Date
|
Hours
|
Work Log Summary
|
Details
|
05-13-2018
|
0.50
|
Dimple the understructure.
|
Details
|
|
|
05-13-2018
|
0.75
|
Deburr horizontal stabilizer.
|
Details
|
|
|
05-12-2018
|
3.00
|
Deburr horizontal stabilizer.
|
Details
|
|
|
05-05-2018
|
0.75
|
Deburr horizontal stabilizer.
|
Details
|
|
|
02-12-2018
|
0.50
|
Drill / match drill to final size all the holes at
|
Details
|
|
|
02-12-2018
|
0.30
|
Cleco on the VS-801PP / VS-901 skin.
|
Details
|
|
|
01-28-2018
|
0.27
|
Prepare ribs and spars parts.
|
Details
|
|
|
01-28-2018
|
0.30
|
Final drill spar doubler and hinge brackets to rea
|
Details
|
|
|
01-28-2018
|
0.13
|
Final drill all rib to spar attach points.
|
Details
|
|
|
01-28-2018
|
0.10
|
Drill holes in hinge brackets.
|
Details
|
|
|
01-28-2018
|
0.20
|
Cleco parts to the rear spar.
|
Details
|
|
|
01-28-2018
|
0.12
|
Clamp ribs to front and rear spars.
|
Details
|
|
|
01-27-2018
|
0.30
|
Drill remaining holes in HS-814-1, HS-810-1, and H
|
Details
|
|
|
01-22-2018
|
0.60
|
Drill holes attaching HS-801PP skin.
|
Details
|
|
|
01-21-2018
|
0.00
|
Reinstall HS-00005 and HS-00006 ribs.
|
Details
|
|
|
01-21-2018
|
0.05
|
Re-clamp flanges of HS-00006 to HS-801PP skin.
|
Details
|
|
|
01-21-2018
|
0.10
|
Match drill HS-00005 rib to HS-801PP sckin.
|
Details
|
|
|
01-21-2018
|
0.13
|
Match drill #40 aft flange of HS-00006 to HS-702 a
|
Details
|
|
|
01-21-2018
|
0.10
|
Match drill #30 aft flange of HS-00005 rib to HS-6
|
Details
|
|
|
01-21-2018
|
0.16
|
Mark top and bottom flanges for holes.
|
Details
|
|
|
01-21-2018
|
0.00
|
Mark centerline on forward flange of HS-00005.
|
Details
|
|
|
01-21-2018
|
0.18
|
Mark and drill #40 two holes common to HS-00003, H
|
Details
|
|
|
01-21-2018
|
0.08
|
Install and match drill forward flange of HS-00005
|
Details
|
|
|
01-21-2018
|
0.00
|
Flute HS-00005 and HS-00006.
|
Details
|
|
|
01-21-2018
|
0.10
|
Enlarge HS-708 and HS-603PP attachment holes to #2
|
Details
|
|
|
01-21-2018
|
0.10
|
Drill HS-706, HS-707, and HS-708 rib attach holes
|
Details
|
|
|
01-21-2018
|
0.00
|
Drill holes in aft flange of HS-00006.
|
Details
|
|
|
01-21-2018
|
0.13
|
Deburr holes.
|
Details
|
|
|
01-21-2018
|
0.00
|
Cleco the ribs and spar assembly together.
|
Details
|
|
|
01-21-2018
|
0.50
|
Cleco on the HS-801PP skin.
|
Details
|
|
|
01-21-2018
|
0.15
|
Cleco HS-702, HS-603PP, HS-706, HS-707, and HS-708
|
Details
|
|
|
01-21-2018
|
0.10
|
Cleco HS-00003, HS-810-1 and HS-814-1 to HS-702.
|
Details
|
|
|
01-21-2018
|
0.00
|
Choose ribs for left and right side.
|
Details
|
|
|
01-16-2018
|
0.25
|
Trim HS-702 flanges.
|
Details
|
|
|
01-10-2018
|
0.50
|
Drill to final size all holes attaching HS-801PP s
|
Details
|
|
|
01-10-2018
|
0.50
|
Drill remaining holes in HS-814-1, HS-310-1, and H
|
Details
|
|
|
01-08-2018
|
0.25
|
Reinstall HS-00005
|
Details
|
|
|
01-08-2018
|
0.30
|
Match drill skin to HS-00005 rib. Re-clamp HS-000
|
Details
|
|
|
01-08-2018
|
0.30
|
Match drill HS-801PP skin to the HS-00005 rib.
|
Details
|
|
|
01-08-2018
|
0.25
|
Match drill HS-00006 to HS-702 and HS-00003. Mark
|
Details
|
|
|
01-08-2018
|
0.25
|
Drill HS-00005 rib to HS-603PP spar.
|
Details
|
|
|
01-07-2018
|
0.30
|
Uncleco, deburr, and re-cleco.
|
Details
|
|
|
01-07-2018
|
1.50
|
Prepare parts.
|
Details
|
|
|
01-07-2018
|
0.10
|
Mark top and bottom flange holes.
|
Details
|
|
|
01-07-2018
|
0.25
|
Identify ribs, mark and drill holes in flange of H
|
Details
|
|
|
01-07-2018
|
0.10
|
Enlarge holes.
|
Details
|
|
|
01-07-2018
|
0.50
|
Cleco on skin.
|
Details
|
|
|
01-07-2018
|
0.50
|
Cleco HS-702, HS-603PP, HS-706, HS-707, and HS-708
|
Details
|
|
|
01-07-2018
|
0.25
|
Cleco HS-00003, HS-810-1, and HS-814-1 to HS-702.
|
Details
|
|
|
01-07-2018
|
0.25
|
Cleco HS-00003, HS-810-1, and HS-814-1 to HS-702.
|
Details
|
|
|
11-04-2017
|
0.25
|
Notch HS-00006
|
Details
|
|
|
10-28-2017
|
0.75
|
Dimple and Countersink HS-702, HS-810-1, and HS-81
|
Details
|
|
|
10-27-2017
|
0.10
|
Trim the inboard ends of HS-702
|
|
|
|
10-27-2017
|
0.30
|
Profile HS-810-1 and HS-814-1 reinforcement angle.
|
Details
|
|
|
10-27-2017
|
0.10
|
Match drill holes in front spar.
|
Details
|
|
|
10-27-2017
|
0.10
|
Mark bend line on HS-702
|
Details
|
|
|
10-27-2017
|
0.10
|
Drill relief hole in HS-702.
|
Details
|
|
|
10-27-2017
|
0.10
|
Cleco HS-810-1 and HS-814-1 to HS-702.
|
Details
|
|
|
10-27-2017
|
0.10
|
Bend the tabs of HS-702.
|
Details
|
|
|
10-27-2017
|
0.10
|
Bend HS-810-1 and HS-814-1 to 6 degrees.
|
Details
|
|
|
10-27-2017
|
0.40
|
Attach spar doublers HS-00003 to HS-702 spar chann
|
Details
|
|
|
10-24-2017
|
0.50
|
Rivit HS-411 Assembly
|
Details
|
|
|
10-24-2017
|
0.50
|
Identified parts for section 6.2, separate HS-0000
|
Details
|
|
|
10-23-2017
|
0.50
|
Remove and label rear spar assembly parts.
|
Details
|
|
|
10-23-2017
|
0.30
|
HS-412PP and HS-413PP
|
Details
|
|
|
10-23-2017
|
0.30
|
HS-411APP, HS411BPP, and VA-146
|
Details
|
|
|
10-23-2017
|
0.25
|
Drill bearing assembly.
|
Details
|
|
|
10-22-2017
|
0.50
|
Prepare HS-609PP parts.
|
Details
|
|
|
10-22-2017
|
0.25
|
Enlarge 8th hole to #21.
|
Details
|
|
|
10-22-2017
|
1.00
|
Cleco HS-203PP to HS-609PP and drill to final size
|
Details
|
|
|
10-08-2017
|
1.00
|
Identify parts and prepare HS-609PP.
|
Details
|
|
|
10-01-2017
|
1.00
|
Inventory of box 2 completed.
|
Details
|
|
|
09-29-2017
|
1.50
|
Inventory small box.
|
Details
|
|
|
09-28-2017
|
0.50
|
Took delivery of empeenage.
|
|
|