Powered By Kitlog Pro v2.0
Garys Web Site
RV-8A
All
Work Logs Found:
88
Category Work Time:
1289 Hours
Date
Hours
Work Log Summary
Details
01-08-2020
2.00
Cockpit engine and fuel tank controls
Details
12-22-2019
16.00
GRT roll autopilot servo
Details
12-13-2019
24.00
Wheel pant fairings
Details
12-13-2019
16.00
Nose wheel upper fairing
Details
12-12-2019
24.00
wheel pant intersection fairing
Details
11-30-2019
8.00
Weight and Balance
Details
11-27-2019
16.00
406 ELT and remote installed
Details
11-17-2019
16.00
Rear seat throttle linkage installed
Details
09-18-2019
2.00
Engine first run
Details
09-10-2019
16.00
Install Nose wheel pants
Details
08-29-2019
32.00
Seat floors and Baggage area
Details
07-23-2019
32.00
Installed wingtips
Details
07-23-2019
16.00
Installed Step
Details
07-21-2019
16.00
Installed flap gap fairing
Details
07-18-2019
8.00
Aligning flap and ailereon
Details
06-21-2019
24.00
Wing bolts installed and torqued
Details
06-15-2019
36.00
Wings installed
Details
06-02-2019
40.00
Panel installed
Details
05-30-2019
40.00
Panel Wiring fun
Details
05-16-2019
30.00
Pitch autopilot install
Details
05-01-2019
8.00
Uavionics UAT ADS-B installed
Details
03-23-2019
24.00
Wheel Pants
Details
03-07-2019
8.00
Oil door
Details
02-18-2019
16.00
oil cooler installation
Details
02-14-2019
16.00
Engine baffle seals
Details
02-12-2019
16.00
installed prop
Details
02-12-2019
10.00
fitted upper cowl
Details
02-02-2019
24.00
Lower Cowl
Details
01-21-2019
40.00
Engine baffles
Details
01-16-2019
6.00
spinner backplate
Details
01-09-2019
18.00
Windshield fiberglass
Details
01-04-2019
6.00
Windshield
Details
12-18-2018
18.00
Throttle Quadrant and control cables
Details
12-18-2018
24.00
Engine control quadrant
Details
12-14-2018
24.00
Canopy Fitting
Details
12-06-2018
40.00
Canopy fitting
Details
12-04-2018
34.00
Canopy Skirts
Details
12-02-2018
10.00
installed engine exhaust
Details
11-30-2018
18.00
Installed Engine
Details
11-23-2018
8.00
Engine mounts
Details
11-21-2018
24.00
Installed landing gear
Details
11-13-2018
2.00
Installed engine mount
Details
11-13-2018
2.00
engine purchased.
Details
11-12-2018
2.00
Finish kit
Details
10-27-2018
36.00
wiring
Details
10-26-2018
6.00
Aileron trim install
Details
10-24-2018
4.00
Electrical block on sub-panel
Details
08-25-2018
4.00
Installed elevator manual trim cable
Details
08-21-2018
3.00
static ports
Details
08-21-2018
16.00
bulkheads, windscreen,sub-panel
Details
08-13-2018
5.00
Installed fuel system lines and pump
Details
08-11-2018
5.00
Installed rudder and brake pedals
Details
08-09-2018
4.00
installed flap motor. rigged elevator stops.
Details
08-08-2018
4.00
installed elevator control rods.
Details
08-07-2018
8.00
installed center control column and sticks
Details
08-06-2018
4.00
Cut control tubes to length and installed bearings
Details
08-05-2018
8.00
installed left and right elevators
Details
08-04-2018
5.00
Installed Vertical Stab
Details
08-03-2018
2.00
Riveted aft deck to longerons
Details
08-03-2018
8.00
Installed horizontal Stab
Details
05-18-2018
4.00
cabin flooring, flap rods, foot wells
Details
05-16-2018
3.00
Riveted Rear seat
Details
05-15-2018
4.00
assembled seats and installing step
Details
05-10-2018
2.00
riveted lower longerons
Details
05-09-2018
2.00
Installed gear weldments
Details
04-25-2018
4.00
Seat back support assy
Details
04-16-2018
6.00
Aft Battery Box and Aft Deck
Details
01-24-2018
8.00
initial fitting of gear weldments
Details
01-19-2018
4.00
Fwd Fuse Section
Details
01-18-2018
4.00
Longereon bending
01-02-2018
5.00
fwd floor ribs
Details
12-27-2017
4.00
riveting center section assy
Details
12-19-2017
6.00
Fwd Fuse Floor assy
Details
12-17-2017
5.00
Firewall assy
Details
12-15-2017
4.00
fuselage recieved
Details
12-14-2017
6.00
Started Firewall assy
Details
11-30-2016
24.00
wing skins
Details
11-26-2016
16.00
Aileron bellcrank in wing
Details
11-25-2016
16.00
Wing buildup and skins
Details
11-24-2016
16.00
wing in fixture
Details
11-22-2016
24.00
flight control surfaces
Details
11-05-2016
24.00
Wing buildup
Details
10-22-2016
40.00
Working wing structure
Details
10-18-2016
60.00
Built fuel tanks
Details
10-15-2014
24.00
Fixtures for holding control surfaces
Details
10-12-2014
16.00
Elevator trim tab
Details
10-03-2014
8.00
Elevator
Details
10-02-2014
16.00
Building up elevator
Details
SITE NAVIGATION
Contact Builder
RV-8A Home
Category
# Logs
# Hours
All
88
1289
Auto Pilot
2
46
Avionics
1
40
Canopy
4
116
Cowling
3
42
Electrical
2
48
ELT
1
16
Empennage
5
88
Engine
11
132
Engine Baffles
1
40
Fiberglass
5
104
Fuselage
35
255
Miscellaneous
2
4
Prop
2
22
Weight and Balance
1
8
Wheels
2
32
Wings
11
296
Copyright © 2001-2024 Matronics. All Rights Reserved.