Powered By Kitlog Pro v2.0
Eric's RV-7
RV-7
All
Work Logs Found:
133
Category Work Time:
718 Hours
Date
Hours
Work Log Summary
Details
05-01-2020
3.50
Misc
Details
05-01-2020
5.00
Cowling
Details
04-30-2020
7.00
Final Engine Cowl Trim
Details
04-28-2020
5.50
Engine Cowling
Details
04-25-2020
3.50
Engine Baffles
Details
04-23-2020
7.00
Engine Baffles
Details
04-22-2020
7.00
Engine Baffles
Details
04-21-2020
6.00
Mounted Antennas
Details
04-20-2020
6.00
Canopy Adjustment / snap bushings
Details
04-18-2020
6.50
Canopy Painting / riveting
Details
04-17-2020
5.50
Oil and fuel systems
Details
04-16-2020
6.00
Fuel Line Mockup
Details
04-15-2020
7.00
Fuel Pump / Lines
Details
04-14-2020
6.50
Avionics boxes / FF layout
Details
04-13-2020
7.50
Finished the spinner
Details
04-12-2020
4.00
Propeller and Spinner
Details
04-11-2020
7.50
Finished the canopy frame reinforcement
Details
04-10-2020
4.00
More Canopy Work
Details
04-09-2020
8.00
Hung the engine
Details
04-08-2020
6.50
Firewall / Landing Gear
Details
04-06-2020
5.50
Finishing up in the tail section
Details
04-05-2020
9.00
Lifts struts / canop reinforcement
Details
04-03-2020
7.50
Final Canopy trim / drill
Details
04-02-2020
7.00
Back canopy
Details
04-01-2020
7.50
Big cut / fitting the canopy
Details
03-31-2020
8.50
Canopy frame / canopy
Details
03-30-2020
8.00
Canopy frame
Details
03-29-2020
6.50
Canopy
Details
03-28-2020
6.50
Canopy frame
Details
03-27-2020
7.50
Misc riveting / started the canopy frame
Details
03-26-2020
8.00
Riveted foward fuselage
Details
03-26-2020
5.00
Engine Cowling
Details
03-25-2020
8.50
FF access panels / mounting avionics
Details
03-24-2020
10.00
Mounting Avionics
Details
03-23-2020
3.50
Flap Position Sensor / Avionics
Details
02-23-2020
8.00
Assembly
Details
02-22-2020
8.00
Assembly
Details
02-21-2020
2.00
Bench tested avionics
Details
02-19-2020
0.50
Received the Avionics
Details
02-15-2020
8.00
Assembly
Details
02-14-2020
8.00
Starting Asembly
Details
01-29-2020
6.00
Painted the Interior
Details
01-26-2020
1.00
Installed Andair locking fuel caps
Details
01-25-2020
3.00
Axle nut wrench / Modified F-745 ribs
Details
12-30-2019
2.00
Panel Layout / Ordered Skyview Components
Details
12-29-2019
0.50
The parts returned from the powder coater
Details
12-28-2019
1.50
Pressure washed fuselage
Details
12-25-2019
1.50
ADHRS Bracket / Dimpling
Details
12-24-2019
2.00
Canopy latch brackets / Static ports / Naca vents
Details
12-08-2019
7.00
Misc riveting / organized fasteners
Details
12-07-2019
2.00
Misc riveting / f-704k covers
Details
12-04-2019
1.00
Primed misc parts
Details
12-01-2019
6.50
Canopy Jettison system / misc
Details
11-30-2019
3.50
Canopy hinge blocks
Details
11-28-2019
3.50
Canopy Jettison System
Details
11-25-2019
1.00
Another new engine
Details
11-24-2019
4.50
Roll bar brace / Canopy Latch
Details
08-18-2019
2.50
Secured conduit and reinstalled floor
Details
08-18-2019
2.50
Installed Canopy Release
Details
07-27-2019
3.00
Removed the passenger side floor
Details
06-23-2019
3.00
Finishing details before painting the interior
Details
06-09-2019
3.00
Finishing details before painting the interior
Details
05-19-2019
4.00
Finishing details before painting the interior
Details
05-18-2019
5.00
Center covers and pitch autopilot servo
Details
05-05-2019
3.00
center covers
Details
05-04-2019
4.00
Mounted fuel pumps and covers
Details
03-31-2019
4.00
Time to find a new engine
Details
03-24-2019
4.00
Forward Fuselage
03-23-2019
3.00
Installed air vents
03-10-2019
7.00
F-771 Forward skin
Details
03-03-2019
6.00
Upper Forward Fuselage
Details
02-10-2019
2.00
Forward ribs and subpanel
Details
02-03-2019
5.00
Forward Ribs and Sub panel
Details
02-02-2019
7.00
Finished the roll bar
Details
01-20-2019
4.00
Mounting the roll bar
Details
01-13-2019
8.00
Roll bar #2
Details
11-25-2018
8.00
Roll Bar
Details
04-08-2018
4.00
Finished VS mounting / fitted rudder
Details
04-08-2018
7.00
Finished HS mounting and started VS
Details
04-07-2018
2.00
Started mounting horizontal stabilizer
Details
03-31-2018
2.00
Fitted elevators
Details
03-25-2018
2.00
Flap rod coutouts / aileron travel
Details
03-18-2018
2.00
Fitted control sticks / aileron pushrods
Details
03-04-2018
4.00
Root Fairings
Details
03-04-2018
2.00
Fuel tank vents / fuel lines
Details
03-04-2018
1.00
Drilled fuselage skin to wings
Details
02-24-2018
3.00
Fuel lines and Valve
Details
02-21-2018
1.00
Fuel Tank Brackets
Details
02-20-2018
1.50
Fuel Tank Brackets
Details
02-19-2018
1.50
Fuel Tank Brackets
Details
02-18-2018
6.00
Rear spars / flaps
Details
02-07-2018
1.50
Riveted rudder pedal brace / Firewall Recess
Details
02-06-2018
2.00
Mounted Front Tires
Details
02-05-2018
1.50
Installed Landing Gear
Details
02-04-2018
2.00
Mounted Engine Mount
Details
02-03-2018
3.50
Mounted Aileron / Flaps
Details
02-02-2018
1.00
Finished Skin Riveting - Left Wing
Details
01-31-2018
4.00
Skin Riveting - Left Wing
Details
01-27-2018
2.00
Skin Riveting - Left Wing
Details
01-22-2018
1.00
Riveted gap fairing / Flap Brace - Left Wing
Details
01-21-2018
6.00
Left Wing - Priming / flap brackets
Details
01-20-2018
6.00
New skin / wing conduit - Left Wing
Details
01-07-2018
5.00
Left Wing
Details
01-06-2018
4.00
Tank pressure testing
Details
12-18-2017
1.00
Debured flap brace and aileron fairing
12-17-2017
1.00
Wing wiring
Details
12-17-2017
3.00
Installed Dynon roll servo
12-17-2017
4.00
Completed right fuel tank
12-16-2017
2.00
Left tank sealed
12-09-2017
3.00
Mounted left flap
12-08-2017
1.00
The propeller arrived
11-21-2017
2.00
Fuel tank mods continued
11-20-2017
6.00
More fuel tank mods
Details
11-19-2017
2.00
Left fuel tank mods
Details
11-18-2017
12.00
Pitot
Details
11-07-2017
4.00
Starting on the left wing
10-14-2017
8.00
Tailwheel
Details
08-18-2017
12.00
Rudder pedals
Details
07-30-2017
20.00
Building the Seats
05-12-2017
2.00
Engine Stand
Details
04-29-2017
1.00
Quickbuild Kits Arrive
04-06-2017
8.00
Buffer
Details
04-04-2017
1.00
Engine Arrives
03-14-2017
20.00
Aerosport Power Build School
01-29-2017
30.00
Right elevator
01-07-2017
25.00
Vertical Stabilizer finished
12-03-2016
40.00
Rudder is finished
10-29-2016
20.00
Horizontal stabilizer is finished
09-18-2016
10.00
Construction Begins
08-02-2016
1.00
Empannage kit arrives / inventory
07-28-2016
1.00
Tool Kit Ordered
Details
07-27-2016
2.00
Vans Aircraft Tour
Details
07-16-2016
1.00
Workshop is finished
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
133
718
Avionics
4
10
Canopy
1
6
Empennage
8
130
Engine
6
30
Firewall Forward
17
100
Fuselage
68
342
Miscellaneous
3
10
Prop
1
1
Tools
2
9
Wings
23
80
Copyright © 2001-2024 Matronics. All Rights Reserved.