KitLog pro

Powered By Kitlog Pro v2.0

DARREN'S WEB SITE
Work Logs Found: 511
Category Work Time: 2531 Hours
 Date
Hours
Work Log Summary

Details

 05-17-2020
7.00
Wheel pants, wrapping
Details

 05-16-2020
4.00

Details

 05-15-2020
8.00

Details

 05-12-2020
8.00

Details

 05-11-2020
8.00

Details

 05-10-2020
7.00

Details

 05-09-2020
8.00

Details

 05-08-2020
6.00

Details

 04-14-2020
2.00
ALt air door testing
Details

 04-13-2020
4.00
Alt air door
Details

 04-10-2020
2.00
system updates
Details

 04-06-2020
4.00
Priming touch up
Details
     

 03-27-2020
3.00
Alucrom bare metal. flap switch checking, canopy h
Details

 03-23-2020
2.00
Prop governor setup, idle set up
Details

 03-23-2020
3.00
filling and sanding wing tips
Details

 03-22-2020
3.00

Details

 03-21-2020
3.00

Details

 03-16-2020
6.00
cowling on, adjusted idle setting, fast taxi tria
Details

 03-15-2020
6.00

Details

 03-14-2020
8.00

Details

 03-11-2020
9.00
First engine start
Details
       

 03-09-2020
8.00
Avionics check today... mostly fine!
Details

 03-08-2020
4.00
Rear baggage panels installed, rear side panaels i
Details

 03-07-2020
7.00
final installaition of interior
Details

 03-06-2020
4.00
Trim, flaps etc
Details

 03-06-2020
3.00
Rudder pedals back in
Details

 03-04-2020
10.00
fuel stuff, fairings, rudder pedal stress loading
Details

 03-02-2020
4.00
Writing the POH
Details

 02-29-2020
7.00
Getting ready for last inspection..
Details

 02-27-2020
1.50
Fuel calibration
Details

 02-26-2020
8.00
panel finished off, wiring complete, fuel flow che
Details
     

 02-25-2020
4.00
installed port side switch gear
Details
     

 02-24-2020
7.00
SB CB panel installed
Details
     

 02-23-2020
5.00
ziptips connected, wiring loom tidied inside
Details
     

 02-22-2020
7.00
Finalised roll servo, installed port Zip tip
Details

 02-21-2020
3.00
wiring roll servo and CAN bus
Details

 02-20-2020
2.00
Safety wiring
Details
       

 02-19-2020
7.00
wiring, plumbing, prop...
Details
       

 02-18-2020
1.00

Details

 02-17-2020
2.00

Details

 02-16-2020
7.00
Wing bolts finished, SB wiring and tips added
Details
       

 02-15-2020
4.00
Flaps/Ailerons connected
Details

 02-12-2020
7.00
Wings installed fully, propellor hung, spinner att
Details
     

 02-11-2020
3.00
Wing bolts inserted
Details

 02-10-2020
7.00

Details
     

 02-09-2020
5.00
Tail feather stuff
Details
       

 02-08-2020
6.00

Details

 01-29-2020
4.00
Moved the fuselage to the hangar!

 01-26-2020
6.00
leather work for side panels
Details

 01-25-2020
5.00

Details

 01-22-2020
12.00
finishing odd jobs
Details

 01-20-2020
3.00

Details

 01-15-2020
6.00
painting, leather side panels, moved bits to the h
Details

 01-13-2020
5.00
More small jobs..
Details

 01-12-2020
4.00

Details

 01-08-2020
4.00
Engine compartment bits
Details

 01-06-2020
4.00

Details

 12-31-2019
5.00
Throttle cable, DME aerial, Wing airvent NACA duct
Details
     

 12-30-2019
7.00
Baffle seals, prop governot and cables
Details
       

 12-29-2019
5.00
Engine baffles, rear throttle handle
Details

 12-28-2019
5.00
ariel cables, cabin heat cables,
Details

 12-25-2019
3.00
Fitting right hand control cluster
Details

 12-24-2019
7.00
More wiring
Details
       

 12-23-2019
3.00
Fitted map reading light at front
Details
     

 12-22-2019
8.00
seat belts
Details
     

 12-21-2019
5.00
Painted the cockpit rails and the central roll bar
Details
       

 12-20-2019
3.00
Garage re-organised, getting ready to paint some c
Details

 12-18-2019
6.00
Aerials, additional ammeter shunt
Details
     

 12-15-2019
6.00
New aerials for updated traffic
Details

 12-11-2019
5.00
Garmin setup stuff, made draft mount for oxygen/he
Details

 12-09-2019
4.00

Details

 12-08-2019
4.00
Battery leads, aerial changes
Details

 12-07-2019
6.00
Park brake, oil shutter cables fitted
Details

 12-06-2019
3.00
panel configuration, TOGA button, ipad mount tweak
Details
     

 12-05-2019
2.00
Discrete inputs
Details

 12-04-2019
7.00
panel switch lighting sorted
Details

 12-03-2019
6.00
Air vent, GPS installed
Details

 12-01-2019
8.00
avionics wire checking
Details

 11-30-2019
7.00
configuring the components..
Details

 11-27-2019
7.00
panel wiring...and strengthening
Details

 11-26-2019
2.00
USB installation to ipd mini
Details

 11-24-2019
6.00
Got the transponder working!
Details
     

 11-23-2019
6.00
Decided to fit the panel..
Details

 11-20-2019
7.00
wiring switches again...
Details

 11-19-2019
3.00
Wiring fixed!
Details

 11-18-2019
6.00
Connected the battery...
Details

 11-17-2019
6.00

Details

 11-16-2019
6.00
Wired the heated seats and the rear USB ports
Details
       

 11-15-2019
4.00
more wiring to the CB panel
Details
       

 11-13-2019
5.00
Right side switch panel
Details
       

 11-12-2019
2.00
re-wiring, then putting it back as it was!
Details

 11-10-2019
7.00
wiring...
Details

 11-09-2019
7.00
wiring
Details

 11-08-2019
2.00
panel
Details

 11-06-2019
5.00

Details

 11-04-2019
6.00

Details

 11-03-2019
6.00
more wiring
Details

 11-02-2019
7.00
Wiring...
Details

 11-01-2019
4.00
more wiring...

 10-30-2019
6.00
wiring...
Details

 10-29-2019
4.00
wiring
Details

 10-28-2019
6.00
wiring... starting to tidy up the looms a bit.

 10-27-2019
8.00
wiring
Details

 10-20-2019
6.00
switches and mags...
Details
     

 10-19-2019
7.00
wiring woes
Details

 10-16-2019
7.00
more wiring..
Details

 10-15-2019
2.00
Wiring
Details

 10-13-2019
5.00
panel syub frame, front stick Torsten wiring
Details

 10-12-2019
6.00
GTN and DME wiring
Details

 10-08-2019
5.00
panel wiring
Details

 10-07-2019
4.00
Can bus wiring finished
Details
     

 10-06-2019
7.00
Wiring
Details

 10-05-2019
7.00
Wiring again...
Details

 10-04-2019
3.00
Wiring
Details

 10-03-2019
2.00
CAN bus fabricated
Details

 10-02-2019
9.00
Wired the main port side switch bank
Details

 10-01-2019
2.00
switches..
Details

 09-30-2019
7.00
I hate wiring!
Details
     

 09-28-2019
7.00

Details

 09-26-2019
3.00
Avionics bay cover
Details
     

 09-25-2019
7.00
Panel and ventilation
Details
       

 09-24-2019
4.00
Heater/Vent panel work
Details
       

 09-23-2019
5.00
Panel fitting, more issues!
Details

 09-22-2019
6.00

Details

 09-21-2019
8.00
wiring the panel started..
Details

 09-18-2019
6.00
AOA installed, main bus bars fabricated
Details
       

 09-17-2019
2.00
Vents/heater
Details
       

 09-16-2019
6.00
More panel work, and canopy latch made
Details
     

 09-14-2019
8.00
Panel prep, GTN rack fitted, brakes and oil cooler
Details
       

 09-13-2019
4.00


 09-12-2019
7.00
More hole cutting...
Details
     

 09-11-2019
8.00
Panel woes...
Details

 09-10-2019
4.00
avionics shelf fabricated
Details

 09-09-2019
6.00
wiring commences
Details

 09-06-2019
2.00
dimmers for lighting installed
Details

 09-05-2019
3.00
Panel prep
Details

 09-04-2019
9.00
Panel work
Details

 09-02-2019
6.00
Edge trim and vent/heater panel made
Details
       

 09-01-2019
2.00
Flap switch added
Details
     

 08-30-2019
4.00
Cut the main panel and holes for avionics
Details
     

 08-29-2019
4.00
Elevator movement range set
Details

 08-28-2019
6.00
Controlstick fitting
Details
       

 08-27-2019
3.00
Control rods..
Details

 08-26-2019
8.00
Painting!
Details
       

 08-25-2019
8.00
Painting!
Details

 08-24-2019
8.00
Cowling prep
Details

 08-23-2019
2.00
Cowling
Details

 08-21-2019
4.00
Cowling prep
Details

 08-20-2019
2.00
Cowling prep
Details
     

 08-18-2019
4.00
fiinlly fitted the oil shutter and FAB
Details
       

 08-17-2019
3.00
Oil shutter installation and fitting the oil coole
Details
       

 08-17-2019
4.00
Cowling prep... epoxy coating
Details
       

 08-16-2019
2.00
Oil cooler shutter fabrication
Details

 08-16-2019
3.00
Cowling work
Details

 08-15-2019
4.00
cowling prep
Details

 08-14-2019
4.00
more cowling sanding
Details

 08-13-2019
2.00
sanding the cowling/fuselage junction
Details

 08-11-2019
3.00
Throttle quadrant and switch box fitting
Details
       

 08-11-2019
3.00
Canopy fettling
Details

 08-11-2019
2.00
Alt airbox sensor
Details
     

 08-10-2019
8.00
Canopy fitting
Details
       

 08-09-2019
2.00
More sanding
Details

 08-07-2019
8.00
more fibreglassing...
Details
     

 08-07-2019
2.00
Alternate air gate work
Details
       

 08-06-2019
3.00
Canopy sanding
Details

 08-05-2019
8.00
Canopy work
Details

 08-04-2019
9.00
canopy work
Details
       

 08-03-2019
8.00

Details
       

 08-02-2019
5.00
more sanding
Details

 07-31-2019
6.00
undercarriage fairings
Details

 07-31-2019
3.00
canopy frame sanding
Details

 07-30-2019
4.00
more wheel pant fairing prep
Details

 07-29-2019
5.00
Fairings wheel pants
Details

 07-27-2019
6.00
sanding the canopy, cowling and wheel fairings
Details

 07-26-2019
4.00
Wheel pants sanding, sikaflex sealer to canopy fra
Details
       

 07-24-2019
3.00
wheel pant fairings
Details

 07-23-2019
2.00
sanding the wheel pant fairings...

 07-21-2019
10.00
oil door and wheel pant fairing
Details
       

 07-20-2019
7.00
Oil door and wheel fairings
Details

 07-17-2019
5.00
Cowling
Details
       

 07-16-2019
3.00
Canopy sanding
Details

 07-15-2019
8.00
Canopy painted!
Details
       

 07-14-2019
8.00
Canopy prep, Alternate air door
Details
       

 07-13-2019
6.00
Canopy prep
Details

 07-12-2019
3.00
Canopy prep
Details

 07-11-2019
3.00
Canopy prep
Details

 07-10-2019
2.00
canopy prep
Details

 07-08-2019
4.00
Canopy prep
Details

 07-07-2019
7.00
Canopy work, CB Panel
Details
     

 07-06-2019
7.00
Canopy cutting and fixing
Details

 07-05-2019
4.00
canopy cutting, part 2
Details
     

 07-04-2019
3.00
Blast tubes
Details
       

 07-02-2019
2.00
wiring and routing changes
Details

 07-01-2019
7.00
Cowling /baffles
Details

 06-30-2019
4.00
Cowling/baffle seals
Details

 06-12-2019
3.00

Details

 06-10-2019
7.00
baffles painted and reinstalled
Details
       

 06-09-2019
7.00
Baffle works, then painting
Details

 06-08-2019
8.00
baffle prep
Details
       

 06-07-2019
4.00
baffles...
Details

 06-06-2019
3.00
SB baffles
Details

 06-05-2019
8.00
Baffle work, and 'snorkel' installed
Details

 06-01-2019
8.00
Baffles, oil cooler
Details
       

 05-30-2019
2.00
sanding...
Details

 05-29-2019
8.00
Tweaked the trottle controls and switch gear
Details
     

 05-27-2019
7.00
Cowling work and throttle quadrant
Details
       

 05-26-2019
6.00
more cowling, and the throttle quadrant
Details
       

 05-25-2019
7.00
Cowling work
Details

 05-24-2019
4.00
Cowling work..
Details

 05-23-2019
2.00
cowling trimming
Details

 05-22-2019
6.00
cowling trimming, Skybolt fixing
Details
       

 05-21-2019
4.00
cowling work
Details
     

 05-20-2019
5.00
more wiring and plumbing
Details
       

 05-19-2019
5.00
finished EGT/CHT wiring, more pipework
Details
       

 05-18-2019
6.00
ECT/CHT wiring, tidying up other wiring
Details
     

 05-17-2019
5.00
More oil lines, engine wiring.
Details
       

 05-15-2019
6.00
engine remounting
Details

 05-13-2019
6.00
firewall stainless foil and heat barrier installed
Details

 05-11-2019
6.00
wheel pant mods
Details

 05-10-2019
2.00
Breather pipe
Details

 05-08-2019
3.00

Details

 05-07-2019
2.00
Mixture bracket
Details

 05-05-2019
0.00
Wedding Day.. No work done!
Details

 05-01-2019
6.00
Stainless oil lines fitted, Mixture bracket fitted
Details
       

 05-01-2019
1.00
Painted canopy frame interio
Details

 04-30-2019
4.00

Details

 04-28-2019
6.00
Control cables
Details

 04-27-2019
8.00
Inverted oil system installation
Details

 04-24-2019
6.00
sensors installed
Details
       

 04-23-2019
3.00
Connected the Alternator F leads, backup B lead
Details

 04-22-2019
4.00
Wiring the starter and alternators
Details
     

 04-22-2019
4.00
canopy frame prep again..
Details

 04-21-2019
6.00
Canopy bubble catastrophe!
Details

 04-20-2019
8.00
Canopy work
Details
     

 04-17-2019
4.00
Wheel fairing prep
Details

 04-17-2019
1.00
Final wheel/brake installation
Details

 04-17-2019
3.00
Exhaust fitted
Details
     

 04-15-2019
9.00
Wheel alignment checked, more work on wheel pants
Details

 04-14-2019
9.00
wheel fairings fitted, brakes installed.
Details
       

 04-13-2019
10.00
Wheel fairings..
Details
     

 04-11-2019
2.00
Fitted the engine
Details
       

 04-10-2019
2.00
Glareshield cover removed and sanded
Details

 04-10-2019
3.00
Attached the engine!
Details

 04-09-2019
2.00
making glare shield fit, and back to filling and s
Details

 04-08-2019
4.00
Documenting the wiring scheme
Details

 04-07-2019
4.00
Wiring comms and tidying looms
Details

 04-06-2019
8.00
ELT installed
Details
       

 04-05-2019
2.00
Ran wired from Flap sensor to panel
Details

 04-04-2019
5.00
canopy frame prep
Details

 04-04-2019
3.00
Baggage tie downs and Flap position indicator inst
Details
       

 04-03-2019
8.00
Bose LEMO and Mic/Headset installation
Details
       

 03-31-2019
8.00
More wiring,and found a problem with the port fuel
Details

 03-30-2019
8.00
Floors rivetted, more conduit and rear baggage she
Details
       

 03-29-2019
2.00

Details

 03-28-2019
3.00
started to fix the floor panels
Details
     

 03-27-2019
5.00
More wiring...
Details
       

 03-26-2019
4.00
Battery and avionics support fabricated
Details
     

 03-25-2019
6.00
Wiring and headset plug installation
Details

 03-24-2019
8.00
More wiring, roll bar fitted and last bit of cockp
Details
       

 03-22-2019
2.00
Garmin connections to potch servo
Details
     

 03-21-2019
2.00
Strobe synch lead connected and re-routed
Details

 03-20-2019
7.00
wiring looms for wings done
Details

 03-18-2019
7.00
Avionics shelf finished, more wiring done
Details
     

 03-17-2019
7.00
More avionics shelf stuff
Details
       

 03-16-2019
7.00
Avionics shelf rework
Details

 03-14-2019
1.00
fire protecting floor
Details

 03-13-2019
6.00
wiring continues
Details
       

 03-12-2019
3.00

Details
     

 03-11-2019
7.00

Details

 03-10-2019
7.00
Wiring...
Details

 03-10-2019
1.00
Fitted second alternator
Details

 03-09-2019
3.00
Fuel line installation started.
Details
       

 03-09-2019
4.00
Engine mount installed
Details
       

 03-08-2019
2.00
Roll bar prep
Details
       

 03-07-2019
3.00
Engine unboxed!
Details
       

 03-06-2019
6.00
Canopy work, engine arrived!
Details
       

 03-04-2019
3.00
Started wiring...
Details

 03-03-2019
6.00
Front cowling latch changes, fitted conduits in th
Details
     

 03-02-2019
6.00
Roll bar and mid-latch fitting, rudder pedal mods
Details
       

 03-01-2019
3.00
Rivetted flap fairing SB, plus filled all missing
Details

 02-28-2019
4.00
Gascolator re-plumbed...
Details
       

 02-27-2019
2.00
Rivetted flap fairings and step on port side
Details
     

 02-27-2019
5.00
Prepped step for fitting, made face plate for cano
Details

 02-26-2019
6.00
Canopy handle work
Details
       

 02-24-2019
6.00
Fuel lines, flap hinges and canopy work
Details

 02-22-2019
3.00
Fuel lines to gascolator fitted, fuel pump install
Details
     

 02-21-2019
6.00
Gascolator installation, nut plates installed for
Details
     

 02-20-2019
6.00
WIngs off, gascolators fitted
Details

 02-19-2019
2.00
Aerolab gascolator installation SB side
Details
       

 02-18-2019
4.00
Fairing work and gascolator bracket fabrication
Details
     

 02-17-2019
2.00

Details

 02-16-2019
4.00
Painted the wing and flap fairings
Details

 02-14-2019
6.00
Wing Fairings and flap fairings
Details
       

 02-13-2019
8.00
Wing fairings fitted, flaps fitted
Details
       

 02-11-2019
5.00
Tank mounts fitted, aileron controls hooked up
Details
     

 02-06-2019
2.00
lower skin drilling, fuel vent lines
Details

 02-04-2019
3.00
Wing rear spar drilling
Details
     

 02-03-2019
6.00
WIngs on!
Details

 02-02-2019
8.00
Wings on!
Details
     

 02-01-2019
2.00
Magnetometer woes
Details

 01-29-2019
3.00
canopy sanding and filling
Details

 01-28-2019
4.00
More filling and sanding
Details

 01-28-2019
5.00
Brake master cylinder mounting mod
Details
       

 01-26-2019
9.00
Brake work
Details
       

 01-25-2019
2.00
Rear rudder pedals
Details
     

 01-23-2019
8.00
Braking system
Details
       

 01-22-2019
2.00
Fitted new brake pedals
Details
       

 01-21-2019
7.00
More fibreglass work, rivetted the rear skin fully
Details
     

 01-20-2019
7.00
Canopy frame sanding, empennage fairing finished.
Details
       

 01-19-2019
6.00
Canopy frame prep
Details

 01-18-2019
5.00
Empennage fairing... again!
Details

 01-16-2019
6.00
Nearly finished the fairing, and added the lower f
Details
       

 01-15-2019
3.00
more sanding
Details

 01-14-2019
5.00
More empennage fairing work...
Details

 01-13-2019
7.00
More fairin work
Details

 01-12-2019
7.00
sanding, filling...
Details

 01-11-2019
2.00
more empennage fairing prep
Details

 01-10-2019
1.00
Empennage fairing prep
Details

 01-09-2019
2.00
Fibreglass Empennage fairing
Details

 01-07-2019
7.00
empennage fitting
Details
       

 01-06-2019
6.00
Wheels fitted... mobile at last!
Details
       

 01-05-2019
7.00
Aerials and undercarriage fitted
Details
     

 01-04-2019
2.00
More sanding of the canopy shell
Details

 01-02-2019
7.00
Canopy work and battery housing
Details
       

 12-31-2018
7.00
Canopy work
Details
       

 12-30-2018
6.00
Canopy work, finished rivetting turtledeck
Details
       

 12-29-2018
7.00
Rudder pedal rebuild, started on canopy
Details
     

 12-28-2018
8.00
Turtledeck rivetting
Details
       

 12-26-2018
6.00
turtledeck prep
Details

 12-24-2018
8.00
Control rods, flaps and static lines installed
Details
       

 12-23-2018
6.00
Throttle housing
Details
     

 12-22-2018
8.00
building the garage extension so that the wings ca
Details

 12-21-2018
6.00
Throttle installation
Details

 12-18-2018
3.00
More HS tip work
Details

 12-17-2018
3.00
Aspen RSM positioning
Details
     

 12-16-2018
6.00
Avionics shelf, cable routing and RSM mounting int
Details
     

 12-15-2018
6.00
Prep for painting
Details
     

 12-14-2018
1.00
Internal painting
Details

 12-12-2018
2.00
sanded all control rods and powder coated bits
Details

 12-09-2018
4.00
Elevator horn drilled
Details

 12-08-2018
6.00
Rudder trim manufacter
Details

 12-07-2018
3.00
Rudder trim mount design and fabrication
Details

 12-05-2018
3.00
Fastback instrument cover installed.
Details
     

 12-05-2018
3.00
Emptied the fuselage in prep for painting
Details

 12-04-2018
4.00
baggage floor hatch construction
Details

 12-02-2018
3.00
Switch plate attached
Details
     

 12-02-2018
2.00
Rear baggage door access panel cut
Details
     

 12-02-2018
2.00
Fuel pipes installed
Details
     

 12-02-2018
1.00
Front fresh air vent attached
Details
     

 12-01-2018
6.00

Details
       

 11-30-2018
4.00
Chris riveted the instrument panel frame whilst I
Details
       

 11-28-2018
5.00
Panels fitted nd rudder pedals removed
Details
     

 11-26-2018
3.00
Re-fitted elevators, mass balanced them
Details
     

 11-26-2018
4.00
Flap selector re-work
Details
       

 11-25-2018
6.00

Details
     

 11-24-2018
4.00
Rear throttle quadrant work again
Details
       

 11-22-2018
3.00
rebuilt the HS spar reinforcement
Details
     

 11-21-2018
4.00
HS -814 refabricated
Details

 11-19-2018
8.00
Throttle quadrant done!
Details
       

 11-18-2018
6.00
Throttle woes
Details

 11-18-2018
5.00
Flap switching gear assembled
Details

 11-17-2018
8.00
Aileron trim installation
Details
     

 11-16-2018
3.00
Baggage door lock finally installed
Details
       

 11-15-2018
2.00
Baggage door mechanism fabricated
Details

 11-14-2018
8.00
Baggage door work, and pitch servo installed
Details
       

 11-12-2018
2.00
Panel mount work
Details

 11-12-2018
6.00
Baggage door
Details
       

 11-10-2018
6.00
Finished rear rudder pedal installation
Details
       

 11-09-2018
2.00
connected rudder pedals to firewall
Details

 11-08-2018
7.00
Rudder pedals installed
Details
       

 11-07-2018
6.00
HS dismantled and rudder cables fitted
Details
       

 11-06-2018
2.00
Rear rudder pedals finished.
Details

 11-06-2018
2.00
Dismantled empennage ready for final prep
Details

 11-04-2018
8.00
fitted flap motor and control arm, more fabricatio
Details
       

 11-03-2018
7.00
fitted control rods, adjusted the lengths and trie
Details
       

 11-02-2018
8.00
corntrol rods sticks fabricated and assembled
Details
     

 10-31-2018
8.00
drilled and fitted H and VS, fitted elevators
Details
     

 10-29-2018
8.00
fitted horizontal stabiliser
Details
       

 10-28-2018
8.00
work on the throttle quadrant mount
Details
       

 10-27-2018
9.00
throttle quadranr work
Details
       

 10-26-2018
4.00
Fastback instrument panel fibreglassing
Details

 10-25-2018
2.00
Fastback side rail attached port side
Details

 10-24-2018
7.00
finished rear seat construction
Details
       

 10-23-2018
2.00
started to put panels in the front...
Details
     

 10-22-2018
6.00
seats and battery box fitted.
Details
     

 10-20-2018
8.00
More floor fitting
Details

 10-19-2018
4.00
footwells
Details

 10-18-2018
1.00
started assembling the floor
Details

 10-17-2018
8.00
Priming fuselage
Details
       

 10-15-2018
3.00
Started on the cockpit floor
Details

 10-14-2018
7.00
Priming inside fuselage
Details
     

 10-13-2018
8.00
Front upper skin cut, baggage door work and primin
Details
       

 10-12-2018
4.00
Front skin cutting
Details

 10-10-2018
4.00
new side canopy rails fitted
Details
     

 10-09-2018
5.00
Fastback prep
Details
       

 10-08-2018
8.00
Started Fastback installation
Details

 10-07-2018
5.00
Rotisserie mods
Details
     

 10-06-2018
6.00

Details
     

 10-05-2018
3.00
Undercarriage bolts finished
Details
     

 10-04-2018
3.00
Constructed the centre undercarriage cover plate
Details
     

 10-03-2018
4.00
Bolting the outer undercarriage weldments and rive
Details

 10-02-2018
2.00
Undercarriage bolts issues
Details

 10-01-2018
3.00
Channel preparation
Details
       

 09-30-2018
8.00
drilling undercarriage
Details

 09-28-2018
3.00
Improved rotisserie
Details
     

 09-27-2018
3.00

Details
     

 09-26-2018
8.00
Rotisserie building
Details
       

 09-23-2018
20.00
wing finishing
Details
       

 09-15-2018
6.00
Finished rivetting, filling and sanding started ag
Details
     

 09-14-2018
2.00
skin rivetting
Details
     

 09-13-2018
2.00
Wiring work...
Details

 09-12-2018
4.00
SB wing prep
Details

 09-12-2018
2.00
Rivetting port outer skin
Details

 09-12-2018
3.00
pitot/AOA tubing arrived! More wiring.
Details
       

 09-11-2018
2.00
SB Wing skin fettling before final priming
Details

 09-10-2018
8.00
Starboard wing skin attached
Details

 09-09-2018
6.00
Painted the lower half of the Starboard wing
Details

 09-08-2018
8.00
Painting, fitted ailerons, and Delrin spacer mod
Details
       

 09-08-2018
1.00
Aileron movenment checked
       

 09-07-2018
3.00
More painting...
Details

 09-06-2018
3.00
Wiring
Details

 09-05-2018
9.00
paintining...
Details

 09-03-2018
4.00
SB wingtip nutplates attached
Details

 09-02-2018
9.00
starboard wing tip attached
Details

 09-01-2018
9.00
wing tip port
Details
       

 08-31-2018
4.00
Aileron alignment and the Delrin spacer
Details
       

 08-30-2018
2.00
Roll bellcrank bushings
Details

 08-28-2018
3.00
Garmin roll servo fitted
Details
     

 08-26-2018
6.00
Port tank re-fitted, Pitot and regulator fitted
Details
       

 08-25-2018
3.00
Torqued wing tank attachment bolts
Details
     

 08-23-2018
3.00
More dimpling, and replaced the inner aileron bear
Details

 08-22-2018
9.00
skin prep
Details

 08-21-2018
4.00
Service ulletin for B Aileron bracket cracks
Details
     

 08-20-2018
8.00
Flaps, conduit and tank testing!
Details
       

 08-19-2018
6.00
Ailerons and flap fitted
Details
       

 08-18-2018
4.00
Stall warner fitted
Details
       

 08-18-2018
2.00
Gretz pitot mast installed
Details
     

 08-18-2018
2.00
Aileron pushrod installed, .
Details
       

 08-17-2018
3.00
Aileron pushrods
Details

 08-16-2018
5.00
flap and aileron braces fixed to spar
Details
       

 08-14-2018
6.00
flap braces and aileron bellcrank fabricated
Details
       

 08-13-2018
8.00
Internal wing spraying
Details
       

 08-11-2018
2.00
Tanks closed!
Details

 08-11-2018
3.00
flop tubes installed
Details
       

 08-10-2018
5.00
flop tubes and fuel senders
Details
       

 08-08-2018
7.00
More tank prep
Details

 08-07-2018
3.00
Tank preparation
Details
     

 08-06-2018
4.00

Details
     

 08-05-2018
4.00

Details
       

 08-04-2018
5.00

Details

 08-03-2018
4.00
QB kit arrives!
Details

 07-22-2018
1.00
Tweaked the brake lines
Details
       

 07-21-2018
1.00
Brake line fabrication
Details
       

 07-20-2018
1.00
Fairings first fix
Details
     

 06-28-2018
3.00
Rudder trimming
Details
       

 06-12-2018
1.00
Fixed nutplates to wheelpants
Details
     

 06-09-2018
6.00
Inner mud guard fabricated from fibreglass
Details
       

 06-08-2018
2.00
connecting lip between pant ends filled
Details

 06-06-2018
4.00
Contouring fron of wheel pants
Details

 06-05-2018
2.00
Tinnerman washers and anchor nuts to the left whee
Details

 06-04-2018
4.00
Tinnerman washers and anchor nuts tor secure SB wh
Details

 06-03-2018
4.00
sanding joint between wheel pant halves
Details
     

 06-02-2018
3.00
Joining front and rear of wheel pants
Details
     

 05-31-2018
1.50
sanding wheel pants
Details

 05-30-2018
3.00
Wheel pants prep
Details

 05-28-2018
3.00
More spraying!
Details
     

 05-27-2018
3.00
Trim servo bracket prep
Details
       

 05-26-2018
6.00
Rudder fibreglass prep
Details

 05-25-2018
6.00
Rudder lower fibreglassing
Details

 05-23-2018
15.00
More filling and sanding
Details
       

 05-16-2018
20.00
Filling and sanding...
Details
       

 05-08-2018
5.00
Fibreglass tips to rudder and VS
Details
       

 05-07-2018
1.00
Rudder fixed to VS
Details
     

 05-06-2018
4.00
Trim tab works!
Details

 05-05-2018
2.00
Elevator top skin rivetted
Details

 05-04-2018
7.00
Trim tab hinge fitted
Details
       

 05-03-2018
2.00
Trim servo box
Details
       

 05-02-2018
6.00
Right elevator tweaking
Details
     

 05-01-2018
4.00
Elevator tweaking
Details
     

 04-30-2018
7.00
The dreaded spray booth...
Details

 04-29-2018
9.00
Elevator trim tab
Details
       

 04-28-2018
11.00
LE tweaks, started elevator prep
Details
     

 04-27-2018
5.00
Rudder TE tweaks
Details

 04-26-2018
3.00
VS skins rivetted
Details

 04-25-2018
2.00
Trim tab started
Details
       

 04-25-2018
6.00
Rudder and HS rivetted
Details
       

 04-25-2018
2.00
Met LAA inspector
Details

 04-24-2018
4.00
More rib prep
Details

 04-23-2018
7.00
Elevators started
Details
     

 04-22-2018
9.00
Rudder Rivetting
Details
       

 04-21-2018
8.00
HS skeleton assembled
Details
       

 04-20-2018
3.00
HS Front spar rivetting
Details

 04-19-2018
3.00
Rear spar rivetting... real construction!
Details

 04-18-2018
5.00

Details
       

 04-17-2018
2.00
Replacement ribs arrived
Details

 04-16-2018
4.00
playing with primer
Details

 04-15-2018
7.00
Dimpling problem resolved!
Details
     

 04-14-2018
7.00
More rudder skin prep
Details
     

 04-13-2018
5.00
Clecoed rudder box and made rudder tip
Details
       

 04-12-2018
4.00
Dimple dies arrived
Details
       

 04-11-2018
4.00
Rudder box fabrication
Details
       

 04-10-2018
3.00
Rudder shims
Details
     

 04-09-2018
7.00
Rudder started
Details
       

 04-08-2018
7.00
VS started
Details
       

 04-07-2018
6.00
Dimpling fun
Details
     

 04-06-2018
3.00
Tip Rib problems
Details
     

 04-04-2018
4.00
Rudder box made
Details
       

 04-04-2018
5.00
HS skins added
Details
       

 04-03-2018
6.00
HS Ribs
Details

 04-02-2018
6.00
HS spar
Details

 04-01-2018
3.00
It all begins here...
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.