KitLog pro

Powered By Kitlog Pro v2.0

Eric's RV-7
Work Logs Found: 133
Category Work Time: 718 Hours
 Date
Hours
Work Log Summary

Details

 05-01-2020
3.50
Misc
Details

 05-01-2020
5.00
Cowling
Details
     

 04-30-2020
7.00
Final Engine Cowl Trim
Details
     

 04-28-2020
5.50
Engine Cowling
Details
     

 04-25-2020
3.50
Engine Baffles
Details
       

 04-23-2020
7.00
Engine Baffles
Details
       

 04-22-2020
7.00
Engine Baffles
Details

 04-21-2020
6.00
Mounted Antennas
Details
       

 04-20-2020
6.00
Canopy Adjustment / snap bushings
Details

 04-18-2020
6.50
Canopy Painting / riveting
Details
       

 04-17-2020
5.50
Oil and fuel systems
Details
       

 04-16-2020
6.00
Fuel Line Mockup
Details
       

 04-15-2020
7.00
Fuel Pump / Lines
Details
       

 04-14-2020
6.50
Avionics boxes / FF layout
Details
     

 04-13-2020
7.50
Finished the spinner
Details
       

 04-12-2020
4.00
Propeller and Spinner
Details
       

 04-11-2020
7.50
Finished the canopy frame reinforcement
Details
       

 04-10-2020
4.00
More Canopy Work
Details
       

 04-09-2020
8.00
Hung the engine
Details
       

 04-08-2020
6.50
Firewall / Landing Gear
Details
     

 04-06-2020
5.50
Finishing up in the tail section
Details

 04-05-2020
9.00
Lifts struts / canop reinforcement
Details
       

 04-03-2020
7.50
Final Canopy trim / drill
Details
     

 04-02-2020
7.00
Back canopy
Details

 04-01-2020
7.50
Big cut / fitting the canopy
Details
       

 03-31-2020
8.50
Canopy frame / canopy
Details
       

 03-30-2020
8.00
Canopy frame
Details
       

 03-29-2020
6.50
Canopy
Details
       

 03-28-2020
6.50
Canopy frame
Details
     

 03-27-2020
7.50
Misc riveting / started the canopy frame
Details
     

 03-26-2020
8.00
Riveted foward fuselage
Details

 03-26-2020
5.00
Engine Cowling
Details
       

 03-25-2020
8.50
FF access panels / mounting avionics
Details
       

 03-24-2020
10.00
Mounting Avionics
Details
       

 03-23-2020
3.50
Flap Position Sensor / Avionics
Details
       

 02-23-2020
8.00
Assembly
Details
       

 02-22-2020
8.00
Assembly
Details
       

 02-21-2020
2.00
Bench tested avionics
Details

 02-19-2020
0.50
Received the Avionics
Details
       

 02-15-2020
8.00
Assembly
Details
       

 02-14-2020
8.00
Starting Asembly
Details
       

 01-29-2020
6.00
Painted the Interior
Details
       

 01-26-2020
1.00
Installed Andair locking fuel caps
Details

 01-25-2020
3.00
Axle nut wrench / Modified F-745 ribs
Details

 12-30-2019
2.00
Panel Layout / Ordered Skyview Components
Details
     

 12-29-2019
0.50
The parts returned from the powder coater
Details
     

 12-28-2019
1.50
Pressure washed fuselage
Details

 12-25-2019
1.50
ADHRS Bracket / Dimpling
Details

 12-24-2019
2.00
Canopy latch brackets / Static ports / Naca vents
Details

 12-08-2019
7.00
Misc riveting / organized fasteners
Details

 12-07-2019
2.00
Misc riveting / f-704k covers
Details

 12-04-2019
1.00
Primed misc parts
Details

 12-01-2019
6.50
Canopy Jettison system / misc
Details

 11-30-2019
3.50
Canopy hinge blocks
Details
       

 11-28-2019
3.50
Canopy Jettison System
Details

 11-25-2019
1.00
Another new engine
Details
       

 11-24-2019
4.50
Roll bar brace / Canopy Latch
Details
       

 08-18-2019
2.50
Secured conduit and reinstalled floor
Details
       

 08-18-2019
2.50
Installed Canopy Release
Details
       

 07-27-2019
3.00
Removed the passenger side floor
Details

 06-23-2019
3.00
Finishing details before painting the interior
Details
       

 06-09-2019
3.00
Finishing details before painting the interior
Details
     

 05-19-2019
4.00
Finishing details before painting the interior
Details
       

 05-18-2019
5.00
Center covers and pitch autopilot servo
Details
       

 05-05-2019
3.00
center covers
Details
       

 05-04-2019
4.00
Mounted fuel pumps and covers
Details
       

 03-31-2019
4.00
Time to find a new engine
Details
       

 03-24-2019
4.00
Forward Fuselage

 03-23-2019
3.00
Installed air vents
       

 03-10-2019
7.00
F-771 Forward skin
Details
       

 03-03-2019
6.00
Upper Forward Fuselage
Details
       

 02-10-2019
2.00
Forward ribs and subpanel
Details
       

 02-03-2019
5.00
Forward Ribs and Sub panel
Details
       

 02-02-2019
7.00
Finished the roll bar
Details
       

 01-20-2019
4.00
Mounting the roll bar
Details
       

 01-13-2019
8.00
Roll bar #2
Details
     

 11-25-2018
8.00
Roll Bar
Details
     

 04-08-2018
4.00
Finished VS mounting / fitted rudder
Details
       

 04-08-2018
7.00
Finished HS mounting and started VS
Details
       

 04-07-2018
2.00
Started mounting horizontal stabilizer
Details
       

 03-31-2018
2.00
Fitted elevators
Details

 03-25-2018
2.00
Flap rod coutouts / aileron travel
Details

 03-18-2018
2.00
Fitted control sticks / aileron pushrods
Details

 03-04-2018
4.00
Root Fairings
Details
       

 03-04-2018
2.00
Fuel tank vents / fuel lines
Details
       

 03-04-2018
1.00
Drilled fuselage skin to wings
Details

 02-24-2018
3.00
Fuel lines and Valve
Details
     

 02-21-2018
1.00
Fuel Tank Brackets
Details
       

 02-20-2018
1.50
Fuel Tank Brackets
Details

 02-19-2018
1.50
Fuel Tank Brackets
Details

 02-18-2018
6.00
Rear spars / flaps
Details
       

 02-07-2018
1.50
Riveted rudder pedal brace / Firewall Recess
Details
       

 02-06-2018
2.00
Mounted Front Tires
Details
     

 02-05-2018
1.50
Installed Landing Gear
Details
     

 02-04-2018
2.00
Mounted Engine Mount
Details
     

 02-03-2018
3.50
Mounted Aileron / Flaps
Details
       

 02-02-2018
1.00
Finished Skin Riveting - Left Wing
Details
     

 01-31-2018
4.00
Skin Riveting - Left Wing
Details

 01-27-2018
2.00
Skin Riveting - Left Wing
Details

 01-22-2018
1.00
Riveted gap fairing / Flap Brace - Left Wing
Details
       

 01-21-2018
6.00
Left Wing - Priming / flap brackets
Details
       

 01-20-2018
6.00
New skin / wing conduit - Left Wing
Details

 01-07-2018
5.00
Left Wing
Details

 01-06-2018
4.00
Tank pressure testing
Details
     

 12-18-2017
1.00
Debured flap brace and aileron fairing

 12-17-2017
1.00
Wing wiring
Details

 12-17-2017
3.00
Installed Dynon roll servo
       

 12-17-2017
4.00
Completed right fuel tank
       

 12-16-2017
2.00
Left tank sealed
       

 12-09-2017
3.00
Mounted left flap
       

 12-08-2017
1.00
The propeller arrived
       

 11-21-2017
2.00
Fuel tank mods continued
       

 11-20-2017
6.00
More fuel tank mods
Details
       

 11-19-2017
2.00
Left fuel tank mods
Details
       

 11-18-2017
12.00
Pitot
Details
       

 11-07-2017
4.00
Starting on the left wing
       

 10-14-2017
8.00
Tailwheel
Details
       

 08-18-2017
12.00
Rudder pedals
Details
       

 07-30-2017
20.00
Building the Seats
       

 05-12-2017
2.00
Engine Stand
Details
       

 04-29-2017
1.00
Quickbuild Kits Arrive
       

 04-06-2017
8.00
Buffer
Details
     

 04-04-2017
1.00
Engine Arrives
       

 03-14-2017
20.00
Aerosport Power Build School
       

 01-29-2017
30.00
Right elevator
       

 01-07-2017
25.00
Vertical Stabilizer finished
     

 12-03-2016
40.00
Rudder is finished
       

 10-29-2016
20.00
Horizontal stabilizer is finished
       

 09-18-2016
10.00
Construction Begins
       

 08-02-2016
1.00
Empannage kit arrives / inventory

 07-28-2016
1.00
Tool Kit Ordered
Details

 07-27-2016
2.00
Vans Aircraft Tour
Details

 07-16-2016
1.00
Workshop is finished
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.