Powered By Kitlog Pro v2.0
Eds Vans RV-6A/7A Web Site
Aerolite 103
All
Work Logs Found:
60
Category Work Time:
0 Hours
Date
Hours
Work Log Summary
Details
04-20-2018
0.00
Ernie my EAA Technical Counselor.
Details
03-28-2018
0.00
Replace Tie Wraps near engine with SS locks.
Details
03-27-2018
0.00
Stephanie trying to close the hanger door.
Details
03-26-2018
0.00
Hanging at the hanger.
Details
03-25-2018
0.00
Nees star washers on both sides of ground bolt.
Details
03-24-2018
0.00
Preparing for EAA Technical Counselor visit.
Details
03-23-2018
0.00
Stephanie and I
Details
03-22-2018
0.00
Complete...
Details
03-21-2018
0.00
Relocate right rear elevator anchor point.
Details
03-20-2018
0.00
Fuselage arrives safely in the hanger.
Details
03-19-2018
0.00
Moving day for the fuselage.
Details
03-11-2018
0.00
Fabricate mounts, iPhone, radio and GPS unit.
Details
03-10-2018
0.00
Mini panel power station.
Details
03-09-2018
0.00
Switch labels.
Details
03-08-2018
0.00
Time to adjust the carburetor cables.
Details
03-07-2018
0.00
Lets install the prop.
Details
03-06-2018
0.00
Lets install the engine muffler.
Details
03-05-2018
0.00
Instrument panel mounted and the wind screen.
Details
03-04-2018
0.00
No screw slot on engine choke cable lock.
Details
03-03-2018
0.00
Install the beacon.
Details
03-02-2018
0.00
Examine BRS components. Pulled trigger.
Details
03-01-2018
0.00
Lets check out the BRS and mount it up..
Details
02-27-2018
0.00
Wiring the engine to EIS
Details
02-26-2018
0.00
Wiring of CHT/EGT and Battery.
Details
02-25-2018
0.00
Time for wiring the engine.
Details
02-23-2018
0.00
Mounting the fuel pump to engine.
Details
02-21-2018
0.00
Hanging the engine, Hirth 2701 part 2.
Details
02-19-2018
0.00
Hanging the engine, Hirth 2702.
Details
02-17-2018
0.00
Moving day for the wings and tail section.
Details
02-15-2018
0.00
Instrument panel.
Details
02-13-2018
0.00
Warp Drive 3 Bladded Prop.
Details
02-11-2018
0.00
Flap motor parts.
Details
02-09-2018
0.00
Hirth 2702 Engine assembly
Details
02-07-2018
0.00
Engine unboxing. Hirth 2702.
Details
02-05-2018
0.00
Empenage is attached.
Details
02-03-2018
0.00
Fitting the empenage.
Details
02-01-2018
0.00
Just a picture of the shop.
Details
01-29-2018
0.00
An opps and a gotcha.
Details
01-27-2018
0.00
Attach wing strut attach brackets.
Details
01-25-2018
0.00
Cut out wing fabric patches for strut brackets.
Details
01-23-2018
0.00
Attach and shape aft end of wing ribs.
Details
01-21-2018
0.00
Drill/attach upper/lower wing struts anchor points
Details
01-19-2018
0.00
Major components attached.
Details
01-17-2018
0.00
Add more stabilizer anchor points.
Details
01-15-2018
0.00
Added stabiliizer annchor points to tail boom.
Details
01-13-2018
0.00
Aileron cable anchoe attach bracket install.
Details
01-11-2018
0.00
Made 2 right wing struts. Crap.
Details
01-09-2018
0.00
Add Jury Strut anchor points to Struts.
Details
01-07-2018
0.00
Attaching the control surface horns and hinges.
Details
01-05-2018
0.00
Control Surface Zip Tie Direction change.
Details
01-03-2018
0.00
Installing empenage skins with Stephanie.
Details
01-01-2018
0.00
Parts, Control surfaces, skins
Details
08-15-2017
0.00
Made it home safe and unpacked.
Details
08-13-2017
0.00
Travel home from Oshkosh to Vancouver.
Details
08-11-2017
0.00
Fit the plane on the custom trailer.
Details
08-09-2017
0.00
Build a trailer at Oshkosh 2017. No electricity.
Details
08-07-2017
0.00
On display at Oshkosh 2017.
Details
08-05-2017
0.00
Lets fly this thing.
Details
08-03-2017
0.00
Arrived at Oshkosh for first visit.
Details
08-01-2017
0.00
Here's the Goal.
Details
SITE NAVIGATION
Contact Builder
Aerolite 103 Home
Category
# Logs
# Hours
All
60
0
Miscellaneous
60
RV-6A Home
RV-7A Home
Copyright © 2001-2024 Matronics. All Rights Reserved.