022
0.60
Avionics Wiring

 03-22-2022
2.70
Avionics Wiring

 03-21-2022
5.20
Avionics Wiring

 03-16-2022
4.10
Avionics Wiring

 03-14-2022
5.60
Avionics Wiring
Details
     

 03-08-2022
0.70
Wiring

 02-24-2022
2.90
Avionics Wiring
Details
     

 02-23-2022
2.00
Avionics Wiring

 02-04-2022
2.30
Avionics Wiring

 01-28-2022
4.40
Avionics Wiring
     

 01-27-2022
3.80
Wiring
Details
       

 01-25-2022
7.50
Wiring
Details
       

 01-25-2022
0.00
Wiring
     

 01-24-2022
1.80
Wiring
Details
     

 01-23-2022
4.40
Wiring

 01-22-2022
3.40
Electric Elevator Trim Wiring
Details
       

 01-20-2022
4.10
Elevator Trim Wiring
Details
     

 01-18-2022
4.60
Wiring

 01-06-2022
3.80
ELT and other Wiring
Details
       

 12-27-2021
3.00
ELT Wiring

 12-22-2021
2.60
Wiring

 12-21-2021
3.10
Autopilot servo and wiring
Details
     

 12-05-2021
1.70
Panel and Wiring

 12-04-2021
0.70
Panel and Wiring

 12-02-2021
1.30
Instrument Panel
Details
     

 12-01-2021
3.10
Instrument Panel
Details
       

 11-30-2021
7.70
Instrument Panel
Details
       

 11-29-2021
4.70
Avionics Shelf
Details
       

 11-28-2021
0.80
Avionics Shelf
Details
     

 11-26-2021
2.70
Avionics Shelf

 11-20-2021
6.70
Avionics Shelf
Details
       

 11-19-2021
2.70
Avionics Shelf
Details
       

 11-18-2021
4.30
Instrument Panel
Details
       

 11-14-2021
5.20
Instrument Panel
Details
       

 11-14-2021
0.00
Instrument Panel
       

 11-14-2021
0.00
Instrument Panel
     

 06-14-2021
1.20
Instrument Panel

 05-28-2021
0.70
Instrument Panel

 05-25-2021
5.20
Instrument Panel
       

 05-24-2021
5.00
Instrument Panel
       

 05-21-2021
4.80
Instrument Panel
     

 05-20-2021
2.70
Instrument Panel

 05-19-2021
2.10
Instrument Panel
     

 04-11-2021
3.60
Instrument Panel
     

 04-10-2021
2.30
Instrument Panel

 04-09-2021
2.30
Instrument Panel

 03-19-2021
4.80
Instrument Panel
       

 03-18-2021
5.50
Panel Layout and Cutting
Details

 03-16-2021
7.90
Pitch Servo, VS Forward Spar, Panel Layout
Details
       

 03-15-2021
2.80
Pitch Servo

 03-14-2021
3.00
Pitch Servo

 03-13-2021
1.80
ELT Bracket
Details
     

 03-12-2021
3.80
ELT Bracket
       

 03-11-2021
2.20
ELT Bracket
Details
     

 03-10-2021
2.30
Aileron Trim
     

 03-08-2021
1.70
Aileron Trim

 03-07-2021
4.70
Aileron Trim
       

 03-01-2021
1.70
Aileron Trim

 02-27-2021
1.60
Riveting the Aft Upper Skin

 02-26-2021
1.80
Riveting After Upper Skin
Details
       

 02-25-2021
30.00
Electrical System Design
Details
       

 02-15-2021
8.00
Electrical System Design
Details

 02-11-2021
1.80
Drift Pins, Drain Holes, Rear Skin
Details

 01-25-2021
3.70
Baggage Door
       

 01-24-2021
1.30
Baggage Door
     

 01-23-2021
1.20
Baggage Door

 01-22-2021
1.80
Brake Lines

 01-19-2021
1.30
Static System & Air Vent
     

 01-13-2021
2.50
Map Box Construction
       

 01-11-2021
4.60
Map Box Prep, Gussets, Forward Fuselage Dimpling
     

 01-05-2021
3.90
Forward Fuselage Top Skin
     

 01-03-2021
8.10
Fuselage Bulkheads, Instrument Panel and Priming
Details
       

 01-02-2021
4.20
Forward Upper Fuselage
Details

 01-01-2021
1.70
Forward Upper Fuselage
Details
     

 12-31-2020
2.70
Service Letter 00014
Details
     

 12-30-2020
1.20
Service Letter 00014
Details
     

 12-29-2020
2.60
Static System and Roll Bar
Details
     

 12-27-2020
6.50
Aft Skin and Tie Down Storage
Details
     

 12-15-2020
4.70
Elevator Rigging
Details
       

 12-14-2020
2.50
Aft Skin
Details

 12-13-2020
6.10
Aft Upper Skin
Details
       

 12-11-2020
2.00
Aft Fuselage Skin

 12-08-2020
3.70
Brake System
Details
       

 12-06-2020
5.20
Brake System
Details
     

 12-05-2020
2.00
Fuel System
Details
     

 11-29-2020
5.20
Fuel System
Details
       

 11-24-2020
7.60
Rudder Pedals and Fuel System
Details
       

 11-21-2020
1.00
Priming

 11-16-2020
1.20
Fuel Filter and Pump Brackets
Details

 11-13-2020
5.20
Fuel Vent Lines
Details
     

 11-12-2020
4.00
Fuel System
Details

 11-11-2020
5.30
Rudder Pedals
Details
       

 11-10-2020
3.40
Rudder Pedals
Details
     

 11-08-2020
4.30
Rudder Cables and Rudder Pedals
Details
       

 10-02-2020
2.90
Control Rigging

 09-25-2020
2.00
Control Surface Rigging

 09-24-2020
4.40
Elevator Control System
Details
       

 09-23-2020
3.10
Elevator Control System
Details

 09-15-2020
0.80
Control System

 09-09-2020
2.40
Control System
       

 09-08-2020
1.70
Control System
       

 09-07-2020
1.00
Control System

 09-04-2020
2.80
Priming

 09-03-2020
1.80
Assembling F-841 Pushrod
Details
       

 08-24-2020
3.80
Elevator Control System
Details
       

 06-14-2020
2.80
Mounting the Vertical Stabilizer
       

 06-04-2020
2.50
Mounting the Vertical Stabilizer
Details
       

 06-01-2020
2.30
Mounting the Vertical Stabilizer
Details
     

 05-25-2020
1.00
Mounting the Vertical Stabilizer
       

 05-20-2020
2.30
Attaching the Empennage
Details
     

 05-19-2020
3.00
Attaching the Empennage
Details
     

 05-15-2020
5.80
Riveting Footwells and Making Cable Anchor
Details
       

 05-14-2020
6.50
Riveting Rear Seat Back and Floors
Details
       

 05-14-2020
0.00
Riveting Rear Seat Back and Floors
       

 05-13-2020
3.10
Riveting Seats
Details
     

 05-12-2020
6.20
Priming Fuselage Parts
Details

 05-11-2020
7.30
Cockpit Preparation

 05-08-2020
5.20
Fuselage Floors
Details
       

 05-08-2020
0.00
Fuselage Floors
       

 05-07-2020
2.90
Fitting the Flap Bearing Blocks
Details

 05-05-2020
4.40
Floors and Baggage Area
Details
       

 05-04-2020
3.70
Rear Seatback
Details
     

 05-01-2020
1.10
Drilling Front Seatback
Details
     

 04-24-2020
3.70
Landing Gear Installation
Details

 04-22-2020
8.20
Fitting the Landing Gear
Details
       

 04-21-2020
2.50
Drilling F-804N-1 Bulkhead Caps
Details

 04-17-2020
2.70
Verifying QB Fuselage
Details
     

 04-16-2020
6.80
Ensuring QB Fuselage is Complete
Details
       

 04-15-2020
2.70
Ensuring Quick Build is Complete
Details
     

 03-28-2020
3.50
Wing Tips
Details

 03-28-2020
2.00
Building a Rotisserie
Details

 03-27-2020
4.50
Wing Tips
Details

 03-25-2020
3.50
Wing Tips
Details
     

 03-23-2020
2.30
Wingtip
Details
     

 03-13-2020
4.90
Riveting Platenuts for Inspection Covers and Fitti
Details
       

 03-05-2020
5.10
Riveting the Bottom Wing Skins
Details
       

 03-05-2020
0.00
Riveting the Bottom Wing Skins
       

 03-04-2020
3.90
Riveting the Bottom Wing Skins
Details

 02-18-2020
3.30
Riveting The Bottom Wing Skins
Details

 02-17-2020
5.70
Riveting the Bottom Skins
Details
     

 02-10-2020
2.90
Riveting the Bottom Wing Skins
Details
     

 02-09-2020
1.70
Riveting the Bottom Skins
Details
     

 02-08-2020
1.70
Rigging the Flaps
Details

 02-06-2020
4.70
Rigging the Flaps
Details
       

 02-03-2020
3.00
Rigging Ailerons and Flaps
Details

 01-27-2020
7.00
Rigging the Ailerons and Flaps
Details
       

 01-27-2020
0.00
Rigging the Ailerons and Flaps
     

 01-20-2020
2.70
Aileron Bellcranks and Pushrods
Details
       

 01-19-2020
1.80
Aileron Pushrods
Details
     

 01-18-2020
3.50
Aileron Pushrods
Details
     

 01-12-2020
6.80
Riveting the Aileron
Details

 01-11-2020
6.80
Riveting the Flaps
Details

 01-10-2020
5.20
Riveting the Flaps
Details
       

 01-09-2020
1.30
Countersinking the Flap Brace
Details

 01-08-2020
2.60
Building the Flaps
Details
       

 01-07-2020
2.30
Finishing the Left Aileron
Details
       

 01-06-2020
5.90
Riveting the Left Aileron
Details
       

 01-06-2020
0.00
Riveting the Left Aileron
       

 01-05-2020
0.00
Pitot Work and Assembling the Ailerons
       

 01-05-2020
10.10
Pitot Work and Assembling the Ailerons
Details
       

 01-04-2020
2.00
Pitot Tube
Details
       

 01-03-2020
1.50
Wiring and Pitot Plumbing
Details

 12-29-2019
1.70
Wiring
Details

 12-18-2019
3.00
Wiring
Details

 12-12-2019
2.00
Mounting Pitot Controller
Details
     

 11-21-2019
1.00
Wiring

 11-19-2019
2.70
Riveting Flap and Aileron Fairings
       

 11-17-2019
3.30
Aileron Brackets
Details
       

 11-17-2019
0.00
Aileron Brackets
       

 11-16-2019
5.20
Priming
Details

 10-30-2019
1.70
Gretz Pitot Mount
Details
       

 10-29-2019
8.30
Flaps, Wiring and Pitot Tube
Details
     

 10-28-2019
5.30
Flaps
Details

 10-27-2019
6.10
Building the Flaps
Details
       

 10-25-2019
3.10
Flap Assembly
Details
       

 10-24-2019
6.00
Ailerons and Flaps
Details
       

 10-23-2019
2.20
Ailerons
Details

 10-22-2019
4.30
Ailerons
Details
     

 10-21-2019
7.00
Aileron and Flap Fairings
Details
       

 10-02-2019
4.80
Riveting Top Skins
Details

 09-29-2019
7.20
Riveting the Top Skins
Details
       

 09-24-2019
2.60
Priming and Clecoing Top Skins
Details

 09-18-2019
5.70
Installing the Fuel Tanks
Details
       

 09-13-2019
3.50
Riveting Leading Edges
Details
       

 09-12-2019
5.80
Riveting Leading Edges
Details
     

 09-11-2019
3.90
Riveting Leading Edges
Details
       

 09-09-2019
9.00
Fuselage Inventory
Details

 09-08-2019
3.80
Fuselage Inventory
Details

 09-07-2019
0.40
Riveting Leading Edges
Details
       

 09-06-2019
2.60
Scarf Joints
Details
     

 08-30-2019
2.50
Scarf Joints
Details

 08-20-2019
3.00
Preparing the Splice Plates
Details
       

 08-09-2019
1.40
Preparing the Wings for Riveting
Details

 08-04-2019
7.40
Priming and Dimpling Wing Ribs and Spars
Details

 08-03-2019
2.30
Countersinking Main Spar
Details

 08-02-2019
2.20
Countersinking Main Spar
Details
     

 07-28-2019
1.60
Deburring Wing Skeleton
Details

 07-25-2019
7.30
Priming and Deburring
Details

 07-17-2019
2.30
Dimpling the Wing Skins

 07-16-2019
6.50
Prepping the Wing Skins
Details

 07-10-2019
1.60
Prepping the Wing Skins
Details

 06-27-2019
5.60
Prepping the Wing Skins
Details

 05-23-2019
3.00
Leak Testing the Tanks
Details
       

 04-30-2019
8.50
Sealing the Tanks
Details
       

 04-30-2019
0.00
Sealing the Tanks
     

 04-24-2019
5.60
Sealing the Tanks
Details

 04-17-2019
2.70
Sealing the Tanks

 04-09-2019
4.10
Sealing the Tanks
Details

 04-08-2019
5.60
Sealing the Tanks
Details

 04-07-2019
5.20
Modifying the Left Tank for Flop Tube
Details
       

 04-04-2019
2.90
Sealing the Tanks
Details

 04-03-2019
8.50
Sealing the Tanks
Details
       

 04-02-2019
3.00
Building the Tanks
Details
       

 04-01-2019
8.50
Building the Tanks
Details
       

 04-01-2019
0.00
Building the Tanks
       

 04-01-2019
0.00
Building the Tanks
       

 03-25-2019
2.60
Sealing the Tanks
Details
       

 03-25-2019
0.00
Sealing the Tanks
       

 03-08-2019
3.50
Sealing The Tanks
Details
     

 03-04-2019
5.30
Sealing the Tanks
Details

 03-03-2019
6.50
Sealing the Tanks
Details
       

 03-03-2019
0.00
Sealing the Tanks
     

 03-02-2019
5.00
Sealing the Tanks
Details
     

 03-01-2019
5.00
Sealing the Tanks
Details
       

 03-01-2019
0.00
Sealing the Tanks
       

 02-08-2019
2.00
Fuel Tank Prep
Details
       

 02-06-2019
4.90
Fuel Tank Prep
Details
       

 01-29-2019
2.00
Fuel Tank Prep
     

 01-04-2019
6.30
Fuel Tank Preparations
Details
       

 01-04-2019
0.00
Fuel Tank Preparations
       

 01-04-2019
0.00
Fuel Tank Preparations
     

 01-03-2019
2.60
Riveting Platenuts
Details
     

 12-30-2018
2.00
Drilling and Countersinking Z Brackets
Details
       

 12-29-2018
3.60
Drilling Tank Skins
Details
       

 12-28-2018
0.00
Fitting Tanks Skins and Z Brackets
     

 12-28-2018
5.20
Fitting Tank Skins and Z Brackets
Details
       

 12-27-2018
3.00
Fitting Tank Skins and Z Brackets
Details

 12-21-2018
2.50
Fitting Tank Skins
Details

 12-20-2018
0.00
Fitting the Attach Angles and Tanks Skins
       

 12-20-2018
8.20
Fitting Attach Angles and Tanks Skins
Details
       

 12-19-2018
5.30
Fitting the Attach Angles
Details
       

 12-19-2018
0.00
Fitting the Attach Angles
     

 12-18-2018
3.40
Fitting Attach Angles to Spar
Details
       

 12-17-2018
7.70
Fitting the Leading Edges
Details
     

 12-16-2018
4.30
Drilling the Main Wing Skins
Details
     

 12-15-2018
0.50
Fitting the Main Wing Skins
Details

 12-14-2018
1.00
Clecoing Main Skins
Details

 12-07-2018
4.70
Fitting Main Skins and Fitting Leading Edge
Details
       

 12-06-2018
5.00
Riveting Wing Skeleton/Fitting Main Skins
Details
       

 12-01-2018
2.80
Wing Walk Doublers and Riveting Wing Skeleton
Details
       

 11-30-2018
5.50
Assembling the Wing Skeleton
Details
       

 11-30-2018
0.00
Assembling the Wing Skeleton
       

 11-29-2018
1.00
Assembling the Rear Spar
Details

 11-22-2018
1.00
Drilling Out Rivets
Details

 11-20-2018
0.00
Assembling the Wing Skeleton
       

 11-20-2018
0.00
Assembling the Wing Skeleton
       

 11-20-2018
4.20
Assembling the Wing Skeleton
Details
       

 11-19-2018
1.20
Assembling the Wing Skeleton
Details
     

 11-13-2018
6.30
Priming
Details

 11-06-2018
6.80
Preparing and Drilling Wing Ribs
Details
       

 11-06-2018
0.00
Preparing and Drilling the Wing Ribs
     

 11-01-2018
9.60
Preparing the Wing Ribs
Details
       

 10-31-2018
4.30
Priming and Assembling the Rear Spar
Details
       

 10-26-2018
4.40
Assembling the Rear Spar
Details
       

 10-25-2018
4.70
Tie Down and Rear Spar
Details
       

 10-24-2018
0.00
Building the Tie Down Assembly
       

 10-24-2018
7.40
Building the Tie Down Assembly
Details
       

 10-19-2018
4.50
Preparing the Main Spar
Details
       

 10-18-2018
4.50
Preparing the Main Spar
Details
     

 10-17-2018
5.40
Preparing the Main Spar
Details
       

 10-16-2018
1.70
Marking and Drilling Main Spar
Details

 10-15-2018
3.30
Building Wing Cradle
Details
       

 10-14-2018
8.50
Building Wing Cradle
Details
     

 10-13-2018
3.00
Building Wing Stand
Details
       

 10-12-2018
4.00
Building Wing Stand
Details

 10-11-2018
8.90
Finishing the Elevators
Details
       

 10-11-2018
0.00

       

 10-11-2018
0.00

     

 10-07-2018
1.50
Finishing the Elevators
Details
     

 10-03-2018
7.40
Riveting the Elevators
Details
       

 10-03-2018
0.00

       

 10-03-2018
0.00

       

 10-02-2018
1.00
Priming
Details

 10-01-2018
2.10
Building the Trim Tab
Details
       

 09-28-2018
4.40
Fabricating Riblets
Details
       

 09-28-2018
0.00
Fabricating Riblets
       

 09-09-2018
1.10
Riblet Fabrication
Details
       

 09-01-2018
2.20
Riveting the Left Elevator
Details
       

 09-01-2018
0.00

       

 08-31-2018
5.40
Riveting the Left and Right Elevators
Details
       

 08-31-2018
0.00

       

 08-31-2018
0.00

       

 08-30-2018
6.60
Trimming the Stiffeners, Riveting the Left Elevato
Details
       

 08-30-2018
0.00

       

 08-30-2018
0.00

       

 08-30-2018
0.00

       

 08-16-2018
8.00
Wing Kit Inventory
Details

 08-15-2018
8.00
Wing Kit Inventory
Details

 08-14-2018
2.00
Wing Kit Inventory
Details
       

 08-14-2018
1.60
Completing the Leading Edge of the Rudder
Details
       

 08-13-2018
0.50
Completing the Leading Edge of the Rudder
Details
       

 08-09-2018
1.00
Completing the Leading Edge of the Rudder
Details
       

 08-02-2018
1.00
Riveting the Rudder
Details
     

 07-29-2018
6.00
Riveting the Rudder
Details
       

 07-29-2018
0.00

       

 07-29-2018
0.00

       

 07-29-2018
0.00

       

 07-27-2018
4.10
Priming
Details

 07-26-2018
5.70
Trimming the Elevator Stiffeners
Details

 07-23-2018
2.30
Building the Trim Tab
Details
     

 07-22-2018
1.30
Preparing the Right and Left Elevator
Details

 07-19-2018
6.00
Preparing the Right and Left Elevator
Details
       

 07-19-2018
0.00

       

 07-19-2018
0.00

       

 07-18-2018
2.30
Trimming the Elevator Stiffeners and Preparing the
Details
       

 07-18-2018
0.00

       

 07-15-2018
7.70
Trimming the Elevator Stiffeners and Preparing the
Details
       

 07-15-2018
0.00

       

 07-14-2018
1.30
Trimming the Elevator Stiffeners
Details

 07-08-2018
3.80
Building the rudder skeleton and trimming the elev
Details

 06-15-2018
7.50
Building the rudder skeleton
Details
       

 06-15-2018
0.00

       

 06-15-2018
0.00

       

 06-15-2018
0.00

       

 06-13-2018
2.20
Bending the rudder trailing edge
Details
       

 06-11-2018
1.70
Riveting the Stiffeners to the Rudder Skin
Details
       

 06-11-2018
0.00

       

 06-08-2018
0.50
Riveting the Stiffeners to the Rudder Skin
Details

 06-07-2018
1.30
Riveting the Stiffeners to the Rudder Skin
Details
       

 06-07-2018
0.00

       

 06-01-2018
9.00
Riveting the Vertical Stabilizer
Details
       

 06-01-2018
0.00

       

 06-01-2018
0.00

       

 06-01-2018
0.00

       

 06-01-2018
0.00

       

 06-01-2018
0.00

       

 06-01-2018
0.00

       

 05-31-2018
3.50
Riveting the Horizontal Stabilizer
Details
       

 05-31-2018
0.00

       

 05-19-2018
4.30
Riveting the Horizontal Stabilizer
Details
       

 05-19-2018
0.00

       

 05-19-2018
0.00

       

 05-13-2018
2.00
Riveting the Horizontal Stabilizer
Details
       

 05-11-2018
2.60
Riveting the Horizontal Stabilizer
Details
       

 05-11-2018
0.00

       

 05-08-2018
1.30
Riveting the Horizontal Stabilizer
Details
       

 05-07-2018
2.60
Riveting the Horizontal Stabilizer
Details
       

 05-07-2018
0.00

     

 05-01-2018
2.30
Riveting the Horizontal Stabilizer
Details
       

 05-01-2018
0.00

       

 04-26-2018
6.00
Priming
Details
       

 04-26-2018
0.00

       

 04-21-2018
4.30
Trimming Rudder Stiffeners, Fitting Stiffeners to
Details
       

 04-21-2018
0.00

       

 04-19-2018
1.30
Trimming Rudder Stiffeners
Details
       

 04-18-2018
4.00
Drilling and Dimpling Vertical Stabilizer
Details
       

 04-17-2018
3.50
Dimpling Horizontal Stabilizer skin, Drilling Vert
Details
       

 04-17-2018
0.00

       

 04-17-2018
0.00

       

 04-16-2018
4.00
Dimpling
Details

 03-16-2018
1.50
Drilling HS-708 Right
Details
     

 02-18-2018
2.50
Deburring Parts
Details

 02-15-2018
5.50
Finish Drilling Left and Right Horizontal Stabiliz
Details
       

 02-15-2018
0.00

     

 02-14-2018
4.50
Left side horizontal stabilizer assembly
Details
       

 02-14-2018
0.00

     

 02-12-2018
1.50
Rib Prep
Details

 02-11-2018
3.00
Edge Prep
Details

 02-09-2018
5.00
Completed Rear Spar Assembly & Front Spar Assembly
Details
       

 02-09-2018
0.00

       

 02-08-2018
2.00
Verified work done by previous builder
Details
       

 01-18-2018
3.00
Empennage Kit Inventory
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.