KitLog pro

Powered By Kitlog Pro v2.0

DOUGs Web Site
Work Logs Found: 484
Category Work Time: 705 Hours
 Date
Hours
Work Log Summary

Details

 12-31-2019
0.50
2 Leak tested static and pitot lines
Details
       

 12-31-2019
2.00
1 Installed Pitot and Static lines
Details
       

 12-28-2019
2.00
Installed radio rack
Details
     

 12-24-2019
2.00
Assembled Radio rack
Details
       

 12-23-2019
2.00
NAV122, dimmers and a panel stand
Details
       

 12-21-2019
1.50
Installed circuit breakers and ELT switch
Details
       

 12-14-2019
1.00
Instrument lighting, switch caps and static source
Details
       

 12-08-2019
0.50
4 Installed Garmin G3X Touch
Details
       

 12-08-2019
1.00
3 Installed toggle switches
Details
       

 12-08-2019
1.00
2 Altimeter lighting and toggle switches
Details
       

 12-08-2019
0.50
1 flap switch installation
Details
       

 12-07-2019
1.50
switch guards and instruments
Details
       

 12-01-2019
1.00
Started panel assembly
Details
     

 11-30-2019
0.50
Clear coated panel
Details
     

 11-29-2019
1.50
1 Applied Decals to Panel
Details
       

 11-23-2019
1.50
Primed and painted Avionics panel
Details
       

 11-16-2019
1.00
2 Temporary "Pole Prop"
Details
       

 11-16-2019
1.00
1 Temoparary Oil system
Details
       

 06-18-2019
1.00
Panel & Dash Modifications
Details
       

 06-15-2019
1.00
Assembled Com radio rack
Details
       

 06-13-2019
1.00
Panel and Dash Modifications
Details
       

 06-12-2019
0.50
Radio rack and bracket fitting
Details
     

 06-08-2019
1.50
Fabricated radio stack brackets
Details
       

 05-26-2019
0.50
Test Fitting Panel
Details
     

 05-23-2019
1.50
Ordered Dry Transfer Labels
Details
     

 05-17-2019
0.50
Received Panel Today
Details
       

 05-10-2019
2.00
Panel sent out to for Fab
Details
       

 05-09-2019
1.00
Replaced indicator lights with larger size
Details
     

 05-08-2019
2.00
Added Marker Beacon Switches
Details
     

 05-07-2019
3.00
Tweaked Panel Layout
Details
       

 05-03-2019
3.00
Finalized Panel Layout
Details
 

 05-01-2019
7.00
Instrument Panel Design
Details
     

 04-22-2019
1.00
Test fit new exhaust
Details
       

 04-15-2019
1.50
2 - firewall heavy wiring
Details
       

 04-15-2019
1.50
1 - Firewall wiring
Details
       

 04-09-2019
1.50
Installed magneto grounding wires
Details
       

 04-08-2019
1.00
2 - misc riveting
Details
       

 04-08-2019
0.50
1 - New tools and parts; Tail fairing hole enlarge
Details
       

 04-04-2019
0.50
5 - fairing install complete
Details
       

 04-04-2019
0.50
4 - Empennage fairing rivnut installation
Details
       

 04-04-2019
0.50
3 - Empennage fairing installation
Details
       

 04-04-2019
0.50
2 - wiring and battery contactor
Details
       

 04-04-2019
0.50
1 - Engine wiring survey
Details
       

 04-03-2019
1.00
2 - Modified main gear cover
Details
       

 04-03-2019
0.50
1 - engine wiring survey
Details
       

 04-02-2019
1.50
Installed voltage regulator & capacitor to firewal
Details
       

 04-01-2019
1.50
2 - re installed vertical stab & rudder
Details
       

 04-01-2019
1.50
1 - Removed vert stab & rudder for rework
Details
       

 03-30-2019
0.50
2 - Test fitting canopy frame
Details
     

 03-30-2019
1.00
1 - Installed tail cover
Details
       

 03-28-2019
0.50
3 - Misc tail work
Details
       

 03-28-2019
0.50
2 - installed baggage dome light
Details
       

 03-28-2019
1.00
1 - wired cockpit spot lights
Details
       

 03-26-2019
0.50
2 - Elevator wiring and access covers
Details
       

 03-26-2019
0.50
1 - Completed rudder installation
Details
       

 03-25-2019
1.00
3 - Rudder installation
Details
       

 03-25-2019
1.00
2 - Installed vertical stabilizer
Details
 

 03-25-2019
1.00
1 - Set elevator deflection angles
Details
       

 03-24-2019
0.50
2 - fit vertical stabilizer
Details
       

 03-24-2019
1.00
1 - Installed elevator hinge bolts
Details
       

 03-22-2019
1.20
3 - completed rod end install; connected hinge
Details
       

 03-22-2019
1.30
2 - machined spacers for elevator rod end connecti
Details
       

 03-22-2019
1.00
1 - Installed Horiz Stab
Details
       

 03-20-2019
1.00
2 - installed airframe connectors for tail
Details
       

 03-20-2019
0.50
1 - finished GMU 11 connector wiring
Details
       

 03-19-2019
1.30
2 - Tail connector rivnuts
Details
       

 03-19-2019
0.50
1 - Magnetometer connector
Details
       

 03-15-2019
2.00
Fabricated bracket and mounted magnetometer
Details
       

 03-14-2019
0.70
2 - HStab pass-through wire connectors
Details
       

 03-14-2019
1.00
1 - Trim tab, wire grommet & magnetometer
Details
       

 03-12-2019
1.50
Rewired and installed trim servo
Details
       

 03-11-2019
1.00
Completed wiring of vertical stab & rudder
Details
       

 03-10-2019
0.50
2 - Re-routed tail light wire through rudder
Details
       

 03-10-2019
0.50
1 - Drilled new wire routing holes in rudder
Details
       

 03-09-2019
1.00
Changed a flat tire
Details
       

 03-07-2019
3.00
Rudder / Vert Stab connector for tail light
Details
       

 03-06-2019
1.00
Soldered 4-pin connector jack to tail light
Details
       

 03-04-2019
1.00
2 - installed a plug connector for the servo cable
Details
       

 03-04-2019
1.00
1 - installed connector jack on elevator trim serv
Details
       

 03-03-2019
0.50
Riveted empennage connector bracket
Details
       

 02-28-2019
1.00
3 - exhaust diagnosis
Details
       

 02-28-2019
1.00
2 - exhaust assembly
Details
       

 02-28-2019
1.00
1 - Oil tank installation & exhaust assembly
Details
       

 02-27-2019
0.30
4 - torqued motor mount nuts
Details
       

 02-27-2019
0.40
3 - Tightened engine mount nuts
Details
       

 02-27-2019
0.40
2 - installed mounting hardware
Details
       

 02-27-2019
0.40
1 - Uncrated engine and attached to hoist
Details
       

 02-26-2019
0.50
2 - Adjusted rudder cable tension and stops
Details
       

 02-26-2019
0.80
1 - Shortened left steering pushrod
Details
       

 02-25-2019
2.00
Debugging steering & rudder movement
Details
       

 02-24-2019
1.00
2 - assembly and installation of steering pushrods
Details
       

 02-24-2019
1.00
1 - shortened steering push rod tubes
Details
       

 02-22-2019
1.00
2 - steering pushrod trouble shooting
Details
       

 02-22-2019
1.00
1 - Steering push rod installation
Details
       

 02-19-2019
1.00
Installed static source tubing and water reservoir
Details
       

 02-19-2019
0.50
1 - Installed rivnuts to trim servo
Details
       

 02-18-2019
1.00
2 - Installed motor mount / front wheel assembly
Details
     

 02-18-2019
0.50
1 - Sealed cabin heat duct
Details
       

 02-17-2019
1.00
3 - Installed Firex sound / heat material to firew
Details
       

 02-17-2019
1.00
2 - Installed shunt on firewall
Details
       

 02-17-2019
1.00
1 - Replaced static source rivets
Details
       

 01-13-2019
0.00
Hangar Organizing
Details
       

 01-12-2019
0.00
Moving the fuselage
Details
       

 01-11-2019
0.00
Moving the wings and engine
Details
 

 01-10-2019
0.00
Moving the shop tools
Details
       

 01-07-2019
0.00
Rented a hangar
Details
     

 12-31-2018
1.00
Static ports installation
Details
       

 12-28-2018
1.00
Hole cover fab and fitment
Details
       

 12-27-2018
1.00
Punched holes in Firex material
Details
       

 12-22-2018
1.00
Proposed G3X Interconnect Diagram
Details
     

 12-21-2018
1.50
Fabricated mounting plate for voltage regulator an
Details
       

 12-20-2018
1.00
Firewall Foam insulation fitment
Details
       

 12-17-2018
2.00
Firewall templates
Details
       

 12-12-2018
2.00
Firewall preparation
Details
       

 12-08-2018
2.00
Starter and Battery solenoid mounting
Details
       

 12-01-2018
1.00
Cabin heat, oil tank bracket and fuel pump shroud
Details
       

 11-30-2018
1.00
Completed cabin heat control box
Details
       

 11-02-2018
1.00
Installed new missing parts
Details
       

 11-01-2018
0.50
Engine Inventory
Details
     

 10-26-2018
0.50
Added rivets to wing tip light mounting plates
Details
       

 10-22-2018
1.00
Ebay Instruments
Details
       

 10-17-2018
1.50
Installed comm antenna and mounting plates
Details
       

 10-15-2018
0.40
2 - Installed Comm & Nav coax connectors
Details
       

 10-15-2018
0.60
1 - Comm antenna mount prep
Details
       

 10-14-2018
0.20
2 - clecod booted flanges to firewall
Details
       

 10-14-2018
0.50
1 - Clecod steering rod boots to flanges
Details
       

 10-13-2018
1.00
Installed VOR antenna BNC flange connector
Details
       

 10-12-2018
0.50
BNC connector crimping - practice
Details
       

 10-10-2018
1.00
2 - Completed heater flap assembly
Details
       

 10-10-2018
1.00
1 - Assembled heater flap to hinge
Details
       

 10-09-2018
2.50
Finished re-mounting control linkage
Details
       

 10-08-2018
2.00
Re-installing controls to reduce friction
Details
       

 10-07-2018
0.50
3 - Installed water overflow & brake fluid resevoi
Details
       

 10-07-2018
1.50
2 - Battery box assembly and installation
Details
       

 10-07-2018
1.00
1 - Fit fuel pump and heater box
Details
       

 10-06-2018
2.00
Misc FF preparations
Details
       

 10-04-2018
1.00
2 - Transponder and ADS-B "IN" antennas
Details
       

 10-04-2018
1.00
1 - Marker Beacon antenna installation
Details
       

 10-03-2018
0.50
1 - Installed flap actuator
Details
       

 10-03-2018
2.00
1 - FF kit receipt and inventory
Details
       

 10-02-2018
1.00
2 - fitting wing tips to wings
Details
       

 10-02-2018
1.00
1 - fitting wing tips and drilling holes
Details
       

 10-01-2018
1.00
3 - fabricated and installed wing tip expansion br
Details
       

 10-01-2018
0.50
2 - fitting wing tips to wing
Details
       

 10-01-2018
1.00
1 - Installing Port position light
Details
       

 09-30-2018
1.00
2 - Installed right tip light
Details
       

 09-30-2018
1.00
1 - installing wing tip lights
Details
       

 09-29-2018
0.00
4 - First time to sit in cockpit!
Details
 

 09-29-2018
1.00
3 - Installed stick grips
Details
       

 09-29-2018
1.00
2 - Measured and cut control sticks for grip
Details
       

 09-29-2018
1.00
1 - Fabricated and installed new eyebolt spacers
Details
       

 09-28-2018
1.50
4 - Installed pushrods to servos and controls
Details
       

 09-28-2018
1.00
3 - fabricated servo pushrods
Details
       

 09-28-2018
1.00
2 - installed aileron servo
Details
       

 09-28-2018
1.50
1 - Installing elevator servo
Details
       

 09-27-2018
1.50
3 - riveted tip ribs to wings
Details
       

 09-27-2018
1.00
2 - tip rib fitment
Details
       

 09-27-2018
1.50
1 - Installing wing tips
Details
       

 09-26-2018
1.50
2 - Installed long elevator eyebolt and flap torqu
Details
       

 09-26-2018
1.50
1 - Installed aileron stick to stick pushrod
Details
       

 09-25-2018
1.00
3 - Installed elevator crank & pushrods
Details
       

 09-25-2018
1.00
2 - Modified stick bushings
Details
       

 09-25-2018
1.00
1 - Fit elevator crank stop sleeves
Details
       

 09-24-2018
1.50
2 - Installed contol sticks
Details
       

 09-24-2018
1.00
1 - Control sticks prep
Details
       

 09-23-2018
0.30
3 - Pitot and AOA pressure test
Details
     

 09-23-2018
0.70
2 - Aileron and Flap fitment
Details
       

 09-23-2018
1.00
1 - Attempted reforming of tip rib
Details
       

 09-22-2018
1.00
3 - primed tip rib brackets and test fit ribs
Details
       

 09-22-2018
0.50
2 - Fit tip rib skins
Details
       

 09-22-2018
0.50
1 - Installed remaining spar rivets
Details
       

 09-21-2018
0.80
2 - Loaded wings onto wing dolly
Details
       

 09-21-2018
0.70
1 - Finished wing stand dolly
Details
       

 09-20-2018
1.50
2 - Wing dolly construction
Details
       

 09-20-2018
1.50
1 - Wing dolly construction
Details
       

 09-19-2018
2.50
Installed left fuel tank to wing
Details
       

 09-18-2018
0.50
Leak tested left fuel tank after repair
Details
     

 09-18-2018
2.50
Installed right fuel tank to wing
Details
       

 09-17-2018
1.00
Leak testing of fuel tanks
Details
       

 09-15-2018
0.50
Leak test prep
Details
       

 09-15-2018
1.50
Installed fuel level senders to tanks
Details
       

 09-14-2018
2.00
2 - Removed right tank and cleaned excess sealant
Details
       

 09-14-2018
1.50
1 - Cleaned off excess sealant from left fuel tank
Details
       

 09-13-2018
1.00
Removed fuel tank from left wing
Details
       

 09-10-2018
3.00
2 - closed right fuel tank with sealant
Details
       

 09-10-2018
2.00
1 - Cleaned inside of right fuel tank
Details
       

 09-09-2018
3.50
2 - Completed Left Fuel Tank Assembly
Details
       

 09-09-2018
1.50
1 Finished cleaning inside of Left fuel tank
Details
       

 09-08-2018
2.00
Cleaned up inside of fuel tanks
Details
       

 09-04-2018
2.50
Touch up sealing inside of fuel tanks
Details
       

 08-29-2018
0.50
Set fuel level sender floats
Details
       

 08-28-2018
6.00
Started left fuel tank assembly
Details
       

 08-27-2018
5.50
Start assembly & sealing of right fuel tank
Details
       

 08-26-2018
2.00
Prepared fuel tanks for assembly
Details
     

 08-26-2018
2.00
New panel layout with custom Flap Controls
Details
     

 08-25-2018
3.00
1 - Latest Panel Layout
Details
     

 08-24-2018
2.00
2 - Fitment of L & R fuel tanks to wings
Details
       

 08-24-2018
2.00
1 - fitment of fuel return fittings and clamp
Details
       

 08-23-2018
2.00
3 - More parts prep for fuel tank assembly
Details
       

 08-23-2018
1.00
2 - Fuel tank supply line fitment
Details
       

 08-23-2018
1.00
1 - Fabricated and fit right fuel tank vent line
Details
       

 08-22-2018
1.00
5 - Fuel breather tube fabrication: left fuel tank
Details
       

 08-22-2018
1.00
4 - Fuel filler neck preparation
Details
       

 08-22-2018
1.00
3 - Installed nut plates to tank brackets
Details
       

 08-22-2018
1.00
2 - installed ground lug to sender mounting plate
Details
       

 08-22-2018
0.50
1 - Flattend fuel tank outer rib flanges
Details

 08-21-2018
0.50
Fuel tank assembly
Details
       

 08-19-2018
1.50
Complete riveting left wing
Details
       

 08-18-2018
1.50
5 - Completed riveting of top skins for left wing
Details
       

 08-18-2018
2.00
4 - Riveting top skins of left wing
Details
       

 08-18-2018
1.00
3 - Aileron push rod fitment
Details
       

 08-18-2018
1.00
2 - Installed top skins to left wing with clecos
Details
 

 08-18-2018
1.00
1 - Completed Pitot tube installation
Details
       

 08-17-2018
1.50
Pitot fittings installation
Details
       

 08-17-2018
0.00
First tail dragger lesson ever
Details
     

 08-15-2018
1.00
Installed landing light wing connectors
Details
       

 08-14-2018
0.50
3 - Installed connectors on landing lamps
Details
       

 08-14-2018
1.00
2 - Clecod tip top and leading edge skins of left
Details
       

 08-14-2018
1.00
1 - Added rib rivets & riveted landing light assy
Details
       

 08-12-2018
1.00
4 - primed top skins for left wing
Details
       

 08-12-2018
1.00
3 - Landing and strobe light routing
Details
       

 08-12-2018
0.50
2 - Pitot system tubing
Details
       

 08-12-2018
1.00
1 - Pitot Tube installation
Details
       

 08-11-2018
0.50
Began tubing and wire installation in left wing
Details
       

 08-10-2018
0.50
3 Flipped wing over and fit pitot tube
Details
       

 08-10-2018
1.00
2 Installed M4 rivnuts for left wing inspection pa
Details
       

 08-10-2018
2.00
1 Riveted bottom skins of left wing
Details
       

 08-09-2018
1.00
Started Riveting the left lower wing skins
Details
       

 08-09-2018
1.50
Started left wing bottom skin assembly
Details
       

 08-08-2018
0.50
Left wing bottom side work
Details
       

 08-08-2018
1.00
Fit top skins to left wing
Details
       

 08-07-2018
2.00
3-Riveted left wing ribs
       

 08-07-2018
1.50
2-Completed step bends & started riveting
Details
       

 08-07-2018
1.50
1-Formed step on bottom rib brackets
Details
       

 08-06-2018
1.00
Started Left Wing assembly
Details
       

 08-05-2018
2.00
Primed left wing ribs
Details
       

 08-02-2018
0.50
Replaced fuel sender o-rings
Details
     

 07-30-2018
1.50
Assembled re-configured fuel level senders
Details
       

 07-29-2018
1.00
Right wing tank test fit
Details
       

 07-29-2018
1.50
Left wing tank test fit
Details
       

 07-28-2018
1.00
Cut templates for fuel tank fixtures
Details
       

 07-27-2018
4.00
Fit prototype panel and avionics to dash
Details
     

 07-27-2018
1.00
Cut and formed fuel level float arms
Details
     

 07-26-2018
1.00
Installed parking brake valve
Details
       

 07-26-2018
1.00
Assembled landing and taxi lights
Details
       

 07-25-2018
0.50
Prepared for left wing light assembly
Details
     

 07-25-2018
0.50
Installed longer clevis on master cylinder
Details
       

 07-25-2018
1.50
Completed right wing skin assembly
Details
       

 07-24-2018
5.00
Riveted the top right wing skins
Details
       

 07-23-2018
3.00
Right wing top side assembly
Details
       

 07-23-2018
3.00
Assembled top skins to right wing
Details
       

 07-22-2018
0.50
Installed wing strobe / position lights wiring
Details
       

 07-22-2018
1.00
Installed M4 rivnuts for inspection panels
Details
       

 07-21-2018
3.00
Riveted right wing bottom skins
Details
       

 07-20-2018
4.00
Installed bottom skins to right wing assembly
Details
       

 07-19-2018
3.00
Riveted right wing ribs and spars
Details
       

 07-18-2018
1.50
3 - Right Wing Assembly
Details
       

 07-18-2018
1.50
2 - Right Wing Assembly
Details
       

 07-18-2018
2.50
1 - Right Wing Assembly
Details
       

 07-17-2018
0.50
X1 - Wing twist jig setup
Details
       

 07-17-2018
0.50
Riveted wing twist jigs together
Details
       

 07-17-2018
3.00
Assembled rear spars with clecos
Details
       

 07-16-2018
1.00
Assembled wing ribs 009 L&R
Details
       

 07-16-2018
2.00
Assembled wing ribs 008 L&R
Details
       

 07-16-2018
2.00
Assembled wing rib 006 L&R
Details
       

 07-13-2018
2.50
Assembled wing rib 004
Details
       

 07-13-2018
1.50
Assembled wing rib 001
Details
       

 07-12-2018
1.50
riveted left wing flap
Details
       

 07-12-2018
3.00
Assembled right wing flap
Details
       

 07-11-2018
1.00
Scotch bright and primed flap ribs
Details
       

 07-10-2018
1.00
Prep'd parts for flap assembly
Details
     

 07-09-2018
3.00
Completed Ailerons
Details
       

 07-08-2018
2.50
Started Aileron build
Details
       

 07-08-2018
1.00
Broke down crates and made a workbench
Details
       

 07-07-2018
6.00
Unpacking and inventory of wing & finish kit
Details
       

 07-06-2018
1.00
throttle quadrant assembly
Details
       

 07-05-2018
2.00
Finished riveting the inner arch skin
Details
       

 07-04-2018
1.00
Riveted top arch skin
Details
       

 07-04-2018
3.50
Arch Ready for Rivets!
Details
       

 07-03-2018
3.00
Top arch fluting and inner arch skin clecod
Details
     

 07-03-2018
0.50
lower arch supports installed
Details
       

 07-03-2018
1.00
Inner arch flanges
Details
       

 07-02-2018
2.50
Installed Cabin Lights
Details
       

 06-30-2018
2.00
Assembly of Throttle and Brake controls
Details
       

 06-29-2018
1.00
Vacuumed out rivet removal debris
Details
       

 06-29-2018
2.00
NEW PANEL LAYOUT
Details
     

 06-27-2018
6.00
Riveted tail cone top skins
Details
       

 06-27-2018
2.00
Latest panel layout rendering
Details
       

 06-26-2018
4.00
Installed & clecod top tail cone skin
Details
       

 06-23-2018
10.00
Avionics Panel Layout
Details
     

 06-21-2018
6.00
Avionics Panel Layout
Details
     

 06-20-2018
0.50
Misc. stuff
Details
       

 06-18-2018
1.00
Reworked and riveted steps
Details
       

 06-18-2018
3.00
Avionics panel layout in CAD
Details
       

 06-17-2018
1.00
Rudder stop adjustments
Details
       

 06-17-2018
0.50
Installed wiring for magnetometer
Details
       

 06-16-2018
1.00
Rudder cable hook-up and test
Details
       

 06-16-2018
1.00
Misc interior riveting
Details
       

 06-15-2018
1.50
Mounted Vertical Stabilizer
Details
       

 06-15-2018
1.00
Cockpit cleanup and seat belt mounts
Details
       

 06-14-2018
0.70
Inside cocpit riveting 2
Details
       

 06-14-2018
0.80
Inside Cockpit Riveting
Details
       

 06-12-2018
0.50
Riveted inside panel and cable guides
Details
       

 06-10-2018
3.00
Finished riveting right side and firewall
Details
       

 06-09-2018
3.00
Riveted right side of outer skin to uprights
Details
       

 06-05-2018
0.50
Riveted left inside panel
Details
     

 06-04-2018
5.00
Riveting side skins of fuselage
Details
       

 06-03-2018
4.00
Riveted inside connection & installed wing spacer
Details
       

 05-28-2018
2.00
2 - Riveted rear Fuselage to Central Fuselage
Details
       

 05-28-2018
3.00
1 - Cable & coax routing, wrapping and securing
Details
       

 05-27-2018
1.50
Routed wire & coax from rear to central fuselage
Details
       

 05-26-2018
1.00
1 - Routed GPS antenna coax
Details
       

 05-25-2018
2.00
Routed and secure wire & cable tubing
Details
       

 05-24-2018
1.50
4 - transition piece, joining bracket and rear can
Details
       

 05-24-2018
1.50
3 - After Joining work
Details
       

 05-24-2018
1.50
2 - Closing the gap on the joints
Details
       

 05-24-2018
1.50
1 - Central/Rear fuselage joining
Details
       

 05-23-2018
2.00
3 - Installed and riveted right longeron
Details
       

 05-23-2018
1.00
2 - Bent and fit connector bracket
Details
       

 05-23-2018
2.00
1 - Connector bracket design & fabrication
Details
       

 05-22-2018
0.50
4 - Mounted Hstab for connector wiring plan
Details
       

 05-22-2018
1.00
3 - Assembled and riveted seat bottom and back #2
Details
       

 05-22-2018
1.50
2 - Riveted seat bottom #2 (again)
Details
       

 05-22-2018
2.50
1 - Riveted and then disassembled seat bottom #2
Details
       

 05-21-2018
0.50
5 - Started seat bottom #2
Details
     

 05-21-2018
1.00
4 - Seat Bottom Final Assy #1
Details
       

 05-21-2018
2.00
3 - Seat Bottom #2 Latch assembly
Details
       

 05-21-2018
2.00
2 - Seat Bottom Assy #1
Details
       

 05-21-2018
1.00
1 - Seat Back Assy #2
Details
       

 05-20-2018
1.00
4 - Seat Back Assembly #2
Details
       

 05-20-2018
3.00
3 - Seat Back assembly #1
Details
       

 05-20-2018
0.50
2 - Drilled and clecod the air duct rivet holes
Details
       

 05-20-2018
0.50
1 - Clecod and drilled holes for controls cover br
Details
       

 05-18-2018
1.00
2 - Installed soundproofing foam to luggage back
Details
       

 05-18-2018
1.00
1 - Assembled and installed foam to luggage floor
Details
       

 05-17-2018
0.80
6 - Rudder fitment
Details
       

 05-17-2018
0.70
5 - VStab fitment
Details
       

 05-17-2018
1.50
4 - Ran tubing conduit and wires
Details
       

 05-17-2018
0.50
3 - fit autpilot brackets and grommets
Details
       

 05-17-2018
0.50
2 - repaired front luggage shelf
Details
       

 05-17-2018
0.50
1 - Test fitting skins
Details
       

 05-16-2018
0.50
8 - wire and coax routing
Details
       

 05-16-2018
0.50
7 - rivnuts, stops and antenna
Details
       

 05-16-2018
1.00
6 - Installing rudder cables
Details
       

 05-16-2018
0.50
5 - Fitting rudder cables and hardware
Details
       

 05-16-2018
0.50
4 - Fit gear skin cover on fuselage
Details
       

 05-16-2018
1.00
3 - Rivet removal and bracket install
Details
       

 05-16-2018
1.00
2 - Miscs fuselage brackets
Details
       

 05-16-2018
1.00
1 - Installed rudder pedals
Details
       

 05-15-2018
1.50
1 - Installed left longeron with rivets
Details
       

 05-14-2018
2.50
3 - Riveted step supports
Details
       

 05-14-2018
4.50
2 - Riveted tail cone side skins
Details
       

 05-14-2018
3.00
1 - Installed top skins and riveted bottom of tail
Details
       

 05-13-2018
2.00
2 - Temporary install of top skins
Details
       

 05-13-2018
1.00
1 - Ordered ELT, Pitch Servo, GPS & ADS-B Antennas
Details
     

 05-13-2018
3.00
1 - Fitting Tail Skins
Details
       

 05-12-2018
2.50
2 - Test fitting rear skins
Details
       

 05-12-2018
2.50
1 - Primed and re-installed brackets
Details
       

 05-11-2018
0.00
Avionics Panel #16
     

 05-11-2018
0.50
5 - Test fit top RF longerons
Details
       

 05-11-2018
1.00
4 - RF Brackets test fit
Details
       

 05-11-2018
2.00
3 - Assembled Longerons to Tail Cone Ribs
Details
       

 05-11-2018
2.00
2 - Riveted tail cone floor assembly
Details
       

 05-11-2018
3.00
1 - Prepared tail cone for assembly
Details
       

 05-10-2018
1.00
3 - Riveted longerons
Details
       

 05-10-2018
0.50
2 - RF Longerons assembly continued
Details
       

 05-10-2018
1.50
1 - Rear fuselage longerons
Details
       

 05-09-2018
3.50
Prep'd Fuselage and Clecod Left outer skin
Details
       

 05-08-2018
1.00
Final Install of Right Outer Side Skin with Clecos
Details
       

 05-07-2018
3.00
1 - Sand and prime right side fuselage
Details
       

 05-06-2018
1.50
3 - Removed film from outer skin rivet holes
Details
     

 05-06-2018
1.00
2 - Completed Right Side Top Rail Installation
Details
       

 05-06-2018
2.50
1 - Installing Right Top Rail
Details
       

 05-05-2018
2.00
2 - PREPARING FOR OUTER SKIN
Details
       

 05-05-2018
2.00
1 - RIVETING LEFT TOP RAIL
Details
       

 05-04-2018
0.50
4 - Mounted Horizontal tail for wiring plan
Details
       

 05-04-2018
0.50
3 - Motor Mount angle
Details
       

 05-04-2018
3.50
2 - cockpit sides sound proofing
Details
       

 05-04-2018
0.50
1 - Torqued gear bolts
Details
       

 05-03-2018
1.00
6 - Misc. stuff
Details
       

 05-03-2018
0.50
5 - Ground Legs
Details
       

 05-03-2018
1.00
4 - Nose gear installation
Details
       

 05-03-2018
1.00
3 - Nose gear installation
Details
       

 05-03-2018
2.00
2 - Nose gear preparation
Details
       

 05-03-2018
0.50
1 - Front wheel & tire assembly
Details
       

 05-02-2018
0.50
6 - mounted right wheel & tire to axle
Details
       

 05-02-2018
1.00
5 - Installed right wheel axle & caliper
Details
       

 05-02-2018
0.50
4 - installed canopy slides
Details
     

 05-02-2018
1.50
3 - Installed left tire & wheel to main gear
Details
       

 05-02-2018
1.50
2 - Left wheel assembly
Details
       

 05-02-2018
0.50
1 - Modified cubby hole top piece
Details
       

 05-01-2018
1.50
4 - Main Gear installation
Details
       

 05-01-2018
1.00
3 - Main Gear installation
Details
       

 05-01-2018
0.50
2 - Drill out main undercarriage bolt holes
Details
       

 05-01-2018
1.00
1 - Riveted stringer to luggage floor and install
Details
       

 05-01-2018
0.50
1 - rivet drilling and angle install
Details
       

 04-30-2018
0.50
4 - Heater duct
Details
       

 04-30-2018
1.50
3 - right inner panel install
Details
       

 04-30-2018
2.00
2 - left top rail skin mounting angle adjustment
Details
       

 04-30-2018
2.00
1 - Left inner panel mod
Details
       

 04-29-2018
1.00
Top rail anchor nut install & seat belt bolts
Details
       

 04-29-2018
1.00
Slide modification for canopy
Details
       

 04-29-2018
1.30
Riveted rear inside panels
Details
       

 04-29-2018
1.20
Riveted forward left panel to braces
Details
       

 04-29-2018
1.00
Reworked engine mounting
Details
       

 04-29-2018
1.00
Installed cockpit rib
Details
       

 04-28-2018
2.50
3 - Bracket riveting and console panels
Details
       

 04-28-2018
4.00
2 - Installed and Riveted Firewall to cockpit
Details
       

 04-28-2018
3.00
1 - Prefit various cockpit skins & brackets
Details
       

 04-27-2018
1.00
Started Firewall Assembly
Details
       

 04-27-2018
1.50
Riveted floor panel to cockpit
Details
       

 04-27-2018
1.00
Installed rear console with headset jack mounts
Details
       

 04-27-2018
1.50
Install forward floor to cockpit
Details
       

 04-26-2018
3.00
2 - Fit skin to VStab frame & Riveted
Details
       

 04-26-2018
2.50
1 - Installed antenna cable & strobe wiring
Details
       

 04-25-2018
1.00
Riveted Front mounting box upright
Details
       

 04-25-2018
0.00
Panel #13A
Details
     

 04-25-2018
2.50
Mounted VOR antenna to VStab
Details
       

 04-25-2018
2.00
Completed, Riveted Vertical Stabilizer Frame
Details
       

 04-24-2018
1.50
RRRibs and more ribs
Details
 

 04-24-2018
3.00
RRibs #3 & #2 completed
Details
       

 04-24-2018
2.00
Ribs #5 and #4 assembly
Details
       

 04-24-2018
0.30
Replacement part for VStab received today
Details
     

 04-24-2018
0.20
New UHF Antenna
Details
     

 04-23-2018
1.00
Rib 9 Assembly completed
Details
       

 04-23-2018
4.00
Rib 9 Assembly
Details
       

 04-22-2018
1.50
Started rear fuselage
Details
       

 04-21-2018
0.00
My latest panel idea
Details
     

 04-21-2018
2.00
Misc. skin flange details
Details
       

 04-20-2018
2.00
Test fitting Top rail assemblies
Details
       

 04-20-2018
0.50
Test Fitting Rudder Pedals
Details
       

 04-20-2018
1.50
Sound proofing and console installation
Details
       

 04-20-2018
1.50
Riveted CF Floor
Details
       

 04-19-2018
2.00
Started CF Floor installation
Details
       

 04-19-2018
3.00
Installed seat rails, gussets & supports
Details
       

 04-18-2018
2.00
Fixed AP bracket & Prep'd seat rails
Details
       

 04-17-2018
3.50
3 - Installed autopilot bracket and fit main spar
Details
       

 04-17-2018
1.00
2 - Skin Longerons and console brackets
Details
       

 04-17-2018
2.00
1 - Riveted skin to spar mounting box
Details
       

 04-16-2018
1.50
Rear Spar Mounting Box Assembly
Details
     

 04-16-2018
3.50
Rear spar assembly
Details
       

 04-16-2018
2.50
Clecoed and riveted ribs to the landing gear uprig
Details
       

 04-15-2018
1.50
Reworked spar angle mounts
Details
       

 04-15-2018
1.00
Center Fuselage Ribs, Gear & Spar assembly
Details
       

 04-15-2018
2.50
Center console rib left
Details
       

 04-15-2018
2.00
Assembled and Riveted CF Ribs 1 & 2
Details
       

 04-14-2018
0.00
Main spar flap bracket installation
       

 04-14-2018
1.50
Main Spar flap acutator bracket
Details
       

 04-14-2018
2.50
Main Spar components
Details
       

 04-14-2018
2.00
Center uprights
Details
       

 04-14-2018
0.50
Brackets for fuselage assembly
Details
     

 04-13-2018
0.00
Garage orginization
Details
       

 04-13-2018
1.00
Assembled front landing gear fork
Details
     

 04-12-2018
2.50
Rudder tail light / strobe installation
Details
       

 04-12-2018
0.50
Installed rivnuts on spar supports
Details
       

 04-12-2018
0.50
Installed inspection panel
Details
       

 04-11-2018
2.00
Fuselage Kit Inventory
Details
     

 04-10-2018
2.00
Mounted autopilot bracket and main spar
Details
       

 04-10-2018
1.00
4 - Inspection of Fuselage Kit
Details
       

 04-10-2018
1.00
3 - Inventory of Undercarriage Kit
Details
       

 04-10-2018
2.00
2 - Started Vert Stab Assembly
Details
       

 04-10-2018
1.00
1 - Cleco and drill Rudder Tip
Details
       

 04-09-2018
0.50
Rivnut installation attempt
Details
       

 04-09-2018
2.00
Riveted Rudder
Details
     

 04-09-2018
3.00
Assembled Rudder with clecos
     

 04-08-2018
0.00
3 - N-number reserved
Details
     

 04-08-2018
2.50
2 - Rudder frame riveted
Details
       

 04-08-2018
2.00
1 - Completed Horizontal Stabilizer
Details
     

 04-07-2018
3.50
2 - Horiz stab riveting
Details
       

 04-07-2018
2.50
1 - Horiz Stab Fit, cleco, adjust and rivet
Details
       

 04-06-2018
2.00
Test Fit skin to horiz stab
Details
       

 04-06-2018
0.00
Horiz stab frame continued
       

 04-06-2018
2.50
Assembled and riveted horiz stab frame
Details
       

 04-05-2018
1.00
Horizontal Stab ribs and spar riveted
       

 04-05-2018
2.50
Horiz Stab frame prep & assy
Details
       

 04-04-2018
4.00
Completeted Elevator Skin riveting
Details
       

 04-03-2018
3.00
Elevator skin rivets
Details
     

 04-02-2018
5.50
Elevator Skins
Details
       

 04-01-2018
2.00
Elevator Ribs
Details
       

 03-31-2018
2.00
Elevator spar riveting
Details
       

 03-30-2018
3.50
Trim tab completion and started elevator spar
Details
       

 03-28-2018
3.00
Trim Tab Rivets
Details
       

 03-27-2018
1.00
Trim tab parts prep
Details
       

 03-25-2018
1.00
Project Kick-Off
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.