Date
|
Hours
|
Work Log Summary
|
Details
|
01-08-2023
|
2.00
|
Riveted passenger seatbelt channel
|
Details
|
|
|
01-08-2023
|
1.50
|
Finished drilling and riveted inside elevator cabl
|
Details
|
|
|
01-23-2022
|
1.50
|
Continued cutting panel
|
Details
|
|
|
01-17-2022
|
2.00
|
Continued cutting panel
|
Details
|
|
|
01-15-2022
|
3.50
|
Cutting holes for control panel stack
|
Details
|
|
|
01-14-2022
|
5.00
|
Cut panel to shape
|
Details
|
|
|
01-09-2022
|
3.00
|
Working on passenger seatbelt channel
|
Details
|
|
|
01-09-2022
|
3.00
|
Working on interior pulley for elevator cable
|
Details
|
|
|
12-12-2021
|
2.50
|
Finished closing right wing
|
Details
|
|
|
03-28-2021
|
3.00
|
Started to close right wing
|
Details
|
|
|
12-13-2020
|
3.00
|
Deburring right wing skins
|
Details
|
|
|
07-11-2020
|
6.00
|
Continuing left wingtip
|
Details
|
|
|
07-05-2020
|
2.00
|
Working on wingtips
|
Details
|
|
|
06-27-2020
|
0.50
|
Starting wingtips
|
Details
|
|
|
06-21-2020
|
7.00
|
Closed left wing
|
Details
|
|
|
06-20-2020
|
2.00
|
Prepped to close left wing.
|
Details
|
|
|
06-07-2020
|
4.00
|
Installed fine fuel filter
|
Details
|
|
|
05-26-2020
|
0.50
|
Improving wire standoffs in wings
|
Details
|
|
|
05-24-2020
|
0.50
|
Installing fuel lines on each side of fuel pumps
|
Details
|
|
|
05-22-2020
|
1.00
|
Installing fuel filters with fuel pumps
|
Details
|
|
|
05-22-2020
|
1.00
|
Finished assembling avionics tray
|
Details
|
|
|
05-22-2020
|
0.50
|
Drilling passenger side seatbelt channel flange
|
Details
|
|
|
05-09-2020
|
1.00
|
Ran ECU harness through firewall
|
Details
|
|
|
05-09-2020
|
1.50
|
Installed fuel pumps on firewall
|
Details
|
|
|
05-09-2020
|
2.00
|
Drilling out seatbelt assembly doublers
|
Details
|
|
|
05-09-2020
|
2.50
|
Building avionics tray
|
Details
|
|
|
05-03-2020
|
3.50
|
Continued work on the seatbelt assembly
|
Details
|
|
|
03-13-2020
|
2.00
|
Started seatbelt assembly
|
Details
|
|
|
03-08-2020
|
1.50
|
Mounting ignition module plates
|
Details
|
|
|
03-08-2020
|
1.00
|
Mounting ECU
|
Details
|
|
|
03-01-2020
|
2.50
|
Ignition module mount and cooling hose for voltage
|
Details
|
|
|
02-29-2020
|
4.00
|
Mounting plates for ignition modules/voltage regul
|
Details
|
|
|
02-29-2020
|
2.00
|
Finished cutting baffles
|
Details
|
|
|
02-22-2020
|
0.50
|
Marking pilot's side baffle for trimming
|
Details
|
|
|
02-17-2020
|
3.50
|
Cutting baffles
|
Details
|
|
|
01-25-2020
|
3.00
|
Working on elevator cable pulleys
|
Details
|
|
|
01-25-2020
|
3.00
|
Installing oil cooler, starting baffles
|
Details
|
|
|
01-12-2020
|
4.50
|
Riveting gusset plates and installing trim servo
|
Details
|
|
|
12-31-2019
|
3.00
|
Riveting tail gusset plate
|
Details
|
|
|
12-30-2019
|
2.50
|
Finished drilling mounting holes for horizontal st
|
Details
|
|
|
12-24-2019
|
1.00
|
Clecoed on horizontal stabilizer gusset plates
|
Details
|
|
|
12-22-2019
|
3.00
|
Riveted elevator, started to drill horizontal stab
|
Details
|
|
|
12-15-2019
|
0.50
|
Mounted autopilot pitch servo
|
Details
|
|
|
12-15-2019
|
5.00
|
Finished drilling out elevator, worked on leveling
|
Details
|
|
|
12-07-2019
|
2.00
|
Running first set of fuel lines
|
Details
|
|
|
12-07-2019
|
2.00
|
Finished constructing pitch servo mount
|
Details
|
|
|
11-24-2019
|
3.00
|
Fit and drilled new elevator hinge
|
Details
|
|
|
11-24-2019
|
1.00
|
Center console side panels
|
Details
|
|
|
11-16-2019
|
1.50
|
Installing gascolators under seat pans
|
Details
|
|
|
11-16-2019
|
2.50
|
Continued fitting elevator and attaching trim tab.
|
Details
|
|
|
10-12-2019
|
2.00
|
Started building new elevator.
|
Details
|
|
|
10-11-2019
|
7.50
|
Mounting engine to firewall.
|
Details
|
|
|
08-11-2019
|
1.00
|
Finished attempting to fix elevator twist.
|
Details
|
|
|
08-10-2019
|
1.50
|
Center console side panels.
|
Details
|
|
|
07-14-2019
|
2.00
|
Attempt to fix elevator twist
|
Details
|
|
|
07-07-2019
|
2.00
|
Reinstalled roll servo mount angle and started dri
|
Details
|
|
|
06-30-2019
|
0.50
|
Finished opening up the twisted side of elevator.
|
Details
|
|
|
06-30-2019
|
1.00
|
Drilled angle for autopilot roll servo mount
|
Details
|
|
|
06-22-2019
|
0.50
|
Removed two ribs to diagnose elevator twist
|
Details
|
|
|
06-22-2019
|
0.50
|
Finished bending pitch servo mount
|
Details
|
|
|
06-16-2019
|
1.00
|
Trimmed horizontal stabilizer caps and test fit el
|
Details
|
|
|
06-16-2019
|
1.00
|
Riveted static ports
|
Details
|
|
|
06-16-2019
|
2.00
|
Bending pitch servo mount and drilling bolt holes
|
Details
|
|
|
06-09-2019
|
5.50
|
Finished elevator
|
Details
|
|
|
06-02-2019
|
0.50
|
Drilled rivet holes for static ports
|
Details
|
|
|
05-29-2019
|
3.00
|
Finished autopilot roll servo mount
|
Details
|
|
|
05-28-2019
|
2.00
|
Started roll servo mount
|
Details
|
|
|
05-28-2019
|
0.50
|
Fitting static ports
|
Details
|
|
|
05-11-2019
|
5.50
|
Installing torque tube, dual sticks, pushrods
|
Details
|
|
|
05-04-2019
|
1.00
|
Starting dual stick brackets
|
Details
|
|
|
04-07-2019
|
1.00
|
Nose gear suspension and fork
|
Details
|
|
|
03-31-2019
|
1.00
|
Safety wire and drilling axle hole
|
Details
|
|
|
03-10-2019
|
2.50
|
Mounting nose gear fork
|
Details
|
|
|
03-09-2019
|
4.00
|
Installing rudder pedals
|
Details
|
|
|
03-03-2019
|
0.50
|
Mounting brake cylinders
|
Details
|
|
|
03-02-2019
|
2.50
|
Finishing initial assembly of rudder pedals
|
Details
|
|
|
03-02-2019
|
3.00
|
Continuing nose gear assembly
|
Details
|
|
|
02-24-2019
|
3.50
|
Starting rudder pedal assembly
|
Details
|
|
|
02-24-2019
|
1.00
|
Starting nose gear assembly
|
Details
|
|
|
02-10-2019
|
1.50
|
Mounted main gear on the fuselage.
|
Details
|
|
|
02-09-2019
|
2.00
|
Mounting wheels and tires on spring
|
Details
|
|
|
02-09-2019
|
1.00
|
Elevator
|
Details
|
|
|
01-19-2019
|
2.00
|
Tim tab motor
|
Details
|
|
|
01-06-2019
|
4.00
|
Elevator assembly, hinge fitting.
|
Details
|
|
|
12-16-2018
|
4.50
|
Substantial completion of horizontal stabilizer
|
Details
|
|
|
12-09-2018
|
2.00
|
Started horizontal stabilizer skin and tip ribs
|
Details
|
|
|
12-09-2018
|
3.00
|
Assembling horizontal stabilizer skeleton
|
Details
|
|
|
12-02-2018
|
1.00
|
Started on the horizontal stabilizer
|
Details
|
|
|
12-02-2018
|
4.00
|
Finishing passenger side flaperons
|
Details
|
|
|
11-25-2018
|
1.00
|
Pass. side flaperon skeletons
|
Details
|
|
|
11-25-2018
|
4.50
|
Completing pilot's side flaperons
|
Details
|
|
|
11-23-2018
|
4.00
|
Pilot's side flaperons
|
Details
|
|
|
11-10-2018
|
1.00
|
Worked on the O/B pilots side flaperon skeleton
|
Details
|
|
|
11-10-2018
|
1.00
|
Misc. - I/B nose skin angle, insp. cover holes, st
|
Details
|
|
|
11-10-2018
|
2.00
|
Drilling out top skin
|
Details
|
|
|
11-03-2018
|
1.50
|
Started pilots side flaperons
|
Details
|
|
|
11-03-2018
|
2.50
|
Finished right wing fuel system
|
Details
|
|
|
10-28-2018
|
5.00
|
Top skins, root rib, fuel tank.
|
Details
|
|
|
10-21-2018
|
5.00
|
Right wing bottom skins
|
Details
|
|
|
10-20-2018
|
6.50
|
Drilling out R wing skins
|
Details
|
|
|
10-13-2018
|
2.00
|
Bottom skin stiffener L angles
|
Details
|
|
|
09-30-2018
|
2.50
|
Riveting on right wing rear spar
|
Details
|
|
|
08-25-2018
|
1.00
|
Fitting right wing rear spar
|
Details
|
|
|
08-12-2018
|
2.00
|
Right wing skeleton riveting
|
Details
|
|
|
08-12-2018
|
4.50
|
Fuel tank fitting and running hoses
|
Details
|
|
|
08-11-2018
|
2.50
|
Fuel tank fittings
|
Details
|
|
|
08-04-2018
|
3.00
|
Strobe light wiring and cutting fuel sender hole
|
Details
|
|
|
08-04-2018
|
1.50
|
Flaperon arms and wingtip L-angles
|
Details
|
|
|
07-29-2018
|
4.00
|
Securing wires and testing components
|
Details
|
|
|
07-28-2018
|
1.25
|
Running wires for pitot heat
|
Details
|
|
|
07-22-2018
|
4.50
|
Flaperon arms, landing light assembly, R wing skel
|
Details
|
|
|
07-15-2018
|
2.50
|
Pitot tube and plumbing installed
|
Details
|
|
|
07-15-2018
|
3.00
|
Landing light assembly started
|
Details
|
|
|
07-14-2018
|
7.00
|
Drilling top skins
|
Details
|
|
|
07-04-2018
|
4.00
|
Top skin fitting
|
Details
|
|
|
06-17-2018
|
5.50
|
Cutout pitot mast hole and riveted bottom skins
|
Details
|
|
|
05-28-2018
|
3.00
|
Spar fitting and landing light cutout
|
Details
|
|
|
05-06-2018
|
5.50
|
Drilling out bottom skins and starting on strut fi
|
Details
|
|
|
04-21-2018
|
5.00
|
Outboard bottom skin
|
Details
|
|
|
04-14-2018
|
7.50
|
Rear spar
|
Details
|
|
|
04-08-2018
|
7.00
|
Drilled out, assembled, and riveted ribs to spar
|
Details
|
|
|
04-06-2018
|
1.00
|
Finished uncrating wings and started expanding fla
|
Details
|
|
|
10-14-2017
|
3.25
|
Riveted skeleton and skin, finished top cap
|
Details
|
|
|
10-13-2017
|
2.50
|
Finished deburring, clecoed together to check fit
|
Details
|
|
|
10-12-2017
|
1.25
|
Finish drilling rudder spar doublers and expanding
|
Details
|
|
|
10-11-2017
|
1.25
|
Started drilling rudder spar doublers
|
Details
|
|