KitLog pro

Powered By Kitlog Pro v2.0

SAMUEL'S WEB SITE
Work Logs Found: 47
Category Work Time: 70 Hours
 Date
Hours
Work Log Summary

Details

 07-12-2019
1.50
Rear Fuselage Finishing Touches
Details
       

 07-12-2019
2.00
Front Baggage Compartment
Details
       

 07-11-2019
2.00
Front Baggage Compartment
Details
       

 07-11-2019
2.00
Front Baggage Compartment
Details
       

 07-04-2019
2.00
Rear Baggage Compartment
Details
       

 07-04-2019
2.00
Rear Baggage Compartment
Details
       

 07-03-2019
2.00
Fuselage Assembly
Details
       

 07-03-2019
4.00
Fuselage Assembly
Details
       

 07-01-2019
2.50
Top skin/RF supports
Details
       

 06-29-2019
1.00
Side Skin
Details
       

 06-29-2019
2.50
Side Skin
Details
       

 06-29-2019
0.50
Bottom Skin
Details
       

 06-28-2019
1.00
Bottom Skin
Details
       

 06-28-2019
3.00
Bottom Skin
Details
       

 09-15-2018
0.50
Mounted Hinge brackets onto the stabilizer
Details
       

 09-15-2018
1.00
Installed vortex generators, completed tail sectio
Details
       

 09-15-2018
0.50
Installed pushrod for electric trim, tested system
Details
       

 09-14-2018
1.00
Riveted control brackets, riveted access panel, ri
Details
       

 09-14-2018
2.00
Fit elevator to stabilizer, trimmed as needed. Add
Details
       

 09-14-2018
0.50
Drilled/riveted trailing edge of passenger side
Details
       

 09-14-2018
0.75
Drilled/clecoed/riveted trailing edge on pilot sid
Details
       

 09-11-2018
1.50
Trimmed leading edge material, riveted actuator, c
Details
       

 09-11-2018
1.00
Streched top skin in place, trimmed trailing edge
Details
       

 09-11-2018
1.00
Skin removed for trimming, skin trimmed
Details
       

 09-11-2018
2.00
Made cutouts for electric trim actuator, reassembl
Details
       

 09-10-2018
1.00
Installed tip ribs, and added L-brackets to the el
Details
       

 09-10-2018
1.00
Installed rear ribs and nose ribs on elevator spar
Details
       

 09-10-2018
2.00
Begun skin installation, top and bottom
Details
       

 09-10-2018
1.00
Added rear elevator support, finished elevator ske
Details
       

 08-29-2018
1.50
Rivited skin, Cutout hole for elevator cable on le
Details
       

 08-29-2018
1.00
Fabricated hinge bracket and gusset, rivited brack
Details
       

 08-28-2018
1.00
Made cutout for elevator cable, and mounted L-brac
Details
       

 08-28-2018
2.50
Holes for brackets cut out, skins remounted and ri
Details
       

 08-28-2018
1.50
Drilling and Clecoing Bottom stabilizer skin to sk
Details
       

 08-28-2018
1.00
Drilled/Clecoed top skin in place
Details
       

 08-27-2018
1.00
Fabricated/Mounted rear mounting bracket
Details
       

 08-27-2018
1.00
Debured/Painted/Final Assembly of Skeleton
Details
       

 08-27-2018
2.00
Added ribs to front and rear spar
Details
       

 08-27-2018
2.00
Added doublers, joined front and rear spars
Details
       

 08-27-2018
2.00
Added all brackets to front spar of horizontal sta
Details
       

 08-20-2018
1.00
Drilling the doublers onto the front spar of the h
Details
       

 08-20-2018
1.00
Drilled and clecoed rear ribs and front rib to spa
Details
       

 07-27-2018
2.00
Nose skin installation
Details
       

 07-27-2018
2.50
I installed the rudder skin on the rudder skeleton
Details
       

 07-24-2018
1.25
I finished drilling and clecoing all the remaining
Details
       

 07-24-2018
0.50
Beginning Rudder Construction
Details
       

 07-24-2018
1.00
Began mounting ribs to the rudder main spar
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.