Date
|
Hours
|
Work Log Summary
|
Details
|
12-14-2018
|
2.00
|
Door handle micro release
|
|
|
|
12-13-2018
|
3.00
|
purchase order gascolator and misc fuel parts
|
|
|
|
12-13-2018
|
4.00
|
Flap motor 2.0 rapid prototype mount & adapter
|
|
|
|
12-12-2018
|
1.00
|
Wingtip clear lense clay mockup
|
|
|
|
12-12-2018
|
2.00
|
Flap motor 2.0 wiring mockup
|
|
|
|
12-11-2018
|
4.00
|
Brake pedals mockup and interior hose measure
|
|
|
|
12-10-2018
|
1.00
|
WLS Primer wheel boots and horizontal
|
|
|
|
12-10-2018
|
3.00
|
Wingtip lights prep for mold
|
|
|
|
12-10-2018
|
4.00
|
6BID Mold layup - Wingtip lights
|
|
|
|
12-06-2018
|
2.00
|
Micro spread on wingtips and horizontal
|
|
|
|
12-06-2018
|
4.00
|
Brake hard line install - under seat
|
|
|
|
12-05-2018
|
4.00
|
Shopping AN Fittings for fuel system
|
|
|
|
12-05-2018
|
2.00
|
Micro layer wingtips and elevator counterweights
|
|
|
|
12-05-2018
|
0.50
|
Fuel system flow testing design
|
|
|
|
12-05-2018
|
2.00
|
Flox install cable connectors baggage bulkhead 2x
|
|
|
|
12-04-2018
|
3.00
|
Prep, sand, flox install rear cable bulkhead
|
|
|
|
12-04-2018
|
1.00
|
Flox install cable connectors 2x
|
|
|
|
12-03-2018
|
2.00
|
Pull tubing and bulkhead for adjustable cables
|
|
|
|
12-03-2018
|
3.00
|
1/4 inch brake hard lines center wing
|
|
|
|
11-30-2018
|
1.00
|
Shop flap motor 2.0
|
|
|
|
11-30-2018
|
4.00
|
Rudder controls Nicopress flex cable 2x
|
|
|
|
11-29-2018
|
1.50
|
Pulling baggage door kit parts
|
|
|
|
11-29-2018
|
2.00
|
Micro horizontal stab 2.0
|
|
|
|
11-29-2018
|
2.00
|
Flap motor CFD testing
|
|
|
|
11-28-2018
|
1.50
|
Tail group control surface assembly and mockup
|
|
|
|
11-28-2018
|
1.00
|
Shop LED strip lights for wingtips
|
|
|
|
11-28-2018
|
2.50
|
Round sanding wintips and tail root
|
|
|
|
11-25-2018
|
3.00
|
Mold removal and cleanup
|
|
|
|
11-25-2018
|
1.00
|
Baggage door layup schedule
|
|
|
|
11-25-2018
|
1.00
|
Adjustable pedal schematic
|
|
|
|
11-21-2018
|
10.00
|
Mold build - Pilot side baggage door/window
|
|
|
|
11-15-2018
|
3.00
|
Esco strut cam finish machining
|
|
|
|
11-14-2018
|
1.00
|
Flap servo motor clevis tuning
|
|
|
|
11-14-2018
|
1.00
|
center console foam mockup
|
|
|
|
11-14-2018
|
8.00
|
4 axis CNC program, setup, and machining Esco stru
|
|
|
|
11-13-2018
|
2.00
|
Light bar CAD drawings
|
|
|
|
11-13-2018
|
4.00
|
Flap Clevis drill and rivet, water jet control arm
|
|
|
|
11-13-2018
|
6.00
|
Flap anchor design and machining
|
|
|
|
11-12-2018
|
6.00
|
Flap clevis CAD design and machining
|
|
|
|
11-11-2018
|
4.00
|
Sanding micro wingtips and horiz fairings
|
|
|
|
11-11-2018
|
2.00
|
Flap servo connection hardware design
|
|
|
|
11-09-2018
|
1.00
|
shop Led tape lights and rotary pot flap controls
|
|
|
|
11-09-2018
|
3.00
|
Right wingtip install
|
|
|
|
11-09-2018
|
2.00
|
Left wingtip and horizontal root micro
|
|
|
|
11-08-2018
|
2.00
|
Oil pan removal and cleaning lead sludge
|
|
|
|
11-06-2018
|
4.00
|
Sanding 150 Grit wings and body
|
|
|
|
11-06-2018
|
3.00
|
Engine Cleaning
|
Details
|
|
|
11-06-2018
|
4.50
|
4BID surround on nose gear tunnel
|
|
|
|
11-05-2018
|
4.00
|
Left horizontal root fairing clay mold and 4 BID
|
|
|
|
11-02-2018
|
4.00
|
Right horizontal root fairing clay mold and 4BID
|
|
|
|
10-31-2018
|
4.00
|
Rightwingtip part layup 4BID
|
|
|
|
10-30-2018
|
5.00
|
CAM, CNC cut right wingtip pattern
|
|
|
|
10-29-2018
|
3.00
|
Shop fuel systems, seat cushions, piston set order
|
|
|
|
10-27-2018
|
0.50
|
Wingtip demold and deburr
|
|
|
|
10-26-2018
|
4.00
|
Wingtip 4 BID layup
|
|
|
|
10-25-2018
|
3.00
|
Mock up panels laser cut
|
|
|
|
10-23-2018
|
0.50
|
Shop Panel switches and switch covers
|
|
|
|
10-22-2018
|
0.50
|
Shop Flap servo and controller
|
|
|
|
10-22-2018
|
1.00
|
Concept panel and center console
|
|
|
|
10-22-2018
|
1.00
|
Concept avionics layout, ebrakes, digital switch p
|
|
|
|
10-20-2018
|
1.00
|
3D modeling centerconsole
|
Details
|
|
|
10-19-2018
|
1.50
|
Fine Sanding tail group
|
|
|
|
10-18-2018
|
6.50
|
CNC cut new wingtip design
|
|
|
|
10-17-2018
|
2.00
|
Sanding and micro wingtip molds
|
|
|
|
10-17-2018
|
4.00
|
New wingtip design CAD and CAM
|
|
|
|
10-16-2018
|
5.00
|
CNC machine wingtip bottom and bottom tip
|
|
|
|
10-15-2018
|
6.00
|
CNC program and machine wingtip bottom
|
|
|
|
10-13-2018
|
4.00
|
CNC 3d surface wingtip top
|
|
|
|
10-12-2018
|
8.00
|
CNC Machine programming
|
|
|
|
10-11-2018
|
4.00
|
Cnc machine cleaning and setup
|
|
|
|
10-10-2018
|
8.00
|
Wingtip mold design and NC programming
|
|
|
|
10-09-2018
|
3.00
|
Wingtip mold design and prep
|
|
|
|
10-08-2018
|
5.00
|
Primer sanding
|
Details
|
|
|
10-04-2018
|
2.00
|
Sanding for primer
|
|
|
|
10-03-2018
|
4.00
|
3D scan fuselage
|
|
|
|
10-02-2018
|
1.50
|
Sanding fuselage primer 60 grit - 150 grit
|
|
|
|
09-27-2018
|
4.00
|
nose tunnel flox and 3 BID
|
|
|
|
09-27-2018
|
6.00
|
CFD testing winglet
|
|
|
|
09-27-2018
|
1.00
|
Block sanding right wing 180 grit
|
|
|
|
09-27-2018
|
1.00
|
3D scan baggage window legacy
|
|
|
|
09-26-2018
|
2.00
|
Post-cure nose tunnel
|
|
|
|
09-26-2018
|
1.00
|
Mount wings to fuselage
|
|
|
|
09-25-2018
|
4.00
|
Wingtip design solidworks
|
|
|
|
09-25-2018
|
4.50
|
Nose tunnel 6 BID (second attempt)
|
|
|
|
09-21-2018
|
3.00
|
Wingtips Soliworks
|
|
|
|
09-20-2018
|
6.00
|
Nose tunnel extend 6 BID
|
|
|
|
09-19-2018
|
1.00
|
Sanding Wing center section
|
|
|
|
09-19-2018
|
4.00
|
Main gear brake line assembly
|
|
|
|
09-18-2018
|
6.00
|
Brake pedal group assembly
|
|
|
|
09-17-2018
|
4.00
|
Electric retract system design
|
|
|
|
09-13-2018
|
3.00
|
Separation of unneeded items, cleaning
|
|
|
|
09-13-2018
|
6.00
|
CNC machining spinner backplate
|
|
|
|
09-12-2018
|
3.00
|
Hydraulic piston sourcing
|
|
|
|
09-11-2018
|
2.00
|
Hydraulic pump mount 6 Bid and vacuum
|
|
|
|
09-11-2018
|
1.00
|
hydralic fittings and pump
|
|
|
|
09-11-2018
|
1.00
|
Fuel and hydralic parts search
|
|
|
|
09-11-2018
|
2.00
|
Center wing fuel lines - final mount and torque
|
|
|
|
09-10-2018
|
5.00
|
Fuel lines and fittings wing connection
|
|
|
|
09-10-2018
|
3.00
|
Fuel line fabrication
|
|
|
|
09-10-2018
|
1.00
|
Electric system planning
|
|
|
|
09-05-2018
|
0.50
|
Sand upper gear fairings
|
|
|
|
09-05-2018
|
2.50
|
Fuel selector valve with mount ready for install
|
|
|
|
09-05-2018
|
1.00
|
finish sand & Reinstall wheel fairings
|
|
|
|
09-05-2018
|
1.00
|
Elevators micro fill
|
|
|
|
09-04-2018
|
0.50
|
Sand wheel fairings
|
|
|
|
08-31-2018
|
2.00
|
sand and micro wheel fairings
|
|
|
|
08-31-2018
|
1.50
|
Micro upper right fairing
|
|
|
|
08-31-2018
|
2.00
|
Bond upper right main gear fairing
|
|
|
|
08-30-2018
|
3.00
|
Remove hinge from gear fairing, prep for fairing b
|
|
|
|
08-30-2018
|
4.00
|
prep and install upper left fairing, bond right la
|
|
|
|
08-30-2018
|
1.00
|
Inspection panel nutplates 4x
|
|
|
|
08-29-2018
|
4.00
|
Landing gear fairing prep
|
|
|
|
08-29-2018
|
2.00
|
Aileron servo fairing install
|
|
|
|
08-28-2018
|
6.00
|
Landing gear install
|
|
|
|
08-27-2018
|
3.00
|
Install elevator and elev. trim motor to airframe
|
|
|
|
08-24-2018
|
8.00
|
Finish rudder and elevator trim tab functions
|
|
|
|
08-23-2018
|
5.00
|
CAD design tail dragger leg mounts and source part
|
|
|
|
08-22-2018
|
2.00
|
Surface finish and trim wheel tunnel areas
|
|
|
|
08-22-2018
|
3.50
|
Demolish/remove nose wheel tunnel
|
|
|
|
08-21-2018
|
4.00
|
Source parts to complete build
|
|
|
|
08-17-2018
|
6.00
|
Verify completed actions and update checklist
|
|
|